36C24418Q9575-001.docx
DOCX document 123 KB Posted
- Attached to
- Building 2 Lead Abatement Federal contract opportunity
- Solicitation number
- 36C24418Q9575
About this file
36C24418Q9575 36C24418Q9575.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24418Q9575-0001001.pdf | ||
| 36C24418Q9575-0001000.docx | DOCX document | |
| 36C24418Q9575-0001004.pdf | ||
| 36C24418Q9575-0001005.pdf | ||
| 36C24418Q9575-0001006.pdf | ||
| 36C24418Q9575-0001003.pdf | ||
| 36C24418Q9575-0001002.pdf | ||
| 36C24418Q9575-002.pdf | ||
| 36C24418Q9575-003.pdf | ||
| 36C24418Q9575-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24418Q9575
OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL
BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SI
GN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGN
ATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR
LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
36C24418Q9575 09-14-2018 Brittney J. Parker 610-384-7711 x3230 09-24-2018
10:00AM
00244 Department of Veterans Affairs Network Contracting Office 4 Services 1 1400 Black Horse Hill Road Coatesville PA 19320 X X 562910 750 Employees X N/A X Department of Veteran Affairs Butler VA Medical Center 325 New Castle Road Building 2 Butler PA 16001 00244 Department of Veterans Affairs Network Contracting Office 4 Services 1 1400 Black Horse Hill Road Coatesville PA 19320
Austin Payment Center Department of Veterans Affairs PO Box 149971 Austin TX 78714-9971
(877) 353-9791
(512) 460-5429 See CONTINUATION Page Lead Dust Abatement and Cleaning See Continuation Pages.
Period of Performance:
12 Weeks After Receipt of Order (ARO) No questions will be answered after 3:00PM 9/20/2018.
All quotes must be submitted by 10:00AM 9/24/2018 via email to Ms. Brittney Parker at Brittney.Parker@va.gov to be accepted for consideration of award.
A site visit will be held on Wednesday, September 19, 2018 at 9:00AM at the Butler VAMC. Please refer to FAR clause 52.237-1 for additional information.
See CONTINUATION Page X X X Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 4 |
| B.3 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011) | 4 |
| B.4 PRICE/COST SCHEDULE | 21 |
| ITEM INFORMATION | 21 |
| B.5 DELIVERY SCHEDULE | 21 |
| SECTION C - CONTRACT CLAUSES | 23 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 23 |
| C.2 SUPPLEMENTAL INSURANCE REQUIREMENTS | 23 |
| C.3 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997) | 24 |
| C.4 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 24 |
| C.5 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 24 |
| C.6 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 25 |
| C.7 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 27 |
| C.8 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018) | 27 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 35 |
| SECTION E - SOLICITATION PROVISIONS | 36 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2015) | 36 |
| E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 39 |
| E.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 40 |
| E.4 52.216-1 TYPE OF CONTRACT (APR 1984) | 41 |
| E.5 52.233-2 SERVICE OF PROTEST (SEP 2006) | 41 |
| E.6 52.237-1 SITE VISIT (APR 1984) | 42 |
| E.7 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008) | 42 |
| E.8 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998) | 43 |
| E.9 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 43 |
| E.10 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 44 |
| EVALUATION—COMMERCIAL ITEMS | 44 |
| E.11 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2017) | 44 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer 36C244 Ryan M. Hess, Ryan.Hess3@va.gov; Contract Specialist: Brittney J. Parker, Brittney.Parker@va.gov Department of Veterans Affairs Network Contracting Office 4 Services 1 1400 Black Horse Hill Road Coatesville PA 19320
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] At the completion of the project. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Austin Payment Center Department of Veterans Affairs PO Box 149971 Austin TX 78714-9971 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes FAR 52.219-14 Limitations on Subcontracting. Accordingly, any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.
B.3 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the contract. To that end, the support contractor(s) may require access to the contractor's business records or other proprietary data to review such business records regarding contract compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.
36C24418Q9575
Page 1 of Page 1 of
STATEMENT OF WORK
Butler VA Medical Center Building #2: Lead Dust Abatement and Cleaning Overview:
The contractor shall perform Lead (Pb) dust abatement including sealing off areas and ventilation systems, including all Fan Coil Units (FCU's) and Air Handling Units (AHU's), rooms and individual floors of the building as areas are completely abated to prevent re-contamination of surfaces in Building 2 at the Butler VA Medical Center (VAMC). This Pb abatement will include all piping, all interior and exterior surfaces of the HVAC ductwork, Fan Coil Units, Air Handling Units, electrical conduit, cabinets, lockers, all items above the suspended ceiling tiles and ceiling support grids, including the ceiling tile, water lines, and gas lines. Also included are all stair wells, stairs, window sills, elevator compartment/cab, windows, all rooms including administrative, exam, kitchen, mechanical, electrical, pump rooms, corridors, interior ramps, walk-in coolers, and fixed equipment within the building shall be cleaned within the scope of this statement of work.
The contractor shall employ a vacuum truck system with a HEPA exhaust filtration system, along with mobile HEPA VACS, negative-pressure HEPA air filtration equipment, and other cleaning equipment to ensure lead-contaminated surfaces are cleaned to a level below the acceptable threshold limit of 40ug/ft2. Should a porous surface, including rough concrete, speed tile, unpainted wood, and or areas/surfaces that are inaccessible for adequate cleaning, are not able to be abated to a level below the threshold limit of 40ug/ft2 .
The contractor awarded this project shall utilize a pre-approved encapsulate to bind the remaining Pb to secure the surfaces from releasing that substance thereby reducing potential exposure to airborne particulates and skin contact. The building shall be cleaned in accordance with all applicable regulations and the contractor shall provide a written building clearance certificate signed by the contractor’s CIH, for the VA Butler’s subsequent occupation of all building spaces.
The contractor shall employ a Certified Industrial Hygienist to monitor abatement work activities and perform personal air sampling on the contractor’s employees. The contractor’s I.H. shall also wipe test areas cleaned to ensure they are cleaned to the project threshold limit < 40 ug/ft2. The contractor shall follow all surface cleaning procedures as outlined by certified lead (Pb) abatement protocols to include the following methods at a minimum: Cleaning with High Efficiency Vacuum Tools and wet wiping with an appropriate concentration of Tri-Sodium Phosphate, TSP, solution. These procedures require cleaning all horizontal and vertical surfaces with a vacuum system equipped with a high efficiency particulate air filter (HEPA) or an equivalent high efficiency filter. Within a room, start with the highest horizontal surfaces and work down to the floor. Be sure to clean dust traps such as windows, radiators, air vents/registers, ceiling fans, duct work, AHUs, and FCUs work from the cleanest areas to the dirtiest areas to minimize the spreading of lead-contaminated dust to previously cleaned areas. The contractor shall not open or change the filters and bags within the building being abated. The contractor shall follow all manufacturer's instructions and routine maintenance procedures for equipment deployed to this VA Butler site.
Methods:
1. Isolate the AHU and associated ductwork with Pb contamination (determined by pre-abatement sampling to determine extent)
2. Plan for staged decontamination…dirtiest to cleanest HVAC contaminated surfaces
3. Contractor will submit a written detailed abatement plan for review and approval, by the VA Butler staff and their Industrial Hygiene representative, prior to the commencement of work.
4. During the decontamination process all HVAC systems and ductwork should be sealed externally with acceptable barriers to prevent Pb migration within the sections of ductwork and between rooms, as the wipe test results are obtained within the threshold limits.
5. Contractor will HEPA vacuum entire contaminated system(s) between air intakes, fans/blowers, fan coils, heat exchangers, motors, filter housing units, registers and diffusers, in addition to air return and exhaust ducts. VA Butler’s 3rd party I.H. service provider and Safety Officer will be responsible for reviewing contractor actions, wipe test results, air monitoring data, work practices and recommending subsequent steps/actions. A visual observation of the abatement contractor’s final HEPA vacuum cleaning will determine readiness for the next progressive steps toward wet washing, wipe testing and final clearance of each area.
6. Contractor will utilize tri-sodium phosphate (TSP) detergent solution to wet wash the surfaces of the entire contaminated system(s) and interior building surfaces. A visual assessment of the abatement contractor’s final wet washing procedure will determine readiness for the next progressive steps toward wipe testing and final clearance of each area.
7. Perform wipe sampling on a representative number of homogenous areas and surfaces, i.e. ceilings, walls, sills, floors, vents ducts, and other surfaces. Wipe test all decontaminated HVAC system surfaces (NIOSH method 9100; random target within hard-to-clean areas).
8. Re-clean if wipe sample test results exceed 40ug/ft.2
9. Criteria for surface wipe testing should not exceed 40 ug/ft.2 Pb
10. Should a porous surface, including rough concrete, speed tile, unpainted wood, and or areas/surfaces that are inaccessible for adequate cleaning, are not able to be abated to a level below the threshold limit of 40ug/ft2, the contractor awarded this project shall utilize a pre-approved encapsulate to bind the remaining Pb to secure the surfaces from releasing that substance, thereby reducing potential exposure to airborne particulates and skin contact. Concurrence between the VA I.H. representative, the contractor’s C.I.H. and the VA Safety Officer will be obtained prior to ceasing cleaning and applying pre-approved encapsulate to those areas and materials
11. Contractor will perform continuous background/area environmental air monitoring for airborne Pb in rooms/spaces outside of where ductwork is being decontaminated.
12. The contractor shall clean all carpeted surfaces utilizing the following methods: HEPA vacuum with a rotor bar vacuum device will be utilized at a cleaning rate not to exceed more than two minutes per 10 square feet in a side-to-side direction, followed by another pass at the same rate in a direction perpendicular to the direction of the first vacuuming, for a total of four minutes per 10 square feet. The contractor shall utilize steam clean or other suitable carpet scrubbing equipment on the carpet areas using an acceptable commercial cleaning method, after performing the HEPA vacuuming outlined above.
13. Targeted wipe monitoring should be performed in work areas supplied by Pb contaminated ducts for two weeks after turning on the AHU (served area should be vacant and have little furniture. If furniture is present is should be covered. If the HVAC unit was operable at the time of contamination the served area should be included in the abatement/cleanup assessment)
14. Wipe test all of the 28 previously tested locations that exceeded the threshold limit in the FCUs and AHUs, (as shown on drawings), and at a minimum the 28 rooms or areas that are supplied by those contaminated HVAC units. A minimum of two walls shall be tested, along with window sills and floors (one sample each). All positive duct work, FCUs (fan coil units), AHUs (air handling unit) and rooms/areas supplied by those HVAC system components shall be tested.
15. If a post–abatement wipe sample result exceeds 40ug/ft.2, following initial cleaning and testing, the contractor shall re-clean the areas and re-sample with wipe tests until test results are less than 40ug/ft.2.
16. The abatement contractor will be permitted to remove and properly dispose all flexible air handling ductwork to provide access to the interior face of the diffusers and the solid “box” or hard pipe ductwork for abatement. The contractor will not be responsible for replacement of the aforementioned-flex ductwork as defined during the walk-through of the pre-bid process.
17. Whereas the abatement contractor will be required to remove ceiling tiles to access the above utilities space, HVAC, concrete, painted, and speed tile surfaces, the contractor will be required to replace any more than minor damages to existing structures, including ceiling support grids, hangers, light fixtures, sprinkler systems, etc. Any damages caused, observed and reported to the VA Butler agents previously mentioned herein shall be assessed and conveyed to the COR and Contracting Officer for resolution.
18. One area of this Building #2 abatement project shall be performed after 7:00 PM and before 5:30 AM Sunday through Saturday. This small area is in the Building #2’s connecting corridor between Building #1 and Building #20, on the 1st floor only.
The following specifications shall be followed:
1.1 SUMMARY OF THE WORK
1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS
Drawings, general provisions of the contract, including general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work.
1.1.5 CONTRACTORS USE OF PREMISES
| A. | The Contractor and Contractor's personnel shall cooperate fully with the VA representative/consultant to facilitate efficient use of buildings and areas within buildings. The Contractor shall perform the work in accordance with the VA specifications, drawings, phasing plan and in compliance with any/all applicable Federal, State and Local regulations and requirements. |
| B. | The Contractor shall use the existing facilities in the building strictly within the limits indicated in contract documents as well as the approved VA Design and Construction Procedures. VA Design and Construction Procedures drawings of partially occupied buildings will show the limits of regulated areas; the placement of decontamination facilities; the temporary location of bagged waste; the path of transport to outside the building; and the temporary waste storage area for each building/regulated area. Any variation from the arrangements shown on drawings shall be secured in writing from the VA representative through the pre-abatement plan of action. The following limitations of use shall apply to existing facilities shown on drawings: |
| 1.3 | Area Monitoring: Sampling of lead(Pb) concentrations within lead DEFINITIONS |
| A. | Control area and inside physical boundaries which are representative of airborne lead concentrations which may reach breathing zone of personnel potentially exposed to lead. Maintain a negative air pressure. |
| B. | Breathing Zone: Area within hemisphere, forward of shoulders, with 150 mm to 225 mm (6 to 9 inches) radius and center at nose or mouth of employee. |
| C. | Certified Industrial Hygienist (CIH): As used in this section, refers to an Industrial Hygienist employed by Contractor. |
| D. | Change Rooms and Shower Facilities: Rooms within designated physical boundary around lead control area equipped with separate storage facilities for clean protective work clothing and equipment and for street clothes which prevent cross contamination. |
