36C10D23Q0068.docx
DOCX document 150 KB Posted
- Attached to
- J063--Upgrade Physical Access Control System: Federal contract opportunity
- Solicitation number
- 36C10D23Q0068
About this file
This solicitation seeks proposals to upgrade the physical access control system at the Department of Veterans Affairs Saint Paul Regional Office in Minnesota. The selected contractor will replace the existing CCure 9000 system or equivalent with a new standalone PACS utilizing two managed switches, and provide all necessary equipment, installation, training, documentation, and a five-year extended warranty. The contractor must install 96 contactless door readers, two PACS head units, cabling and related components. The proposal response is due by August 30, 2023 with award by September 11, 2023 and completion by January 31, 2024. Pricing will be fixed for the base year with an option to extend services and warranty for an additional year. The opportunity is set aside for certified service-disabled veteran-owned small businesses.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10D23Q0068
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
VA
36C10D23Q0068 08-23-2023 Eric Davidson 317-916-3855 08-30-2023 3:00 pm
EDT
00101 Department of Veterans Affairs Veterans Benefits Administration Acquisition Directorate 1800 G Street NW Washington
DC
20006 X X 561621 $25 Million N/A X 00101 Department of Veterans Affairs Veterans Benefits Administration Acquisition Division 1800 G Street NW Washington
DC
20006 00101 Department of Veterans Affairs Veterans Benefits Administration Acquisition Directorate 1800 G Street NW Washington
DC
20006
All invoices must be e-mailed to:
eric.davidson@va.gov
See CONTINUATION Page The contractor will provide and install a new PACS system pursuant to the terms and conditions contained herein.
See CONTINUATION Page X Table of Contents
| SECTION A | 1 | |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 | |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 5 | |
| B.1 CONTRACT ADMINISTRATION DATA | 5 | |
| Statement of Work | 6 | |
| 1.0 | Introduction | 6 |
| 1.1 | Background | 6 |
| 1.2 | Objective | 8 |
| 1.3 | Applicable Documents | 8 |
| 2.0 | Contractor Personnel & Management | 10 |
| 2.1 | Non-Personal Services | 10 |
| 2.2 | Business Relations | 10 |
| 2.3 | Contract Administration and Management | 10 |
| 2.3.1 | Subcontract Management | 10 |
| 2.3.2 | Location and Hours of Work | 11 |
| 2.3.3 | Contractor Extended Warranty | 11 |
| 2.3.4 | Electronic security system spare parts inventory | 12 |
| 2.3.5 | Badging and Identification | 12 |
| 2.3.6 | Safety | 13 |
| 2.3.7 | Government Furnished Materials | 14 |
| 3.0 Current Setup | 14 | |
| 4.0 | Statement of Work | 14 |
| 4.1 | Installation Plan | 14 |
| 4.2 | Coordination with Smart Card Distribution | 14 |
| 4.3 | Transition Approach | 14 |
| 4.4 | Security | 15 |
| 4.5 | Support from Other Organizations | 16 |
| 4.6 | Facility Access Before or After Normal Working Hours | 16 |
| Project Schedule | 16 | |
| 4.7 | Equipment/System Needs | 16 |
| 4.8 | Site Validation | 17 |
| 4.9 | System Preparation | 18 |
| 4.10 | Commencement of Work | 18 |
| 4.11 | Post Installation Testing | 19 |
| 4.12 | Post Change Out Report | 20 |
| 4.13 | Quick Issue Response | 20 |
| 4.14 | Document Installed PACS and Related Systems | 20 |
| 4.15 | Missing or Inoperative Door Equipment | 22 |
| 4.16 | Related Equipment Interfaces | 22 |
| 4.17 | Data Communications Infrastructure | 22 |
| 4.18 | Power and Support | 23 |
| 4.19 | Design Proposal for System Replacement | 23 |
| 4.19 Acceptance Testing and Turnover | 24 | |
| 5.0 | Approved Products | 24 |
| 5.1 | Inspections and Acceptance | 25 |
| 5.2 | Storage | 25 |
| 5.3 | Records | 26 |
| 5.4 | Contractor Testing | 26 |
| 5.5 | Removal of Equipment and Materials | 26 |
| 6.0 Functionality & Performance | 26 | |
| 6.1 Data Conversion | 28 | |
| 7.0 Quality | 28 | |
| 7.1 COR Quality Assurance Plan | 28 | |
| 7.0 Deliverables – Training & Deadlines | 28 | |
| Appendix A | 31 | |
| B.2 PRICE/COST SCHEDULE | 32 | |
| ITEM INFORMATION | 32 | |
| B.3 DELIVERY SCHEDULE | 33 | |
| SECTION C - CONTRACT CLAUSES | 34 | |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022) | 34 | |
| C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 40 | |
| C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 40 | |
| C.4 SUPPLEMENTAL INSURANCE REQUIREMENTS | 40 | |
| C.5 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 41 | |
| C.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 44 | |
| C.7 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 45 | |
| C.8 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 46 | |
| C.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 47 | |
| C.10 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JUN 2023) | 47 | |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 56 | |
| SECTION E - SOLICITATION PROVISIONS | 57 | |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2023) | 57 | |
| E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 61 | |
| E.3 52.216-1 TYPE OF CONTRACT (APR 1984) | 64 | |
| E.4 52.233-2 SERVICE OF PROTEST (SEP 2006) | 64 | |
| E.5 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 65 | |
| E.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 65 | |
| E.7 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 66 | |
| E.8 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022) | 66 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C10E Department of Veterans Affairs Veterans Benefits Administration Acquisition Directorate 1800 G Street NW Washington DC 20006
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [] |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
36C10D23Q0068
Page 1 of Page 1 of Statement of Work Upgrade of Facility Physical Access Control System (PACS) The Department of Veterans Affairs, Veterans Benefits Administration (VBA), St. Paul Regional Office, 1 Federal Drive, St. Paul, Minnesota 55111, has a requirement for a contractor to provide and install a stand-alone Physical Access Control System (PACS) on a closed network utilizing two (2) managed switches. The contractor will provide all labor equipment, materials, software, documentation, and other items and services that are required to replace the PACS at the St. Paul Regional Office. The contractor will acquire, schedule, manage, and supervise all resources to perform these tasks and will coordinate all activities with the Contracting Officer and their designated VA point of contact, and Contracting Officer’s Representative (COR) for this project. In addition to providing and installing a PACS, the contractor will provide five years of full warranty coverage which includes all software licensing, on said PACS System.
1.0 Introduction
1.1 Background
Homeland Security Presidential Directive 12 (HSPD-12) requires federal agencies to issue secure and reliable identification to all employees and contractors. Federal Information Processing Standards (FIPS) Publication 201-1 Personal Identify Verification (PIV) of Federal Employees and Contractors, issued by the National Institute of Standards and Technology (NIST), establishes the technical specifications for the smart cards that respond to this requirement.
HSPD-12 requires Federal agencies to provide a common identity (ID) credential system for all federal employees and contractors. PIV badges are electronically verifiable and protected by digital certificates, biometric data, and a Personal Identification Number (PIN) code. These credentials are issued, tracked, and revoked from a central management system and require applicant background checks.
On February 3, 2011, the Office of Management and Budget (OMB) released Memorandum 11-11, Continued Identification of HSPD 12 that requires all federal agency systems be enabled to use PIV credentials in accordance with NIST guidelines. OMB directs agencies to use PIV badges in daily operations and integrate centrally managed PIV badge systems with PACS. PACS readers must at a minimum, extract unique token identifier information from the PIV badge and by FY 2022, existing federal physical and logical access control systems must be upgraded to use PIV credentials.
In accordance with VA Directive 0730 (12 December 2012) the St. Paul Veterans Administration Regional Office (VARO) is responsible for protecting the lives and property within VA’s jurisdiction which includes the safety and security of its employees and visitors as well as the security and access to the facility, equipment, supplies, and personal service records within the St. Paul VARO. St. Paul VARO therefore has a requirement for a PACS.
The PACS will encompass an electronic employee identification system that will assign identity, monitor, and grant or restrict access to all offices and parking throughout the VARO facility by use of a PIV badge that will open approved exterior, interior, elevator, and stairwell doors.
Page 1 of Page 1 of
1.2 Objective
The objective of this Statement of Work is to specify the tasks the contractor is required to accomplish to replace/upgrade the PACS at the St. Paul VARO to bring the St. Paul VARO into compliance with the aforementioned guidelines and regulations.
The contractor will identify the equipment, software, camera software, and data deliverables that are required to deliver and install a CCure 9000 PACS or equivalent PACS if parts are unavailable for CCure 9000.
Currently the St. Paul VARO’s PACS’s ethernet devices are physically connected to the VA network and logically separated by a virtual local area network (VLAN). This has enabled circumvention of secure baseline configurations and has made the current PACS devices susceptible to vulnerability attacks. Having the PACS on the VLAN network does not meet VA security requirements and hampers necessary mitigations of security risks to the St. Paul VARO Network.
The contractor will alleviate this issue by ensuring the CCure 9000 PACS or equivalent PACS provided and installed by the contractor is implemented and configured on its own closed network utilizing two (2) managed switches and head units. The contractor will ensure the new PACS is a standalone system. The contractor will acquire two
(2) separate switches and head units for installation into the Ground floor and 3rd floor Intermediate Distribution Frame (IDF) closets. The closet network switches are to be interconnected via Small Form-Factor Pluggable (SFP) (mini-GBIC) transceiver modules – GigE fiber optic connectors to connect the switches between the closets. All existing cabling pulled and new RS485 Data Cabling installed to panels; PACS and card readers with two twisted pair data cabling. All systems installed will be FICAM Compliant.
1.3 Applicable Documents
The following NIST documents apply to this Statement of Work:
· FIPS 201-1 Personal Identity Verification (PIV) of Federal Employees & Contractors
· SP 800-73 Interfaces for Personal Identity Verification
· SP 800-116 A Recommendation for the Use of PIV Credentials in PACS VA Physical Access Control Systems (PACS) Requirements VA Master Construction Specifications
· 01 00 00 General Requirements
· 28 13 00 Physical Access Control Systems (PACS)
· 28 05 00 Common Work Results for Electronic Safety and Security
· 28 05 13 Commissioning of Electronic Safety and Security
· 28 13 00 Physical Access Control System (PACS)
· 28 13 16 Physical Access Control System and Database Management
· VHA Directive 2011-036, Safety and Health During Construction
Note: Contractor will ensure all work complies with VA departmental construction standards as well as applicable manufacturer's installation anduser manuals.
Page 1 of Page 1 of
2.0 Contractor Personnel & Management
2.1 Non-Personal Services
The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances will the Government assign tasks to or prepare work schedules for individual contractor employees. It will be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it will be the contractor's responsibility to notify the Contracting Officer(CO) immediately.
2.2 Business Relations
The contractor will successfully integrate and coordinate all activity needed to execute the requirement. The contractor will manage the timeliness, completeness, and quality of problem identification. The contractor will provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor will seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel. Contractor will ensure daily communication with the COR.
2.3 Contract Administration and Management
The following subsections specify requirements for contract, management, and personnel administration.
2.3.1 Subcontract Management
The contractor will be responsible for any subcontract management necessary to integrate work performed on this requirement and will be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Contracting Officer (CO) or Contracting Officer Representative (COR). The Prime General Contractor, whom this contract is awarded to is responsible for coordinating all training and badging requirements of the subcontractor to include subcontractor employees.
2.3.2 Location and Hours of Work
This requirement exists at the St. Paul VA Regional Office, 1 Federal Drive, St. Paul, MN 55111. Normal workdays for the contractor will be Monday through Friday, except US Federal Holidays, from 8:00 am until 4:30 pm, central standard time.
2.3.3 Contractor Extended Warranty
Extended Warranty for five (5) full years from the date the PACS is installed and fully operational. Extended Warranty will be provided by installation contractor. Extended Warranty Coverage Includes:
Page 1 of Page 1 of
1. Service Labor: 24/7, 7 days/week, 365/year coverage
2. All Material PACS
3. Software upgrades and license renewal
4. Technical Service Desk Support – M-F CST
5. Eight (8) hour service responses
2.3.4 Electronic security system spare parts inventory
The contractor will maintain a spare parts inventory sufficient for specified maintenance and repair requirements to keep the system continuously operational.
2.3.5 Badging and Identification
Homeland Security Presidential Directive (HSPD) -12 directs all federal agencies and departments to issue identity credentials to provide government workers, contractors, and affiliates with a credential that provides the attributes of security, authentication, trust, and privacy and can be used to verify identities in order to enter federal buildings or gain access to federal computer networks.
