36C24118Q0271 Attachment 1 - Statement of Work 36C241-18-Q-0186 UPS PMs and Tech Support r.docx

View the file

Other files for this federal contract opportunity

Other files attached to UPS Preventative Maintenance and Support, newest first.
File Type Posted
36C24118Q0271-00001000.docx DOCX document
36C24118Q0271-002.xlsx XLSX spreadsheet
36C24118Q0271-000.docx DOCX document
36C24118Q0271-003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

UNINTERRUPTABLE POWER SUPPLIES AND BATTERIES

Preventative Maintenance and Technical Support 36C241-18-Q-0271

A. OBJECTIVE:

PROVIDE EMERGENCY SERVICES WITHIN A 24 HOUR PERIOD OR SOONER INCLUDING TRAVEL, LABOR, PARTS, 24 HOUR TECHNICAL SUPPORT AND 2 EACH BI-ANNUAL PREVENTIVE MAINTENANCE SERVICE AND 1 ANNUAL PREVENTIVE MAINTENANCE SERVICE.

FOR THE UPS SYSTEM LOCATED IN BLDG # 61 AND BLDG #3 COMPUTER ROOM IN ORDER TO SERVICE AND SUPPORT 2 EACH 16KVA SYMMETRA UPS UNITS MODEL SYMSTRF (S/N TBD) AND 2 EACH APC SYMMETRA EXTENDED RUN BATTERY CABINETS MODEL SYXR12B12 (S/N TBD) LOCATED IN BLDG 61 COMPUTER LAB. REPLACEMENT OF BATTERIES IF NEEDED. ALL OTHER PARTS NOT COVERED CAN BE BILLED SEPAPATELY.

B. GENERAL:

1. SEMI -ANNUAL SERVICE

• Perform a complete visual inspection of all internal sub-assemblies, wiring
harnesses, contactors, cables, and major components
• Check for proper clearance around the unit
• Perform temperature checks on all breakers, connections, and associated
controls. Report all high temperature areas
• Check air filters for cleanliness; clean or replace
• Check module(s) for the following, as applicable:
o Rectifier and inverter snubber circuit board discoloration
o Power capacitors for swelling or leakage
o Capacitor vent caps extruded more than 1 /8"
o Fans for proper operation
o Lubricate and check bearings for abnormal condition, as applicable,
where possible
• Record all meter readings and calibrate as necessary, where possible
• Measure and record phase-to-phase input, output, bypass and battery voltages
and currents, where possible
• Review alarm log/history for any irregular activity, where possible
• Verify remote status panel operation
• Measure and record harmonic trap filter currents, where possible
• Review system performance with customer to address any questions and to
schedule any repairs
• Implement manufacturer field change notices, as possible
• Perform functional system test upon customer approval
• Provide inspection report, with recommendations, to Customer within 7 to 10
business days

2. ANNUAL SERVICE - Consists of all steps included with Semi-Annual Service, plus:

• Check the inverter and rectifier snubbers for discoloration or damaged wiring
• Check all contacts to ensure secure connections
• Verify all connections show no signs of discoloration
• Check fuses on the DC capacitor deck for continuity, as applicable
• Clean interior and exterior of unit
• With customer approval, perform operational test of the system including unit
transfer and battery discharge
• Measure and calibrate, as necessary, where possible, all electronics to system
specifications
• Measure and record all low-voltage power supply levels

3. REPLACE BATTERIES WHEN CAPACITY IS BELOW 50% CAPACITY

4. SPECIFICATIONS

a. Building 61 has 2 power systems that are APC SYMMETRA models. They each provide 16KVA of UPS power. One has a single extended frame, the other has 2 extended frames. Each Frame has 12 battery modules type SYBATT.

b. Building 3 has a APC SYMMETRA PX SYCF40KF system and the battery model # is SYBTU1-PLP and there are 48 batteries.