EXHIBIT C - calculation of self-performed work.docx
DOCX document 39 KB Posted
- Attached to
- Z1DA--Replace Steam Traps and Under Ground Steam Lines Federal contract opportunity
- Solicitation number
- 36C24423R0005
About this file
This document provides details for a federal construction contract opportunity to replace steam traps and underground steam lines at the Altoona VA Medical Center. The solicitation will be issued as a Request for Proposal conducted in accordance with FAR Subpart 15 to award a single, firm-fixed-price construction contract. The construction project scope includes replacing steam traps and underground steam lines in compliance with applicable codes, VA policies and standards, and contract terms. The contractor must provide all tools, labor, materials, permits, licenses, and supervision. The opportunity is set aside as a total 100% service-disabled veteran-owned small business and has a NAICS code of 236220 with a $45 million size standard. The period of performance is 365 days from notice to proceed, and the construction cost is estimated between $5 million to $10 million. The solicitation is scheduled for issue on or about March 15, 2023.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO: Request for Proposal 36C24423R0005
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $
B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self-performed)
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)
B.4 Remainder is “Total amount of work to be performed under the Contract” = $
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %