Remove UST 3-4-5 at Building 7 Project 529-17-101 Federal contract opportunity
Solicitation number
36C24418B0458
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24418B0458 A0001 S05 UST questions and answers A00001.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Remove UST 3-4-5 at Building 7 Project 529-17-101, newest first.
File Type Posted
36C24418C0269-000.docx DOCX document
36C24418B0458-A0001000.docx DOCX document
36C24418B0458-A0001006.pdf PDF
36C24418B0458-A0001001.pdf PDF
36C24418B0458-A0001002.pdf PDF
36C24418B0458-A0001004.pdf PDF
36C24418B0458-A0001005.pdf PDF
36C24418B0458-A0001003.pdf PDF
36C24418B0458-004.pdf PDF
36C24418B0458-006.pdf PDF
36C24418B0458-001.docx DOCX document
36C24418B0458-003.pdf PDF
36C24418B0458-002.pdf PDF
36C24418B0458-005.pdf PDF
36C24418B0458-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1 Wednesday, August 22, 2018 Firm is very interested in bidding the storage tank removal project #36C24418B0458.

We missed the site visit, would we be able to come visit the site?

A1 Only one site visit was scheduled for this project (Tuesday August 22, 2018): we do not anticipate any additional site visits, please monitor FBO.gov for updates.

Q2 Bldg. 7- Fuel Availability: During the replacement of the piping sump, the bldg. will be without fuel for 2 - 3 days.

Is this acceptable? If other provisions must be made by contractor during this period, please specify.

Q4 Bldg. 99 - Temporary Tank Fuel: Is the supply of fuel for the temporary tank the responsibility of the contractor?

Who supplies the fuel for the temporary tank?

A4 The intent of the contract documents is for the contractor to provide both the temporary fuel oil tank and fuel oil.

Q5 Bldg. 99 - New Supply Piping: For the new supply piping run, a transition sump model # APT-2922 is specified.

This is the same model that is being removed and replaced at Bldg. 7. Should this transition sump be the same model OPW PTS 4021 being installed there?

A2 Fuel oil is currently supplied to building 7 by UST 1 and 2. Yes acceptable to be without fuel for 2-3 days.

Q3 Bldg. 7 - Steel Piping: Can we thread the steel piping above the transition sump?

A3 Section 2.5 in spec. 231000-12. Threaded joints prohibited except at valves, unions and tank connections.

A5 Yes, this should be the OPW model since it provides access into the sump.

Q6 Bldg. 99 - Fuel Supply: Who supplies fuel for the new tank at Building 99? If contractor, please provide estimated qty/allowance.

A6 Provide 500 gallons.

A0001

Q7

A7

Q8

Q10

A10

Q11

A8

Q9

A9

Q13

A13

A11

Q12

A12

Q17

Q18

Q19

Q20

Q21

Q22

Q14

Q16

A16

A17

A14

Q15

A15

A20

A21

A18

A19

A22

Q23

Q27

Q28

Q29

Q30

Q24

A24

Q25

A23

A27

A28

A25

A26

A31

A29

A30

Q31

Q26

Q33

Q34

Q35

Q39

Q32

A32

A35

Q36

A36

A33

A34

A39

Q37

A37

Q38

A38

Q42

Q43

Q40

A45

Q44

A44

Q45

A42

A43

A40

Q41

A41

AUG 23

File details come from the government source that posted it.