| E. | Competent Person: Person capable of identifying lead hazards in work area and authorized by contractor to take corrective action. |
| F. | Decontamination Room: Room for removal of contaminated personal protective equipment (PPE). |
| G. | Eight Hour Time Weighted Average (TWA): Airborne concentration of lead averaged over 8 hour workday to which an employee is exposed. |
| H. | High Efficiency Particulate Air (HEPA) Filter Equipment: HEPA filtered vacuuming equipment with UL 586 filter system capable of collecting and retaining lead contaminated paint dust. HEPA filter means 99.97 percent efficient against 0.3-micron (0.012 mil) size particles. |
| I. | Lead: Metallic lead, inorganic lead compounds, and organic lead soaps. Excluded from this definition are other organic lead compounds. |
| J. | Lead Control Area: Enclosed area or structure with full containment to prevent spreading lead dust, paint chips, and debris from lead based paint removal operations. Lead control area is isolated by physical boundaries to prevent unauthorized entry of personnel. |
| K. | Lead Permissible Exposure Limit (PEL): Fifty micrograms per cubic meter (0.05 parts per million) of air as 8 hour time weighted average as determined by 29 CFR Part 1910.1025. When employee is exposed for more than 8 hours per work day, determine PEL by following formula. PEL micrograms/cubic meter (parts per million) of air = 400/No. of hrs. worked per day. |
| L. | Personnel Monitoring: Sampling of lead concentrations within employee breathing zone to determine 8 hour time weighted average concentration according to 29 CFR Part 1910.1025. Take samples representative of employee's work tasks. |
| M. | Physical Boundary: Area physically roped or partitioned off around enclosed lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" shall mean same as "outside lead control area." |
| 1.4 | APPLICABLE PUBLICATIONS |
| A. | Comply with references to extent specified in this section. |
| B. | American National Standards Institute (ANSI): |
| 1. | Z9.2 12 - Fundamentals Governing the Design & Operation of Local Exhaust Ventilation Systems. |
| C. | Code of Federal Regulations (CFR): |
| 1. | 29 CFR Part 1910 - Occupational Safety and Health Standards. |
| 2. | 29 CFR Part 1926 - Safety and Health Regulations for Construction. |
| 3. | 40 CFR Part 260 - Hazardous Waste Management System: General. |
| 4. | 40 CFR Part 261 - Identification and Listing of Hazardous Waste. |
| 5. | 40 CFR Part 262 - Standards Applicable to Generators of Hazardous Waste. |
| 6. | 40 CFR Part 263 - Standards Applicable to Transporters of Hazardous Waste. |
| 7. | 40 CFR Part 264 - Standards for Owners and Operations of Hazardous Waste Treatment, Storage, and Disposal Facilities. |
| 8. | 40 CFR Part 265 - Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities. |
| 9. | 40 CFR Part 268 - Land Disposal Restrictions. |
| 10. | 49 CFR Part 172 - Hazardous Material Table, Special Provisions, Hazardous Material Communications, Emergency Response Information, and Training Requirements, and Security Plans. |
| 11. | 49 CFR Part 178 - Specifications for Packaging. |
| D. | Underwriters Laboratories (UL): |
| 1. | 586 09 - High Efficiency, Particulate, Air Filter Units. |
| 1.5 | PRE- REMOVAL MEETINGS |
| A. | Conduct pre- removal meeting at project site minimum 30 days before beginning Work of this section. |
| 1. | Required Participants: |
| a. | Contracting Officer's Representative. |
| b. | Certified Industrial Hygienist. |
| c. | Architect/Engineer. |
| d. | Inspection and Testing Agency. |
| e. | Contractor. |
| f. | Paint removal contractor. |
| g. | Other installers responsible for finishing resulting surfaces. |
| 2. | Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting. |
| a. | Respiratory protection program. |
| b. | Hazard communication program. |
| c. | Hazardous waste management plan. |
| d. | Safety and health regulation compliance. |
| e. | Employee training. |
| f. | Removal schedule. |
| g. | Removal sequence. |
| h. | Preparatory work. |
| i. | Protection before, during, and after removal. |
| j. | Removal. |
| k. | Inspecting and testing. |
| l. | Other items affecting successful completion. |
| 3. | Document and distribute meeting minutes to participants to record decisions affecting installation. |
| 1.6 | SUBMITTALS |
| A. | Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. |
| B. | Manufacturer's Literature and Data: |
| 1. | Description of each product. |
| a. | Paint removal products. |
| b. | Vacuum filters. |
| c. | Respirators. |
| 2. | Safety data sheet for each paint removal product. |
| 3. | Installation instructions. |
| a. | Lead Dust removal products. |
| C. | Test Reports: Submit testing laboratory reports. |
| 1. | Submit air monitoring results within three working days, signed by testing laboratory employee performing air monitoring, employee analyzing sample, and CIH. |
| D. | Certificates: Certify completed training. |
| 1. | Submit certificate for each employee signed and dated by CIH and employee stating employee was trained. |
| E. | Qualifications: Substantiate qualifications comply with specifications. |
| 1. | Lead (Pb) Dust removal contractor. |
| 2. | Testing laboratory. |
| a. | Name, address, and telephone number. |
| b. | Current evidence of participation in NIOSH PAT Program. |
| c. | Copy of current AIHA accreditation certificate. |
| 3. | Industrial hygienist. |
| a. | Name, address, and telephone number. |
| b. | Resume showing previous experience. |
| c. | Copy of current ABIH CIH certification. |
| 4. | Lead Dust disposal facility. |
| a. | Name, address, and telephone number. |
| b. | Current license or authorization to receive and dispose lead contaminated waste. |
| F. | Record Documents: |
| 1. | Completed and signed hazardous waste manifest from waste transporter. |
| 2. | Lead Dust disposal facility receipts and disposition reports. |
| 3. | Certification of medical examinations. |
| 4. | Employee training certification. |
| 1.7 | QUALITY ASSURANCE |
| A. | Safety and Health Regulation Compliance: |
| 1. | Comply with laws, ordinances, rules, and regulations of federal, state, and local authorities having jurisdiction regarding removing, handling, storing, transporting, and disposing lead waste materials. |
| a. | Comply with applicable requirements of 29 CFR Part 1910.1025. |
| b. | Notify Contracting Officer's Representative and request resolution of conflicts between regulations and specified requirements before starting work. |
| 2. | Comply with the following local laws, ordinances, criteria, rules and regulations regarding removing, handling, storing, transporting, and disposing lead contaminated materials: |
| a. | Pennsylvania Department of Environmental Protection |
| B. | Dust Removal Contractor: Experienced contractor, registered or licensed by applicable state agency regulating lead based dust removal. |
| C. | Testing Laboratory: State certified independent testing laboratory experienced in airborne lead monitoring, testing, and reporting. |
| 1. | Successful participant in NIOSH Proficiency Analytical Testing (PAT) Program within prior 12 months. |
| 2. | Accredited by American Industrial Hygiene Association (AIHA). |
| D. | Certified Industrial Hygienist: Certified as CIH by American Board of Industrial Hygiene in comprehensive practice and responsible for: |
| 1. | Certify Training. |
| 2. | Review and approve lead based dust removal plan for conformance to applicable referenced standards. |
| 3. | Inspect lead based dust removal work for conformance with approved plan. |
| 4. | Direct monitoring. |
| 5. | Ensure work is performed according to specifications. |
| 6. | Ensure personnel and environment hazardous exposures are adequately controlled. |
| E. | Lead Dust Disposal Facility: State certified disposal facility qualified to receive and dispose lead based paint. |
| F. | Lead based Dust Removal Plan: |
| 1. | Submit detailed, site specific plan describing lead dust removal procedures. |
| 2. | Include sketch showing location, size, and details of lead control areas, decontamination rooms, change rooms, shower facilities, and mechanical ventilation system. |
| 3. | Include eating, drinking, and restroom procedures, interface of trades, work sequencing, collected wastewater and paint debris disposal plan, air sampling plan, respirators, protective equipment, and detailed description of containment methods ensuring airborne lead concentrations do not exceed action level outside lead control area. |
| a. | Eating, drinking, and smoking are not acceptable within lead control area. |
| 4. | Include air sampling, training and strategy, sampling methodology, frequency, duration, and qualifications of air monitoring personnel. |
| G. | Respiratory Protection Program: Establish and implement program required by 29 CFR Part 1910.134, 29 CFR Part 1910.1025, and 29 CFR Part 1926.62. |
| 1. | Provide each employee negative pressure or other appropriate respirator. |
| a. | Test fit each employee's respirator at initial fitting and maximum 6 month intervals, as required by 29 CFR Part 1926.62. |
| H. | Hazard Communication Program: Establish and implement program required by 29 CFR Part 1910.1200. |
| I. | Hazardous Waste Management Plan: Establish and implement plan according to applicable requirements of Federal, State, and local hazardous waste regulations including the following: |
| 1. | Identification of hazardous wastes associated with work. |
| 2. | Estimated quantities of generated and disposed waste. |
| 3. | Names and qualifications of each contractor transporting, storing, treating, and disposing wastes. Include facility location and 24 hour point of contact. Provide two copies of EPA, State and Local hazardous waste permit applications permits and EPA Identification numbers. |
| 4. | Names and qualifications (experience and training) of personnel working on site with hazardous wastes. |
| 5. | List of required waste handling equipment including cleaning, volume reduction, and transport equipment. |
| 6. | Spill prevention, containment, and cleanup contingency implementation measures. |
| 7. | Work plan and schedule for waste containment, removal, and disposal with daily waste cleaned up and containerization. |