All contractor employees, to include their direct employees and subcontractor employees, entering the St. Paul VARO are required to have an individual non-PIV badge prior to beginning work inside the VARO. Therefore, it is essential the contractor complete section I of VA Form 0711 for all contractor/subcontractor employees who will be working inside the building and provide the completed form to the COR within five
(5) days of being awarded the contract. Once the COR receives the VA Form 0711 it will take approximately two (2) working days before a non-PIV card can be prepared. The contractor will be notified by the COR when each employee is to report to room G831, Support Services Division (SSD) for photographs and issuance of a non-PIV badge. The employee must bring two (2) forms of identification when they report to room G831. The contractor is responsible for the cost of fingerprinting and background investigations (if required). The contractor will include the time necessary to process non-PIV badges in their scheduling.
2.3.6 Safety
The contractor will comply with all applicable Federal, State, and local legal requirements regarding worker health and safety. The requirements include those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and will ensure safe andhealthful working conditions for its employees. Contractor will comply with all applicable codes, laws, rules, regulations, and safety requirements and will erect safety barriers, signs, flagging, and devices as appropriate to warn and protect workers, the public and the existing site and other property. The contractor will remove all demolished materials, debris, waste, and scraps. The waste materials will be disposed of in accordance with all applicable environmental guidelines andstandards. No construction materials to include packaging materials will be left on site.
Page 1 of Page 1 of
2.3.7 Government Furnished Materials
The government will provide no cost parking and access to the VARO loading docks as necessary.
3.0 Current Setup
The current PACS consists of the following components/peripherals which the contractor will ensure are included in the new PACS:
1. 96 contactless door readers and applicable door hardware to include 21 IT Com Closet door readers as part of the 96 door readers
2. 16 control panels with applicable hardware
4.0 Statement of Work
4.1 Installation Plan
The contractor will prepare, present, and maintain a detailed installation plan within 21 days of award. The purpose of this plan is to ensure that all facets of the equipment installation are identified, addressed, and coordinated before and during installation.
4.2 Coordination with Smart Card Distribution
VA is producing and distributing FIPS 201-1 smart cards concurrent with the PACS replacement. VA employees and contractors may need to retain legacy access control cards that are compatible with the existing PACS until this PACS replacement is completed. The contractor will coordinate migration from legacy cards to the new FIPS 201-1 smart cards with facility representatives.
4.3 Transition Approach
This plan will specifically identify the approach for transitioning from the installed system to the replacement system in a manner that minimizes disruption to VA facilities and maintains security. The plan will identify how cardholder, configuration, and history event data will be migrated to the new system and how new data or modifications to data are accurately reflected in both the existing PACS and the replacement PACS with minimal redundant data entry. Access control point transition will be addressed by the installation of multi-technology card readers whenever possible. Additionally, the contractor will propose an approach for managing the collection of legacy access control cards once the modified/replaced system has been completely installed.
4.4 Security
The installation plan will include provisions for minimizing disruption to VA’s facilities during the installation activities. It will specifically include provisions for maintaining an acceptable level of security during this project. The installation plan will specifically describe how the installation of new hardware and/or software will be performed such that security is maintained at the existing level without requiring additional security operations personnel.
Page 1 of Page 1 of
4.5 Support from Other Organizations
The installation plan will identify and describe all support required from the VA, VA contractors, or other organizations not under the direct control of the contractor. The installation schedule will include specific milestones that identify where inputs from external organizations or VA are required and will identify the tasks that will be adversely affected by delays in such support.
4.6 Facility Access Before or After Normal Working Hours
The installation plan will specify any tasks that require access to VA facilities outside normal working hours. Tasks that interfere with, or disrupt, VA operations will be scheduled before or after normal working hours. Work outside normal working hours will be approved by and coordinated with VA at least two weeks in advance and is subject to VA approval.
Project Schedule
The installation plan will include a detailed schedule of installation activities. This schedule will identify all task dependencies and will highlight those tasks that must be performed by organizations other than the contractor. The schedule willbe prepared in Microsoft Project. The schedule will initially be submitted with the contractor’s quote and will be updated on a biweekly, or more frequent, basis until the project is completed. The schedule start date will be the VA estimated date of contract award.
