36C10A23Q0055 - Final.docx
DOCX document 219 KB Posted
- Attached to
- DA10--Engineered Care_VISN 6 (483-23-1-6601-0001) (VA-23-00020231) Federal contract opportunity
- Solicitation number
- 36C10A23Q0055
About this file
This request for quotation (RFQ) from the Department of Veterans Affairs Technology Acquisition Center solicits quotes for a term license to use care transition portal software and maintenance support for seven Veterans Affairs medical centers in VISN 6. The software will be used to create an after hospital care plan for veterans discharged from inpatient settings. Quotes are due by February 21, 2023 with award by March 10, 2023. The base period of performance is 12 months with two 12-month option periods to extend the software licenses and maintenance. Quotes shall include pricing for the term licenses, documentation, training, help desk support, maintenance, and monthly progress reporting to fulfill the requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C10A23Q0055 0001.docx | DOCX document | |
| 36C10A23Q0055 0001_1.docx | DOCX document | |
| 36C10A23Q0055_1.docx | DOCX document | |
| Engineered Care JA at Solicitation.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10A23Q0055
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TAC
02-014-2023 John Sangalang (848)-377-5115 02-21-2023
12:00PM
EST
Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
X
541519 $30 Million
N/A
See Delivery Schedule
Y Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way
Y Department of Veteran Affairs Financial Services Center P.O. Box 149971
Austin TX 78714-8971
(877) 353-9791
See CONTINUATION Page Engineered Care- Care Transitions Portal See section B.4 Price Schedule and B.5 Product Description
See CONTINUATION Page x
Mary Accomando
Table of Contents
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 SCHEDULE OF SUPPLIES AND SERVICES | 3 |
| B.2 PRICE SCHEDULE | 3 |
| B.3 GOVERNING LAW | 8 |
| B.4 SOFTWARE LICENSE, MAINTEANCE AND TECHNICAL SUPPORT | 9 |
| CONTRACT ADMINISTRATION DATA | 10 |
| B.5 1.0 PRODUCT DESCRIPTION | 12 |
| SECTION C - CONTRACT CLAUSES | 24 |
| FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 24 |
| C.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 24 |
| C.2 FAR 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY PRICED LINE ITEM (MAR 1989) | 25 |
| C.3 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 25 |
| C.4 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020) | 25 |
| C.5 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 27 |
| C.6 FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS – COMMERCIAL ITEMS (DEC 2022) | 28 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 36 |
| SECTION E - SOLICITATION PROVISIONS | 37 |
| E.1 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 37 |
| E.2 FAR 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 37 |
| E.3 FAR 52.216-1 TYPE OF CONTRACT (APR 1984) | 40 |
| E.4 FAR 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES – REPRESENTATION (OCT 2020) | 40 |
| E.5 FAR 52.233-2 SERVICE OF PROTEST (SEPT 2006) | 41 |
| E.6 FAR 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 41 |
| E.7 FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022) | 42 |
| E.8 52.233-2 SERVICE OF PROTEST (SEPT 2006) | 60 |
| E.9 VIP VERIFICATION REQUIREMENT FOR SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (SDVOSBs) | 61 |
| E.10 BASIS FOR AWARD | 61 |
| E.11 QUOTES SUBMISSION INSTRUCTIONS | 62 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 SCHEDULE OF SUPPLIES AND SERVICES
Period of performance: 12 Months with two (2) 12 month options and an optional task. Software support is effective February 22, 2023.
B.2 PRICE SCHEDULE
Base Period
The Period of Performance of this Order shall be 12 months from date of award.
| Line Item |
| Description/ Part Number |
| QTY |
Unit Unit Price Extended Price
| 0001 |
| Term License to use Care Transitions Portal software |
Software and maintenance support license for customer sites:
Asheville VAMC, Asheville, NC Durham VAMC, Durham, NC Fayetteville VAMC, Fayetteville, NC Hampton VAMC, Hampton, VA Richmond VAMC, Richmond, VA Salem VAMC, Salem, VA Salisbury VAMC, Salisbury, NC
| 7 |
| EA |
| $ |
| $ |
| 0001AA |
| Contractor Project Management Plan |
In Accordance With (IAW) PD Section 1.2
| 1 |
| EA |
| NSP |
| NSP |
| 0001AB |
| Kickoff meeting agenda |
IAW PD Section 1.3
| 1 |
| EA |
| NSP |
| NSP |
| 0001AC |
| Kickoff meeting minutes |
IAW PD Section 1.3
| 1 |
| EA |
| NSP |
| NSP |
| 0001AD |
| Help Desk Support Plan |
IAW PD Section1.4
| 1 |
| EA |
| NSP |
| NSP |
| 0001AE |
| Full Documentation for All Manufacturer—Sponsored Software Changes/Modifications (major releases) - due within seven days after completion or modification changes. |
For three minor patch releases.
IAW PD Section 1.5
| 1 |
| EA |
| NSP |
| NSP |
| 0001AF |
| Manufacturer-Supplied User Manuals – due 30 days after award and due seven days following any updates. |
IAW PD Section 1.5
| 1 |
| EA |
| NSP |
| NSP |
| 0001AG |
| Monthly Progress Report |
IAW PD Section 1.6
| 12 |
| EA |
| NSP |
| NSP |
| 0001AH |
| Root cause Analysis |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 0001AI |
| After Action Report |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 0001AJ |
| Security Logs (encrypted) |
IAW PD Section1.8
| 1 |
| EA |
| NSP |
| NSP |
| 0001AK |
| Incident Report |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 0001AL |
| PowerPoint Training Slide Deck and Video or materials. |
IAW PD Section 1.9.1
| 1 |
| EA |
| NSP |
| NSP |
| 0001AM |
| Quarterly Webinar PowerPoint Training Slide Deck and Video. |
IAW PD Section 1.9.1
| 4 |
| EA |
| NSP |
| NSP |
| Total Base Period |
| $ |
Option Period 1
This Option Year may be exercised IAW FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000). The period of performance, if exercised, shall be 12 months.
| Line Item |
| Description/ Part Number |
| QTY |
Unit Unit Price Extended Price
| 1001 |
| Term License to use Care Transitions Portal software |
Software and maintenance support license for customer sites:
Asheville VAMC, Asheville, NC Durham VAMC, Durham, NC Fayetteville VAMC, Fayetteville, NC Hampton VAMC, Hampton, VA Richmond VAMC, Richmond, VA Salem VAMC, Salem, VA Salisbury VAMC, Salisbury, NC
| 7 |
| EA |
| $ |
| $ |
| 1001AA |
| Full Documentation for All Manufacturer—Sponsored Software Changes/Modifications (major releases) - due within seven days after completion or modification changes. |
For three minor patch releases.
IAW PD Section 1.5
| 1 |
| EA |
| NSP |
| NSP |
| 1001AB |
| Manufacturer-Supplied User Manuals – due 30 days after award and due seven days following any updates. |
IAW PD Section 1.5
| 1 |
| EA |
| NSP |
| NSP |
| 1001AC |
| Monthly Progress Report |
IAW PD Section 1.6
| 12 |
| EA |
| NSP |
| NSP |
| 1001AD |
| Root cause Analysis |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 1001AE |
| After Action Report |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 1001AF |
| Security Logs (encrypted) |
IAW PD Section1.8
| 1 |
| EA |
| NSP |
| NSP |
| 1001AG |
| Incident Report |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 1001AH |
| PowerPoint Training Slide Deck and Video or materials. |
IAW PD Section 1.9.1
| 1 |
| EA |
| NSP |
| NSP |
| 1001AI |
| Quarterly Webinar PowerPoint Training Slide Deck and Video. |
IAW PD Section 1.9.1
| 4 |
| EA |
| NSP |
| NSP |
| Total Option Period 1 |
| $ |
Option Period 2
This Option Year may be exercised IAW FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000). The period of performance, if exercised, shall be 12 months.
| Line Item |
| Description/ Part Number |
| QTY |
Unit Unit Price Extended Price
| 2001 |
| Term License to use Care Transitions Portal software |
Software and maintenance support license for customer sites:
Asheville VAMC, Asheville, NC Durham VAMC, Durham, NC Fayetteville VAMC, Fayetteville, NC Hampton VAMC, Hampton, VA Richmond VAMC, Richmond, VA Salem VAMC, Salem, VA Salisbury VAMC, Salisbury, NC
| 7 |
| EA |
| $ |
| $ |
| 2001AA |
| Full Documentation for All Manufacturer—Sponsored Software Changes/Modifications (major releases) - due within seven days after completion or modification changes. |
For three minor patch releases.
IAW PD Section 1.5
| 1 |
| EA |
| NSP |
| NSP |
| 2001AB |
| Manufacturer-Supplied User Manuals – due 30 days after award and due seven days following any updates. |
IAW PD Section 1.5
| 1 |
| EA |
| NSP |
| NSP |
| 2001AC |
| Monthly Progress Report |
IAW PD Section 1.6
| 12 |
| EA |
| NSP |
| NSP |
| 2001AD |
| Root cause Analysis |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 2001AE |
| After Action Report |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 2001AF |
| Security Logs (encrypted) |
IAW PD Section1.8
| 1 |
| EA |
| NSP |
| NSP |
| 2001AG |
| Incident Report |
IAW PD Section 1.8
| 1 |
| EA |
| NSP |
| NSP |
| 2001AH |
| PowerPoint Training Slide Deck and Video or materials. |
IAW PD Section 1.9.1
| 1 |
| EA |
| NSP |
| NSP |
| 2001AI |
| Quarterly Webinar PowerPoint Training Slide Deck and Video. |
IAW PD Section 1.9.1
| 4 |
| EA |
| NSP |
| NSP |
| Total Option Period 2 |
| $ |
Optional Task
The following Optional Item may be exercised IAW FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item.
Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
| Line Item |
| Description/ Part Number |
| QTY |
Unit Unit Price Extended Price
| 0002 |
| Implementation Technical Support, NTE 1 year from contract initiation date for the 7 VAMC's. Inclusive of System Redesign Support, Project Management and Training. |
| 7 |
| EA |
| $ |
| $ |
| Total Optional Task |
| $ |
| Total Contract Value |
| $ |
B.3 GOVERNING LAW
Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Order. Commercial license agreements may be made a part of this Order but only if both parties expressly make them an addendum hereto, as permitted by FAR 12.212. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C. § 3901 et seq.), Contracts for Data Processing or Maintenance (38 U.S.C. § 5725), and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this clause and any provision in the Order or the commercial license agreement or elsewhere, the terms of this clause shall prevail. The Contractor shall deliver to the Government all data first produced under this Order with unlimited rights as defined by FAR 52.227-14. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ) in accordance with 28 U.S.C. § 516; at the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Order must be made by modification (Standard Form 30) and shall only be made by a warranted Contracting Officer. Nothing in this Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.
B.4 SOFTWARE LICENSE, MAINTEANCE AND TECHNICAL SUPPORT
(1). Definitions.
a) Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.”
b) Licensor. The term “licensor” shall mean the Contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “Contractor” is the party identified in Block 17a on the SF1449. If the Contractor is a reseller and not the Licensor, the Contractor remains responsible for performance under this Contract/Order.
c) Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services.
d) Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below.
e) Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise.
f) Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware.
g) Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version 5.4 to 6).
(2). Software License.
a) Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software.
b) The Government may use the software in a networked environment.
c) Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d).
d) All limitations of software usage are expressly stated in the Schedule of Supplies/Services and the Performance Work Statement/Product Description.
(3). Software Maintenance and Technical Support.
a) If the Government desires to continue software maintenance and support beyond the period of performance identified in this Contract/Order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received, the Contractor is neither authorized nor permitted to renew any of the previously furnished services.
b) The Contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the Contractor to its commercial customers so as to cause the software to perform according to its specifications, documentation or demonstrated claims.
c) Any telephone support provided by Contractor shall be at no additional cost.
d) The Contractor shall provide all maintenance services in a timely manner in accordance with the Contractor’s customary practice or as defined in the Performance Work Statement or Product Description. However, prolonged delay (exceeding 2 business days) in resolving software problems will be noted in the Government’s various past performance records on the Contractor (e.g., www.cpars.gov).
e) If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse.
(4). Disabling Software Code. The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive key, node lock, time-out or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the Contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government. Inability of the Contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.
(5). Manuals and Publications. Upon Government request, the Contractor shall furnish the most current version of the user manual and publications for all products/services provided under this Contract/Order at no cost.
CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
Engineered Care, Inc.
Chris Corio, chris.Corio@Engineeredcare.com 44 Montgomery St STE 3500 San Francisco, CA 94104
b. GOVERNMENT: Contracting Officer 36C10A Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] | |
| b. Semi-Annually | [] | |
| c. Other | [X] Upon acceptance of Deliverables, In accordance with | (IAW) Section B.4 Price Schedule |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
https://www.fsc.va.gov/einvoice.asp ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
ACCOUNTING AND APPROPRIATION DATA
Funds in the amount of $TBD are obligated on IFCAP Order Number TBD to fund CLIN TBD.
The contractor shall reference the IFCAP Order Number on each invoice submitted for payment.
B.5 1.0 PRODUCT DESCRIPTION
The Medical, Administrative, and Leadership teams at the 7 Veterans Administration Medical Centers (VAMCs) within the Mid-Atlantic Health Care Network (VISN 6), which is part of the Veterans Health Administration (VHA) and the Department of Veterans Affairs (VA) have a requirement for a license to use the the Care Transitions Portal software, which will be used to create the After Hospital Care Plan. The After Hospital Care Plan is a booklet containing all of the relevant information and instructions for patients discharged from an inpatient hospital setting. The information is presented in an easy to read, patient friendly format, written at a literacy level appropriate for the Veteran population. Information contained includes the current medication regimen, diagnoses, provider/team contact information, and follow up appointment information. This tool will make a meaningful impact on the patient’s understanding of his/her diagnoses and next steps in care, resulting in increased patient satisfaction. In addition, this booklet allows a more streamlined discharge process since it pulls information from multiple components of the VA’s Electronic Health Record, “Computerized Patient Record System,” (CPRS), reducing the number of people who must manually extract this information, thus also reducing the chance for human error. Finally, helping patients remain healthy post-discharge will reduce unplanned readmissions.
The Contractor shall provide term licenses for all users at the 7 VAMCs in VISN 6 to use the Care Transition Portal, including a VistA-Integrated Care Transitions Portal user interface to create and print an After Hospital Care Plan for every veteran discharge and other associated documents from the 7 sites in VISN 6. This shall include installation, integration, customization of the After Hospital Care Plan software configuration, testing, and deployment, as well as other professional services (as necessary), and training of VISN 6 users for the base year. The software shall be housed on a VA server. The period of performance shall be a 12-month base period with two (2) 12-month Option Periods for use of the licenses and maintenance.
