36C24418B0605 503-17-101 - 100_ Bid Documents Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24418B0605-001.docx | DOCX document | |
| 36C24418B0605-003.pdf | ||
| 36C24418B0605-004.docx | DOCX document | |
| 36C24418B0605-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2907 PLEASANT VALLEY BLVD.
ALTOONA, PA
LOCATION MAP
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
COVER SHEET PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
C-X-1
503-17-101
170704D
JAMES E. VAN ZANDT VETERANS
ADMINISTRATION MEDICAL CENTER
ALTOONA, PA.
PAINT WALLS
PROJECT # 503-17-101
INDEX OF DRAWINGS
SHEET NO. SHEET NAME
00 GENERAL INFORMATION
C-X-1 COVER SHEET
C-X-2 SYMBOLS AND ABBREVIATIONS
C-X-3 EXISTING ALTOONA CAMPUS PLAN
04 ARCHITECTURE
1-1-1 BLDG 01 - 1ST FLOOR - PART A - PHASE 1
1-1-2 BLDG 01 - 1ST FLOOR - PART B - PHASE 1
1-1-3 BLDG 01 - 1ST FLOOR - PART C - PHASE 1
1-1-4 BLDG 01 - 1ST FLOOR - PART D - PHASE 1
1-1-5 ENLARGED PLAN - FIRST FLOOR - SEQUENCE 1
1-1-6 ENLARGED PLAN - FIRST FLOOR - SEQUENCES 2 & 3
1-1-7 ENLARGED PLAN - FIRST FLOOR - SEQUENCES 4 & 5
1-1-8 ENLARGED PLAN - FIRST FLOOR - SEQUENCES 6 & 7
1-1-9 ENLARGED PLAN - FIRST FLOOR - SEQUENCES 8 & 9
1-1-10 ENLARGED PLAN - FIRST FLOOR - SEQUENCES 10 & 11
1-3-1 BLDG 01 - PARTIAL 3RD FLOOR PLAN - PHASE 2
1-3-2 ENLARGED PLAN - THIRD FLOOR - PHASE 2
concrete masonry unit demolish, demolition
CU cubic
DR
D
DS
DWG
DF
DIA
DTL
DL
DEM
DIM
door downspout drinking fountain drain drawing dead load diameter detail dimension
AUTO automatic cast iron column ceramic tile cement control joint construction concrete continuous, continue ceiling catch basin
COL
CJT
CONT
CONST
CONC
CMU
CI
CT
CEM
CLG
CB
basement below finish floor bearing plate both sides board block building bottom built up roof bench mark bituminous
BLK
BS
BD
BUR
BLDG
BOT
BFF
BPL
BSMT
BM
BIT
alternate air conditioning above finish floor asphalt anchor bolt architect (ural) approximate aluminum
ALT
AB
ARCH
APPROX.
ASPH
ALUM
AC
AFF
WC water closet plaster air conditioning
PLAS
insulation insulated glass unit inside diameter include (d) (ing) hot water heater hose bib horizontal hollow metal hollow core interior
INCL
INSUL
IGU
ID
INT
HOR
HWH
HM
HB
HC
point plywood plate concrete plank-painted square inch pounds per square foot pounds per polyvinyl chloride
PSF
PSI
PL
PT
PVC
PWD
PLK
west, width, wide welded wire fabric waterproof (ing) wood base wired glass
WB
WG
WWF
WP
W/ W
WD
with wood manholeMH
EXP expansion, exposed galvanized hollow metal fire extinguisher cabinet
GA
galvanized gypsum wall board glazed masonry unit general contractor heating ventilating grade, grading hardware gypsum gauge
GWB
HVAC
HDW
GYP
GALV
GMU
GHM
GD
GC
fire extinguisher finish (ed) exterior finished floor line foundation footing floor drain floor (ing) flashingFLG
FLR
FND
FTG
FD
EXT
FFL
FEC
FE
FIN
nominalNOM north opening on center outside diameter perimeter panel polished float glass overhead overall not to scale not in contract
OD
PER
OH
OA
PNL
PFG
N
OC
OPG
NTS
NIC
marble masonry manufacture (er) maximum metal mechanical miscellaneous minimum medium medium density overlay masonry opening
MTL
MECH
MISC
MIN
MED
MAX
MBL
MAS
MFR
MDO
MO
emergency each way existing exhaust estimate electric water cooler elevation electric (al)
EST
EXH
EXIST
EMER
ELEV
EW
EWC
ELEC
knock out invert left hand lavatory
LBL
LH
LPL
LAV
label low presure laminate
JT
KO
INV
joint
RO rough opening
TBD to be determined tempered float glass tongue & groove thick (ness) vinyl covered drywall vinyl composition tile vertical
VCT
VCD
VERT
TYP typical
TFG
T&G
THK
schedule section specification (s) square straight structural storage south, switch (es) seamless floor
SPEC
ST
SQ
STR
STL
STO
steel
SIM
SEC
SCH
SF
S similar reference quarry tile property line right of way revision, revised return air
REF
ROW
REV
RM
R
RA
riser room
QT
PL
R radius RCP reflected ceiling plan plastic laminateP-LAM
SYS system high pressure laminateHPL
LT light
ABBREVIATIONS
A301
A301
OT
GYM10'-0"
A.F.F.
DETAIL TAG
COLUMN LINE BUBBLE TAG
CEILING HEIGHT TAG
A-?
DWG NAME
SCALE:
SECTION TAG
ROOM TAG - NEW WORK
WINDOW TAG
WALL TYPE TAG
TITLE TAG
W05
INTERIOR ELEVATION
EXTERIOR ELEVATION
ELEVATION MARK
DETAIL CALL OUT
TAG
REVISION TAG
FIRST FLOOR
DOOR TAG
CONSTRUCTION KEY
NOTE TAG
X
D1-202A
A201
A201
125 SF
STOREFRONT
WINDOW TAG
S05
INTERIOR
WINDOW TAG
i05 S05
STOREFRONT
WINDOW TAG - WIDE
BUILDING DATA
PROJECT NAME: VA ALTOONA - PAINT WALLS
PROJECT LOCATION: BUILDING 1
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602-4377
NOTE:
FIRST FLOOR DEDUCT ALTERNATE NO. 1 - CORRIDOR A-1S
GENERAL DESCRIPTION:
SYMBOLS
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
SYMBOLS AND
ABBREVIATIONS
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
C-X-2
503-17-101
170704D
BLDG. 01
PLEASANT VALLEY BOULEVARD
S.
7T H
S
TR
EE
T
S.
7T H
S
TR
EE
T
S.
7T H
S
TR
EE
T
CAYUGA
CIRCLE
MAIN ENTRANCE ROAD
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
EXISTING ALTOONA
CAMPUS PLAN
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
C-X-3
503-17-101
170704D
SCALE: 1" = 50'
25' 50'0 100'
PLAN NORTH
TRUE NORTH
SCALE: 1" = 50'-0"C-X-3
1 EXIST ALTOONA CAMPUS PLAN
MECHANICAL ROOM
CHECKOUT
172F
OFFICE
179G
EXAM
EXAM
Room
Room
CLEAN STOR
TLT
197C
EXAM
OFFICE
EXAM RM
179E
EXAM RM
179D
EXAM RM
179C
PHARMACY
VAULT
157A
STORAGE
157B
EXAM
Room 179B
EXAM RM
179F
Room
ELEC
Room
EXAM
SOCIAL WK
MECH
171A
EXAM RM
179A
MECHANICAL RM
EXAM-5
172 EXAM-4
EXAM-3
174 EXAM-2
MEDS
CLEAN STOR.
CLOSET
SCIC EXAM
STAIR
S104
MATCHLINE PART A
MATCHLINE PART B
MATCHLINE PART A
MATCHLINE PART B
CORRIDOR
A-1C
CORRIDOR
A-1A
CORRIDOR
A-1B
172J
CORRIDOR WAITING
A
A-1WW
1-1-5
1 FIRST FLOOR - SEQUENCE 1
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
HINGE SIDE
CORRIDOR
PAINT TO MATCH CORRIDOR
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
HINGE SIDE
OFFICE
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
PAINT TO MATCH CORRIDOR
MASKING POINT MASKING POINT
OUTSWING
DOOR
INSWING
DOORDOOR FRAME
DOOR PANEL
DOOR FRAME
DOOR PANEL
DOOR FRAME PAINTING NOTES
• ONLY DOOR FRAMES WITHIN THE SCOPE OF WORK ARE TO BE PAINTED.
• CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING ROOM LABEL IF
LOCATED ON PORTION OF FRAME TO BE PAINTED. VA TO REAPPLY THE NEW
LABELS AFTER PAINTING OF SPACE IS COMPLETED. LABELS PLACED ON
HINGES ARE TO REMAIN.
• ALL HOLLOW METAL DOOR FRAMES TO BE PAINTED:
IF INTERIOR ROOM FINISH MATCHES CORRIDOR - PAINT THE WHOLE FRAME
IF INTERIOR ROOM FINISH IS DIFFERENT FROM CORRIDOR - MASK OFF AND
PAINT THE CORRIDOR SIDE ONLY
• SMOKE DOOR FRAMES AT CORRIDORS TO BE PAINTED.
• CONTRACTOR TO MASK OFF AND PAINT AROUND ALL EXISTING HARDWARE.
• METAL FRAME SERVICE WINDOWS TO BE PAINTED.
• ALUMINUM ENTRANCE FRAMES AND ALUMINUM WINDOW FRAMES ARE
EXCLUDED (DO NOT PAINT)
• DOOR FRAMES COVERED WITH ACROVYN ARE EXCLUDED (DO NOT PAINT).
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
BLDG 01 - 1ST FLOOR -
PART A - PHASE 1
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-1
503-17-101
170704D
SCALE: 1/8" = 1'-0"
4'-0" 8'-0"0 16'-0"
PLAN NORTH
TRUE NORTH
SCALE: 1/8" = 1'-0"1-1-1
1 EXIST 1ST FLOOR - PART A
ROOM FINISH SCHEDULE - 1ST FLOOR - PART A
ROOM NAME
ROOM
NUMBER
WALL FINISHES
COMMENTSNORTH EAST SOUTH WEST
CORRIDOR A-1A P-1/ P-2 P-1/ P-2 P-1/ P-2 P-1/ P-2
CORRIDOR A-1B P-1/ P-2 P-1/ P-2 P-1/ P-2 P-1/ P-2
CORRIDOR A-1C P-1/ P-2 P-1/ P-2 P-1/ P-2 P-1/ P-2
LINEAR FEET 1ST A
ROOM NAME
ROOM
NUMBER PERIMETER
CORRIDOR A-1A 207'-11 3/4"
CORRIDOR A-1B 81'-8"
CORRIDOR A-1C 109'-2 5/8"
APPROXIMATE 398'-10 3/8"
FIRST FLOOR - PHASE 1
SEQUENCE: 1
FIRST FLOOR SEQUENCE 1: 34 DOORS OF VARIOUS SIZES.
WALLPAPER
HANDRAIL
ACROVYN WAINSCOT 46"
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
*̂ = TELEVISION
= WINDOW/ CHECKOUT
CLERK
OFFICE
156D
SEC
OFFICE
156C
SUPERVISOR
TLT
197B
OFFICE
OFFICE
195C
OFFICE
OFFICE
195A
OFFICE
195B
RCDS
193J
RCDS
193I RCDS
193H
RCDS
193G
RCDS
193F
RCDS
193E
RCDS
193D
CLERK
193C
CLERK
193BB
CONSULT
156B
CONSULT
156A
RX PICKUP
A-1X
WOMENS TLT
MENS TLT
HAC
Room
ELEC
ARMORY
POLICE
ON-CALL
A107
CL
A114
INTERVIEW
A108
OFFICE
A113
STAIR
S101
COMP & PENSION
OFFICE
VIC/ENROLLMENT
A106D
STAFF TLT
A106C
OPERATOR
A106B NOD
A101B
AOD
A101D
CENTRAL
REGISTRATION
A106
REGISTRATION
A105
TRIAGE
A145
CLEAN HOLD
A147
MED RM
A146
ER WAITING
A101E
ROI
A106FF
ROI OFF.
A106E
ER STOR
A148B
WAITING
A117
TLT
A120 TLT
A119
CONF.
A118
STOR.
A110
EXAM
A111
EXAM
A112
OFFICE
A115
OFFICE
A116
STAFF RM
A123
EXAM RM
A129
UTILITY
A124
MED RM
A125
SU
A126
EXAM RM
A127
EXAM RM
A135
EXAM RM
A136
EXAM RM
A137
TLT
A139
EXAM RM
A134
EXAM RM
A133EXAM RM
A132EXAM RM
A131
EXAM RM
A130
STAIR
S105
ELEC CL
A140A
OXYGEN STOR.
A140
BED-4
A138E
BED-3
A138D
BED-2
A138C BED-1
A138B DECON
A141
ER CLERK
A144
MECHANICAL ROOM
OFFICE
179GPHARMACY
CLOSET
193A
E
LE
V A
TO
R
S
MATCHLINE PART A
MATCHLINE PART B
M
AT
C H
LI
N
E
PA
R T
C
M
AT
C H
LI
N
E
PA
R T
B
M
AT
C H
LI
N
E
PA
R T
C
M
AT
C H
LI
N
E
PA
R T
B
EXISTING TILE
AT THIS WALL,
NOT TO BE
PAINTED
CORRIDOR
A-1I
CORRIDOR
A-1J
CORRIDOR
A-1K
CORRIDOR
A-1L
CORRIDOR
A-1R
CORRIDOR
A-1S
CORRIDOR
A-1T
CORRIDOR
A-1U
CORRIDOR
A-1V
CORRIDOR WAITING
A-1W
CORRIDOR WAITING
A
A-1WW
P-2
P-2
P-2
P-2
P-2P-2
P-2
P-2 P-2
P-2
1-1-6
1 FIRST FLOOR - SEQUENCE 2
1-1-6
2 FIRST FLOOR -
SEQUENCE 3
1-1-7
1 FIRST FLOOR - SEQUENCE 4
1-1-7
2FIRST FLOOR -
SEQUENCE 5
FIRST FLOOR DEDUCT ALTERNATE NO. 1
CORRIDOR A-1S
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
HINGE SIDE
CORRIDOR
PAINT TO MATCH CORRIDOR
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
HINGE SIDE
OFFICE
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
PAINT TO MATCH CORRIDOR
MASKING POINT MASKING POINT
OUTSWING
DOOR
INSWING
DOORDOOR FRAME
DOOR PANEL
DOOR FRAME
DOOR PANEL
DOOR FRAME PAINTING NOTES
• ONLY DOOR FRAMES WITHIN THE SCOPE OF WORK ARE TO BE PAINTED.
• CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING ROOM LABEL IF
LOCATED ON PORTION OF FRAME TO BE PAINTED. VA TO REAPPLY THE NEW
LABELS AFTER PAINTING OF SPACE IS COMPLETED. LABELS PLACED ON
HINGES ARE TO REMAIN.
• ALL HOLLOW METAL DOOR FRAMES TO BE PAINTED:
IF INTERIOR ROOM FINISH MATCHES CORRIDOR - PAINT THE WHOLE FRAME
IF INTERIOR ROOM FINISH IS DIFFERENT FROM CORRIDOR - MASK OFF AND
PAINT THE CORRIDOR SIDE ONLY
• SMOKE DOOR FRAMES AT CORRIDORS TO BE PAINTED.
• CONTRACTOR TO MASK OFF AND PAINT AROUND ALL EXISTING HARDWARE.
• METAL FRAME SERVICE WINDOWS TO BE PAINTED.
• ALUMINUM ENTRANCE FRAMES AND ALUMINUM WINDOW FRAMES ARE
EXCLUDED (DO NOT PAINT)
• DOOR FRAMES COVERED WITH ACROVYN ARE EXCLUDED (DO NOT PAINT).
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
BLDG 01 - 1ST FLOOR -
PART B - PHASE 1
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-2
503-17-101
170704D
PLAN NORTH
TRUE NORTHSCALE: 1/8" = 1'-0"
4'-0" 8'-0"0 16'-0"
SCALE: 1/8" = 1'-0"1-1-2
1 EXIST 1ST FLOOR - PART B
ROOM FINISH SCHEDULE - 1ST FLOOR - PART B
ROOM NAME
ROOM
NUMBER
WALL FINISHES
COMMENTSNORTH EAST SOUTH WEST
CORRIDOR A-1I P-1/ P-2 P-1/ P-2 P-1/ P-2 P-1/ P-2
CORRIDOR A-1J P-1 P-1 P-1 P-1
CORRIDOR A-1K P-1 N/A P-1 N/A
CORRIDOR A-1L P-1/ P-2 P-1/ P-2 P-1/ P-2 P-1/ P-2
CORRIDOR A-1R P-1/ P-2 P-1/ P-2 P-1/ P-2 P-1/ P-2
CORRIDOR A-1S P-1 P-1 P-1 P-1
CORRIDOR A-1T P-1/ P-2 P-1/ P-2 P-1 P-1/ P-2 REFER TO DRAWING FOR ACCENT WALL
LOCATIONS
CORRIDOR A-1U P-1/ P-2 P-1/ P-2 P-1 P-1/ P-2
CORRIDOR A-1V P-1/ P-2 N/A P-1/ P-2 P-1/ P-2
CORRIDOR WAITING A-1W P-2 P-2 P-1 P-1 COLUMNS TO BE P-1
CORRIDOR WAITING
A
A-1WW P-A P-A P-A P-A
RX PICKUP A-1X P-2 P-1 P-1 P-1
LINEAR FEET 1ST B
ROOM NAME
ROOM
NUMBER PERIMETER
CORRIDOR A-1I 55'-10"
CORRIDOR A-1J 32'-2 1/4"
CORRIDOR A-1K 62'-8 3/8"
CORRIDOR A-1L 151'-8 1/4"
CORRIDOR A-1R 106'-0"
CORRIDOR A-1S 245'-5 3/8"
CORRIDOR A-1T 305'-10 1/8"
CORRIDOR A-1U 83'-1 7/8"
CORRIDOR A-1V 157'-10 7/8"
CORRIDOR WAITING A-1W 254'-7 1/2"
CORRIDOR WAITING A A-1WW 40'-1 1/8"
RX PICKUP A-1X 67'-1 3/4"
APPROXIMATE 1562'-7 3/4"
FIRST FLOOR - PHASE 1
SEQUENCES: 2 - 5
FIRST FLOOR SEQUENCES 2 - 5: 59 DOORS OF VARIOUS SIZES.
VETERANS BEN.
141L
PAT. CLOTHING
STORAGE
OFFICE
WOMENS LOCKER
ROOM
144A
CHIEF OF RADIOLOGY
OFFICE
145A
TECH STAFF ASSM.
AREA
145B
EC
RADIOLOGY
RECEPTION
146A
RADIOLOGY WAITING
ROOM
XRAY
CAD AREA
FEM. DRS. RM
128BMALE DRS. RM
128A
XRAY
Room
TLT
OFFICE
132STAIR
S100
MORGUE
AUTOPSY
140A
LAUNDRY
141A
STORAGE
141E CONTROL RM
131G
MRI EQUIPMENT
ROOM
STORAGE
190A
MRI ROOM
190C
MRI CONTROL ROOM
190D
CHN ROOM
190E
PREP ROOM
131I
TLT
131A
CAT SCAN
ELEC
130B
STOR
130A ULTRASOUND
129B
INPATIENT
LITTER/WAITING
AREA
129A
INPATIENT
LITTER/WAITING
AREA
129 XRAY
TLT
TLT
OFFICE
OFFICE
OFFICE
120 OP. MAN. OFFICE
121A
MEDS
131K
CL
148F
OFFICE
SECRETARY
121D
EXAM
121E
EXAM
121F
EXAM
121G
WAITING ROOM
121H
CASHIER
CLERK
151A
CLERK
CLERK
152A
CLERK
BILLING OFFICE
TLT
197A
TLT
197B
OFFICE
195B
OFFICE
198D
STAIR
S102
OFFICE
OFFICE
RESP
118A RESP
EXAM
116B
EXAM
116A
RESP
117A
CLOSET
117C
E
LE
V A
TO
R
S
ELEVATOR
ELEV
TLT
140C
MATCHLINE PART A
MATCHLINE PART B
M
AT
C H
LI
N
E
PA
R T
C
M
AT
C H
LI
N
E
PA
R T
B
M
AT
C H
LI
N
E
PA
R T
C
M
AT
C H
LI
N
E
PA
R T
B
MATCHLINE PART C
MATCHLINE PART D
MATCHLINE PART C
MATCHLINE PART D
CORRIDOR
A-1D
CORRIDOR
A-1E
CORRIDOR
A-1F
CORRIDOR
A-1G
CORRIDOR
A-1H
CORRIDOR
A-1M
CORRIDOR
A-1N
CORRIDOR
A-1O
CORRIDOR
A-1P
CORRIDOR
A-1Q
P-2
P-2
P-
1-1-8
1 FIRST FLOOR - SEQUENCE 6
1-1-8
2 FIRST FLOOR - SEQUENCE 7
1-1-9
1-1-10
FIRST FLOOR - SEQUENCE 9
FIRST FLOOR - SEQUENCE 10
1-1-10
2 FIRST FLOOR - SEQUENCE 11
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
HINGE SIDE
CORRIDOR
PAINT TO MATCH CORRIDOR
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
HINGE SIDE
OFFICE
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
PAINT TO MATCH CORRIDOR
MASKING POINT MASKING POINT
OUTSWING
DOOR
INSWING
DOORDOOR FRAME
DOOR PANEL
DOOR FRAME
DOOR PANEL
DOOR FRAME PAINTING NOTES
• ONLY DOOR FRAMES WITHIN THE SCOPE OF WORK ARE TO BE PAINTED.
• CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING ROOM LABEL IF
LOCATED ON PORTION OF FRAME TO BE PAINTED. VA TO REAPPLY THE NEW
LABELS AFTER PAINTING OF SPACE IS COMPLETED. LABELS PLACED ON
HINGES ARE TO REMAIN.
• ALL HOLLOW METAL DOOR FRAMES TO BE PAINTED:
IF INTERIOR ROOM FINISH MATCHES CORRIDOR - PAINT THE WHOLE FRAME
IF INTERIOR ROOM FINISH IS DIFFERENT FROM CORRIDOR - MASK OFF AND
PAINT THE CORRIDOR SIDE ONLY
• SMOKE DOOR FRAMES AT CORRIDORS TO BE PAINTED.
• CONTRACTOR TO MASK OFF AND PAINT AROUND ALL EXISTING HARDWARE.
• METAL FRAME SERVICE WINDOWS TO BE PAINTED.
• ALUMINUM ENTRANCE FRAMES AND ALUMINUM WINDOW FRAMES ARE
EXCLUDED (DO NOT PAINT)
• DOOR FRAMES COVERED WITH ACROVYN ARE EXCLUDED (DO NOT PAINT).
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
BLDG 01 - 1ST FLOOR -
PART C - PHASE 1
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-3
503-17-101
170704DSCALE: 1/8" = 1'-0"1-1-3
1 EXIST 1ST FLOOR - PART C
PLAN NORTH
TRUE NORTHSCALE: 1/8" = 1'-0"
4'-0" 8'-0"0 16'-0"
ROOM FINISH SCHEDULE - 1ST FLOOR - PART C
ROOM NAME
ROOM
NUMBER
WALL FINISHES
NORTH EAST SOUTH WEST
CORRIDOR A-1D P-1/ P-2 P-1 P-1/ P-2 P-2
CORRIDOR A-1E P-1 P-1 P-1 P-1
CORRIDOR A-1F P-1 N/A P-1/ P-2 P-1/ P-2
CORRIDOR A-1G P-1 P-1 P-1 P-1
CORRIDOR A-1H P-1/ P-2 P-1/ P-2 P-1/ P-2 P-2
CORRIDOR A-1M P-1 P-1 P-1 P-1
CORRIDOR A-1N P-1 P-1 P-1 P-1
CORRIDOR A-1O P-1 P-1 P-1 P-1
CORRIDOR A-1P P-1 P-1 P-1 P-1
CORRIDOR A-1Q P-1 P-1 P-1 P-1
LINEAR FEET 1ST C
ROOM NAME ROOM NUMBER PERIMETER
CORRIDOR A-1D 284'-1 1/8"
CORRIDOR A-1E 42'-8 1/4"
CORRIDOR A-1F 48'-0 7/8"
CORRIDOR A-1G 63'-8 3/8"
CORRIDOR A-1H 151'-10 1/4"
CORRIDOR A-1M 161'-10 1/4"
CORRIDOR A-1N 95'-11 7/8"
CORRIDOR A-1O 213'-4 3/4"
CORRIDOR A-1P 144'-10 1/4"
CORRIDOR A-1Q 159'-6 3/8"
APPROXIMATE 1366'-0 1/4"
FIRST FLOOR - PHASE 1
SEQUENCES: 6,7,9,10 & 11
FIRST FLOOR SEQUENCES 6,7,9,10 &11: 63 DOORS OF VARIOUS SIZES.