| 8. | Hazardous waste disposal cost. |
| 1.8 | WARRANTY |
| A. | Construction Warranty: FAR clause 52.246 21, "Warranty of Construction." |
PART 2 - PRODUCTS
| 2.1 | LEAD DUST REMOVAL PRODUCTS |
| A. | No Chemical Stripper will be used: Biodegradable, non toxic, capable of removing existing paint layers in one application, and acceptable to CIH. |
| 2.2 | ACCESSORIES |
| A. | Waste Collection Drums: 49 CFR Part 178; Type 1A2, steel, removable head, 200 L (55 gal.) capacity, capable of containing waste without loss. |
| B. | Vacuum Cleaner: HEPA filtered type. |
| C. | Scrapers: |
| 1. | Metal type for use on metal, concrete, and masonry surfaces. |
| 2. | Plastic type for use on wood, plaster, gypsum board, and other surfaces. |
| D. | Rinse Water: Potable. |
| E. | Cleaning Cloths: Cotton. |
PART 3 - EXECUTION
| 3.1 | EXAMINATION |
| A. | Before exposure to lead contaminated dust, provide workers with comprehensive medical examination required by 29 CFR Part 1926.62 (I) (1) (i) and (ii). |
| 1. | Exemption: Examination is not required when employee medical records show last examination required by 29 CFR Part 1926.62(I) was completed within previous 12 months. |
| B. | Maintain complete and accurate employee medical records according to 29 CFR Part 1910.20. |
| C. | Train each employee performing lead dust removal, disposal, and air sampling operations according to 29 CFR Part 1926.62. |
| 1. | Certify training is completed before employee is permitted to work on project and enter lead control area. |
| 3.2 | PREPARATION |
| A. | Protect existing work indicated to remain. |
| 1. | Perform paint removal work without damaging and contaminating adjacent work. |
| 2. | Restore damage and contamination to original condition. |
| B. | Notify Contracting Officer 10 days before starting paint removal work. |
| C. | Lead Control Area Requirements: |
| 1. | Establish lead control area by completely enclosing lead based dust removal work area with containment screens. |
| 2. | Contain removal operations using negative pressure full containment system with minimum one change room and HEPA filtered exhaust. |
| D. | Boundary Requirements: Provide physical boundaries around lead control area by providing curtains, portable partitions or other enclosures to ensure that airborne lead concentrations do not meet or exceed action level outside of lead control area. |
| E. | Heating, Ventilating and Air Conditioning (HVAC) Systems: Shut down, lock out, and isolate HVAC systems supplying exhausting, and passing through lead control areas. Seal HVAC inlets and outlet within lead control area with 6 mil plastic sheet and tape. Tape seal seams in HVAC components passing through lead control area. |
| F. | Change Room and Shower Facilities: Provide clean change rooms and shower facilities within physical boundary around lead control area according to 29 CFR Part 1926.62. |
| G. | Mechanical Ventilation System: |
| 1. | Provide ventilation system to control personnel exposure to lead according to 29 CFR Part 1926.57. |
| 2. | Design, construct, install, and maintain HEPA filtered fixed local exhaust ventilation system according to ANSI Z9.2 and approved by CIH. |
| 3. | Exhaust ventilation air to exterior wherever possible. |
| 4. | When exhaust ventilation air must be recirculated into work area, provide HEPA filter with reliable back up filter and controls to monitor lead concentration in return air and to bypass recirculation system automatically when system fails. |
| H. | Personnel Protection: Provide and use required protective clothing and equipment within lead control area. |
| I. | Warning Signs: Provide warning signs complying with 29 CFR Part 1926.62 at lead control area approaches. Locate signs so personnel read signs and take necessary precautions before entering lead control area. |
| 3.3 | WORK PROCEDURES |
| A. | Abate lead dust according to approved removal plan. |
| 1. | Perform work only in presence of CIH or Industrial Hygienist (IH) Technician under direction of CIH ensuring continuous inspection of work in progress and direction of air monitoring activities. |
| 2. | Handle, store, transport, and dispose lead or and lead contaminated waste according to 40 CFR Part 260, 40 CFR Part 261, 40 CFR Part 262, 40 CFR Part 263, 40 CFR Part 264, and 40 CFR Part 265. Comply with land disposal restriction notification requirements as required by 40 CFR Part 268. |
| B. | Use procedures and equipment required to limit occupational and environmental lead exposure when lead based paint is removed according to 29 CFR Part 1926.62. |
| C. | Dispose removed paint and waste according to Environmental Protection Agency (EPA), federal, state, and local requirements. |
| D. | Personnel Exiting Procedures: |
| 1. | When personnel exit lead control area, comply with the following procedures: |
| a. | HEPA Vacuum exposed clothing surfaces. |
| b. | Remove protective clothing and equipment in decontamination room. Place clothing in approved impermeable disposal bag. |
| c. | Shower. |
| d. | Dress in clean clothes before leaving lead control area. |
| E. | Monitoring - General: |