The following shall be part of the implementation solutions:
· Creation of After Hospital Care Plan with health literacy appropriate patient discharge instructions for patients;
· Report functionality to enable continual quality improvement and performance tracking;
· Administrative interface to perform user management, application configuration and auditing;
· Integrate the AHCP software with the hospital based VISTA software used for evidence-based, VISTA-Integrated Discharge Instructions. Replaces a site`s existing CPRS discharge note with a patient-friendly discharge instruction booklet that:
a. Has been shown to reduce unnecessary readmissions,
b. Is customized for the VA environment to help educate veterans about their care and additional VA programs,
c. Improves the discharge process at a VA site while providing leadership opportunities for clinical staff. A new software that will interface with Computerized Patients Record System (CPRS) to improve the discharge process. It allows the care givers to have one source to print Care Plans, the patients schedule appointments, etc. End-users will access via CPRS Tools. Grants a license for VISN 6 VAMC’s and the medical staff involved in discharging in-patientss to use the Care Transitions Portal, during the 12-month base and two (2) 12-month option years.
· Allows care givers to have one source to print Care Plans, the patients schedule appointment, ECT, through access via CPRS Tools.
· Clear discharge instructions compiled in a booklet to keep instructions in one place and be easier for veteran patients to review and understand and follow their Care Plans, in one easy booklet.
· Technology that is a stable integrated application intended to improve the patient discharge process by providing education regarding patient diagnosis, documentation follow-up appointment and discharge services, confirms the medication plan, reviews steps on what to do if a problem arises, assesses the patient’s understanding of the plan, gives the patient a written discharge plan to take home review and follow.
The contractor shall ensure installation and implementation at the following sites:
| VISN 06 Facility Name |
| Address |
| Asheville HCS |
| Asheville VAMC |
1100 Tunnel Rd, Asheville, NC 28805
| Durham HCS |
| Durham Campus |
508 Fulton St. Durham, NC 27705
| Fayetteville HCS |
| Fayetteville VAMC |
2300 Ramsey St, Fayetteville, NC 28301
| Hampton HCS |
| Hampton VAMC |
100 Emancipation Dr, Hampton, VA 23667
| Richmond HCS |
| Richmond VAMC |
1201 Broad Rock Blvd, Richmond, VA 23249
| Salem HCS |
| Salem VAMC |
1970 Roanoke Blvd, Salem, VA 24153
| Salisbury HCS |
| Salisbury VAMC |
1601 Brenner Ave, Salisbury, NC 28144
Table 1 - VISN 06 Facilities/Locations for the Care Transitions Software Portal and Maintenance Support
1.1 SERVICE LEVEL AGREEMENT (SLA) REQUIREMENTS
The following table contains the SLA requirements for this effort.
Table 2: Service Level Agreement (SLA) Requirements
| SLA Metric Name |
| Required Service |
| Desired Outcomes |
| Performance Measure Definition / Standard |
| Minimum Acceptable Performance Level (MAPL) |
| Evaluation Frequency |
| Surveillance Method |
| Uptime Metric |
| Uptime |
| Ensure availability of cloud hosted environments |
| The Contractor shall provide consistent availability (e.g. uptime) of VA cloud hosted environments. The unscheduled downtime of any Contractor supplied and managed service or component will count against availability. Service Availability is defined as all services and applications in the VA cloud environments are available, whether it is during abnormal system operation or software upgrade regardless of hardware, software or user fault. |
| Uptime Requirement is 99.5% |
| Monthly |
| 98% Inspection of Performance Metrics |
| Maintenance Window |
| Scheduled Maintenance Window |
| The Contractor's notification of scheduled maintenance to the Government |
| The Contractor shall notify the COR 48 hours prior to performance of any scheduled maintenance. Calculation of Service Unavailability shall not include any time the Service is unavailable due to scheduled maintenance. |
| Contractor shall notify the Government at least 48 hours prior to scheduled maintenance. Maintenance window shall not exceed the 4-hour period between Midnight and 4 am Eastern Standard Time (EST) and is not to exceed once per week. If the maintenance conflicts with other program requirements the work will be scheduled at the next agreed upon date. |
| Report for each event |
| Periodic Inspection of Maintenance Window Notifications. |
| Recovery Point Objective (RPO) |
| Availability, Backup, Recovery and Monitoring |
| Provide a secure backup, recovery and network solution to facilitate the RPO at AlI SITES. |
| Recovery Point Objective (RPO) |
| For the RPO, the Contractor shall ensure that no more than 1% of data is lost as a result of initiating the recovery process. |
| Monthly |
| Monthly Backup and Recovery logs\Backup Performance Metrics as part of the Help Desk Report |
| Secure Connection Availability |
| Infrastructure Network Availability and Monitoring |
| The Contractor shall provide and monitor availability of the network connections through the VA Trusted Internet Connection (TIC) |
| Secure Site to Site network connection through TIC is defined as the encrypted link between VA's boundary controller and the Contractor's boundary controller. The Contractor is required to maintain the encrypted link on the Contractor-managed end of the connection. |
