This document is a Combined Synopsis/Solicitation for a commercial SCADA workstation replacement at the Manchester VA Medical Center. The solicitation is set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors.
The VA is seeking a contractor to replace the existing SCADA workstation system, including providing a new computer, monitor, accessories, and software. The contractor will also be required to modify and upgrade the existing plant master control system to meet current VA specifications. The solicitation includes a detailed Statement of Work outlining the required tasks and specifications. Quotes are due by June 21, 2024, and the award will be made to the most advantageous quote based on price and technical evaluation. The period of performance will be determined at the time of award.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis-Solicitation Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.
This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through the most current Federal Acquisition Circular. The most current Federal Acquisition Circular can be found at Acquisition.gov.
This solicitation is set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB).
The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, Plumbing, Heating, and Air-Conditioning Contractors, with a small business size standard of 19 million.
The FSC/PSC is J044 Maintenance, Repair, and Rebuilding of Equipment – Furnace, Steam Plant, and Drying Equipment.
The Manchester Veteran Affairs Medical Center (VAMC) is seeking to a contractor to provide a Life Safety Code Assessment.
All interested companies shall provide quotations for the following:
Supplies/Services
| Line Item |
| Description |
| Quantity |
| Unit of Measure |
| Unit Price |
| Total Price |
| 0001 |
| Replace SCADA Workstation |
| 1 |
| JB |
STATEMENT OF WORK
SCADA Upgrade
1.0 INTRODUCTION
The VA Medical Center in Manchester has a SCADA system that requires support services, as well as preventative maintenance services, for the routine and critical maintenance of your facility’s control systems.
An upgrade is needed to the existing plant master control system. Provide all materials, labor, and equipment to perform the bid items detailed below.
2.0 BACKGROUND
The VA equipment to be serviced requires specialized test equipment, tools, training, and certifications/licenses to service. This Contractor shall have the necessary test equipment, tools, training, and certifications to perform this work.
With Support from Microsoft for Windows 7 edition having ended on January 14, 2020, any issues with the workstation operating system will require an OS system upgrade. Due to IFix 5.5. SP1 being released in 2012, it will not be compatible with any upgraded Operating system. The age of the workstation hardware, when combined with the existing software packages being obsolete, and the changes made to the plant / boiler control systems over the years, indicates it is only a matter of time before this system reaches an un-repairable state. Since the SCADA workstation is the central collection point for all the data in the plant, and provides the JCI Building Automation System instrumentation data, it is imperative this system is upgraded as soon as possible. General maintainability will only be able to continue while the existing hardware is functional.
3.0 SCOPE
3.1 Task 1
Replace SCADA workstation system with new workstation in compliance with specifications 23 09 11 SECTION 2.5
| QTY |
| Description |
| Spec. Reference |
| 1 |
| Computer in Mid-Height Tower Case with Intel/AMD multiple-core processor. 8 GB RAM. 512 MB Video. Dual 1000 GB Hard Disk Drives. DVD/CD-R Writer. Mouse, Keyboard. Speakers. |
System backup is performed between the two furnished hard drives, with historical backup using the DVD/CD; eliminating any requirement for a Zip drive.
Includes MS Windows 10 Professional operating system with drivers as required for system.
Ref. 23 09 11, pg 42, pp 2.5.B.1-2
| 1 |
| 24-inch XGA Color LCD Flat Wide Screen Monitor, 1600 x 1200 pixels with 0.26 mm minimum dot pitch. |
| Ref. 23 09 11, pg 43, pp 2.5.B.3 |
| 1 |
| Standard QWERTY-Style enhanced 101-key Keyboard. USB Connection |
| Ref. 23 09 11, pg 43, pp 2.5.B.4 |
| 1 |
| Standard USB Connected Optical Mouse for “Point and Click” navigation. |
| Ref. 23 09 11, pg 43, pp 2.5.B.5 |
| 1 |
| Inductive Automation Ignition! graphics package includes screens, reports and alarms, as required. |
| Ref. 23 09 11, pg 44-60, pp 2.5.C |
| 1 |
| BACNet Driver software installation provides communications via a LAN port to the building management system to provide collected transmitter and computed data. |
| Included as part of Workstation |
| 1 |
| RS-485 to RS-232 Signal Converter and LAN switches as needed for supplied equipment. |
| Included as part of Workstation |
| 1 |
| Logging Report/Graphic Printer is a dedicated color laser printer with large drawer for 8.5”x11” letter sized paper sheets. |
| Ref. 23 09 11, pg 44, pp 2.5.B.7 |
| 1 |
| Alarm Printing is with a dedicated Epson LQ2090, 24-pin Dot Matrix printer using continuous feed paper, with one box of 8½” x 11” fan-fold paper included. |
| Ref. 23 09 11, pg 43, pp 2.5.B.6 |
| 1 |
| APC SU-1000 UPS supplied for the processor & monitor. |
| Ref. 23 09 11, pg 44, pp 2.5.B.9 |
ENGINEERING
| 1 |
| ENGINEERING – Design and programming of SCADA Workstation to meet facility specific requirements and integration. |
| Reference 23 09 11 section 3.2 as applicable |
| 1 |
| Field Services - SCADA system start up by Contractor included. Field services provides the services of a control engineer for the purposes of installation, start up, and check-out of the SCADA system and training of the plant operating personnel. |
One (1) trip with three (3) site-days is provided for the installation and startup of the SCADA computer.