4.7 Equipment/System Needs
The Contractor will include the current listed in Section 3.0 Current Setup, and will provide up to:
1) Two (2) PACS Head units, one (1) for G831 and one (1) for Office 3900
2) 21 PIN Pad Contactless Readers for IT Com Closets as part of the 96 total contactless readers
4.8 Site Validation
The contractor will conduct a site viability validation to confirm the actual numbers and types of readers (contactless, contactless plus keypad, etc.), Server, Server Software and System Boards called for in the System Detail Document as well as the reader mounts (mullion, gang box, outdoor, etc.) and their locations. One (1) business day is allotted for site validation assessments at facilities with a total reader population of 110 or less and two (2) business days for facilities with more than 110 readers.
The site validation assessment will also cover the working rules, site access, equipment staging, special access area requirements, and other facility specific conditions under which the removal and replacement of readers, server, server software and system boards will be performed. A planned date for commencement of necessary PACS system components change outs will also be established with the facility during the visit. The contractor will provide a written report of the results of the site validation to include:
Page 1 of Page 1 of
1. Listing of readers, server, server software and system boards by location, type, and form factor.
2. Date of site validation and planned date for start of work.
3. Details of additional readers, server, server software and system boards and/or systems discovered by location, type, and form factor; and
4. Initial schedule for execution readers, server, server software and system boards change out work.
Reports will be submitted electronically to the Contracting Officer, with copies to the facility point of contact (POC) and Contracting Officer’s Representative(COR) and will be included in the Post Change Out Report.
4.9 System Preparation
The contractor will assist the facility in configuring the appropriate settings in the PACS for the VA PIV card V8. The contractor will, to every extent feasible work in cooperation with any third-party contractor the facility may have providing maintenance and support services for the system. The facility will be responsible for entering cardholder and PIV data into the PACS.
4.10 Commencement of Work
If the reader count is within 20% of the total provided in the system detail document, the contractor will proceed with change out on the date agreed to with the facility unless otherwise directed by the COR. Any direction to delay the start of change out will be given by the COR no less than 5 working days prior to the planned start date. In cases where reader counts exceed the 20% threshold, work will not commence until directed by the COR.
The first reader replaced will be used as a check point to verify System Preparation has been performed successfully and the PIV card profile entered into the PACS back end operates correctly at the access control point. Proper configuration will be confirmed prior to continuing with reader change out.
All readers, server, server software and system boards, devices, wiring, and components removed by the contractor will be delivered to the VARO or disposed of as directed by the COR.
4.11 Post Installation Testing
Readers, server, server software, and system boards will be tested for proper operation in accordance with manufacturer’s procedures in all modes required for their specific locations to verify installation.
Post installation testing at access control points where reader to controller operation failed prior to change out will be the responsibility of the facility.
Page 1 of Page 1 of
4.12 Post Change Out Report
Contractor will prepare and submit a report that details readers, server, server software and system boards removed and replaced, test results for each reader,server, server software and system boards, and configuration changes made in the PACS for the VA PIV card. The report will include systems and their associated readers, server, server software and system boards that are not on the facility detail document discovered during site validation which were remediated at the option of the COR. All system preparation, change out, and post installation test procedures and requirements will apply. Readers exceeding the 20% limit of the detail document quantity may be changed out at the option of the COR. All change out and post installation test procedures and requirements detailed will apply.
Note: Cost on a per reader basis; exercised on a system basis by the COR.
4.13 Quick Issue Response
During the 30 days immediately following the installation, testing, and acceptance of PIV-compliant card readers, server, server software, system boards and any operational issues directly or consequentially arising from such installation will be remediated by the contractor as follows: (1) issue identification, (2) diagnostic procedures, (3) resolution recommendation, (4) COR approval, (5) issue correction, and (6)acceptance by facility.
4.14 Document Installed PACS and Related Systems
The contractor will:
1. Identify all existing PACS components (readers, server, server software and system boards) to ensure the system replacement activity adequately addresses all access control equipment that requires replacement to meet HSPD-12 and FICAM requirements.
2. Identify equipment, systems, and software connected to the existing PACS to ensure that related equipment such as intrusion detection, video, visitor management, and other systems are also replaced.
3. Ensure that external interfaces to IDS, Life Safety, Fire Alarms, and other systems remain operational during and after the installation
4. Identify existing primary and redundant power, communications, and other infrastructures that may be affected by the PACS replacement.
5. Identify the equipment, power supplies, enclosures, cabling, and miscellaneous components the contractor proposes to retain and re-use for the new system and report same to COR for review and approval prior to beginning work; and
6. Identify the equipment, cabling, and miscellaneous components the contractor will remove for disposal once the replaced system is installed, accepted, and operational.
The contractor will inspect the St. Paul VARO and document the currently installed access control system to the extent necessary to achieve these objectives and as specified in the following paragraphs.
The contractor will produce block diagrams that identify each of these components and their typical interconnections and document each component (type, manufacturer, and
Page 1 of Page 1 of revision level, location, condition) in a tabular form that is readily tracked to the block diagrams. The intent of this documentation is not to provide detailed engineering drawings but rather to ensure all components have been identified to a level adequate to ensure they are appropriately addressed during the replacement/upgrade project. The contractor will deliver a completed copy of this list to the COR within 30 days of award.
4.15 Missing or Inoperative Door Equipment
The contractor will specifically identify hardware of this (or similar) type that is missing, inoperative, or installed in violation of local life/safety and/or building codes, and its location. The contractor will replace such missing or inoperative equipment with new equipment that is equivalent in form, fit, and function to other similar equipment in the facility; compatible with the replacement or upgraded PACS; and meets all local building codes, electrical codes, and life/safety requirements.
4.16 Related Equipment Interfaces
The contractor will identify systems, if any, with which the installed access control system is connected. Such systems might include closed circuit television systems, visitor management systems, fire alarm systems, or intrusion detection systems. The contractor will identify the manufacturer and model number of each system and identify the specific interfaces with the existing access control system. The contractor will determine the specific approach for maintaining the functionality and performance of each of these interfaces during and after the installation of the replacement PACS.
4.17 Data Communications Infrastructure
The contractor will identify the existing data communications inter-connections between major equipment components. Major equipment components include servers, workstations, field panels or distributed controllers, door controllers, programmable logic controllers or interconnect points, card readers, and any other components that will be affected by the system replacement. Types of connections include, but are not limited to, twisted pair Ethernet, fiber optic Ethernet, coax Ethernet; RS-232, RS-422 and RS-485 serial, Weigand, and clock/data serial. The contractor will identify whether these connections are routed through dedicated or shared conduits, are (or should be) plenum rated, and other pertinent installation information. Where conduit is missing or inadequate, new raceways will be installed in accordance with Master Construction Specification 28 05 28.
4.18 Power and Support
VA envisions the re-use of existing PACS power and battery infrastructure as well as associated PACS and power equipment enclosures. The contractor will identify the source, capacity, distribution, and condition of primary and back-up power to each of the existing system components as well as all PACS enclosures, security containers, and associated hardware and report their findings to the COR within 30 days of award.
4.19 Design Proposal for System Replacement
The contractor will prepare and submit within 30 days of award a detailed design for system replacement. This design will include provisions for coordinating the installation
Page 1 of Page 1 of of the PACS in a manner that minimizes disruption of facility operation while maintaining an acceptable level of security.
4.19 Acceptance Testing and Turnover
The contractor will demonstrate the installed system functions in accordance with VA requirements by performing the acceptance procedures specified in Master Construction Specification 28 08 00 Commissioning of Electronic Safety and Security. The contractor is responsible for tailoring test procedures as required for the specific installation. The contractor will identify all software and equipment warranties and provide all warranty documentation to VA.
5.0 Approved Products
The contractor will use equipment and software selected from the approved products listed in Appendix A. Readers, server, server software and system boards are to be on the GSA Approved Products List, as applicable to the specific PACS manufacturer. VA may recommend or direct a specific product from Appendix A to fulfill PACS Enterprise roadmap requirements beyond the direct scope of the project.
The contractor will be responsible for ensuring the upgraded/replacement system selected from the Approved Products Listing in Appendix A, is designed, and configured in such a manner to meet manufacturer specifications and FIPS 201- 1 requirements, and is acquired, installed, and configured to meet, at a minimum, the requirements identified in the VA Physical Access Control Requirements document and VA Master Construction Specifications Division 28 Electronic Safety and Security.
VA will review and approve the contractor’s proposed design and the installation plan prior to the contractor procuring and installing any equipment or software. VA approval addresses the scope of the project installation (i.e., the number and location of devices) and, where appropriate, the use of equipment and components not subject to the Approved Products List. VA approval will not be interpreted as an endorsement that the contractor’s proposed design meets functional or performance requirements; this is the sole responsibility of the contractor. The contractor will procure all equipment, components, software, licenses, and materials and will provide all tools, supplies, and consumables required to install the proposed system replacement in accordance with the requirements of the following paragraphs.
5.1 Inspections and Acceptance
The contractor will perform incoming inspections and tests as required to ensure the equipment and software are complete, functional, and in compliance with manufacturer specifications prior to beginning installation. This will include all parts and components that are required to replace existing inoperative or missing equipment as identified in the proposed design. The contractor will perform all actions necessary to correct or replace defective components and materials prior to installation.
5.2 Storage
Storage space on site is limited or non-existent. Therefore, the contractor will acquire/maintain all required storage for equipment and materials prior to and during installation.
Page 1 of Page 1 of
5.3 Records
The contractor will initiate and maintain records of the equipment and software components, manufacturer warranties, licenses, documentation, inspections, and corrective actions. The contractor will provide these records to VA when the upgraded/replacement system is accepted.
5.4 Contractor Testing
The contractor will test all installed equipment and software in accordance with manufacturer recommendations and standard contractor installation practices. The contractor will certify to VA they have performed these inspections and tests and that all installed equipment and software perform in accordance with manufacturer specifications and are installed in accordance with the approved system design. This certification will include, at a minimum, inspection documents, discrepancy reports, and follow up action reports.
5.5 Removal of Equipment and Materials
The contractor will demolish and remove all obsolete, disconnected, or replaced equipment, cabling, and miscellaneous components and materials and deliver it to the Government or dispose of it as directed by the VA COR. No cable runs are to be abandoned or dead-ended unless specifically agreed-to by the COR. In all such instances, both ends of such cables will be clearly marked as dead ended and annotated with the location of the opposite end.
6.0 Functionality & Performance
Functionality - The upgraded/replacement system will support all functions provided by the existing access control system except where specifically approved by VA. The contractor will specifically identify any features supported by the currently installed systems that will not be adequately addressed by the proposed design and will identify alternatives for addressing those features. Examples of such functions might include automatic data transfer to data warehouses, automatic transfer of employee data and photographs to other systems, or external interfaces with visitor pre- registration and management systems. The intent of this requirement is to ensure the St. Paul VARO maintains the operational functionality provided by their existing PACS upon completion of the PACS replacement, upgrade, or modification work performed under this Statement of Work.
Performance - The upgraded/replacement system will provide performance that is, at a minimum, equivalent to the existing system or that is specified in the VA Physical Access Control Requirements document and VA Master Construction Specifications Division 28 Electronic Safety and Security, tailored to the St. Paul VARO, whichever is greater. Performance specifications include (i) number of cardholders supported, (ii) number of secured areas supported, (iii) number of readers supported, (iv) card holder throughput rate, (v) amount of history data retained, (vi) length of battery operation, and (vii) reliability, operational availability, and maintainability characteristics, (viii) data interchange rates and responsiveness with external systems including the Identity Management System (IDMS) and/or PIV Issuance System.
Page 1 of Page 1 of
6.1 Data Conversion
The contractor will import cardholder data as required to populate the access control system cardholder database. The primary source of credential data are cardholder PIV cards. Additional data may be available from VA’s IDMS and/or PIV Systems. The contractor will extract other cardholder and equipment configuration data, such as demographics, access rights, and door schedules, from the existing access control system.
7.0 Quality
This section describes the Quality Control components for this effort. The following sub- sections provide details of various considerations on this effort.
7.1 COR Quality Assurance Plan
The Government will monitor the contractor’s performance under this project in accordance with the COR’s Quality Assurance Plan.
7.0 Deliverables – Training & Deadlines
The contractor will provide deliverables as described below. Deliverables will be specified by the government.
Number Name Frequency Quantity A001 Privacy and VA Information Training Prior to work beginning 1 Contractor will coordinate with the COR on conducting in mass Privacy and VA Information Assurance Training. ALL employees must attend this mandatory training as well as sign the VA’s Contractor Rules of Behavior Certificate.
A002 OSHA training Prior to work beginning 1 Contractor site supervisor must possess a current OSHA approved 30hr Safety Awareness Training Certificate. All other contractor employees must possess a current OSHA approved 10hr Safety Awareness Training Certificate. Certificates will be provided within 10 days of award.
A003 VA Forms OE 344 and 0711 Prior to work beginning 1 Contractor and all employees to include sub-contractors and sub-contractor employees must submit a completed OE 344 and VA Form 0711 to the COR within 10 days of NTP. These forms are necessary to initiate the PIV badging requirements for this contract. Contractor will coordinate with the COR submission of all VA forms.
A004 CCure 9000 PACS or equivalent Within 90 days of award 1 Contractor to provide and implement CCure 9000 PACS or equivalent that meets or exceeds the specifications of the existing St. Paul VARO PACS as well as the requirements described herein.
| A006 Software license for PACS and | Beginning when PACS 1 |
| ongoing Support | is fully operational |
Contractor to provide software license and support pursuant to the requirements described herein.
A007 System Operational Training Upon completion of install 1 Contractor shall provide training on the new/upgraded PACS systems to ensure that authorized government users are familiar with characteristics and operation of upgraded system.
A008 System Warranty Upon completion of install 1 Contractor shall provide a warranty for a period of five (5) year of parts and labor of all newly installed equipment.
Page 1 of Page 1 of Appendix A
HSPD-12 compliant Physical Access Control Systems preferred
1. Software House C*Cure 9000
2. AMAG Symmetry Professional v9.3
3. Johnson Controls P2000
4. JCI P2000
Contactless PIV Readers Compatible with the authorized systems and compliant with new USAccess V 8.1 PIV Cards
Readers will be listed on the GSA Approved Products and supported by the manufacturer of the PACS on which they are to be installed:
https://www.idmanagement.gov/approved-products-list-pacs-products/
Approved Products List (idmanagement.gov) FIPS 201 Evaluation Program ID Management.gov
HID Global Validation System for Software House C Cure 9000, you can use these types of card readers:
o pivCLASS RP40 Contactless Reader (APL#10003) o pivCLASS RK40 Contactless Reader + PIN (APL# 10004) o pivCLASS RPK40 Contactless Reader + PIN (APL# 10005) o pivCLASS R40 Contactless Reader (APL# 10006) o pivCLASS RKCL40 Contact/Contactless Reader with PIN (APL# 10007) o pivCLASS RPKCL40 Contact/Contactless Reader with PIN (APL# 10008) o pivCLASS RPKCLB40 Contact/Contactless Reader with PIN & BIO (APL# 10026) o pivCLASS RKCLB40 Contact/Contactless Reader with PIN & BIO (APL# 10052) o pivCLASS R10 Contactless Reader (APL# 10085)
· Veridt Bio Dual Contact/Contactless Keypad Reader (APL# 10092)
· Veridt Stealth Dual Contact/Contactless Keypad Reader (APL# 10093)
· Veridt Stealth Lite Dual Contact / Contactless Reader
· Veridt Stealth Contactless Keypad Reader (APL# 10095)
· Veridt Stealth Lite Contactless Reader (APL #10096)
This solution has been approved for use with FIPS 201-2 credentials.
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| SV |
| __________________ |
| __________________ |
Product Number:
St. Paul Regional Office Physical Access Control System Upgrade Contract Period: Base POP Begin: 09-11-2023 POP End: 01-31-2024 PRINCIPAL NAICS CODE: 561621 - Security Systems Services (except Locksmiths) PRODUCT/SERVICE CODE: J063 - Maintenance, Repair, and Rebuilding of Equipment - Alarm, Signal, and Security Detection Systems
| 1.00 |
| SV |
| __________________ |
| __________________ |
Extended Warranty-after the initial manufactures warranty expires.
Contract Period: Option 1 POP Begin: 10-30-2023 POP End: 10-29-2024
| GRAND TOTAL |
| __________________ |
B.3 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| Department of Veterans Affairs |
Saint Paul Regional Office Fort Snelling 1 Federal Drive Saint Paul, MN 55111 United States
1.00
| MARK FOR: |
| Travis Strey |
travis.strey@va.gov
1.00
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government…
This is the start of the file's text. The full file is on GovTribe.