About this file

This document contains a modification to a previous notice for a federal contract opportunity along with related questions and answers. The modification provides additional details for solicitation number 36C24122R0170 seeking a firm fixed price contract to perform electrical system studies at the VA Medical Center in Togus, Maine. The contractor shall prepare a short circuit and coordination study including voltage drop calculations for the entire electrical system, both normal and emergency, which includes over 30 buildings totaling approximately 1 million square feet. The study will include on-site visits and obtaining data from as-built drawings and facility staff. The period of performance is 187 calendar days with qualifications due by September 2, 2022 at 3PM Eastern Time and requests for information due by August 24, 2022 at 3PM Eastern Time.

The questions and answers clarify that the VA review period for submissions is 14 calendar days, not 21-28 days as originally stated. Additionally, a site map is attached showing the location of buildings.

View the file

Other files for this federal contract opportunity

Other files attached to C212--402-22-109SC Electrical Coordination and Arc Flash Study, newest first.
File Type Posted
Q1 Site Map.pdf PDF
36C24122R0170.docx DOCX document
402-22-109SC SOW .docx DOCX document
SF330 Qualifications Request.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modification to a Previous Notice

*= Required Field Modification to a Previous Notice

SUBJECT* 402-22-109SC Electrical Coordination and Arc Flash Study

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE* 01053-9764

SOLICITATION NUMBER* 36C24122R0170

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE 09-02-2022 3:00 PM EASTERN TIME, NEW

YORK, USA

ARCHIVE 90 DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS N

SET-ASIDE

PRODUCT SERVICE CODE* C212

NAICS CODE* 541330

CONTRACTING OFFICE ADDRESS Department of Veterans Affairs

VA CENTRAL WESTERN MASSACHUSETTS

HCS

Acquisitions-90

421 North Main Street

Leeds MA 01053-9764

POINT OF CONTACT*

Contract Specialist

Alexis C. Duda

Alexis.Duda@va.gov

(403) 584-4040

PLACE OF PERFORMANCE

ADDRESS Department of Veterans Affairs

Network Contracting Office 1

Togus VAMC

1 VA Center

Augusta ME

POSTAL CODE 04330

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS Alexis.Duda@va.gov EMAIL DESCRIPTION Alexis.Duda@va.gov

DESCRIPTION

402-22-109SC Electrical Coordination and Arc Flash Study

RFI Questions Submitted

1. Provide a list of buildings to be included in the study with associated area (square footage) for each so that manpower requirements can be determined. If a list of buildings is not available, the total building area (square footage) of all buildings to be included in this study will be adequate for our response to provide SF 330 Qualifications.

Answer:

Bldg Number Use/Name

Square Footage

Bldg Number Use/Name

Square Footage

T-224 OR Linen Quonset Hut

1,170

200E Clinical Addition 139,665

T-225 Paint Shop

201 Garage 11,376

T-226 Sheet Metal

202 Utility Shop/Eng.

Office

13,040

T-227 Fire Department

203 Administration Building

15,638

T-228 Engineering

204 Kitchen/Dining Room

33,917

MRI MRI Building 3,562 205 Administration 61,661

B255 Neurology Clinic 2,232

206 MHC/Administration 57,419

1CC Connecting Corridors

10,304

207 Nursing Home 61,250

1 Housekeeping Qtrs (NHL)

8,763

208 Pain Clinic 2,951

2 Beale House - Visitor Quarters

5,787

209 Police/O&IT 19,894

3 Lodger Quarters 7,242 210 Theater 14,060

4 Contracting Offices

6,951

211 Fire Station 3,571

15 Housekeeping Qtrs Single

3,048

212 Laundry 6,970

16 Housekeeping

3,030

221 Wheelchair Clinic 6,318

17 Housekeeping

3,030

229 Storage 275

18 Housekeeping

3,024

232 Gym/Pool 16,221

19 Housekeeping

3,024

235 Chapel 4,700

20 Housekeeping

3,130

238 Boiler Plant 7,170

21 Storage Barn 15,518

239 Biomass Boiler Plant

9,032

27 DAV

Transportation Office

3,167

240 Supply Warehouse 17,937

32 GEC/VBA Offices 2,896 242 O2 Storage Bldg 128

36 Vacant Historic Hotel Bldg

9,768

244 Emergency Generator

67 Historic Train Station Bldg

245 Vacant Sewage Treatment Plant

2,013

69 On Call Staff Quarters

4,196

249 Chiller Building 2,350

79 3 Car Garage-b212

250 Sand/Salt Building 1,836

200 Gm & S Hosp. 138,693 300 Fisher House 11,912

See attached site map for information on location of building relative to each other.

2. The stated Period of Performance is 187 calendar days. The solicitation requires three peer reviews and a baseline review meeting. These reviews normally take 21-28 days when submittal time, review time and response time are included. This will be a total review time of 84 – 112 calendar days. The arc flash label installation will take 7 calendar days minimum after the final report is submitted. Can the Period of Performance be increased?

Answer: VA review period if 14 calendar days from receipt of submission for each submission not 21 to 28 days.

See attached document: Q1 Site Map.