| 1. | Monitor airborne lead concentrations according to 29 CFR Part 1910.1025by testing laboratory as directed by CIH. |
| 2. | Take personal air monitoring samples on employees anticipated to have greatest exposure risk as determined by CIH. Additionally, take air monitoring samples on minimum 25 percent of work crew or minimum of two employees, whichever is greater, during each work shift. |
| 3. | Submit results of air monitoring samples, signed by CIH, within 16 hours after taking air samples. Notify Contracting Officer's Representative immediately of lead exposure at or exceeding action level outside of lead control area. |
| F. | Monitoring During Paint Removal: |
| 1. | Perform personal and area monitoring during entire paint removal operation. |
| 2. | Conduct area monitoring at physical boundary daily for each work shift to ensure unprotected personnel are not exposed above action level anytime. |
| 3. | For outdoor operations, take at least one sample on each shift leeward of lead control area. When adjacent areas are contaminated, clean area of contamination and have CIH visually inspect and certify lead contamination is cleaned. |
| 4. | Stop work when outside boundary lead levels meet or exceed action level. Notify Contracting Officer's Representative, immediately. |
| 5. | Correct conditions causing increased lead concentration as directed by CIH. |
| 6. | Review sampling data collected during work stoppage to determine if conditions require additional work method modifications as determined by CIH. |
| 7. | Resume paint removal when approved by CIH. |
| 3.4 | LEAD DUST REMOVAL |
| A. | Remove Lead Dust within areas indicated on drawings completely exposing substrate. Minimize damage to substrate. |
| B. | Comply with Lead Dust removal processes described lead paint removal plan. |
| C. | Lead Based Dust Removal: Select processes for each application to minimize work area lead contamination and waste. |
| 3.5 | SUBSTRATE SURFACE PREPARATION |
| A. | Protect substrates from deterioration and contamination until refinished. |
| 1. | Protect metal substrates from flash rusting. |
| 3.6 | FIELD QUALITY CONTROL |
| A. | Field Tests: Performed by testing laboratory specified in Section 01 45 29, TESTING LABORATORY SERVICES. |
| B. | Perform sampling and testing for: |
| 1. | Air monitoring. |
| 2. | Lead based dust. |
3.7 CLEANING AND DISPOSAL
Verify with Industrial Hygienist if wet mopping work area surfaces is necessary.
| A. | Cleaning: |
| 1. | Maintain lead control area surfaces free of accumulating paint chips and dust. Confine dust, debris, and waste to work area. |
| 2. | HEPA Vacuum clean work area daily, at end of each shift, and when paint removal operation is complete. |
| B. | CIH Certification: Certify in writing that inside and outside lead control area air monitoring samples are less than action level, employee respiratory protection was adequate, the work was performed according to 29 CFR Part 1926.62, and no visible accumulations of lead based dust remain on worksite. |
| 1. | Do not remove lead control area or roped off boundary and warning signs before Contracting Officer's Representative's receipt of CIH's certification. |
| 2. | Re-clean areas showing dust or residual paint chips. |
| C. | Testing: Where indicated and when directed by Contracting Officer's Representative, test lead based paint residue and used abrasive according to 40 CFR Part 261 for hazardous waste. |
| D. | Waste Collection: |
| 1. | Collect lead contaminated materials including waste, scrap, debris, bags, containers, equipment, and clothing, which may produce airborne lead contamination. |
| 2. | Place lead contaminated materials in waste disposal drums. Label each drum identifying waste type according to 49 CFR Part 172 and date waste materials were first put into drum. Obtain and complete the Uniform Hazardous Waste Manifest forms. Comply with land disposal restriction notification requirements required by 40 CFR Part 268: |
| 3. | Coordinate temporary storage location on project site with Contracting Officer's Representative. |
| E. | Waste Disposal: |
| 1. | Minimum 14 days before delivery, notify Contracting Officer's Representative who will arrange for job site inspection of drums and manifests by paint disposal facility personnel. |
| F. | Waste Disposal: |
| 1. | Do not store hazardous waste drums in temporary storage location longer than 90 calendar days from drum label date. |
| 2. | Perform TCLP test on material, Remove, transport, and deliver drums oflead dust to approved disposal facility. |
| a. | Obtain signed receipt including date, time, quantity, and description of materials received according to 40 CFR Part 262. |
| b. | Obtain final report of materials disposition after disposal completion. |
Building Square Footage:
Basement - 9274 First Floor - 9224 Second Floor - 8590 Attic - 7536
The approximate size of duct work surfaces to be included in the Lead (Pb) testing plan for building 2 are expressed in linear feet (LF) below:
Basement - 515 Lf 1st Floor - 1265 Lf 2nd Floor - 1387 Lf Attic - 516 Lf There are 63 FCU’s in the building.
