- Project No. 620-12-101 Steam System Improvement Phase 6 Federal contract opportunity
- Solicitation number
- 36C24218B0553
About this file
36C24218B0553 0001 36C24218B0553 0001.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24218C0228-000.docx | DOCX document | |
| 36C24218B0553-0002000.docx | DOCX document | |
| 36C24218B0553-0001001.pdf | ||
| 36C24218B0553-028.zip | ZIP file | |
| 36C24218B0553-025.docx | DOCX document | |
| 36C24218B0553-027.zip | ZIP file | |
| 36C24218B0553-026.pdf | ||
| 36C24218B0553-012.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-01-2018 620-18-1-2317-0007 620-12-101 36C242 Department of Veterans Affairs Network Contracting Office 2 Hudson Valley Health Care System FDR 2094 Albany Post Road Montrose NY 10548 36C242 Department of Veterans Affairs Network Contracting Office 2 Hudson Valley Health Care System FDR 2094 Albany Post Road Montrose NY 10548 To all Offerors/Bidders
36C24218B0553 07-03-2018
X X X Monday, August 13, 2018 at 2:00PM EST X Project No. 620-12-101 Steam System Phase VI at the Hudson Valley Health Care System Montrose Campus
This amendment is in response to RFI's received. Please see attached pre-bid walk through sign in sheet and RFI responses. Additional RFI responses forthcoming.
Bid opening is being extended to 8/13/2018 at 2:00PM EST
Aletha Bourke Contract Specialist
1. Mechanical Dwg. MP-101 shows 5” HPS connection to Main on the Ground Fl. for all Bldgs. However Steam Main connection detail on Dwg. GC-502 indicate to connect the HPS pipe to the mains in Tunnel. Please clarify.
The steam mains are located in the pipe tunnel below the corridor. For bldgs. 3, 4, and 12 – 4” HPS pipes going to all mechanical rooms from Main 8” pipe.
2. Mechanical Dwg. MH-101 shows New Louver & Motorized Damper to be installed in the Service Rm. for each Bldg., however no sizes were provided. Please advise.
Refer to exhaust fan schedule on drawing GC-601 for sizes, and “Exhaust Fan Mounting Detail” on drawing GC-502 for installation.
3. Once project is awarded, when can we expect NTP? Does the 420 day project duration include the time for stopping work during heat season?
NTP will be scheduled as soon as all of the required documentation is received from the awardee. From October 15 to May 15 VA has heat season and these days are not included in 420 day period of performance.
4. On Bldg. # 3 and Bldg. # 4 , removing one of the existing Hot Water Tanks to allow the location of new Heat Exchangers require old steam piping and PRV station and one storage tank to stay to provide hot water to the buildings , after installation of heat exchanger is done , to replace steam piping , PRV stations and cold and hot water piping, interruption of hot water service to buildings will be required since the space available is very limited to accommodate new PRV stations on ceiling , if hot water shut off is required for how many days shall be possible ?
On bldg. 3 we need 8-12hrs, On bldg. 4 (patients occupy building) we need hot water all the time.
5. On Bldg. # 12 Basement , heat exchangers will be located at existing Condensate Receiver location , removing the old Receiver is not possible to drain the steam condensate from existing heat exchanger ,since they have to run to provide hot water to building , how steam condensate can be dump or re-route ?.
The condensate receiver at that location in not in service and is abandoned in place. The condensate pump on the left side of the pit shall remain active.
6. Is there any location on the entire job considered as walk- thru tunnel or manhole as noted on Specifications 3.5 d , ( X-Ray Testing) ?
In Bldgs. 3 & 4 we have a manhole inside the mechanical room and in Bldg. 12 you could have walk-thru access to the tunnel or from tennis court tunnel entrances.
7. Will there be a location available for storage container?
Location for storage container will be specified at Notice To Proceed.
8. Electrical drawings are not showing power and control requirements for motorized steam valves for LPS heating. Please advise.
The old motorized valves are being replaced in kind, all existing power and control wiring shall be re-used to feed new valve.