EXAM
116B
EXAM
116A
EXAM
116C
EXAM
116D
WAITING ROOM
TLT
TLT
115A
CLERK/HBA
CLERK/HBA
100A
EQUIP. RM
100B
NURSE STATION
101B
STAIR
S103
DIRTY LAUNDRY
102A
ENT CONF.
Room 101A
SURGERY
CONSULT
113A
NURSE
113B
EXAM ROOM
NURSE
EXAM ROOM
EXAM ROOM
NURSE
OFFICE
OFFICE
AUDIOLOGY
AUDIO CLINIC
CORRIDOR
CORRIDOR
MATCHLINE PART C
MATCHLINE PART D
MATCHLINE PART C
MATCHLINE PART D
P-2
P-2
1-1-9
1FIRST FLOOR - SEQUENCE 8
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
HINGE SIDE
CORRIDOR
PAINT TO MATCH CORRIDOR
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
HINGE SIDE
OFFICE
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
PAINT TO MATCH CORRIDOR
MASKING POINT MASKING POINT
OUTSWING
DOOR
INSWING
DOORDOOR FRAME
DOOR PANEL
DOOR FRAME
DOOR PANEL
DOOR FRAME PAINTING NOTES
• ONLY DOOR FRAMES WITHIN THE SCOPE OF WORK ARE TO BE PAINTED.
• CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING ROOM LABEL IF
LOCATED ON PORTION OF FRAME TO BE PAINTED. VA TO REAPPLY THE NEW
LABELS AFTER PAINTING OF SPACE IS COMPLETED. LABELS PLACED ON
HINGES ARE TO REMAIN.
• ALL HOLLOW METAL DOOR FRAMES TO BE PAINTED:
IF INTERIOR ROOM FINISH MATCHES CORRIDOR - PAINT THE WHOLE FRAME
IF INTERIOR ROOM FINISH IS DIFFERENT FROM CORRIDOR - MASK OFF AND
PAINT THE CORRIDOR SIDE ONLY
• SMOKE DOOR FRAMES AT CORRIDORS TO BE PAINTED.
• CONTRACTOR TO MASK OFF AND PAINT AROUND ALL EXISTING HARDWARE.
• METAL FRAME SERVICE WINDOWS TO BE PAINTED.
• ALUMINUM ENTRANCE FRAMES AND ALUMINUM WINDOW FRAMES ARE
EXCLUDED (DO NOT PAINT)
• DOOR FRAMES COVERED WITH ACROVYN ARE EXCLUDED (DO NOT PAINT).
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
BLDG 01 - 1ST FLOOR -
PART D - PHASE 1
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-4
503-17-101
170704D
SCALE: 1/8" = 1'-0"1-1-4
1 EXIST 1ST FLOOR - PART D
SCALE: 1/8" = 1'-0"
4'-0" 8'-0"0 16'-0"
PLAN NORTH
TRUE NORTH
ROOM FINISH SCHEDULE - 1ST FLOOR - PART D
ROOM NAME
ROOM
NUMBER
WALL FINISHES
COMMENTSNORTH EAST SOUTH WEST
CORRIDOR 101 P-1/ P-2 P-1/ P-2 P-1/ P-2 P-1/ P-2 REFER TO DRAWING FOR ACCENT WALL
LOCATIONS
CORRIDOR 116 P-1 P-1 P-1 P-1
LINEAR FEET 1ST D
ROOM NAME ROOM NUMBER PERIMETER
CORRIDOR 101 284'-9 3/8"
CORRIDOR 116 50'-9 1/4"
APPROXIMATE 335'-6 5/8"
FIRST FLOOR - PHASE 1
SEQUENCE: 8
FIRST FLOOR SEQUENCE 8: 27 DOORS OF VARIOUS SIZES.
CORRIDOR
A-1C
CORRIDOR
A-1A
CORRIDOR
A-1B
EXAM
EXAM
Room
Room
OFFICE
179G
EXAM RM
179F
EXAM RM
179D
EXAM RM
179C
Room 179B
EXAM RM
179A
SCIC EXAM
CLOSET
CLEAN STOR.
MEDS
EXAM-2
EXAM-3
EXAM-4
EXAM-5
SOCIAL WK
EXAM
Room
ELEC
EXAM
OFFICE
EXAM
CLEAN STOR
TLT
197C
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
ENLARGED PLAN - FIRST
FLOOR - SEQUENCE 1
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-5
503-17-101
170704D
SCALE: 1/4" = 1'-0"1-1-5
1 ENLARGED PLAN - FIRST FLOOR SEQUENCE 1
PLAN NORTH
TRUE NORTHSCALE: 1/4" = 1'-0"
2'-0" 4'-0"0 8'-0"FIRST FLOOR - PHASE 1
SEQUENCE: 1
REFERENCE SHEET 1-1-1 FOR APPROXIMATE DOOR COUNT
A-1V
CORRIDOR
A-1R
CORRIDOR WAITING
A-1W
HAC
Room
ELEC
ARMORY
POLICE
OPERATOR
A106B
VIC/ENROLLMENT
A106D
ROI
A106FF
ROI OFF.
A106E
INTERVIEW
A108
ON-CALL
A107
CLOSET
193A
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024WALLPAPER
HANDRAIL
ACROVYN WAINSCOT 46"
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
*̂ = TELEVISION
= WINDOW/ CHECKOUT
CORRIDOR WAITING
A-1W
CORRIDOR
A-1U
CORRIDOR WAITING
A
A-1WW
OFFICE
179G
RX PICKUP
A-1X
HAC
CHECKOUT
172F
EXISTING TILE
AT THIS WALL,
NOT TO BE
PAINTED
P-2
P-2
P-2
P-2
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
ENLARGED PLAN - FIRST
FLOOR - SEQUENCES 2 & 3
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-6
503-17-101
170704D
SCALE: 1/4" = 1'-0"1-1-6
2 ENLARGED PLAN - FIRST FLOOR SEQUENCE 3
PLAN NORTH
TRUE NORTHSCALE: 1/4" = 1'-0"
2'-0" 4'-0"0 8'-0"
SCALE: 1/4" = 1'-0"1-1-6
1 ENLARGED PLAN - FIRST FLOOR SEQUENCE 2
FIRST FLOOR - PHASE 1
SEQUENCES: 2 & 3
REFERENCE SHEET 1-1-2 FOR APPROXIMATE DOOR COUNT
A-1T
CLERKS
A121
MED RM
A125
SU
A126
UTILITY
A124
EXAM RM
A127
EXAM RM
A131
EXAM RM
A132
EXAM RM
A134
EXAM RM
A133
EXAM RM
A135
EXAM RM
A136
EXAM RM
A137
OFFICE
A115
OFFICE
A116
WAITING
B102
P-2P-2
P-2
P-2 P-2
P-2
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
CORRIDOR
A-1I
CORRIDOR
A-1L
CLERK
SEC
SUPERVISOR
CONSULT
156A
STAIR
S101
COMP & PENSION
OFFICE
RCDS
193J
RCDS
193I
WAITING
A117
OFFICE
195C
OFFICE
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
ENLARGED PLAN - FIRST
FLOOR - SEQUENCES 4 & 5
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-7
503-17-101
170704D
SCALE: 1/4" = 1'-0"1-1-7
1 ENLARGED PLAN - FIRST FLOOR SEQUENCE 4
PLAN NORTH
TRUE NORTHSCALE: 1/4" = 1'-0"
2'-0" 4'-0"0 8'-0"
SCALE: 1/4" = 1'-0"1-1-7
2 ENLARGED PLAN - FIRST FLOOR SEQUENCE 5
FIRST FLOOR - PHASE 1
SEQUENCES: 4 & 5
REFERENCE SHEET 1-1-2 FOR APPROXIMATE DOOR COUNT
ELEVATOR
P-2
CORRIDOR
A-1H
STAIR
S102
CLERK
CLERK
CORRIDOR
A-1G
CASHIER
BILLING OFFICE
198 TLT
197B
TLT
TLT
CORRIDOR
A-1O
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
CORRIDOR
A-1D
CORRIDOR
A-1E
CORRIDOR
A-1F
OFFICE
OP. MAN. OFFICE
121A
OFFICE
EXAM
116A
RESP
CLOSET
117C
CLERK/HBA
OFFICE
RESP
118A
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
ENLARGED PLAN - FIRST
FLOOR - SEQUENCES 6 & 7
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-8
503-17-101
170704D
SCALE: 1/4" = 1'-0"1-1-8
1 ENLARGED PLAN - FIRST FLOOR SEQUENCE 6
PLAN NORTH
TRUE NORTHSCALE: 1/4" = 1'-0"
2'-0" 4'-0"0 8'-0"
SCALE: 1/4" = 1'-0"1-1-8
2 ENLARGED PLAN - FIRST FLOOR SEQUENCE 7
FIRST FLOOR - PHASE 1
SEQUENCES: 6 & 7
REFERENCE SHEET 1-1-3 FOR APPROXIMATE DOOR COUNT
CORRIDOR
CORRIDOR
STAIR
S103
CLERK/HBA
100A
CLERK/HBA
EXAM
116A
EXAM
116B
EXAM
116D
TLT
115A
TLT
WAITING ROOM
NURSE
113B
EXAM ROOM
EXAM ROOM
AUDIO CLINIC
AUDIOLOGY
OFFICE
OFFICE
SURGERY
CORRIDOR
CORRIDOR
A-1D
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
P-2
CORRIDOR
A-1O
CHIEF OF RADIOLOGY
OFFICE
145A
TECH STAFF ASSM.
AREA
145B
RADIOLOGY WAITING
ROOM
CL
148F
OFFICE
CORRIDOR
A-1H
CORRIDOR
A-1G
CORRIDOR
A-1Q
XRAY
CAD AREA
XRAY
CORRIDOR
A-1M
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
ENLARGED PLAN - FIRST
FLOOR - SEQUENCES 8 & 9
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-9
503-17-101
170704DSCALE: 1/4" = 1'-0"1-1-9
1 ENLARGED PLAN - FIRST FLOOR SEQUENCE 8
PLAN NORTH
TRUE NORTHSCALE: 1/4" = 1'-0"
2'-0" 4'-0"0 8'-0"FIRST FLOOR - PHASE 1
SEQUENCES: 8 & 9
SCALE: 1/4" = 1'-0"1-1-9
2 ENLARGED PLAN - FIRST FLOOR SEQUENCE 9
REFERENCE SHEETS 1-1-3 & 1-1-4 FOR APPROXIMATE DOOR COUNT
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
P-
CORRIDOR
A-1Q
CORRIDOR
A-1P
TLT
131A
STOR
130A
ELEC
130B
MEDS
131K
PREP ROOM
131I
CHN ROOM
190E
MRI EQUIPMENT
ROOM
CONTROL RM
131G
MRI ROOM
190C
MRI CONTROL ROOM
190D
XRAY
MALE DRS. RM
128A
FEM. DRS. RM
128B
XRAY
INPATIENT
LITTER/WAITING
AREA
INPATIENT
LITTER/WAITING
AREA
129A
ULTRASOUND
129B XRAY
XRAY
CAT SCAN
EC
CORRIDOR
A-1M
CORRIDOR
A-1N
MORGUE
STAIR
S100
OFFICE
Room
XRAY
CHIEF OF RADIOLOGY
WOMENS LOCKER
ROOM
144A
STORAGE
VETERANS BEN.
