Pre-engineered USP-800 compliant clean room Federal contract opportunity
Solicitation number
36C24218Q9923
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

36C24218Q9923 Work Area Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Pre-engineered USP-800 compliant clean room, newest first.
File Type Posted
36C24218Q9923-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7'

1/

4"

13' - 2"

5' - 0 15/32"

2'

9"

7'

3/

4"

7' - 10"

7' - 7"

Exsisting building wall

Clean Room panel

6'

0"

2' - 9"

7'

2"

N

S

W

E

Drawing Title

Approved: Facility Director , VAHVHCS:

Project Title

Date

Location

Checked

Building(s) Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS: NORTH:Revisions:

Approved: John Cliffe, Facility Chief of Engineering o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

A

97 8654321 10

B

C

D

E

F

G

APPROVED-1

APPROVED-2

APPROVED-3

APPROVED-4 APPROVED-8

APPROVED-7

APPROVED-6

APPROVED-5

1" = 1'-0"

OwnerClean Room Plan Project Number

Issue Date AuthorChecker

Temporary Clean Room

A Enter address hereApprover

Approver

No. Description Date

1" = 1'-0"1 Clean Room

Room Area

205 SF

Negative air

Positive air

Ante Positive air

VHAMORAshayP Polygon

VHAMORAshayP Polygon

VHAMORAshayP Stamp

VHAMORAshayP Stamp

VHAMORAshayP Polygon

N

S

W

E

Drawing Title

Approved: Facility Director , VAHVHCS:

Project Title

Date

Location

Checked

Building(s) Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS: NORTH:Revisions:

Approved: John Cliffe, Facility Chief of Engineering o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

A

97 8654321 10

B

C

D

E

F

G

APPROVED-1

APPROVED-2

APPROVED-3

APPROVED-4 APPROVED-8

APPROVED-7

APPROVED-6

APPROVED-5

OwnerClean Room Plan 3D Project Number

Issue Date AuthorChecker

Temporary Clean Room

B Enter address hereApprover

Approver

No. Description Date

1 3D view 1

2 3D view 2

Sheets
A - Clean Room Plan
B - Clean Room Plan 3D
Project3 - Sheet - A - Clean Room Plan.pdf
Sheets
A - Clean Room Plan
B - Clean Room Plan 3D

File details come from the government source that posted it.