| Ensure the Contractor-managed end of the connection is available 99.5% of the time. |
| Monthly |
| 98% Inspection of Performance Metrics as part of the Help Desk Report |
| Support Response Time |
| Support Response |
| The response time of the Contractor to Government requests |
| Response/Acknowledgment time begins when monitoring alerts are discovered and validated or when the Contractor receives a support request from VA. |
Severity Level 1 - Critical Impact notification received from VA by phone or email Severity Level 2 - Major Impact notification received from VA by phone or email Severity Level 3 - Minor Impact notification varies - either by phone, e-mail or ticket submission Severity Level 4 – Proposed enhancements or usage questions. Notification varies - either by phone or , e-mail or Support Response Times:
Severity Level 1 - Critical within 2-4 hours Severity Level 2 - Major within 4-6 hours Severity Level 3 - Minor within 24 hours Severity Level 4 – Enhancement or usage questions: within 48 hours
| Monthly |
| Periodic Inspection of Help Desk Ticket resolution times for Restorations, as part of the Help Desk Report |
| Incident Reporting |
| Incident Reporting for Disaster Recovery and Continuous Monitoring |
| Contractor incident reporting to VA that provides VA with visibility into the monitoring and operational status of resources |
| In the event of a service disruption, the Contract shall provide Root Cause Analysis Reports in the Contractor’s report formats. |
| Root Cause Analysis (RCA) Reports |
| Monthly |
| Periodic Inspection of Service Disruptions in the Monthly Help Desk Usage reports compared to submission times of After Action Report and Root Cause Analysis reports, as part of the Help Desk Report |
| Tier 1, 2, and 3 Support |
| Help Desk |
| The Contractor will have the ability to provide expert level troubleshooting and analysis to assist users with the research and solution configuration for new or unknown issues. |
| The Contractor shall provide Help Desk support using the Contractor’s existing help desk capability |
| Dedicated Tier 1, Tier 2 and 3 support as required by events/issues in accordance with Table 1 |
| As events occur |
| Periodic Inspection of Help Desk Ticket resolution times for Problems. Periodic Inspection of Customer Satisfaction survey data Monthly Performance Reports, as part of the Help Desk Report |
| Help Desk Ticketing, Incident and Outage Reporting |
| Help Desk Reporting |
| The Contractor will provide ticketing related data to the Government |
| The Contractor shall provide Monthly Ticketing Data Reports in the Contractor format. |
| Provide ticketing related data |
| Ticketing reports – monthly Incident and outage reporting – as event occurs |
| Monthly Inspection of Help Desk Ticket resolution times for Problems. Monthly inspection of Ticketing, incident and outage reporting for problems. Monthly Performance Reports, as part of the Help Desk Report |
| Post Production Catalog Data Updates |
| Ingestion and Normalization and Output to the Supply Chain Management Catalog (SCMC) Updated Data |
| Updated SCMC Catalog |
| Availability of updated data in Dashboard, SCMC, and user. |
| 48 hours |
| Monthly |
| Monthly Performance Reports, as part of the Help Desk Report |
1.2 PROJECT MANAGEMENT
1.2.1CONTRACTOR PROJECT MANAGEMENT PLAN
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline and tools to be used in execution of this TO effort. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the Product Description document. The Contractor shall update and maintain the VA Program Manager (PgM) approved CPMP throughout the PoP.
Deliverable:
A. Contractor Project Management Plan
1.3 Kick-Off Meeting
A technical kickoff meeting shall be held within 10 calendar days after contract award. The Contractor shall coordinate the date, time, and location (can be virtual) with the Contracting Officer (CO), as the Post-Award Conference Chairperson, the VISN 6 PM, as well as the Co-Chairperson, the Contract Specialist (CS), and the COR. The Contractor shall provide a draft agenda to the CO and VA PM at least five (5) calendar days prior to the meeting. Upon Government approval of a final agenda, the Contractor shall distribute to all meeting attendees. During the kickoff-meeting, the Contractor shall present, for review and approval by the Government, the details of the proposed approach, work plan, and project schedule for the effort via a Microsoft Office PowerPoint presentation. At the conclusion of the meeting, the Contractor shall update the presentation with a final slide entitled “Summary Report” which shall include notes on any major issues, agreements, or disagreements discussed during the kickoff meeting and the following statement “As the Post-Award Conference Chairperson, I have reviewed the entirety of this presentation and assert that it is an accurate representation and summary of the discussions held during the Technical Kickoff Meeting for the Care Transitions Software and Maintenance Support application meeting.” The Contractor shall submit the final updated presentation to the CO for review and signature within three calendar days after the meeting. The Contractor shall also work with the CS, the Government’s designated note taker, to prepare and distribute the meeting minutes of the kickoff meeting to the CO, COR and all attendees within three calendar days after the meeting. The Contractor shall obtain concurrence from the CS on the content of the meeting minutes prior to distribution of the document.
Deliverable:
A. Kickoff meeting agenda B. Kickoff meeting minutes
1.4 HOSTED ENVIRONMENT HELP DESK SUPPORT
The Contractor shall provideHelp Desk support meeting the requirements listed below for all the Care Transition application. Help Desk support is defined as expert level troubleshooting and analysis methods. The Help Desk shall include:
a. Providing technical assistance to authorized users.
b. Authenticating a User through questions/challenges in the user profile before giving access; providing information; or making changes to the system.
c. Maintaining a ticket tracking system.
d. Managing and tracking all environment outages.
e. Managing Help Desk request fulfillment, access management, and planned and preventive maintenance.
f. Providing input and technical support to VA help/service desks on all layers until resolution.
g. Providing problem management tracking for four severity (SEV) levels of problem requests and timely resolutions for infrastructure problems in accordance with the SLA:
A. A SEV 1 Incident shall be defined as an error that renders inoperative any part or the entirety of the Software, or that causes the software to fail catastrophically.
B. A SEV 2 Incident shall be defined as an error that significantly degrades performance of the Software or restricts the use of the software.
C. A SEV 3 Incident shall be defined as having only minor impact on the usage of the software.
D. A SEV 4 Incident shall be defined as a proposed enhancement or usage question.
h. Notifying the VA Project Manager (PM) of scheduled maintenance windows per the SLA.
i. Coordinating with VA for network outage, reconfiguration, and network troubleshooting issues.
j. The Contractor shall provide a detailed helpdesk support plan that includes metrics of tracking issues for severity levels 1-3, and standard operating procedures for the support provided in 1.6 (a-g)
Deliverables:
A. Help Desk Support Plan
1.5 TECHNICAL SUPPORT
The Contractor shall provide technical support for the Care Transition software related to operation and configuration. The Contractor shall provide 24x7x365 technical support through a toll-free contact number or email for Severity Level 1 Errors. Technical support for Severity Level 2 Errors will be provided in 4-6 hours, for Level 3 Errors within 24 hors, and for Severity Level 4 hours within 48 hours.
The Contractor shall provide technical support for all Care Transition software including any manufacturer-sponsored modification or revisions. The support provided shall consist of correction of errors, provision of manufacturer-sponsored modifications, improvements, and revisions. The Contractor shall furnish Full Documentation for All Manufacture-Sponsored Software Changes/Modifications. The Contractor shall furnish the most current electronic version of Manufacturer-Supplied User Manuals, when available. All efforts performed on this subtask including trouble tickets shall be reported in the Monthly Progress Report.
Deliverables:
A. Full Documentation for All Manufacturer—Sponsored Software Changes/Modifications (major releases) - due within seven days after completion or modification changes
a. For three minor patch releases B. Manufacturer-Supplied User Manuals – due 30 days after award and due seven days following any updates
1.6 MAINTENANCE
The Contractor shall maintain the Care Transition and updates criteria.
The Contractor shall identify issues, troubleshoot anomalies, and provide maintenance for the content distribution and digital signage. The Contractor shall provide a 24x7x365 toll-free contact number for maintenance. The Contractor shall provide 24x7x365 technical support through a toll-free contact number or email for Severity Level 1 Errors within 2-4 hours. Technical support for Severity Level 2 Errors will be provided in 4-6 hours, for Level 3 Errors within 24 hours, and for Severity Level 4 hours within 48 hours. When required, the Contractor shall initiate on-site corrective action within 24 hours. Once repairs are initiated, the Contractor shall continue until the work is completed. The Contractor shall troubleshoot the content distribution and digital signage hardware and software to determine the best method of repair. The Contractor shall notify the COR of identified defect/failure and continue corrective measures until the problem is resolved. The Contractor shall provide functionally comparable equipment when failed hardware needs to be replaced.
Routine scheduled maintenance shall be scheduled during off peak hours after 9:00pm EST in patient care areas unless otherwise approved by the COR. Maintenance can be schedule anytime in non-patient areas. Holidays and weekends work must be scheduled with COR. The Contractor shall notify VA of routine maintenance seven (7) days prior to the event and shall indicate whether a scheduled event poses a risk of the service to be offline or which may degrade system performance. The Contractor shall provide and install manufacturer software/firmware upgrades within 60 days of manufacturer release. The Contractor shall notify the COR of all upgrades and receive approval prior to installation.
Any actions performed on this subtask shall be reported in the Monthly Progress Report, including any identified security issues, the number of service calls and the resolution of the calls, the amount of time taken to resolve the calls, user complaints and the Contractor action taken on those user complaints.
Deliverables:
A. Monthly Progress Report
1.7 PERFORMANCE MONITORING
The Contractor shall provide periodic performance reporting during the course of AHCP software installation and deployment IAW SLA criteria. ASHEVILLE HCS, DURHAM HCS, FAYETTEVILLE HCS, HAMPTON HCS, RICHMOND HCS, SALEM HCS, SALISBURY HCS shall have real-time access to the AHCP software during this time and may conduct periodic product sampling to verify compliance with requirements.
