36C24221B0024.docx
DOCX document 23 KB Posted
- Attached to
- Y1DA--MRI Replacement Site Prep at Castle Point Campus Federal contract opportunity
- Solicitation number
- 36C24221B0024
About this file
This document provides a pre-solicitation notice for solicitation number 36C24221B0024 for site preparation services related to an MRI replacement project at the Castle Point Campus of the VA Hudson Valley Health Care System in Wappingers Falls, New York. The pre-solicitation notice describes a Service Disabled Veteran Owned Small Business set-aside for furnishing all labor, materials, equipment, supervision and personnel necessary to prepare the site. Specific scope of work includes demolition, roofing alterations, electrical and mechanical work including new split-systems, lighting fixtures, ductwork and controls. The response due date is March 31, 2021 and the period of performance is 360 calendar days from notice to proceed. The solicitation posting date is estimated to be February 22, 2021 on beta.SAM.gov.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Presolicitation Notice
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE
DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
Required Field Contract Opportunity Presolicitation Notice
Y1DA
MRI Replacement Site Prep at Castle Point Campus 10548 36C24221B0024 03-31-2021 10am
EASTERN TIME, NEW YORK, USA
N
SDVOSBC
236220 Department of Veterans Affairs Network Contracting Office 2 Franklin D. Roosevelt VA Medical Center 2094 Albany Post Road Montrose, New York 10548 Contracting Officer Daniel Barone Daniel.Barone@va.gov
(914) 737-4400 x2046 Castle Point VAMC 41 Castle Point Road Wappingers Falls, NY 12590
12590
USA
http://va.gov
VA HOMEPAGE
Daniel.Barone@va.gov Daniel Barone, CO This notice is for Solicitation Number 36C24221B0024, Project Number 620A4-18-217 MRI Site Prep in Building 16, at the VA Hudson Valley Health Care System, Castle Point Campus, 41 Castle Point Road, Wappingers Falls, New York 12590.
This shall be a Service Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. As a result, all SDVOSB's may submit a bid, which will be considered by the agency. This project is classified under NAICS Code 236220 and has a size standard of $39.5 Million. The Magnitude of Construction for this project is between $1,000,000.00 and $2,000,000.00 Scope of Work:
The scope of work shall generally consist of, but not limited to the following:
· The contractor will furnish all materials, equipment, supervision, and personnel necessary to accomplish the site preparation of the MRI replacement at the Castle Point Campus of the Hudson Valley Health Care System. The contractor shall adhere to all accompanying drawings, specifications, and any local and federal codes, regulations, and procedures that apply. Work shall include, but not be limited to, completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Building 16 MRI Replacement as required by drawings and specifications.
· ITEM I, GENERAL CONSTRUCTION, Re-roofing, Fall Protection: Work includes general construction, staging construction area, roofing alterations, walls and other general construction activities for a complete and operable structure.
· ITEM II, Electrical Work: New Split-Systems and Lighting Fixtures: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including but not limited to general lighting and power, equipment power and fire alarm system alterations. Install all wire & cabling, make all connections, terminations, and patch panel connections to all it/phone and control systems to allow a complete commissioning of systems installed or interfacing with this project’s equipment and/or process. Coordinate with VA its department prior to install.
· ITEM III, Mechanical Work: New Split-Systems and New Energy Recovery Ventilator: Work includes all labor, material, equipment and supervision to perform the required mechanical construction work on this project including but not limited new split-systems, new ERV, new split-system controls, ductwork, fire sprinkler system alterations and general demolition.
Project Completion:
360 Calendar Days from Notice to Proceed (NTP).
All other details and information shall be contained in the solicitation which shall be posted on www.beta.sam.gov. The solicitation will be released on or about February 22, 2021. The response submittal address, date and time will be included in the solicitation. This project requires bonding and all responses/submissions to the solicitation to be posted later shall be in hardcopies. Faxed or e-mailed bids will not be accepted. All prospective bidders must be currently registered in www.sam.gov , www.dnb.com (Duns and Bradstreet)and be registered and verified as a Service Disabled Veteran Owned Small Business (SDVOSB) in www.vip.vetbiz.gov at the time of offer submission and before award of this procurement.
End of Description.
File details come from the government source that posted it. Updated .