One (1) additional trip with three (3) site-days included for operator SCADA training.
Each trip includes site-days with Tuesday, Wednesday, and Thursdays, excluding holidays.
3.2 Task 2
Modification upgrade existing plant master control system
Plant Master Panel
· Allen Bradley Control Logix PLC w/ I/O expansion Modules
· Allen Bradley Panel View HMI Feed water System
· Allen Bradley control Logix L32E PLC with I/O expansion modules. Provided by BFS with Tanks and pump systems.
Boiler Controls
· Fireye PPC6000 w/ Fireye YB110 & YZ300 Flame Safeguard/Expanded Annunciator Panel. Provided by Webster Engineering with the Webster Burners, and revised by Contractor in Oct, 2023 to meet VHA Safety Device Testing Manual 7th Edition.
History:
Under subcontract 0321122-3-004 in 2013 with TVC Systems, the Cleaver-Brooks Hawk ICS plant master system was repurposed, and re programmed per the TVC Drawings 1170-SA-001. At this time, the PLC was reprogrammed, while the HMI was disabled. The facility has been operating since with a blind plant master, and totally dependent on the SCADA workstation for monitoring the plant operation.
During a project in 2016-2017, the control systems on the burners were replaced, with Fireye PPC6000 controls replacing the Cleaver-Brooks Hawk Systems that the TVC drawings refer to. At this time, the plant master wiring drawings were not revised to show any changes.
Technical issues:
Plant Master Control System – Existing Plant Master control is a Cleaver-Brooks Hawk system that was re-purposed from the original design, and was not completed properly, leaving the HMI Non-functional. This poses a risk for the operators being dependent on the aging and outdated SCADA workstation to monitor plant operations.
In addition, the existing plant master does not meet current TIL Specification section 23 09 11. Some of the major items not present, include:
· Plant Alarm Annunciator
· Boiler/ Burner Submaster Control Stations
· Touchscreens (although present, it is not functional.)
· Master Steam Pressure control station.
Replace plant master control system to meet current VA TIL SPECIFICATION 23 09 11 Contractor will perform the task of providing all labor, material, equipment, and supervision necessary to replace the plant master control and feedwater control systems with controls to meet master specification 23 09 11, section 2.3 Some examples of the HMI screen information to be provided include:
Bill of Materials Control Panel Located Equipment
Item No
Qty
Description
| A1 |
| 1 |
| Main Control and Instrumentation furnished by Contractor. Control to be pre-assembled and tested on new subpanel for mounting in existing feedwater control panel, upgrading system to full plant master control panel. |
Current plant master control in 24x24x8 cabinet will be removed from service.
Feedwater control system in existing freestanding panel originally supplied by BFS will be revised for use as the new plant master control panel.
Layout of the controls and instruments to identified at time of submittals.
One VCX™ HMI control and display touchscreen is provided for Plant Master functions.
Functionality testing of the provided components is during panel checkout in our Cleveland factory.
Within the panel, battery backup UPS surge protection is provided to the controllers, HMI displays, transmitters, and flow meters.
A site review of the existing panel may be required to confirm the panel and device layout sizing and that there is room for these devices to be installed, operated, and maintained.
| B1 |
| Lot |
| VCX™ Control functions are provided using ASCON Technologic nanoPac nP4 PAC Controller with CanOpen I/O expansion modules. The NanoPAC modules are DIN rail mounted inside the Main Instrumentation Control Panel. Operator interfacing for master is through its specific touch screen color display, which provides continuously updated operating measurements and graphics, and allows tuning of the control loops with proper permissions. |
Contractor configures and programs NanoPAC Controller and modules for control and other functions as presented herein. All I/O modules within each panel communicate via a local CANopen buss with a CPU module, which is programmed for the required local control functions. A local touch screen HMI display provides local graphics and control interface functions within the CPU for the boiler plant operators. Communications to the SCADA computer system is provided via TCP-IP LAN network wiring. All items are 24 VDC powered, with separate supplies furnished for discreet I/O, CPU with analog I/O and network switch, and HMI display.
VCX™ Control modules used for this project include:
· P/N nP4---16E4IW, CPU with CANopen, Modbus TCP/IP ports, and auxiliary RS-232 and RS-485 ports.
· P/N IO-CB-AI-04RT, 4-Channel RTD or TC Input Module.
· P/N IO-CB-AI-08HL, 8-Channel Analog Input Module.
· P/N IO-CB-AO-08HL, 8-Channel Analog Output Module.
· P/N IO-CB-DI-16LV, 16-Channel Digital Input Module – low voltage for 24 VDC signals.
· P/N IO-CB-DI-16HV, 16-Channel Digital Input Module with optical isolation for 120 VAC signals.
· P/N IO-CB-DO-16TS, 16-Channel Digital Out Module.
Auxiliary instrumentation such as power supplies, relays, etc are provided for an integrated system.
| B2 |
| 1 |
| Each HMI display is a 12.1” TFT LCD touch screen that includes a RJ45 LAN communications port and requires 24 VDC power. |
· (1) P/N CM5-T12W C-More Touchscreen HMI.
| B3 |
| 1 |
| Feed Water system monitoring and control is included in the Main Panel Item A1 for two condensate surge tanks and two deaerator tanks; condensate transfer pumps and boiler feed water pumping systems as identified on the project drawings. |
Analog, temperature and digital inputs and output modules are furnished for the various field connections as identified on the referenced System Drawings.
| C |
| 1 |
| Header Steam Pressure Boiler Control is accessed through the Master touch screen HMI display. |
Header steam pressure from a suppressed range transmitter mounted in steam header is used for set point control.
| C2 |
| 1 |
| Condensate Surge Tank and Condensate Transfer Pump control is accessed through the Master touch screen HMI display panel. Tank level control, pump on-off sequencing, and pump speed control is provided. |
Condensate surge tank level is monitored through existing high, low, and low-low switches, which are also wired to the annunciator. A DP transmitter is used in the common tank water column to measure the tank levels.
The on-off status of each pump is monitored from auxiliary contacts in the motor VFD drives, and drive speed is modulated to maintain 30psig condensate transfer pump pressure. If lead pump fails, lag pump will start and run to maintain pressure.
Makeup water flow to condensate tank is controlled with a control valve based on the tank level DP transmitter signal.
Emergency City water Make-up is controlled with a control valve. Emergency Make Water Valve will open upon tank level low-low alarm and modulate in unison with the normal makeup water valve until 8” (Adjustable) of water has been added to the tank level.
| C3 |
| 1 |
| Deaerator Tank and Boiler Feed Water Pump monitoring is accessed through the Master touch screen HMI display panel. DA Tank level controls and pump on-off sequencing control is provided. |
Deaerator tank level is monitored through existing high, low and low-low switches, which are also wired to the annunciator. Existing DP transmitter is used to measure the tank level.
The on-off status of each pump is monitored from auxiliary contacts in the motor VFD drives, and drive speed is modulated to maintain boiler feedwater header pressure. Pressure transmitter for feedwater header is existing and will be re-used. Tank steam pressure is monitored.
| D |
| 1 |
| Alarm horn provided on the main panel for general control alarms. |
· Alarm Horn is panel mounted. 120 VAC. McMaster-Carr 3038T22.
| E |
| 6 |
| ProSense SC6-1102 signal isolator, Single-channel. Provides signal isolation for 4-20 mADC signals. The input channel powers each loop to provide an isolated output signals to up to four remote devices. |
· Six are provided in the Master Control Panel to provide isolated steam pressure master control signals to the sub-master controls in the boiler control cabinets as well as isolated control signals to tank water level control valves.
| F |
| 1 |
| Network switch for 10/100 baseT LAN systems. |
Provided to interconnect the controller CPU & HMI displays. Stride Corp 4-port DIN-rail mount network switch.
· One provided in the Main Control Panel.
| G |
| Lot |
| Digital Signal Isolating Relays. Used to provide contact closure I/O isolation to/from the controllers (Items B). |
Input Isolation 120VAC, DPDT, 120 VAC coil Input Isolation 120VAC, 4PDT, 120 VAC coil Output Isolation 24VDC, DPDT, 24 VDC coil
| H |
| Lot |
| Selector switch, 3-position maintained with standard knob. Not illuminated. Located in the main control panel and the individual boiler control cabinets. Switches are wired for operator selection of the control mode of the feedwater pumps and condensate transfer pumps. 24 VDC contacts wire to UPAC™ digital inputs, and the 120 VAC contacts are used for boiler limit string wiring. |
· Qty.6, 24 VDC switch contacts, Model HT8JBH1DAA5 provided with engraved nameplates: MANUAL - OFF – AUTO
| J |
| Lot |
| 24 VDC Power Supplies are included and sized to power selected devices. Mean Well DIN-rail mounted devices are AC powered from the UPS power conditioners. |
MDR-40-24, 24 VDC, 1.7A, 40 W Power Supply.
MDR-60-24, 24 VDC, 2.5A, 60 W Power Supply.
899, 24 VDC, 2.5 A power supply – Class 2.
One or more used to power each process CPU, analog control modules, digital modules, and their I/O.
One each used to power natural gas flow meters.
One each used for touch screen displays.
One each used to supply a span reference voltage for actuator potentiometer feedback position inputs.
| K |
| 1 |
| AC Power Conditioners, APC Smart Model SC 420 battery backup UPS and power conditioner. 420 VA. |
Provides power conditioning for all microprocessor-based boiler control panel equipment, including controls and their loop-powered transmitters.
One is supplied in the Main Panel.
Engineering Item No
Qty
Description
Engineering Drawing
| ES1 |
| Lot |
| VCX™ control Items B includes custom documentation for each control loop. Please refer to the instruction manuals provided for the Ascon control elements and for the C-More HMI touchscreens. |
Steam Plant Pressure Master Control Description
SAMA diagrams with control discussion to be provided for each loop. Not included with submittals.
36000-000
| ES2 |
| Lot |
| Engineering Services include the systems schematic and wiring schematic drawings. |
| Engineering Drawing |
| ES3 |
| 1 |
| Installation of new controls and instruments by Contractor, including wiring and piping. |
| -- |
| ES4 |
| 1 |
| Startup is included in our Scope of Supply. |
| ES5 |
| 1 |
| Training of the facility personnel on proper control operation is provided and included in our Scope of Supply. |
| -- |
| ES6 |
| Lot |
Main Control Panel Layout
Steam System Control Sheet 1, System Configuration Master Control CPU & HMI, System Configuration
Wiring drawings are not furnished with our submittal.
Wiring Drawings furnished with manuals.
Not with submittal
| Electronic set of operating and maintenance manuals are furnished at the time of shipment. |
| -- |
3.3 Item 1 - Plant Control System
Control panels, controllers and field devices directly monitoring and/or controlled. This includes field calibration of all balance of plant instruments that are capable of being calibrated. This excludes control systems not provided by Contractor. Contractor will at the request of the customer and to the best of our ability and substantial knowledge base, support existing control systems provided by others, however we cannot guarantee successful results.
3.2 Item 2 - Plant Data Network Infrastructure
Network infrastructure devices and interfaces whose function is to pass data throughout the controls network. This excludes customer’s corporate network infrastructure devices and interfaces.
3.3 Item 3 - Plant Human Machine Interface (HMI) System
Control system HMI Servers, workstations, and operator interface terminals (OIT). This excludes HMI’s and OIT’s not provided by Contractor. Contractor will at the request of the customer and to the best of our ability and substantial knowledge base, support existing control systems provided by others.
3.4 Item 4 - Telephone/Remote Support Normal Business Hours: M-F 8-5 Within (4) Four Hours of initial call for support, Contractor shall provide the customer technical phone support and/or remote system access support during NORMAL business hours. This support shall include questions covering troubleshooting, maintenance, and operational issues for all controlled systems covered under this agreement. Up to 40 hours per year of telephone and/or remote support shall be provided during normal business hours as part of the base contract. Additional telephone/remote support services shall be provided on a T&M basis.
3.4 Item 5 - On Site Maintenance Services
Contractor shall provide a qualified control systems engineer and/or technician to perform onsite maintenance services. These services ensure the consistent operation of the field controllers, their systems, and their associated end-devices, as well as the HMI systems, and evaluate performance and functionality of the controlled systems. These maintenance services shall include:
| 1. | Field Controller Hardware Operational Verification |
| 2. | Operational verifications of server and workstation HMI visualization, historical data acquisition and alarming software |
| 3. | Historical database maintenance and backup verification |
| 4. | System performance evaluations |
| 5. | Field Instrumentation Calibration |
| 6. | Troubleshooting |
Onsite maintenance shall be performed up to 3 DAYS ANNUALLY and shall include the services of an engineer and/or up to two (2) technicians, travel time and expenses. Additional onsite maintenance services shall be provided on a T&M basis.
3.5 Item 6 - Project Management
Contractor shall provide Project Management staff. Project Management shall include:
| 1. | A single point of contact to meet the needs of the customer and control systems. |
| 2. | Continuous evaluation of the control system and its controlled systems. |
| 3. | Reports, documentation updates and recommendations will be provided. |
4.0 APPLICABLE DIRECTIVES
4.1 Medical Center, Facility Services Policy, FS-7.
4.2 VA Directive 1810
5.0 PERFORMANCE REQUIREMENTS
All work shall be completed such that the integrity of the systems is maintained. All work shall be done in accordance with OSHA, EPA regulations, NFPA codes, with particular attention to NFPA 85, VA codes, Federal, State, and local regulations throughout the course of this project.
All areas will be left in a clean and workmanlike manner.
6.0 DELIVERABLES
· Contractor shall coordinate with the customer to provide a complete calendar year schedule for scheduled maintenance tasks at the commencement of the contract.
· Contractor shall provide a prioritized phone support contact list at the commencement of the contract.
OTHER CONSIDERATIONS FOR PROPOSAL:
· Material Safety Data Sheets (MSDS’s) must be submitted to the Contracting Officer’s Technical Representative (COTR) for approval for all hazardous materials before they are brought to the work site.
· Two weeks prior notice is required for all work that involves shutting down any of the systems. Work requiring a shutdown may be required to be performed outside of normal working hours.
· End of day cleanup of the work area(s) is mandatory, and all trash shall be bagged and properly disposed of offsite.
· Contractor vehicles, including those of their employees, are to be parked in the lower level of Lot D. Exclusion: Any vehicle directly involved in the cleaning and removal of debris from the boilers.
· Smoking is permitted only in designated locations.
· Work shall be completed during normal business hours of 7:00am – 4:30pm.
***END OF THIS SCOPE OF WORK***
The contract period of performance will be determined at time of award.
Place of Performance/Place of Delivery
| Address: |
| 718 Smyth Rd, Manchester NH |
| Postal Code: |
| 03057 |
| Country: |
| UNITED STATES |
The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
The following solicitation provisions apply to this acquisition:
1. FAR 52.212-1, “Instructions to Offerors–Commercial Products and Commercial Services”
2. FAR 52.212-3, “Offerors Representations and Certifications–Commercial Products and Commercial Services”
Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, “Offerors Representations and Certifications–Commercial Products and Commercial Services.” If paragraph (j) of the provision is applicable, a written submission is required.
The following contract clauses apply to this acquisition:
· 52.203-16, 52.204-4, 852.203-70, 852.219-75
· FAR 52.212-4, “Contract Terms and Conditions–Commercial Products and Commercial Services”
· FAR 52.212-5, “Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Products and Commercial Services”
The following subparagraphs of FAR 52.212-5 are applicable: 52.204-10, Reporting Executive Compensation & First-Tier Subcontract Awards (JUN 2020), 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023), 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021), 52.219-28, Post Award Small Business Program Rerepresentation (FEB 2024), 52.219-33, Nonmanufacturer Rule (SEP 2021), 52.222-3, Convict Labor (JUN 2003), 52.222-26, Equal Opportunity (SEP 2016), 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020), 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020), 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021), 52.222-41, Service Contract Labor Standards (AUG 2018), All quoters shall submit the following:
1. Questions: Any questions must be submitted in writing no later than Friday 14 June 2024 at 3:00 PM EST. Answers to the questions will be posted the following week.
2. Quote: Offeror shall provide a quote using the Line item 0001 table above. Offerors must also provide all applicable labor rates for the solicited services so they can be compared to the applicable wage determination for compliance with the Service Contract Labor Standards.
All quotes shall be sent to the Contracting Officer, David Valenzuela at david.valenzuela2@va.gov.
Award will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government.
The following are the decision factors:
1. Price: Quotes will be compared by price.
1. Technical: The offeror’s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the Statement of Work in a timely efficient manner.
1. Contractor shall provide specification sheets for proposed equipment and include within the solicitation response.
1. Vendors shall be certified as a SDVOSB in VetBiz or VetCert, failure to be certified will remove vendors from consideration.
The award will be made to the response most advantageous to the Government.
Responses should contain your best terms, conditions.
Submission of your response shall be received not later than 21 June 2024 at 3:00 PM EST. All quotes shall be emailed to David Valenzuela at david.valenzuela2@va.gov.
Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1.
Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below.
Point of Contact: David Valenzuela, david.valenzuela2@va.gov.
Effective Date: 03/15/2023 Revision: 01 image1.png image2.png image3.png image4.png image5.png
File details come from the government source that posted it. Updated .