1.8 SECURITY REQUIREMENT
The Contractor shall provide continuous monitoring of all critical hosting resources including the computing environments. The Contractor shall monitor all such resources through automated tools to ensure availability and to guarantee that all systems are operating within the expected parameters as defined by the SLA (detailed in Section 1.2).
In the event of a service disruption, the Contractor shall notify the COR within fifteen (15) minutes of detecting the event. Tools employed in the monitoring of resources should have no less than five (5) minute resolution to ensure there is minimal time between event occurrence and detection. Such notifications shall be disseminated according to the severity and impact according to the Event Escalation Plan.
If an event (System Outage) occurs that impacts the availability of the environment, the Contractor shall provide an Event Update Report every hour until the issue is resolved. After the event, the Contractor shall provide an After-Action Report (AAR) with a detailed summary of the identified problem, chronology of events, impact analysis, remediation actions, total elapsed time, and lessons learned within three (3) business days after the conclusion of the event. The downtime and the impact to the SLA shall be included in the report. Within three (3) business days of resolution, the Contractor shall provide an initial Root Cause Analysis (RCA) outage report IAW Section 1.2. A final version shall be supplied within (5) business days of receiving Government’s feedback.
· Software shall operate within the VA internal/intranet side of the web system (VAWW). VA sensitive information will reside within the vendor database.
· C&A requirements do not apply, and a Security Accreditation Package is not required.
· Uses an MDWS interface to VISTA and uses Remote Procedure Calls already defined in VISTA (RPC Broker calls).
· Software shall integrate with the CPRS Chart.
· Use of this technology must comply with ESCCB requirements which include: Signed Interconnection Agreements/Memorandum of Understanding agreements (MOU/ISA) with each external business partner. Compliance with VA Handbook 6500, and must implement appropriate National Institute of Standards and Technology (NIST) Federal Information Processing Standards CFIP SL requirements for all devices interacting with this technology.
· All instances of deployment using this technology will be reviewed by VA employee, the local ISO (Information Security Officer), to ensure compliance with VA Handbook 6500 and National Institute of Standards and Technology (NIST) standards and an ISO Risk Based Decision (RBD) must be approved by the local ISO/CIO before it can be used in the VA Production Environment. In cases where the technology is used for external connections, a full Enterprise Security Change Control Board (ESCCB) review is required in accordance VA Directive 6004, VA Directive 6517 and VA Directive 6513. The local ISO will advise on the ESCCB review process and ensure privacy of information compliance protections are in place.
Deliverables:
A. Root cause Analysis B. After Action Report C. Security Logs (encrypted) D. Incident Report
1.9 TRAINING
The Contractor shall provide comprehensive training on the use of the AHCP software being purchased for all staff members that are to use this software. At a minimum, training shall include, but not be limited to technical and operational training. Instruction/user guides shall be provided for both training and technical and operational usage.
The training shall occur at the ASHEVILLE HCS, DURHAM HCS, FAYETTEVILLE HCS, HAMPTON HCS, RICHMOND HCS, SALEM HCS, SALISBURY HCS, via on-line, instructor driven classes during normal business hours, 8:00am-4:30pm Eastern Standard Time, Monday through Friday, excluding all Federal Holidays. Training date and time shall be prescheduled and preapproved by the contracting officer’s representative prior to initiation.
1.9.1 TRAINING AND TRAINING DOCUMENTS/MATERIALS
The Contractor shall provide two virtual, instructor led training sessions (on TEAMs, Skype, or Webex) users at the 7 VAMCs in VISN 6 to use the Care Transition Portal, on the operations and functionality of the software, including a troubleshooting section. The training shall also include procedures to submit Engineering transition and support plans to the VA. The Contractor shall deliver the PowerPoint training slide deck. The Contractor shall record the training session and provide a copy of the recorded training session playable on MS Windows 10 environment or equivalent. The Contractor shall coordinate with the COR to schedule the training sessions to be completed prior to software going operational.
The Contractor shall conduct quarterly virtual software update webinar sessions (via Skype or Webex). The Contractor shall deliver the Quarterly webinar PowerPoint training slide deck. The Contractor shall record the Quarterly webinar training session and provide a copy of the recorded training session playable on MS Windows 10 environment or equivalent. The Contractor shall coordinate with the COR to schedule the Quarterly webinar training sessions with the COR.
Deliverables:
1. PowerPoint Training Slide Deck and Video or materials.
1. Quarterly Webinar PowerPoint Training Slide Deck and Video.
1.10 SOFTWARE AND LICENSING REQUIREMENTS
The Contractor shall be responsible for the provision of all software licenses and any associated licensing maintenance required for any development, delivery, integration, operation, and/or maintenance associated with its proposed application(s), software products, software solution, and/or system including, but not limited to, any and all application(s), software and/or software products that comprise, are a part of, or integrate with the Contractor’s proposed application(s), software products, software solution, and/or system for the life of any resulting contract.