141L
PAT. CLOTHING
Room 141D
LAUNDRY
141A
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
ENLARGED PLAN - FIRST
FLOOR - SEQUENCES 10 &
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-1-10
503-17-101
170704D
PLAN NORTH
TRUE NORTHSCALE: 1/4" = 1'-0"
2'-0" 4'-0"0 8'-0"FIRST FLOOR - PHASE 1
SEQUENCES: 10 & 11
SCALE: 1/4" = 1'-0"1-1-10
1 ENLARGED PLAN - FIRST FLOOR SEQUENCE 10
SCALE: 1/4" = 1'-0"1-1-10
2 ENLARGED PLAN - FIRST FLOOR SEQUENCE 11
REFERENCE SHEET 1-1-3 FOR APPROXIMATE DOOR COUNT
STAIR
S302
WAITING
NURSING
EXAM ROOM
SOILED LINEN
EYE TECH
EYE
GU
HAC
MECHANICAL ROOM
WAITING ROOM
NEURO EXAM
CLOSET
EYE CLINIC
EYE TECH
NURSING
EXAM ROOM
EXAM ROOM
NURSING
TEL CLOSET
ELEC. CLOSET
TLT
STORAGE
SEC SURG SVC
LOBBY
386A
WAITING
316A
Room 322A
EYE EXAM
321A
STORAGE
319A
STAIR
S300
ELEVATOR
EQUIPMENT
332A
NURSING
333 CHECK OUT
335A
SECRETARY
335B
CORRIDOR
386B
CHIEF MED SERVICE
342C
OFFICE SURGERY
SERVICE
342B
TEL CLOSET
342D
CHIEF SURG SVC
342A
M
AT
C H
LI
N
E
PA
R T
A
M
AT
C H
LI
N
E
PA
R T
B
NURSE TRIAGE
NURSE TRIAGE
PODIATRY
CORRIDOR
307A
NURSE TRIAGE
NURSE TRIAGE
NEUROLOGY
PULMONOLOGY
314H
GYNECOLOGY
314G
GYNECOLOGY
314E
GENERAL SURGERY
314D
GENERAL SURGERY
314C
WAITING ROOM
TOILET
SUPPLY CLOSET
CLERICAL STAFF
300A
EXAM ROOM
CARDIOLOGY
TOILET
305A
PODIATRY
TOILET
308A
UROLOGY
BREAK ROOM
STAIR
S303
CORRIDOR
302A
CORRIDOR
310A
UROLOGY
TOILET
312A
TOILET/ CHANGING
ROOM
314F
TOILET
314B
CORRIDOR
315A
DIRTY ROOM
314A
FOUNTAIN
& TILE
CORRIDOR
301B
CORRIDOR
301A
CORRIDOR
301C
P- 1/
P -2
1-3-2
1THIRD FLOOR - PHASE 2
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
HINGE SIDE
CORRIDOR
PAINT TO MATCH CORRIDOR
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
HINGE SIDE
OFFICE
AS CORRIDOR SIDE
PAINT ONLY IF SAME COLOR
PAINT TO MATCH CORRIDOR
MASKING POINT MASKING POINT
OUTSWING
DOOR
INSWING
DOORDOOR FRAME
DOOR PANEL
DOOR FRAME
DOOR PANEL
DOOR FRAME PAINTING NOTES
• ONLY DOOR FRAMES WITHIN THE SCOPE OF WORK ARE TO BE PAINTED.
• CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING ROOM LABEL IF
LOCATED ON PORTION OF FRAME TO BE PAINTED. VA TO REAPPLY THE NEW
LABELS AFTER PAINTING OF SPACE IS COMPLETED. LABELS PLACED ON
HINGES ARE TO REMAIN.
• ALL HOLLOW METAL DOOR FRAMES TO BE PAINTED:
IF INTERIOR ROOM FINISH MATCHES CORRIDOR - PAINT THE WHOLE FRAME
IF INTERIOR ROOM FINISH IS DIFFERENT FROM CORRIDOR - MASK OFF AND
PAINT THE CORRIDOR SIDE ONLY
• SMOKE DOOR FRAMES AT CORRIDORS TO BE PAINTED.
• CONTRACTOR TO MASK OFF AND PAINT AROUND ALL EXISTING HARDWARE.
• METAL FRAME SERVICE WINDOWS TO BE PAINTED.
• ALUMINUM ENTRANCE FRAMES AND ALUMINUM WINDOW FRAMES ARE
EXCLUDED (DO NOT PAINT)
• DOOR FRAMES COVERED WITH ACROVYN ARE EXCLUDED (DO NOT PAINT).
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
BLDG 01 - PARTIAL 3RD
FLOOR PLAN - PHASE 2
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-3-1
503-17-101
170704D
SCALE: 1/8" = 1'-0"
4'-0" 8'-0"0 16'-0"
PLAN NORTH
TRUE NORTH
SCALE: 1/8" = 1'-0"1-3-1
1 EXIST 3RD FLOOR - PART A
ROOM FINISH SCHEDULE - 3RD FLOOR
ROOM NAME ROOM NUMBER
WALL FINISHES
CommentsNORTH EAST SOUTH WEST
CORRIDOR 301A N/A P-1/ P-2 N/A P-1/ P-2
CORRIDOR 301B P-1/ P-2 P-1/ P-2 P-1/ P-2 P-1/ P-2
CORRIDOR 301C P-1 P-1 P-1 P-1/ P-2 NO PAINT WHERE TILE EXISTS
LOBBY 386A P-1 P-1/ P-2 P-2 P-2
LINEAR FEET 3RD
ROOM NAME ROOM NUMBER PERIMETER
CORRIDOR 301A 49'-8 1/4"
CORRIDOR 301B 84'-2"
CORRIDOR 301C 69'-11 1/2"
LOBBY 386A 90'-5 3/8"
APPROXIMATE 294'-3 1/8"
THIRD FLOOR - PHASE 2
NO SEQUENCING
THIRD FLOOR: 10 DOORS OF VARIOUS SIZES.
P- 1/
P -2
CORRIDOR
301A
CORRIDOR
301B
WAITING
CORRIDOR
386B
CHECK OUT
335A
NURSING
SECRETARY
335B
STORAGE
TLT
ELEC. CLOSET
TEL CLOSET
STAIR
S302
CORRIDOR
315A
CORRIDOR
301C
LOBBY
386A
FINISH KEY
P-1 SATIN - SHERWIN WILLIAMS - HERON PLUME SW6070
P-2 SATIN - SHERWIN WILLIAMS - POPULAR GRAY SW6071
GENERAL NOTES:
1) WHERE PAINT IS LISTED AS P-1/ P-2.
P-1 IS TO BE ABOVE THE HANDRAIL AND
P-2 IS TO BE BELOW THE HANDRAIL
2) P-3 IS TO BE DOOR FRAMES.
