36C24419Q0245-0001000.docx

DOCX document 27 KB Posted

Attached to
Boiler Inspection Services Federal contract opportunity
Solicitation number
36C24419Q0245
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419Q0245 0001 36C24419Q0245 0001.docx

View the file

Other files for this federal contract opportunity

Other files attached to Boiler Inspection Services, newest first.
File Type Posted
36C24419Q0245-000.docx DOCX document
36C24419Q0245-003.pdf PDF
36C24419Q0245-001.pdf PDF
36C24419Q0245-002.pdf PDF
36C24419Q0245_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-04-2019 N/A 00244 Department of Veterans Affairs Network Contracting Office 4 Services 1 1400 Black Horse Hill Road Coatesville PA 19320 00244 Department of Veterans Affairs Network Contracting Office 4 Services 1 1400 Black Horse Hill Road Coatesville PA 19320 To all Offerors/Bidders

36C24419Q0245 02-04-2019

X X X

9:00AM, 2/07/2019

X The purpose of this solicitation amendment is to provide all interested offero rs the responses to questions submitted by contractors.

In addition, the solicitation closing date is being extended from 9:00AM 2/04/2019 to 9:00AM 2/07/2019.

Questions and responses are on the following page.

Brittney J. Parker Contracting Officer

1. On page 9 of 72 of the General Requirements under topic 2 items b and d it discusses tuning of combustion systems and safety device testing once a year each. However, VA directive requires every 6 months. Should this be changed to every 6 months instead of the once a year stated in the documents?

Response: The safety device testing will be annual as stated in the scope, the VAPHS USRO staff are trained and perform the semiannual in December to meet the VA guidelines for semiannual safety inspections.

2. On page 13 topic 1 item l Calibrate the AARELL- SCADA, what are the requirements for calibrating? Topic 1 item m... What is required for "parts, test instruments, flash drives, or storage disks" to be provided to the VAPHS? Please elaborate.

Response:

a) Calibrate the AARELL- SCADA: The contractor will verify the steam, gas, oil, water flow meters output readings match and record accurately. Example the meters reading out puts are calibrated and match what is indicated and recorder within the AARELL- SCADA system. Verify all monitored points are functioning properly, record accurately and populate properly within the electronic logs.

b) Contractor will provide all calibrated testing equipment, test gasses, parts, fittings to perform the required combustion testing and sensor calibrations as per the manufacturers recommendations. Contractor will provide all the necessary equipment and materials to perform the boiler efficiency and designed performance standards tuning. Also provide required testing equipment to perform manufacturers recommended calibrations for optimal performance and efficiencies.

3. On page 15 topic 1 it states to provide tuning report results "for each fuel source, at all 12 fuel curve points." There are actually 28 curves. Should this be changed from 12 to 28?

Response: There are 28 curves for gas and oil combined; change the 12 to 28 fuel curves.

4. On page 16 and 17 it states to calibrate the following items. The Vortex steam flow meters and oil flow meter cannot be calibrated in place. To calibrate they will need to be removed and factory calibrated. They can be field verified and zeroed in the field. How should this be handled?

Response: Calibrate all vortex meters to 0, meaning shut off all fuel, steam or water supply and ensure the meters fall to a zero reading. The manufacturer of the Vortex meter recommends a bench test calibration after 7 years of service, that falls outside the scope of this contract and will be handled separately when recommended.