B.4 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 2 Lead Abatement and Cleaning Contract Period:
POP Begin: TBD POP End: TBD
| GRAND TOTAL |
| __________________ |
B.5 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| Butler VA Medical Center |
325 New Castle Road Building 2 Butler, PA 16001
USA
| 1.00 |
| 12 Weeks ARO |
| MARK FOR: |
| William Cipriano |
724-285-2773 William.Cipariano@va.gov
SECTION C - CONTRACT CLAUSES
| FAR Number |
| Title |
| Date |
| 52.212-4 |
| CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS |
| JAN 2017 |
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS |
| APR 2014 |
| 52.204-4 |
| PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER |
| MAY 2011 |
| 52.227-14 |
| RIGHTS IN DATA—GENERAL |
| MAY 2014 |
| 52.232-40 |
| PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS |
| DEC 2013 |
C.2 SUPPLEMENTAL INSURANCE REQUIREMENTS
In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:
(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability: $500,000.00 per occurrences.
(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.
(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.
(End of Clause)
C.3 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective—
(1) For such period as the laws of the State in which this contract is to be performed prescribe; or
(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
(End of Clause)
C.4 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
The Contractor shall not make reference in its commercial advertising to Department of Veterans Affairs contracts in a manner that states or implies the Department of Veterans Affairs approves or endorses the Contractor’s products or services or considers the Contractor’s products or services superior to other products or services.
(End of Clause) C.5 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)
(a) Definition. For the Department of Veterans Affairs, “Service-disabled veteran-owned small business concern or SDVSOB”:
(1) Means a small business concern:
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans or eligible surviving spouses (see VAAR 802.201 Surviving Spouse definition);
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans (or eligible surviving spouses) or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran;
(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;
(iv) The business has been verified for ownership and control pursuant to 38 CFR 74 and is so listed in the Vendor Information Pages database, (https://www.vip.vetbiz.gov); and
(v) The business will comply with subcontracting limitations in 13 CFR 125.6, as applicable
(2) “Service-disabled veteran” means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
(b) General.
(1) Offers are solicited only from verified service-disabled veteran-owned small business concerns. Offers received from concerns that are not verified service-disabled veteran-owned small business concerns shall not be considered.
(2) Any award resulting from this solicitation shall be made to a verified service-disabled veteran-owned small business concern.
(c) Agreement. A service-disabled veteran-owned small business concern agrees that in the performance of the contract, the concern will comply with the limitation on subcontracting requirements in 13 CFR §125.6.
(d) A joint venture may be considered a service-disabled veteran owned small business concern if the joint venture complies with the requirements in 13 CFR 125.15, provided that any reference therein to SDVO SBC is to be construed to apply to a VA verified SDVOSB as appropriate.
(e) Any service-disabled veteran-owned small business concern (non-manufacturer) must meet the requirements in FAR 19.102(f) of the Federal Acquisition Regulation to receive a benefit under this program.
(End of Clause)
C.6 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)
(a) Definitions. As used in this clause—
(1) Contract financing payment has the meaning given in FAR 32.001.
(2) Designated agency office has the meaning given in 5 CFR 1315.2(m).
(3) Electronic form means an automated system transmitting information electronically according to the Accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.
(4) Invoice payment has the meaning given in FAR 32.001.
(5) Payment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.
(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.
(c) Data transmission. A contractor must ensure that the data transmission method and format are through one of the following: