36C24418B0458-A0001007.pdf
PDF 96 KB Posted
- Attached to
- Remove UST 3-4-5 at Building 7 Project 529-17-101 Federal contract opportunity
- Solicitation number
- 36C24418B0458
About this file
36C24418B0458 A0001 S05 UST questions and answers A00001.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24418C0269-000.docx | DOCX document | |
| 36C24418B0458-A0001000.docx | DOCX document | |
| 36C24418B0458-A0001006.pdf | ||
| 36C24418B0458-A0001001.pdf | ||
| 36C24418B0458-A0001002.pdf | ||
| 36C24418B0458-A0001004.pdf | ||
| 36C24418B0458-A0001005.pdf | ||
| 36C24418B0458-A0001003.pdf | ||
| 36C24418B0458-004.pdf | ||
| 36C24418B0458-006.pdf | ||
| 36C24418B0458-001.docx | DOCX document | |
| 36C24418B0458-003.pdf | ||
| 36C24418B0458-002.pdf | ||
| 36C24418B0458-005.pdf | ||
| 36C24418B0458-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q1 Wednesday, August 22, 2018 Firm is very interested in bidding the storage tank removal project #36C24418B0458.
We missed the site visit, would we be able to come visit the site?
A1 Only one site visit was scheduled for this project (Tuesday August 22, 2018): we do not anticipate any additional site visits, please monitor FBO.gov for updates.
Q2 Bldg. 7- Fuel Availability: During the replacement of the piping sump, the bldg. will be without fuel for 2 - 3 days.
Is this acceptable? If other provisions must be made by contractor during this period, please specify.
Q4 Bldg. 99 - Temporary Tank Fuel: Is the supply of fuel for the temporary tank the responsibility of the contractor?
Who supplies the fuel for the temporary tank?
A4 The intent of the contract documents is for the contractor to provide both the temporary fuel oil tank and fuel oil.
Q5 Bldg. 99 - New Supply Piping: For the new supply piping run, a transition sump model # APT-2922 is specified.
This is the same model that is being removed and replaced at Bldg. 7. Should this transition sump be the same model OPW PTS 4021 being installed there?
A2 Fuel oil is currently supplied to building 7 by UST 1 and 2. Yes acceptable to be without fuel for 2-3 days.
Q3 Bldg. 7 - Steel Piping: Can we thread the steel piping above the transition sump?
A3 Section 2.5 in spec. 231000-12. Threaded joints prohibited except at valves, unions and tank connections.
A5 Yes, this should be the OPW model since it provides access into the sump.
Q6 Bldg. 99 - Fuel Supply: Who supplies fuel for the new tank at Building 99? If contractor, please provide estimated qty/allowance.
A6 Provide 500 gallons.
A0001
Q7
A7
Q8
Q10
A10
Q11
A8
Q9
A9
Q13
A13
A11
Q12
A12
Q17
Q18
Q19
Q20
Q21
Q22
Q14
Q16
A16
A17
A14
Q15
A15
A20
A21
A18
A19
A22
Q23
Q27
Q28
Q29
Q30
Q24
A24
Q25
A23
A27
A28
A25
A26
A31
A29
A30
Q31
Q26
Q33
Q34
Q35
Q39
Q32
A32
A35
Q36
A36
A33
A34
A39
Q37
A37
Q38
A38
Q42
Q43
Q40
A45
Q44
A44
Q45
A42
A43
A40
Q41
A41