Startup Checklist package-start-up-sheet.pdf

PDF 84 KB Posted

Attached to
J045--Heating and Cooling | HVAC Repair on Non-BAS | Upper Chilled Water Coil Air Handler | Federal contract opportunity
Solicitation number
36C24423Q0949
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

View the file

Other files for this federal contract opportunity

Other files attached to J045--Heating and Cooling | HVAC Repair on Non-BAS | Upper Chilled Water Coil Air Handler |, newest first.
File Type Posted
36C24423Q0949 0003.pdf PDF
36C24423Q0949 0003_1.docx DOCX document
Philadelphia VAMC Directions to Bldg. 6.pdf PDF
36C24423Q0949 0002.pdf PDF
36C24423Q0949 0002_1.docx DOCX document
36C24423Q0949 0001.pdf PDF
36C24423Q0949 0001_1.docx DOCX document
SCA WD 2015-4233 REV 26 DATED 05-10-2023.pdf PDF
ATTACHMENT 1 AHU Nameplate.pdf PDF
36C24423Q0949.pdf PDF
36C24423Q0949_1.docx DOCX document
ATTACHMENT 2 Photos.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

START-UP & SERVICE DATA INSTRUCTION

AHU #1

START-UP CHECKLIST

Date:

Job Name:

Customer Name:

Address:

City: State: Zip:

Model Number: Serial Number:

Qualified Start-up Technician: Signature:

HVAC Contractor: Phone:

Address:

Contractor’s E-mail Address:

Electrical Contractor: Phone:

Distributor Name: Phone:

Design Supply Air CFM: Design Return Air CFM:

Design Outdoor Air CFM At Minimum Position:

Total External Static Pressure:

Supply Static Pressure:

Return Static Pressure:

Design Building Static Pressure:

Outside Air Dilution: Economizer Position Percentage: _ CFM:

REFERENCE

General Inspection Completed See Notes

New Chilled water coil inspected for shipping, storage, or rigging damage. Coil fins in good condition

New Chilled water coil installed with proper clearances

Chilled water coil checked for gross leaks

Terminal screws and Piping connections checked for tightness

Filters installed correctly and clean

Condensate drain trapped properly, refer to Installation Manual

All dampers and actuators exercised from BAS system (CM3)

New Chilled water control valves fully functional w/BAS

All field wiring (power and control) complete

Air Moving Inspection (If Required)

Completed See Notes

Alignment of drive components Correct rotation of motors, Return & Supply

Belt tension adjusted properly

Blower pulleys tight on shaft, bearing set screws tight, wheel tight to shaft

Pressure switch or transducer tubing installed properly

Operating Measurements - Air Flow (If Required)

Fan operates with proper rotation ID Fans Exh. Fans Cond. Fans

Pressure drop across dry Chilled water coil (At maximum design CFM) 1 IWC

External Static Pressure IWC

Return Static Pressure IWC

Supply Static Pressure IWC

Supply Air CFM Using Dry Coil Chart CFM

Final Adjusted Supply Air CFM2 CFM

Verify Proper Operation of Heating/Cooling Staging Controls (If Required)

Create a cooling demand at the Thermostat, BAS System (CM3) Verify that cooling is energized. Ensure new chilled water valve is modulating properly

Create a heating demand at the Thermostat, BAS System (CM3) Verify that heating stage is energized. Ensure new steam valve is modulating properly

Verify Proper Operation of the Variable Frequency Drive (If Required)

Verify that motor speed modulates with duct pressure change.

FINAL - INSPECTION

Verify that all operational control set points have been set to desired value. Verify proper sequence of operation with BAS (CM3) controls.

Thermal Insulation properly installed according to specification. All areas around new coils and fan motors clean and free of installation debris.

Verify that all access panels have been closed and secured

OBSERVED PRODUCT DIFFICIENCIES & CONCERNS: