RFI Replace Valet-Security Shed.pdf
PDF 70 KB Posted
- Attached to
- Y1DA--561-20-112 Replace Valet Booth and Patient Waiting Booth Federal contract opportunity
- Solicitation number
- 36C24220B0042
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24220B0042 0003.docx | DOCX document | |
| S07 Abstract of Offers - Replacement Valet-Security Sheds.pdf | ||
| 36C24220B0042 0002.docx | DOCX document | |
| 36C24220B0042 0001.docx | DOCX document | |
| 36C24220B0042_2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
561-20-112 Replace Valet Booth and Patient Waiting Booth RFI Responses
1. There are two bid dates on the solicitation. In the body of the solicitation it states the bid is due on 7/28/20 and on line 13a it is due on 7/21/20. Please identify which date is correct.
Please see amendment P0001 to original solicitation, date is clarified to reflect 7/28/2020.
2. The bidding documents provide no details as to the basis of design. There are a wide array of possible replacement guard shakes with even greater choices for HVAC tonnage, heat, electrical requirements (outlets, power, lighting) ballistic protection, window tinting, and protective bollards, and intercoms and speakers if desired. Please provide manufacture and details and or cut sheets for what you are looking for at a minimum. As a minimum, we want the same construction as what is existing. Basic number of outlets, lighting, heating & AC to meet the proper size for the structures. The big building needs to have the automatic door as the existing. Also wall mounted unit is preferred to a rooftop unit for prevention of leaks and ease of maintenance.
3. Are spec and/or drawings available for the project? No, existing structures were viewed during the walkthrough. This is a one for one replacement.
4. Is there a basis of design, manufacturer for these new booths? Does agency want these booths from any specific manufacturer? No.
5. Do all the new booths need to have State of NJ modular building certification? If required, then price will have significant upcharge. No.
6. Corona virus has affected the production so the lead time for these booths is minimum 110 calendar days therefore requesting to increase the period of performance to a minimum of 120 calendar days or more. CO will provide for this within the final contract award. VA understands delays with COVID-19.
7. Is there a specification doc and drawing to know the size of the window, type of glass, and etc?
No, as a minimum needs to be tempered and if possible insulated glass.
8. For the re-grading around the Patient Waiting Booth will be acceptable to recontour the area around the concrete pad and place weed barrier and ¾” crushed stone around the existing concrete pad? Yes, most feasible way to divert and remove any stormwaters away from the pad area.
9. Can an extension be added to the rain leader on the new Patient Booth in order to direct the water to the parking lot? Yes
10. Will the existing benches inside the patient booth be reused? Yes.