36C24418B0596-0001009.pdf
PDF 58 KB Posted
- Attached to
- Bldg 1 3rd Floor OR Chiller replacement Federal contract opportunity
- Solicitation number
- 36C24418B0596
About this file
36C24418B0596 0001 RFIs and ANSWERS.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24418C0259-000.docx | DOCX document | |
| 36C24418B0596-0001008.pdf | ||
| 36C24418B0596-0001003.pdf | ||
| 36C24418B0596-0001002.pdf | ||
| 36C24418B0596-0001004.pdf | ||
| 36C24418B0596-0001007.pdf | ||
| 36C24418B0596-0001006.pdf | ||
| 36C24418B0596-0001005.pdf | ||
| 36C24418B0596-0001000.docx | DOCX document | |
| 36C24418B0596-0001001.pdf | ||
| 36C24418B0596-002.pdf | ||
| 36C24418B0596-001.docx | DOCX document | |
| 36C24418B0596-003.pdf | ||
| 36C24418B0596-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFIs and ANSWERES
Q1. Six drawings were provided in Addendum 1, however, drawing G001 includes a drawing index and it looks like drawings MD101, M101, and M501 were not provided. Please indicate whether the drawing index is incorrect or please provide the missing drawings.
A1. MD101, M101 and M501 are not needed.
Q2. Per on site conversation yesterday, please provide the allowable rep for the work associated with controls.
A2. Modern Controls is the local JCI representative- John Anderson, phone 302-325-6800
Q3. If in fact, the new chiller is not the exact size and weight of the existing chiller, to what extent will the GC own any engineering design, calculations, drawings, etc. for the steel modifications?
A3. All be done by change order.
Q4. Will a revised bid form be issued that will include a line item for the requested “equipment and steel cost changes”, if necessary, per item 5.c.i. in the SOW?
A4. Yes
Q5. I believe it was mentioned during the site visit that during the time that the existing chiller is off-line and prior to the installation of the new chiller the system would be tied into the central plant. Can you provide more information regarding this step of the project?
A5. Existing cross connect
Q6. We need to make provisions for new/relocated lightning protection for the new chiller?
A6. Contractor will relocate.
Q7. The following drawings appear to be missing from those issued in Amendment 0001: MD101, M101 & M501.
A7. MD101, M101 and M501 are not needed.