3) PLEASE REFER TO DRAWINGS FOR PAINT COLOR
CLARIFICATION OF SOME AREAS WHERE NO HANDRAILS
EXIST.
4) CORRIDOR LABELS ARE FOR PURPOSES OF THIS PROJECT
ONLY; WHERE NO LABELS CURRENTLY EXIST.
5) ALL WALLS SHALL BE PATCHED AS NEEDED, SANDED AND
PREPARED FOR NEW WALL FINISH.
6) AREAS WHERE WALLPAPER IS REMOVED TO BE SKIM-
COATED AND SANDED.
7) ALL SANDING MUST BE PERFORMED WITH A SANDER WITH
AN INCLUDED VACUUM, AND A SEPARATE HEPA VACUUM
OPERATING AND IMMEDIATELY FOLLOWING THE SANDING
EQUIPMENT.
8) WALLPAPER IS TO BE WETTED AND REMOVED WET.
9) ALL WORK IS TO BE COMPLETED BETWEEN THE HOURS OF
4:30pm - 5:00am.
P-3 SATIN - SHERWIN WILLIAMS - FUNCTIONAL GRAY SW7024
WALLPAPER
HANDRAIL
ACROVYN
WALL CONDITION LEGEND
PAINT
AREAS NOT INCLUDED IN SCOPE OF WORK
Project Title
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
Drawing Title Date
Project No.
Drawing No.
Dwg. Of
Approved: Associate Director for Operations:
Approved: Director, Medical Center:
Drawn:Building No: Checked:
Location:
Additions:
Revisions:
1 5 6 7 8
21 3 4 5 6 7 8
A B
C D
E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot
DELLC
JOB No.
JAMES E. VAN ZANDT
VETERANS ADMINISTRATION
MEDICAL CENTER
2 3 4
Consultants:Date
Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009
ARCHITECTURE
PLANNING
ENGINEERING
100% BID DOCUMENTS SUBMISSION
FULLY SPRINKLERED
BUILDING COST CONSULTANTS
COST ESTIMATING
12917 - 30TH AVENUE
PLATTSMOUTH, NEBRASKA 68048
402.298.8260 - FAX 402.298.8290
ENLARGED PLAN - THIRD
FLOOR - PHASE 2
PAINT WALLS
CDP/ CAJ WFPH/ DGW
ALTOONA, PA
04 /10 /18
1-3-2
503-17-101
170704D
PLAN NORTH
TRUE NORTHSCALE: 1/4" = 1'-0"
2'-0" 4'-0"0 8'-0"THIRD FLOOR - PHASE 2
NO SEQUENCING
SCALE: 1/4" = 1'-0"1-3-2
1 ENLARGED PLAN -THIRD FLOOR - PHASE 2
REFERENCE SHEET 1-3-1 FOR APPROXIMATE DOOR COUNT
| 001 VA ALTOONA - PAINT WALLS - C-X-1 - COVER SHEET |
| Sheets |
| C-X-1 - COVER SHEET |
| 002 VA ALTOONA - PAINT WALLS - C-X-2 - SYMBOLS AND ABBREVIATIONS |
| Sheets |
| C-X-2 - SYMBOLS AND ABBREVIATIONS |
| 003 VA ALTOONA - PAINT WALLS - C-X-3 - EXISTING ALTOONA CAMPUS PLAN |
| Sheets |
| C-X-3 - EXISTING ALTOONA CAMPUS PLAN |
| 004 VA ALTOONA - PAINT WALLS - 1-1-1 - BLDG 01 - 1ST FLOOR - PART A - PHASE 1 Seq 1 |
| Sheets |
| 1-1-1 - BLDG 01 - 1ST FLOOR - PART A - PHASE 1 |
| 005 VA ALTOONA - PAINT WALLS - 1-1-2 - BLDG 01 - 1ST FLOOR - PART B - PHASE 1 Seq 2-5 |
| Sheets |
| 1-1-2 - BLDG 01 - 1ST FLOOR - PART B - PHASE 1 |
| 006 VA ALTOONA - PAINT WALLS - 1-1-3 - BLDG 01 - 1ST FLOOR - PART C - PHASE 1 Seq 6,7,9,10,11 |
| Sheets |
| 1-1-3 - BLDG 01 - 1ST FLOOR - PART C - PHASE 1 |
| 007 VA ALTOONA - PAINT WALLS - 1-1-4 - BLDG 01 - 1ST FLOOR - PART D - PHASE 1 Seq 8 |
| Sheets |
| 1-1-4 - BLDG 01 - 1ST FLOOR - PART D - PHASE 1 |
| 008 VA ALTOONA - PAINT WALLS - 1-1-5 - ENLARGED PLAN - FIRST FLOOR - SEQUENCE 1 |
| Sheets |
| 1-1-5 - ENLARGED PLAN - FIRST FLOOR - SEQUENCE 1 |
| 009 VA ALTOONA - PAINT WALLS - 1-1-6 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 2 & 3 |
| Sheets |
| 1-1-6 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 2 & 3 |
| 010 VA ALTOONA - PAINT WALLS - 1-1-7 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 4 & 5 |
| Sheets |
| 1-1-7 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 4 & 5 |
| 011 VA ALTOONA - PAINT WALLS - 1-1-8 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 6 & 7 |
| Sheets |
| 1-1-8 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 6 & 7 |
| 012 VA ALTOONA - PAINT WALLS - 1-1-9 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 8 & 9 |
| Sheets |
| 1-1-9 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 8 & 9 |
| 013 VA ALTOONA - PAINT WALLS - 1-1-10 - ENLARGED PLAN - FIRST FL - SEQUENCES 10 & 11 |
| Sheets |
| 1-1-10 - ENLARGED PLAN - FIRST FLOOR - SEQUENCES 10 & 11 |
| 014 VA ALTOONA - PAINT WALLS - 1-3-1 - BLDG 01 - PARTIAL 3RD FLOOR PLAN - PHASE 2 |
| Sheets |
| 1-3-1 - BLDG 01 - PARTIAL 3RD FLOOR PLAN - PHASE 2 |
| 015 VA ALTOONA - PAINT WALLS - 1-3-2 - ENLARGED PLAN - THIRD FLOOR - PHASE 2 |
| Sheets |
| 1-3-2 - ENLARGED PLAN - THIRD FLOOR - PHASE 2 |
File details come from the government source that posted it.