2.0 NOTICE OF THE FEDERAL ACCESSIBILITY LAW AFFECTING ALL INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) PROCUREMENTS (SECTION 508) On January 18, 2017, the Architectural and Transportation Barriers Compliance Board (Access Board) revised and updated, in a single rulemaking, standards for electronic and information technology developed, procured, maintained, or used by Federal agencies covered by Section 508 of the Rehabilitation Act of 1973, as well as our guidelines for telecommunications equipment and customer premises equipment covered by Section 255 of the Communications Act of 1934. The revisions and updates to the Section 508-based standards and Section 255-based guidelines are intended to ensure that information and communication technology (ICT) covered by the respective statutes is accessible to and usable by individuals with disabilities.
2.1 SECTION 508 – INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) STANDARDS
The Section 508 standards established by the Access Board are incorporated into, and made part of all VA orders, solicitations and purchase orders developed to procure ICT. These standards are found in their entirety at: https://www.access-board.gov/guidelines-and-standards/communications-and-it/about-the-ict-refresh/final-rule/text-of-the-standards-and-guidelines. A printed copy of the standards will be supplied upon request.
Federal agencies must comply with the updated Section 508 Standards beginning on January 18, 2018. The Final Rule as published in the Federal Register is available from the Access Board: https://www.access-board.gov/guidelines-and-standards/communications-and-it/about-the-ict-refresh/final-rule.
The Contractor shall comply with “508 Chapter 2: Scoping Requirements” for all electronic ICT and content delivered under this contract. Specifically, as appropriate for the technology and its functionality, the Contractor shall comply with the technical standards marked here:
| |X| | E205 Electronic Content – (Accessibility Standard -WCAG 2.0 Level A and AA Guidelines) |
| |X| | E204 Functional Performance Criteria |
| |_| | E206 Hardware Requirements |
| |X| | E207 Software Requirements |
| |X| | E208 Support Documentation and Services Requirements |
2.2 COMPATABILITY WITH ASSISTIVE TECHNOLOGY
The standards do not require installation of specific accessibility-related software or attachment of an assistive technology device. Section 508 requires that ICT be compatible with such software and devices so that ICT can be accessible to and usable by individuals using assistive technology, including but not limited to screen readers, screen magnifiers, and speech recognition software.
2.3 ACCEPTANCE AND ACCEPTANCE TESTING
Deliverables resulting from this solicitation will be accepted based in part on satisfaction of the Section 508 Chapter 2: Scoping Requirements standards identified above.
The Government reserves the right to test for Section 508 Compliance before delivery. The Contractor shall be able to demonstrate Section 508 Compliance upon delivery.
3.- SHIPMENT OF HARDWARE OR EQUIPMENT
Inspection: Destination Acceptance: Destination Free on Board (FOB): Destination
Ship To and Mark For:
Primary
Alternate
| Name: |
| Katherine McMullin |
| Name: |
| Address: |
| 3518 Westgate Dr. |
Suite 200 Durham, NC 27701 Address:
| Voice: |
| 919 354-9348 |
| Voice: |
| Email: |
| Katherine.mcmullin@va.gov |
| Email: |
3.1 VA TECHNICAL REFERENCE MODEL
The Contractor shall support the VA enterprise management framework. In association with the framework, the Contractor shall comply with OIT Technical Reference Model (VA TRM). The VA TRM is one component within the overall Enterprise Architecture (EA) that establishes a common vocabulary and structure for describing the information technology used to develop, operate, and maintain enterprise applications. Moreover, the VA TRM, which includes the Standards Profile and Product List, serves as a technology roadmap and tool for supporting OIT. Architecture & Engineering Services (AES) has overall responsibility for the VA TRM.
3.2 SOCIAL SECURITY NUMBER (SSN) REDUCTION
The Contractor solution shall support the Social Security Number (SSN) Fraud Prevention Act (FPA) of 2017 which prohibits the inclusion of SSNs on any document sent by mail. The Contractor support shall also be performed in accordance with Section 240 of the Consolidated Appropriations Act (CAA) 2018, enacted March 23, 2018, which mandates VA to discontinue using SSNs to identify individuals in all VA information systems as the Primary Identifier. The Contractor shall ensure that any new IT solution discontinues the use of SSN as the Primary Identifier to replace the SSN with the Integrated Control Number (ICN) in all VA information systems for all individuals. The Contractor shall ensure that all Contractor delivered applications and systems integrate with the VA Master Person Index (MPI) for identity traits to include the use of the ICN as the Primary Identifier. The Contractor solution may only use a Social Security Number to identify an individual in an information system if and only if the use of such number is required to obtain information VA requires from an information system that is not under the jurisdiction of VA.
3.3 INTERNET PROTOCOL VERSION 6 (IPV6)
The Contractor solution shall support Internet Protocol Version 6 (IPv6) based upon the memo issued by the Office of Management and Budget (OMB) on November 19, 2020 (https://www.whitehouse.gov/wp-content/uploads/2020/11/M-21-07.pdf).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .