36C24218B0566 S02 Specifications Section 033000- Concrete.doc

View the file

Other files for this federal contract opportunity

Other files attached to 528-18-s60 BUILDING 6 PARKING LOT REPLACEMENT, newest first.
File Type Posted
36C24218C0211-000.docx DOCX document
36C24218B0566-0002000.docx DOCX document
36C24218B0566-0001002.docx DOCX document
36C24218B0566-005.doc DOC document
36C24218B0566-001.docx DOCX document
36C24218B0566-002.doc DOC document
36C24218B0566-003.doc DOC document
36C24218B0566-006.pdf PDF
36C24218B0566-007.pdf PDF
36C24218B0566-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 6 Parking Lot

VA Western New York Healthcare System

3495 Bailey Avenue

Buffalo, New York 14215

528-18-s60

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

PART 1 ‑ GENERAL

1.1 DESCRIPTION:

This section specifies cast‑in‑place structural concrete and materials and mixes for other concrete.

1.2 RELATED WORK:

A.

Materials testing and inspection during construction.

1.3 TESTING AGENCY FOR CONCRETE MIX DESIGN:

A.

Testing agency retained and reimbursed by the Contractor and approved by COR.

B.

Testing agency maintaining active participation in Program of Cement and Concrete Reference Laboratory (CCRL) of National Institute of Standards and Technology.

C.

Testing agency shall furnish equipment and qualified technicians to establish proportions of ingredients for concrete mixes.

1.4 TOLERANCES:

A.

Formwork: ACI 117, except the elevation tolerance of formed surfaces before removal of shores is +0 mm (+0 inch) and -20 mm (-3/4 inch).

B.

Reinforcement Fabricating and Placing: ACI 117, except that fabrication tolerance for bar sizes Nos. 10, 13, and 16 (Nos. 3, 4, and 5) (Tolerance Symbol 1 in Fig. 2.1(a), ACI, 117) used as column ties or stirrups is +0 mm (+0 inch) and -13 mm (-1/2 inch) where gross bar length is less than 3600 mm (12 feet), or +0 mm (+0 inch) and -20 mm (-3/4 inch) where gross bar length is 3600 mm (12 feet) or more.

C.

Cross-Sectional Dimension: ACI 117, except tolerance for thickness of slabs 12 inches or less is +20 mm (+3/4 inch) and - 6 mm (-1/4 inch). Tolerance of thickness of beams more than 300 mm (12 inch) but less than 900 mm (3 feet) is +20 mm (+3/4 inch) and -10 mm (-3/8 inch).

D.

Slab Finishes: ACI 117, Section 4.5.6, F-number method in accordance with ASTM E1155, except as follows:

1.

Test entire slab surface, including those areas within 600 mm (2 feet) of construction joints and vertical elements that project through slab surface.

2.

Maximum elevation change which may occur within 600 mm (2 feet) of any column or wall element is 6 mm (0.25 inches).

3.

Allow sample measurement lines that are perpendicular to construction joints to extend past joint into previous placement no further than 1500 mm (5 feet).

1.5 REGULATORY REQUIREMENTS:

A.

ACI SP-66 – ACI Detailing Manual.

B.

ACI 318 ‑ Building Code Requirements for Reinforced Concrete.

C.

ACI 301 – Standard Specifications for Structural Concrete.

1.6 SUBMITTALS:

A.

Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.

B.

Samples:

1.

Portland cement: 3.5 kg (8 pounds).

2.

Fly ash: 2.25 kg (5 pounds).

C.

Shop Drawings: Reinforcing steel: Complete shop drawings

D.

Mill Test Reports:

1.

Reinforcing Steel.

2.

Cement.

E.

Manufacturer's Certificates:

1.

Abrasive aggregate.

2.

Lightweight aggregate for structural concrete.

3.

Air‑entraining admixture.

4.

Chemical admixtures, including chloride ion content.

5.

Waterproof paper for curing concrete.

6.

Liquid membrane‑forming compounds for curing concrete.

7.

Non‑shrinking grout.

8.

Liquid hardener.

9.

Waterstops.

10.

Expansion joint filler.

11.

Adhesive binder.

F.

Testing Agency for Concrete Mix Design: Approval request including qualifications of principals and technicians and evidence of active participation in program of Cement and Concrete Reference Laboratory (CCRL) of National Institute of Standards and Technology and copy of report of latest CCRL, Inspection of Laboratory.

G.

Test Report for Concrete Mix Designs: Trial mixes including water‑cement ratio curves, concrete mix ingredients, and admixtures.

H.

Test reports on splitting tensile strength (Fct) of lightweight concrete.

1.7 DELIVERY, STORAGE, AND HANDLING:

A.

Conform to ACI 304. Store aggregate separately for each kind or grade, to prevent segregation of sizes and avoid inclusion of dirt and other materials.

1.9 MOCK-UP:

A.

In addition to the other specified samples and tests, construct a mock-up using the materials, reinforcing, forming system and construction methods proposed for use in exposed architectural concrete.

B.

Construct the mock-up with at least a 2.5 m by 2.5 m (8 feet by 8 feet) exposed surface and suitable foundations. Include the following where applicable: Control joints, reglets, recesses or other typical architectural details.

C.

Before casting the mock-up, submit full detailed Shop Drawings of the mock-up formwork for review by the Architect. Perform all necessary preliminary tests to ensure that concrete used for the mock-up will exactly match the approved sample in color and texture.

D.

Perform the surface treatment proposed for use on one or more areas not less than 300 mm by 300 mm (1 foot by 1 foot) on the back side of the mock-up to establish the texture of finish required by the Architect. Repeat as required until a sample satisfactory to the Architect has been obtained.

E.

Treat the finished front surface of the mock-up to produce a uniform appearance similar in every respect to the approved sample area.

F.

The completed mock-up shall be inspected by the Architect. Failure of the mock-up to match the approved sample will require the construction of further mock-ups until approval is obtained. Remove rejected mock-ups immediately.

G.

Maintain the approved mock-ups in good condition at the job site until all architectural concrete surfaces have been completed and approved by the Architect. Remove the mock-up from the site after completion of the above.

1.10 APPLICABLE PUBLICATIONS:

A.

Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.

B.

American Concrete Institute (ACI):

117-06 Tolerances for Concrete Construction and Materials

211.1‑02 Selecting Proportions for Normal, Heavyweight, and Mass Concrete

211.2‑04 Selecting Proportions for Structural Lightweight Concrete

214R‑02 Evaluation of Strength Test Results of Concrete

301-05 Structural Concrete

304R-2000 Guide for Measuring, Mixing, Transporting, and Placing Concrete

305R-06 Hot Weather Concreting

306R-(2002) Cold Weather Concreting

308R-(2001) Standard Practice for Curing Concrete

309R-05 Guide for Consolidation of Concrete

31808 Building Code Requirements for Reinforced Concrete and Commentary

347R-04 Guide to Formwork for Concrete

SP-66-04

ACI Detailing Manual

C.

American National Standards Institute and American Hardboard Association (ANSI/AHA):

A135.4-2004 Basic Hardboard

D.

American Society for Testing and Materials (ASTM):

A82/A82M-07 Steel Wire, Plain, for Concrete Reinforcement

A185/185M‑07 Steel Welded Wire Fabric, Plain, for Concrete Reinforcement

A615/A615M‑08 Deformed and Plain Billet‑Steel Bars for Concrete Reinforcement

A653/A653M-07 Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

A706/A706M-06 Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement

A767/A767M-05 Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement

A775/A775M-07 Epoxy-Coated Reinforcing Steel Bars

A820-06 Steel Fibers for Fiber-Reinforced Concrete

A996/A996M-06 Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement

C31/C31M‑08 Making and Curing Concrete Test Specimens in the field

C33‑07 Concrete Aggregates

C39/C39M‑05 Compressive Strength of Cylindrical Concrete Specimens

C94/C94M‑07 Ready‑Mixed Concrete

C143/C143M‑05 Slump of Hydraulic Cement Concrete

C150‑07 Portland Cement

C171‑07 Sheet Materials for Curing Concrete

C172‑07 Sampling Freshly Mixed Concrete

C173‑07...

Air Content of Freshly Mixed Concrete by the Volumetric Method

C192/C192M‑07 Making and Curing Concrete Test Specimens in the Laboratory

C231‑08 Air Content of Freshly Mixed Concrete by the Pressure Method

C260‑06 Air‑Entraining Admixtures for Concrete

C309‑07 Liquid Membrane‑Forming Compounds for Curing Concrete

C330‑05 Lightweight Aggregates for Structural Concrete

C494/C494M‑08 Chemical Admixtures for Concrete

C496-06 Splitting Tensile Strength of Cylindrical Concrete Specimens

C567-05 Density of Structural Lightweight Concrete

C618‑05 Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Concrete

C666/C666M‑03 Resistance of Concrete to Rapid Freezing and Thawing

C881/C881M-02 Epoxy-Resin-Base Bonding Systems for Concrete

C1107/1107M-07 Packaged Dry, Hydraulic-Cement Grout (Non-shrink)

C1315-08 ………………………………… Liquid Membrane-Forming Compounds Having Special Properties for Curing and Sealing Concrete

D6-95(R2006) Loss on Heating of Oil and Asphaltic Compounds

D297-93(R2006) Rubber Products-Chemical Analysis

D1751‑04 Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types)

D4397-02 Polyethylene Sheeting for Construction, Industrial and Agricultural Applications

E1155-96(R2008) Determining FF Floor Flatness and FL Floor Levelness Numbers

E.

American Welding Society (AWS):

D1.4‑05 Structural Welding Code ‑ Reinforcing Steel

F.

Concrete Reinforcing Steel Institute (CRSI):

Handbook 2008

G.

National Cooperative Highway Research Program (NCHRP):

Report On Concrete Sealers for the Protection of Bridge Structures

H.

U. S. Department of Commerce Product Standard (PS):

PS 1

Construction and Industrial Plywood

PS 20

American Softwood Lumber

I.

U. S. Army Corps of Engineers Handbook for Concrete and Cement:

CRD C513

Rubber Waterstops

CRD C572

Polyvinyl Chloride Waterstops

PART 2 – PRODUCTS:

2.1 FORMS:

A.

Wood: PS 20 free from loose knots and suitable to facilitate finishing concrete surface specified; tongue and grooved.

B.

Plywood: PS-1 Exterior Grade B‑B (concrete‑form) 16 mm (5/8 inch), or 20 mm (3/4 inch) thick for unlined contact form. B-B High Density Concrete Form Overlay optional.

C.

Metal for Concrete Rib‑Type Construction: Steel (removal type) of suitable weight and form to provide required rigidity.

D.

Permanent Steel Form for Concrete Slabs: Corrugated, ASTM A653, Grade E, and Galvanized, ASTM A653, G90. Provide venting where insulating concrete fill is used.

E.

Corrugated Fiberboard Void Boxes: Double faced, completely impregnated with paraffin and laminated with moisture resistant adhesive, size as shown. Design forms to support not less than 48 KPa (1000 psf) and not lose more than 15 percent of their original strength after being completely submerged in water for 24 hours and then air dried.

2.2 MATERIALS:

A.

Portland Cement: ASTM C150 Type I or II.

B.

Fly Ash: ASTM C618, Class C or F including supplementary optional requirements relating to reactive aggregates and alkalies, and loss on ignition (LOI) not to exceed 5 percent.

C.

Coarse Aggregate: ASTM C33.

1.

Size 67 or Size 467 may be used for footings and walls over 300 mm (12 inches) thick.

2.

Coarse aggregate for applied topping, encasement of steel columns, and metal pan stair fill shall be Size 7.

3.

Maximum size of coarse aggregates not more than one‑fifth of narrowest dimension between sides of forms, one‑third of depth of slabs, nor three‑fourth of minimum clear spacing between reinforcing bars.

D.

Lightweight Aggregates for Structural Concrete: ASTM C330, Table 1. Maximum size of aggregate not larger than one‑fifth of narrowest dimension between forms, nor three‑fourth of minimum clear distance between reinforcing bars. Contractor to furnish certified report to verify that aggregate is sound and durable, and has a durability factor of not less than 80 based on 300 cycles of freezing and thawing when tested in accordance with ASTM C666.

E.

Fine Aggregate: ASTM C33. Fine aggregate for applied concrete floor topping shall pass a 4.75 mm (No. 4) sieve, 10 percent maximum shall pass a 150 µm (No. 100) sieve.

F.

Mixing Water: Fresh, clean, and potable.

G.

Admixtures:

1.

Water Reducing Admixture: ASTM C494, Type A and not contain more chloride ions than are present in municipal drinking water.

2.

Water Reducing, Retarding Admixture: ASTM C494, Type D and not contain more chloride ions than are present in municipal drinking water.

3.

High-Range Water-Reducing Admixture (Superplasticizer): ASTM C494, Type F or G, and not contain more chloride ions than are present in municipal drinking water.

4.

Non-Corrosive, Non-Chloride Accelerator: ASTM C494, Type C or E, and not contain more chloride ions than are present in municipal drinking water. Admixture manufacturer must have long-term non-corrosive test data from an independent testing laboratory of at least one year duration using an acceptable accelerated corrosion test method such as that using electrical potential measures.

5.

Air Entraining Admixture: ASTM C260.

6.

Microsilica: Use only with prior review and acceptance of the Resident Engineer. Use only in conjunction with high range water reducer.

7.

Calcium Nitrite corrosion inhibitor: ASTM C494 Type C.

8.

Prohibited Admixtures: Calcium chloride, thiocyanate or admixtures containing more than 0.05 percent chloride ions are not permitted.

9.

Certification: Written conformance to the requirements above and the chloride ion content of the admixture prior to mix design review.

H.

Vapor Barrier: ASTM D4397, 0.25 mm (10 mil).

I.

Reinforcing Steel: ASTM A615, or ASTM A996, deformed, grade as shown.

J.

Welded Wire Fabric: ASTM A185.

SPEC WRITER NOTE: A706 controls the amount of carbon and other elements in order to minimize brittle failures due to crystallization of the base metal.

K.

Reinforcing Bars to be Welded: ASTM A706.

L.

Galvanized Reinforcing Bars: ASTM A767.

M.

Epoxy Coated Reinforcing Bars: ASTM A775.

SPEC WRITER NOTE: A82 is used for spiral ties in columns, particularly in seismic regions.

N.

Cold Drawn Steel Wire: ASTM A82.

O.

Expansion Joint Filler: ASTM D1751.

P.

Sheet Materials for Curing Concrete: ASTM C171.

Q.

Liquid Membrane-forming Compounds for Curing Concrete: ASTM C309, Type I, with fugitive dye. Compound shall be compatible with scheduled surface treatment, such as paint and resilient tile, and shall not discolor concrete surface.

R.

Abrasive Aggregate: Aluminum oxide grains or emery grits.

S.

Liquid Hardener and Dustproofer: Fluosilicate solution of magnesium fluosilicate or zinc fluosilicate. Magnesium and zinc may be used separately or in combination as recommended by manufacturer.

T.

Penetrating Sealer: For use on parking garage ramps and decks. High penetration silane sealer providing minimum 95 percent screening per National Cooperative Highway Research Program (NCHRP) No. 244 standards for chloride ion penetration resistance. Requires moist (non-membrane) curing of slab.

U.

Non-Shrink Grout:

1.

ASTM C1107, pre-mixed, produce a compressive strength of at least 18 MPa at three days and 35 MPa (5000 psi) at 28 days. Furnish test data from an independent laboratory indicating that the grout when placed at a fluid consistency shall achieve 95 percent bearing under a 1200 mm x 1200 mm (4 foot by 4 foot) base plate.

2.

Where high fluidity or increased placing time is required, furnish test data from an independent laboratory indicating that the grout when placed at a fluid consistency shall achieve 95 percent under an 450 mm x 900 mm (18 inch by 36 inch) base plate.

V.

Adhesive Binder: ASTM C881.

1.

Polyvinyl Chloride Waterstop: CRD C572.

2.

Rubber Waterstops: CRD C513.

3.

Bentonite Water Stop: Flexible strip of bentonite 25 mm x 20 mm (1 inch by 3/4 inch), weighing 8.7 kg/m (5.85 lbs. per foot) composed of Butyl Rubber Hydrocarbon (ASTM D297), Bentonite (SS-S-210-A) and Volatile Matter (ASTM D6).

4.

Porous Backfill: Crushed stone or gravel graded from 25 mm to 20 mm (1 inch to 3/4 inch).

5.

Synthetic Fibers: Monofilament or fibrillated polypropylene fibers for secondary reinforcing of concrete members. Use appropriate length and 0.9 kg/m3 (1.5 lb. per cubic yard). Product shall have a UL rating.

6.

Steel Fibers: ASTM A820, Type I cold drawn, high tensile steel wire for use as primary reinforcing in slab-on-grade. Minimum dosage rate 18 kg/m3 (30 lb. per cubic yard).

7.

Epoxy Joint Filler: Two component, 100 percent solids compound, with a minimum shore D hardness of 50.

8.

Bonding Admixture: Non-rewettable, polymer modified, bonding compound.

9.

Architectural Concrete: For areas designated as architectural concrete on the Contract Documents, use colored cements and specially selected aggregates as necessary to produce a concrete of a color and finish which exactly matches the designated sample panel.

2.3 CONCRETE MIXES:

A.

Mix Designs: Proportioned in accordance with Section 5.3, "Proportioning on the Basis of Field Experience and/or Trial Mixtures" of ACI 318.

1.

If trial mixes are used, make a set of at least 6 cylinders in accordance with ASTM C192 for test purposes from each trial mix; test three for compressive strength at 7 days and three at 28 days.

2.

Submit a report of results of each test series, include a detailed listing of the proportions of trial mix or mixes, including cement, admixtures, weight of fine and coarse aggregate per m3 (cubic yard) measured dry rodded and damp loose, specific gravity, fineness modulus, percentage of moisture, air content, water‑cement ratio, and consistency of each cylinder in terms of slump. Include dry unit weight of lightweight structural concrete.

3.

Prepare a curve showing relationship between water‑cement // ‑fly ash// ratio at 7‑day and 28‑day compressive strengths. Plot each curve using at least three specimens.

4.

If the field experience method is used, submit complete standard deviation analysis.

B.

After approval of mixes no substitution in material or change in proportions of approval mixes may be made without additional tests and approval of Resident Engineer or as specified. Making and testing of preliminary test cylinders may be carried on pending approval of cement, providing Contractor and manufacturer certify that ingredients used in making test cylinders are the same. Resident Engineer may allow Contractor to proceed with depositing concrete for certain portions of work, pending final approval of cement and approval of design mix.

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete Strength
Non-Air-Entrained
Air-Entrained

Min. 28 Day Comp. Str.

MPa (psi) Min. Cement kg/m3 (lbs/c. yd)

Max. Water Cement Ratio
Min. Cement

kg/m3 (lbs/c. yd) Max. Water

Cement Ratio

35 (5000)1,3
375 (630)
0.45
385 (650)
0.40
30 (4000)1,3
325 (550)
0.55
340 (570)
0.50
25 (3000)1,3
280 (470)
0.65
290 (490)
0.55
25 (3000)1,2
300 (500)
*
310 (520)
*

1.

If trial mixes are used, the proposed mix design shall achieve a compressive strength 8.3 MPa (1200 psi) in excess of f'c. For concrete strengths above 35 Mpa (5000 psi), the proposed mix design shall achieve a compressive strength 9.7 MPa (1400 psi) in excess of f’c.

2.

Lightweight Structural Concrete. Pump mixes may require higher cement values.

3.

For concrete exposed to high sulfate content soils maximum water cement ratio is 0.44.

Determined by Laboratory in accordance with ACI 211.1 for normal concrete or ACI 211.2 for lightweight structural concrete.

C.

Maximum Slump: Maximum slump, as determined by ASTM C143 with tolerances as established by ASTM C94, for concrete to be vibrated shall be as shown in Table II.

TABLE II ‑ MAXIMUM SLUMP, mm (INCHES)*

Type of Construction
Normal Weight Concrete
Lightweight Structural Concrete
Reinforced Footings and Substructure Walls
75mm (3 inches)
75 mm (3 inches)
Slabs, Beams, Reinforced Walls, and Building Columns
100 mm (4 inches)
100 mm (4 inches)

Slump may be increased by the use of the approved high-range water-reducing admixture (superplasticizer). Tolerances as established by ASTM C94. Concrete containing the high-range-water-reducing admixture may have a maximum slump of 225 mm (9 inches). The concrete shall arrive at the job site at a slump of 50 mm to 75 mm (2 inches to 3 inches), and 75 mm to 100 mm (3 inches to 4 inches) for lightweight concrete. This should be verified, and then the high-range-water-reducing admixture added to increase the slump to the approved level.

D.

Air-Entrainment: Air-entrainment of normal weight concrete shall conform with Table III. Air-entrainment of lightweight structural concrete shall conform with Table IV. Determine air content by either ASTM C173 or ASTM C231.

TABLE III ‑ TOTAL AIR CONTENT

FOR VARIOUS SIZES OF COARSE AGGREGATES (NORMAL CONCRETE)

Nominal Maximum Size of Total Air Content
Coarse Aggregate, mm (Inches) Percentage by Volume
10 mm (3/8 in).6 to 10
13 mm (1/2 in).5 to 9
20 mm (3/4 in).4 to 8
25 mm (1 in).3‑1/2 to 6‑1/2

40 mm (1 1/2 in).3 to 6

TABLE IV

AIR CONTENT OF LIGHTWEIGHT STRUCTURAL CONCRETE

Nominal Maximum size of Total Air Content
Coarse Aggregate, mm’s (Inches) Percentage by Volume
Greater than 10 mm (3/8 in) 4 to 8
10 mm (3/8 in) or less 5 to 9

E.

High early strength concrete, made with Type III cement or Type I cement plus non-corrosive accelerator, shall have a 7-day compressive strength equal to specified minimum 28‑day compressive strength for concrete type specified made with standard Portland cement.

F.

Lightweight structural concrete shall not weigh more than air‑dry unit weight shown. Air‑dry unit weight determined on 150 mm by 300 mm (6 inch by 12 inch) test cylinders after seven days standard moist curing followed by 21 days drying at 23 degrees C ( 1.7 degrees C (73.4 ( 3 degrees Fahrenheit), and 50 (plus or minus 7) percent relative humidity. Use wet unit weight of fresh concrete as basis of control in field.

G.

Concrete slabs placed at air temperatures below 10 degrees C (50 degrees Fahrenheit) use non-corrosive, non-chloride accelerator. Concrete required to be air entrained use approved air entraining admixture. Pumped concrete, synthetic fiber concrete, architectural concrete, concrete required to be watertight, and concrete with a water/cement ratio below 0.50 use high-range water-reducing admixture (superplasticizer).

H.

Durability: Use air entrainment for exterior exposed concrete subjected to freezing and thawing and other concrete shown or specified. Air content as shown in Table III or Table IV.

I.

Enforcing Strength Requirements: Test as specified in Section 01 45 29, TESTING LABORATORY SERVICES, during the progress of the work. Seven‑day tests may be used as indicators of 28‑day strength. Average of any three 28‑day consecutive strength tests of laboratory‑cured specimens representing each type of concrete shall be equal to or greater than specified strength. No single test shall be more than 3.5 MPa (500 psi) below specified strength. Interpret field test results in accordance with ACI 214. Should strengths shown by test specimens fall below required values, Resident Engineer may require any one or any combination of the following corrective actions, at no additional cost to the Government:

1.

Require changes in mix proportions by selecting one of the other appropriate trial mixes or changing proportions, including cement content, of approved trial mix.

2.

Require additional curing and protection.

3.

If five consecutive tests fall below 95 percent of minimum values given in Table I or if test results are so low as to raise a question as to the safety of the structure, Resident Engineer may direct Contractor to take cores from portions of the structure. Use results from cores tested by the Contractor retained testing agency to analyze structure.

4.

If strength of core drilled specimens falls below 85 percent of minimum value given in Table I, Resident Engineer may order load tests, made by Contractor retained testing agency, on portions of building so affected. Load tests in accordance with ACI 318 and criteria of acceptability of concrete under test as given therein.

5.

Concrete work, judged inadequate by structural analysis, by results of load test, or for any reason, shall be reinforced with additional construction or replaced, if directed by the Resident Engineer.

2.4 BATCHING AND MIXING:

A.

General: Concrete shall be "Ready‑Mixed" and comply with ACI 318 and ASTM C94, except as specified. Batch mixing at the site is permitted. Mixing process and equipment must be approved by Resident Engineer. With each batch of concrete, furnish certified delivery tickets listing information in Paragraph 16.1 and 16.2 of ASTM C94. Maximum delivery temperature of concrete is 380C (100 degrees Fahrenheit). Minimum delivery temperature as follows:

Atmospheric Temperature
Minimum Concrete Temperature

-1. degrees to 4.4 degrees C

(30 degrees to 40 degrees F)

15.6 degrees C (60 degrees F.)

-17 degrees C to -1.1 degrees C (0 degrees to 30 degrees F.)
21 degrees C (70 degrees F.)

1.

Services of aggregate manufacturer's representative shall be furnished during the design of trial mixes and as requested by the Resident Engineer for consultation during batching, mixing, and placing operations of lightweight structural concrete. Services will be required until field controls indicate that concrete of required quality is being furnished. Representative shall be thoroughly familiar with the structural lightweight aggregate, adjustment and control of mixes to produce concrete of required quality. Representative shall assist and advise Resident Engineer.

PART 3 – EXECUTION

3.1 FORMWORK:

A.

General: Design in accordance with ACI 347 is the responsibility of the Contractor. The Contractor shall retain a registered Professional Engineer to design the formwork, shores, and reshores.

1.

Form boards and plywood forms may be reused for contact surfaces of exposed concrete only if thoroughly cleaned, patched, and repaired and Resident Engineer approves their reuse.

2.

Provide forms for concrete footings unless Resident Engineer determines forms are not necessary.

3.

Corrugated fiberboard forms: Place forms on a smooth firm bed, set tight, with no buckled cartons to prevent horizontal displacement, and in a dry condition when concrete is placed.

B.

Treating and Wetting: Treat or wet contact forms as follows:

1.

Coat plywood and board forms with non‑staining form sealer. In hot weather, cool forms by wetting with cool water just before concrete is placed.

2.

Clean and coat removable metal forms with light form oil before reinforcement is placed. In hot weather, cool metal forms by thoroughly wetting with water just before placing concrete.

3.

Use sealer on reused plywood forms as specified for new material.

C.

Size and Spacing of Studs: Size and space studs, wales and other framing members for wall forms so as not to exceed safe working stress of kind of lumber used nor to develop deflection greater than 1/270 of free span of member.

D.

Unlined Forms: Use plywood forms to obtain a smooth finish for concrete surfaces. Tightly butt edges of sheets to prevent leakage. Back up all vertical joints solidly and nail edges of adjacent sheets to same stud with 6d box nails spaced not over 150 mm (6 inches) apart.

E.

Lined Forms: May be used in lieu of unlined plywood forms. Back up form lining solidly with square edge board lumber securely nailed to studs with all edges in close contact to prevent bulging of lining. No joints in lining and backing may coincide. Nail abutted edges of sheets to same backing board. Nail lining at not over 200 mm (8 inches) on center along edges and with at least one nail to each square foot of surface area; nails to be 3d blued shingle or similar nails with thin flatheads.

F.

Architectural Liner: Attach liner as recommended by the manufacturer with tight joints to prevent leakage.

G.

Wall Form Ties: Locate wall form ties in symmetrically level horizontal rows at each line of wales and in plumb vertical tiers. Space ties to maintain true, plumb surfaces. Provide one row of ties within 150 mm (6 inches) above each construction joint. Space through‑ties adjacent to horizontal and vertical construction joints not over 450 mm (18 inches) on center.

1.

Tighten row of ties at bottom of form just before placing concrete and, if necessary, during placing of concrete to prevent seepage of concrete and to obtain a clean line. Ties to be entirely removed shall be loosened 24 hours after concrete is placed and shall be pulled from least important face when removed.

2.

Coat surfaces of all metal that is to be removed with paraffin, cup grease or a suitable compound to facilitate removal.

H.

Inserts, Sleeves, and Similar Items: Flashing reglets, steel strips, masonry ties, anchors, wood blocks, nailing strips, grounds, inserts, wire hangers, sleeves, drains, guard angles, forms for floor hinge boxes, inserts or bond blocks for elevator guide rails and supports, and other items specified as furnished under this and other sections of specifications and required to be in their final position at time concrete is placed shall be properly located, accurately positioned, and built into construction, and maintained securely in place.

1.

Locate inserts or hanger wires for furred and suspended ceilings only in bottom of concrete joists, or similar concrete member of overhead concrete joist construction.

2.

Install sleeves, inserts and similar items for mechanical services in accordance with drawings prepared specially for mechanical services. Contractor is responsible for accuracy and completeness of drawings and shall coordinate requirements for mechanical services and equipment.

3.

Do not install sleeves in beams, joists or columns except where shown or permitted by Resident Engineer. Install sleeves in beams, joists, or columns that are not shown, but are permitted by the Resident Engineer, and require no structural changes, at no additional cost to the Government.

4.

Minimum clear distance of embedded items such as conduit and pipe is at least three times diameter of conduit or pipe, except at stub‑ups and other similar locations.

5.

Provide recesses and blockouts in floor slabs for door closers and other hardware as necessary in accordance with manufacturer's instructions.

I.

Construction Tolerances:

1.

Set and maintain concrete formwork to assure erection of completed work within tolerances specified and to accommodate installation of other rough and finish materials. Accomplish remedial work necessary for correcting excessive tolerances. Erected work that exceeds specified tolerance limits shall be remedied or removed and replaced, at no additional cost to the Government.

2.

Permissible surface irregularities for various classes of materials are defined as "finishes" in specification sections covering individual materials. They are to be distinguished from tolerances specified which are applicable to surface irregularities of structural elements.

3.2 PLACING REINFORCEMENT:

A.

General: Details of concrete reinforcement in accordance with ACI 318 and ACI 315, unless otherwise shown.

B.

Placing: Place reinforcement conforming to CRSI DA4, unless otherwise shown.

1.

Place reinforcing bars accurately and tie securely at intersections and splices with 1.6 mm (16 gauge) black annealed wire. // Use epoxy-coated tie wire with epoxy-coated reinforcing. // Secure reinforcing bars against displacement during the placing of concrete by spacers, chairs, or other similar supports. Portions of supports, spacers, and chairs in contact with formwork shall be made of plastic in areas that will be exposed when building is occupied. Type, number, and spacing of supports conform to ACI 315. Where concrete slabs are placed on ground, use concrete blocks or other non‑corrodible material of proper height, for support of reinforcement. Use of brick or stone supports will not be permitted.

2.

Lap welded wire fabric at least 1 1/2 mesh panels plus end extension of wires not less than 300 mm (12 inches) in structural slabs. Lap welded wire fabric at least 1/2 mesh panels plus end extension of wires not less than 150 mm (6 inches) in slabs on grade.

3.

Splice column steel at no points other than at footings and floor levels unless otherwise shown.

C.

Spacing: Minimum clear distances between parallel bars, except in columns and multiple layers of bars in beams shall be equal to nominal diameter of bars. Minimum clear spacing is 25 mm (1 inch) or 1‑1/3 times maximum size of coarse aggregate.

D.

Splicing: Splices of reinforcement made only as required or shown or specified. Accomplish splicing as follows:

1.

Lap splices: Do not use lap splices for bars larger than Number 36 (Number 11). Minimum lengths of lap as shown.

2.

Welded splices: Splicing by butt‑welding of reinforcement permitted providing the weld develops in tension at least 125 percent of the yield strength (fy) for the bars. Welding conform to the requirements of AWS D1.4. Welded reinforcing steel conform to the chemical analysis requirements of AWS D1.4.

a.

Submit test reports indicating the chemical analysis to establish weldability of reinforcing steel.

b.

Submit a field quality control procedure to insure proper inspection, materials and welding procedure for welded splices.

c.

Department of Veterans Affairs retained testing agency shall test a minimum of three splices, for compliance, locations selected by Resident Engineer.

3.

Mechanical Splices: Develop in tension and compression at least 125 percent of the yield strength (fy) of the bars. Stresses of transition splices between two reinforcing bar sizes based on area of smaller bar. Provide mechanical splices at locations indicated. Use approved exothermic, tapered threaded coupling, or swaged and threaded sleeve. Exposed threads and swaging in the field not permitted.

a.

Initial qualification: In the presence of Resident Engineer, make three test mechanical splices of each bar size proposed to be spliced. Department of Veterans Affairs retained testing laboratory will perform load test.

b.

During installation: Furnish, at no additional cost to the Government, one companion (sister) splice for every 50 splices for load testing. Department of Veterans Affairs retained testing laboratory will perform the load test.

E.

Bending: Bend bars cold, unless otherwise approved. Do not field bend bars partially embedded in concrete, except when approved by Resident Engineer.

F.

Cleaning: Metal reinforcement, at time concrete is placed, shall be free from loose flaky rust, mud, oil, or similar coatings that will reduce bond.

G.

Future Bonding: Protect exposed reinforcement bars intended for bonding with future work by wrapping with felt and coating felt with a bituminous compound unless otherwise shown.

3.3 VAPOR BARRIER:

A.

Except where membrane waterproofing is required, interior concrete slab on grade shall be placed on a continuous vapor barrier.

1.

Place 100 mm (4 inches) of fine granular fill over the vapor barrier to act as a blotter for concrete slab.

2.

Vapor barrier joints lapped 150 mm (6 inches) and sealed with compatible waterproof pressure‑sensitive tape.

3.

Patch punctures and tears.

3.5 CONSTRUCTION JOINTS:

A.

Unless otherwise shown, location of construction joints to limit individual placement shall not exceed 24,000 mm (80 feet) in any horizontal direction, except slabs on grade which shall have construction joints shown. Allow 48 hours to elapse between pouring adjacent sections unless this requirement is waived by Resident Engineer.

B.

Locate construction joints in suspended floors near the quarter-point of spans for slabs, beams or girders, unless a beam intersects a girder at center, in which case joint in girder shall be offset a distance equal to twice width of beam. Provide keys and inclined dowels as shown. Provide longitudinal keys as shown.

C.

Place concrete for columns slowly and in one operation between joints. Install joints in concrete columns at underside of deepest beam or girder framing into column.

D.

Allow 2 hours to elapse after column is cast before concrete of supported beam, girder or slab is placed. Place girders, beams, grade beams, column capitals, brackets, and haunches at the same time as slab unless otherwise shown.

3.6 EXPANSION JOINTS:

A.

Clean expansion joint surfaces before installing premolded filler and placing adjacent concrete.

3.7 PLACING CONCRETE:

A.

Preparation:

1.

Remove hardened concrete, wood chips, shavings and other debris from forms.

2.

Remove hardened concrete and foreign materials from interior surfaces of mixing and conveying equipment.

3.

Have forms and reinforcement inspected and approved by Resident Engineer before depositing concrete.

4.

Provide runways for wheeling equipment to convey concrete to point of deposit. Keep equipment on runways which are not supported by or bear on reinforcement. Provide similar runways for protection of vapor barrier on coarse fill.

B.

Bonding: Before depositing new concrete on or against concrete which has been set, thoroughly roughen and clean existing surfaces of laitance, foreign matter, and loose particles.

1.

Preparing surface for applied topping:

a.

Remove laitance, mortar, oil, grease, paint, or other foreign material by sand blasting. Clean with vacuum type equipment to remove sand and other loose material.

b.

Broom clean and keep base slab wet for at least four hours before topping is applied.

c.

Use a thin coat of one part Portland cement, 1.5 parts fine sand, bonding admixture; and water at a 50: 50 ratio and mix to achieve the consistency of thick paint. Apply to a damp base slab by scrubbing with a stiff fiber brush. New concrete shall be placed while the bonding grout is still tacky.

C.

Conveying Concrete: Convey concrete from mixer to final place of deposit by a method which will prevent segregation. Method of conveying concrete subject to approval of Resident Engineer.

D.

Placing: For special requirements see Paragraphs, HOT WEATHER and COLD WEATHER.

1.

Do not place concrete when weather conditions prevent proper placement and consolidation, or when concrete has attained its initial set, or has contained its water or cement content more than 1 1/2 hours.

2.

Deposit concrete in forms as near as practicable in its final position. Prevent splashing of forms or reinforcement with concrete in advance of placing concrete.

3.

Do not drop concrete freely more than 3000 mm (10 feet) for concrete containing the high-range water-reducing admixture (superplasticizer) or 1500 mm (5 feet) for conventional concrete. Where greater drops are required, use a tremie or flexible spout (canvas elephant trunk), attached to a suitable hopper.

4.

Discharge contents of tremies or flexible spouts in horizontal layers not exceeding 500 mm (20 inches) in thickness, and space tremies such as to provide a minimum of lateral movement of concrete.

5.

Continuously place concrete until an entire unit between construction joints is placed. Rate and method of placing concrete shall be such that no concrete between construction joints will be deposited upon or against partly set concrete, after it's initial set has taken place, or after 45 minutes of elapsed time during concrete placement.

6.

On bottom of members with severe congestion of reinforcement, deposit 25 mm (1 inch) layer of flowing concrete containing the specified high-range water-reducing admixture (superplasticizer). Successive concrete lifts may be a continuation of this concrete or concrete with a conventional slump.

7.

Concrete on metal deck:

a.

Concrete on metal deck shall be minimum thickness shown. Allow for deflection of steel beams and metal deck under the weight of wet concrete in calculating concrete quantities for slab.

1) The Contractor shall become familiar with deflection characteristics of structural frame to include proper amount of additional concrete due to beam/deck deflection.

E.

Consolidation: Conform to ACI 309. Immediately after depositing, spade concrete next to forms, work around reinforcement and into angles of forms, tamp lightly by hand, and compact with mechanical vibrator applied directly into concrete at approximately 450 mm (18 inch) intervals. Mechanical vibrator shall be power driven, hand operated type with minimum frequency of 5000 cycles per minute having an intensity sufficient to cause flow or settlement of concrete into place. Vibrate concrete to produce thorough compaction, complete embedment of reinforcement and concrete of uniform and maximum density without segregation of mix. Do not transport concrete in forms by vibration.

1.

Use of form vibration shall be approved only when concrete sections are too thin or too inaccessible for use of internal vibration.

2.

Carry on vibration continuously with placing of concrete. Do not insert vibrator into concrete that has begun to set.

3.8 HOT WEATHER:

Follow the recommendations of ACI 305 or as specified to prevent problems in the manufacturing, placing, and curing of concrete that can adversely affect the properties and serviceability of the hardened concrete. Methods proposed for cooling materials and arrangements for protecting concrete shall be made in advance of concrete placement and approved by Resident Engineer.

3.9 COLD WEATHER:

Follow the recommendations of ACI 306 or as specified to prevent freezing of concrete and to permit concrete to gain strength properly. Use only the specified non-corrosive, non-chloride accelerator. Do not use calcium chloride, thiocyantes or admixtures containing more than 0.05 percent chloride ions. Methods proposed for heating materials and arrangements for protecting concrete shall be made in advance of concrete placement and approved by Resident Engineer.

3.10 PROTECTION AND CURING:

A.

Conform to ACI 308: Initial curing shall immediately follow the finishing operation. Protect exposed surfaces of concrete from premature drying, wash by rain and running water, wind, mechanical injury, and excessively hot or cold temperatures. Keep concrete not covered with membrane or other curing material continuously wet for at least 7 days after placing, except wet curing period for high-early-strength concrete shall be not less than 3 days. Keep wood forms continuously wet to prevent moisture loss until forms are removed. Cure exposed concrete surfaces as described below. Other curing methods may be used if approved by Resident Engineer.

1.

Liquid curing and sealing compounds: Apply by power-driven spray or roller in accordance with the manufacturer’s instructions. Apply immediately after finishing. Maximum coverage 10m2/L (400 square feet per gallon) on steel troweled surfaces and 7.5m2/L (300 square feet per gallon) on floated or broomed surfaces for the curing/sealing compound.

2.

Plastic sheets: Apply as soon as concrete has hardened sufficiently to prevent surface damage. Utilize widest practical width sheet and overlap adjacent sheets 50 mm (2 inches). Tightly seal joints with tape.

3.

Paper: Utilize widest practical width paper and overlap adjacent sheets 50 mm (2 inches). Tightly seal joints with sand, wood planks, pressure‑sensitive tape, mastic or glue.

3.11 REMOVAL OF FORMS:

A.

Remove in a manner to assure complete safety of structure after the following conditions have been met.

1.

Where structure as a whole is supported on shores, forms for beams and girder sides, columns, and similar vertical structural members may be removed after 24 hours, provided concrete has hardened sufficiently to prevent surface damage and curing is continued without any lapse in time as specified for exposed surfaces.

2.

Take particular care in removing forms of architectural exposed concrete to insure surfaces are not marred or gouged, and that corners and arises are true, sharp and unbroken.

B.

Control Test: Use to determine if the concrete has attained sufficient strength and curing to permit removal of supporting forms. Cylinders required for control tests taken in accordance with ASTM C172, molded in accordance with ASTM C31, and tested in accordance with ASTM C39. Control cylinders cured and protected in the same manner as the structure they represent. Supporting forms or shoring not removed until strength of control test cylinders have attained at least 70 percent of minimum 28‑day compressive strength specified. // For post-tensioned systems supporting forms and shoring not removed until stressing is completed. // Exercise care to assure that newly unsupported portions of structure are not subjected to heavy construction or material loading.

C.

Reshoring: Reshoring is required if superimposed load plus dead load of the floor exceeds the capacity of the floor at the time of loading. // In addition, for flat slab/plate, reshoring is required immediately after stripping operations are complete and not later than the end of the same day. // Reshoring accomplished in accordance with ACI 347 at no additional cost to the Government.

3.12 CONCRETE SURFACE PREPARATION:

A.

Metal Removal: Unnecessary metal items cut back flush with face of concrete members.

B.

Patching: Maintain curing and start patching as soon as forms are removed. Do not apply curing compounds to concrete surfaces requiring patching until patching is completed. Use cement mortar for patching of same composition as that used in concrete. Use white or gray Portland cement as necessary to obtain finish color matching surrounding concrete. Thoroughly clean areas to be patched. Cut out honeycombed or otherwise defective areas to solid concrete to a depth of not less than 25 mm (1 inch). Cut edge perpendicular to surface of concrete. Saturate with water area to be patched, and at least 150 mm (6 inches) surrounding before placing patching mortar. Give area to be patched a brush coat of cement grout followed immediately by patching mortar. Cement grout composed of one part Portland cement, 1.5 parts fine sand, bonding admixture, and water at a 50:50 ratio, mix to achieve consistency of thick paint. Mix patching mortar approximately 1 hour before placing and remix occasionally during this period without addition of water. Compact mortar into place and screed slightly higher than surrounding surface. After initial shrinkage has occurred, finish to match color and texture of adjoining surfaces. Cure patches as specified for other concrete. Fill form tie holes which extend entirely through walls from unexposed face by means of a pressure gun or other suitable device to force mortar through wall. Wipe excess mortar off exposed face with a cloth.

C.

Upon removal of forms, clean vertical concrete surface that is to receive bonded applied cementitious application with wire brushes or by sand blasting to remove unset material, laitance, and loose particles to expose aggregates to provide a clean, firm, granular surface for bond of applied finish.

3.13 CONCRETE FINISHES:

A.

Vertical and Overhead Surface Finishes:

1.

Unfinished areas: Vertical and overhead concrete surfaces exposed in pipe basements, elevator and dumbwaiter shafts, pipe spaces, pipe trenches, above suspended ceilings, manholes, and other unfinished areas will not require additional finishing.

2.

Interior and exterior exposed areas to be painted: Remove fins, burrs and similar projections on surfaces flush, and smooth by mechanical means approved by Resident Engineer, and by rubbing lightly with a fine abrasive stone or hone. Use ample water during rubbing without working up a lather of mortar or changing texture of concrete.

3.

Interior and exterior exposed areas finished: Give a grout finish of uniform color and smooth finish treated as follows:

a.

After concrete has hardened and laitance, fins and burrs removed, scrub concrete with wire brushes. Clean stained concrete surfaces by use of a hone stone.

b.

Apply grout composed of one part of Portland cement, one part fine sand, smaller than a 600 µm (No. 30) sieve. Work grout into surface of concrete with cork floats or fiber brushes until all pits, and honeycombs are filled.

c.

After grout has hardened slightly, but while still plastic, scrape grout off with a sponge rubber float and, about 1 hour later, rub concrete vigorously with burlap to remove any excess grout remaining on surfaces.

d.

In hot, dry weather use a fog spray to keep grout wet during setting period. Complete finish of area in same day. Make limits of finished areas at natural breaks in wall surface. Leave no grout on concrete surface overnight.

4.

Textured: Finish as specified. Maximum quantity of patched area 0.2 m2 (2 square feet) in each 93 m2 (1000 square feet) of textured surface.

B.

Slab Finishes:

1.

Monitoring and Adjustment: Provide continuous cycle of placement, measurement, evaluation and adjustment of procedures to produce slabs within specified tolerances. Monitor elevations of structural steel in key locations before and after concrete placement to establish typical deflection patterns for the structural steel. Determine elevations of cast-in-place slab soffits prior to removal of shores. Provide information to Resident Engineer and floor consultant for evaluation and recommendations for subsequent placements.

2.

Set perimeter forms to serve as screed using either optical or laser instruments. For slabs on grade, wet screeds may be used to establish initial grade during strike-off, unless Resident Engineer determines that the method is proving insufficient to meet required finish tolerances and directs use of rigid screed guides. Where wet screeds are allowed, they shall be placed using grade stakes set by optical or laser instruments. Use rigid screed guides, as opposed to wet screeds, to control strike-off elevation for all types of elevated (non slab-on-grade) slabs. Divide bays into halves or thirds by hard screeds. Adjust as necessary where monitoring of previous placements indicates unshored structural steel deflections to other than a level profile.

3.

Place slabs monolithically. Once slab placement commences, complete finishing operations within same day. Slope finished slab to floor drains where they occur, whether shown or not.

4.

Use straightedges specifically made for screeding, such as hollow magnesium straightedges or power strike-offs. Do not use pieces of dimensioned lumber. Strike off and screed slab to a true surface at required elevations. Use optical or laser instruments to check concrete finished surface grade after strike-off. Repeat strike-off as necessary. Complete screeding before any excess moisture or bleeding water is present on surface. Do not sprinkle dry cement on the surface.

5.

Immediately following screeding, and before any bleed water appears, use a 3000 mm (10 foot) wide highway straightedge in a cutting and filling operation to achieve surface flatness. Do not use bull floats or darbys, except that darbying may be allowed for narrow slabs and restricted spaces.

6.

Wait until water sheen disappears and surface stiffens before proceeding further. Do not perform subsequent operations until concrete will sustain foot pressure with maximum of 6 mm (1/4 inch) indentation.

7.

Scratch Finish: Finish base slab to receive a bonded applied cementitious application as indicated…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.