36C24418B0596-0001009.pdf

PDF 58 KB Posted

Attached to
Bldg 1 3rd Floor OR Chiller replacement Federal contract opportunity
Solicitation number
36C24418B0596
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24418B0596 0001 RFIs and ANSWERS.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Bldg 1 3rd Floor OR Chiller replacement, newest first.
File Type Posted
36C24418C0259-000.docx DOCX document
36C24418B0596-0001008.pdf PDF
36C24418B0596-0001003.pdf PDF
36C24418B0596-0001002.pdf PDF
36C24418B0596-0001004.pdf PDF
36C24418B0596-0001007.pdf PDF
36C24418B0596-0001006.pdf PDF
36C24418B0596-0001005.pdf PDF
36C24418B0596-0001000.docx DOCX document
36C24418B0596-0001001.pdf PDF
36C24418B0596-002.pdf PDF
36C24418B0596-001.docx DOCX document
36C24418B0596-003.pdf PDF
36C24418B0596-000.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs and ANSWERES

Q1. Six drawings were provided in Addendum 1, however, drawing G001 includes a drawing index and it looks like drawings MD101, M101, and M501 were not provided. Please indicate whether the drawing index is incorrect or please provide the missing drawings.

A1. MD101, M101 and M501 are not needed.

Q2. Per on site conversation yesterday, please provide the allowable rep for the work associated with controls.

A2. Modern Controls is the local JCI representative- John Anderson, phone 302-325-6800

Q3. If in fact, the new chiller is not the exact size and weight of the existing chiller, to what extent will the GC own any engineering design, calculations, drawings, etc. for the steel modifications?

A3. All be done by change order.

Q4. Will a revised bid form be issued that will include a line item for the requested “equipment and steel cost changes”, if necessary, per item 5.c.i. in the SOW?

A4. Yes

Q5. I believe it was mentioned during the site visit that during the time that the existing chiller is off-line and prior to the installation of the new chiller the system would be tied into the central plant. Can you provide more information regarding this step of the project?

A5. Existing cross connect

Q6. We need to make provisions for new/relocated lightning protection for the new chiller?

A6. Contractor will relocate.

Q7. The following drawings appear to be missing from those issued in Amendment 0001: MD101, M101 & M501.

A7. MD101, M101 and M501 are not needed.

File details come from the government source that posted it.