This engineering data list provides technical specifications for an ICBM cable assembly. The document identifies over 100 applicable drawings, specifications, and standards. It includes details such as connector types, wire gauges, insulation materials, and potting compounds. The list also specifies documentation requirements for item manufacturing and inspection reports. The related federal contract opportunity is a 100% small business set-aside issued by the Defense Logistics Agency Aviation to procure the ICBM cable assembly. The solicitation references the National Stock Number and part number identified in the engineering data package. The response deadline and award date are not provided.

View the file

Other files for this federal contract opportunity

Other files attached to ICBM Cable Assembly, newest first.
File Type Posted
SPRHA222R0041.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING DATA LIST

DATE:

04 JAN 2022

REVISION: 15 *HISTORY*

CAGE:

98747

PAGE:

NSN:

6150002392236AH

DATA TECH:

Schrader, Terry L

END ITEM:

LGM-30

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACA/

MANUFACTURER NAME:

OGDEN AIR LOGISTICS CENTER

REFERENCE NUMBER:

69C49442G1

NOUN:

CABLE ASSEMBLY,SPEC

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 07868 69C49442 D S CABLE ASSEMBLY SPECIAL

PURPOSE ELECTRICAL W5K

Schrader, Terry L 04 JAN 2022

WITH EO 03C0829, 13A1044-H, & 16A0084-H

NAME: DATE:

L 15226 S30042/4 AB S REQUIREMENTS FOR HARNESS

ASSEMBLIES

W/EO 18A0536-H

L 15226 R2290 M S FERRULE HEAT SHRINKABLE

L 15226 S30042 V S ENGINEERING AND QUALITY

STANDARD FOR ELECTRONIC

EQ

W/EO 18A0534-H

L 15226 S30042/1 E S WIRE AND LEAD

PREPARATION,

REQUIREMENTS FOR

L 15226 S30042/2 M S SOLDERING TERMINATION,

PREPARATION AND

REQUIREMENT

L 15228 MSP535130 A S MATERIAL SPEC FOR

PROPRIETARY SOLVENTS

L 15226 S30042/3 M S SHIELD TERMINATIONS,

L 15226 S30042/6 F S TERMINATION PREPARATION

AND CRIMPING REQ

W/EO 18A0537-H

L 15226 S30042/5 K S HARNESS INSTALLATION

STANDARD PROCEDURE

L 15226 S30042/10 C S POINT TO POINT WIRING,

L 07868 68B48450 YY S NAMEPLATE/MARKING

CONTROL DRAWING

W/EO 16A0130-H

L 07868 74A54881 G S POLYURETHANE COMPOUND,

POTTING AND

ENCAPSULATION,

WITH EO'S 12A0865-H, 19A0280-H

L 07868 74A54879 D S COMPOUND, POLYURETHANE,

ELECTRONIC PACKAGING

L 15226 47A101726 J S PRIMERS FOR POLYURETHANE

POTTING COMPOUNDS

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

FURNISHED METHOD CODE LEGEND:

Page 1 of 6EDL Version 15Generated by PRPS using Jasper Reports on 20 Jan 2022

L 15226 MSP535131 A S MATERIAL SPECIFICATION

FOR PROPRIETARY

POLYURETHA

L 15226 R6540 D S POLYURETHANE COMPOUND

L 15228 PSP535133 A S MATERIAL SPECIFICATION

FOR APPLICATION OF

POLYURET

L 15228 MSP535132 A S MATERIAL SPECIFICATION

FOR POLYURETHANE

COMPOUNDS

L 07868 68C52766 A S LIST, INTERCONNECTION

MMIII R/S W5K

L 15226 R2164 D S BRAID, WIRE-ROLLED FLAT

(TIN COATED COPPER AMD

ICK

L 15226 R2479 R S INSULATION SLEEVING,

ELECTRICAL-POLYOLEFIN,

HEAT S

L 07868 68D50425 F S TERMINATION, RFI

HARDWARE, TYPICAL

L 07868 67A60756 B S INSULATION SLEEVING,

FLEXIBLE, POLYOLEFIN, HEAT

SH

WITH EO 13A0064-H

L 07868 67D53795 K S TERMINATION, EMR

HARDWARE, TYPICAL

L 15226 128A4792 C S POLYSULFIDE POTTING AND

SEALING COMPOUNDS

L 07868 66A49682 D S COMPOUND, POTTING AND

CONFORMAL COATING,

POLYURETH

W/EO 16A0381-H

L 07868 68A49484 C S RESINS, PLYURETHANE

L 07868 69C49442G1 D S CABLE ASSY, SP ELEC W5K Schrader, Terry L 04 JAN 2022

WITH EO 13A0062-H, 13A0288-H, 13A0995-H, 13A1045-H, AND 13A1221-H

L 07868 66A48000 A S INSERT ARRANGEMENT,

ELECTRICAL CONNECTOR (JT

AND L

WITH EO 12A0836-H

Page 2 of 6EDL Version 15Generated by PRPS using Jasper Reports on 20 Jan 2022

L 07868 66A48037 D S PLUG END SEAL - ELECTRICAL

CONNECTOR

WITH EO 12A0839-H

L 07868 67A60221 H S WIRE, ELECTRICAL,

INSULATED, RADIATION

RESISTANT,

WITH EO 12A0738-H AND 12A0847-H

L 07868 67A60276 D S CABLE, ELECTRICAL-TWISTED

POLYVINYLIDENE FLURIDE

L 15226 R3701 J S CABLE ELECTRICAL TWISTED

RADIATION RESIS

L 15226 R16321 E S MARKER, IDENTIFICATION,

HEAT SHRINKABLE SLEEVING

L 07868 66A49678 F S TAPE, VINYL, ADHESIVE

BACKED-CABLE MARKER

SPECIFIC

WITH EO 12A1412-H

L 15226 R6535 C S COMPOUND, POLYURETHANE,

ELECTRONIC PKGNG

L 07868 75A49531 D S SEALER COATING,

APPLICATION OF

WITH EO 07A0200-H

L 07868 71A45529 S PIGMENT, FLUORESCENT

L 15226 128A5500 E S FILLERS, COLLOIDAL SILICA

L 15228 MSP535144 S MATL SPEC FOR COLLOIDAL

SILICA FILLERS

L 15226 R2311 K S WIRE, ELECTRICAL-SOLID,

COPPER LEAD ALLOY

COATED,

W/EO 18A0272-H

L 98747 200827989 S LABEL, UNIQUE

IDENTIFICATION

WITH EO'S 15A0535-H, 15A0971-H, 16A0081-H, 17A0140-H

L 07868 68A51752 E S CONNECTOR, PLUG,

ELECTRIC-BAYONET

COUPLING

WITH EO 12A0739-H & 12A0858-H

L 07868 68A51760 B S CONTACTS, SOCKET - CRIMP

STYLE, ELECTRICAL CONNECT

L 07868 66A48008 A S CONNECTOR, PLUG,

ELECTRICAL - BAYONET

COUPLING, CR

WITH EO 12A0837-H

Page 3 of 6EDL Version 15Generated by PRPS using Jasper Reports on 20 Jan 2022

L 07868 66A48038 E S CONTACTS, PIN AND SOCKET -

CRIMP STYLE, ELECTRICAL

WITH EO 12A0840-H

L 15226 R2690 E S WIRE, ELECTRICAL,

INSULATED, RADIATION

RESISTANT,

L 07868 66A48036 A S ADAPTER, ELECTRICAL

CONNECTOR TO RFI SHIELD

FOR MI

L 07868 66A48035 A S SHIELD, ELECTICAL

CONNECTOR, - RFI, STRAIGHT

FOR M

L 07868 66A48033 A S SHIELD, ELECTICAL

CONNECTOR, - RFI, RIGHT

ANGLE FO

L 07868 66A48034 A S FERRULE, REDUCING - RFI

SHIELD

L 07868 66A48030 S CONNECTOR, PLUG

ELECTRICAL CABLE

CONNECTING BAYONE

WITH EO 12A0838-H

L 07868 67A55295 A S BACKSHELL, ELECTRIC

CONNECTOR STRAIGHT,

SHORT, FOR

WITH EO 12A0844-H

L 07868 66A50855 T S CONNECTOR PLUG

ELECTRICAL BAYONET

COUPLI

L 07868 67A55296 C S CLAMP, CABLE - STRAIN

RELIEF FOR MIL-C-38999 TYPE,

WITH EO 12A0845-H

L 07868 66A50856 N S JAM NUT MOUNTING,

BAYONET COUPLING,

ENVIRONMENT RE

WITH EO 12A0842-H & 21A3265-H

L 07868 67A55297 E S ELBOW 90 DEGREES, ELECTIC

CONNECTOR - BACKSHELL

WITH EO 12A0846-H

L 07868 66A50857 M S CONNECTOR, PLUG,

COUPLING, CR

WITH EO 12A0843-H & ICBM12C391

Page 4 of 6EDL Version 15Generated by PRPS using Jasper Reports on 20 Jan 2022

L 07868 68A51749 E S CONNECTIRM OKYGM

COUPLING CRI

WITH EO 12A0856-H

L 07868 66A50241 L S CONNECTOR, RECEPTACLE,

COUPLI

WITH EO 12A0841-H

L 15226 118A1526 AD S IDENTIFICATION MARKING Schrader, Terry L 04 JAN 2022

WITH EO 09A0419-H, 18A0636-H & 21A3136-H

L 15226 R6591 S MARKING INK, PERMANENT,

(MACHINE APPLICATIONS)

WITH EO 18A1028-H & 21A3057-H

L 15226 118A1526/1 B S IDENTIFICATION MARKING Schrader, Terry L 04 JAN 2022

WITH EO 18A0034-H & 21A3091-H

L 15226 S30042/7 M S AGE WIRING, REQUIREMENTS

FOR

WITH EO 18A0043-H

L 15226 S30042/8 K S PRINTED WIRING BOARD,

L 15226 S30042/9 T S PRINTED WIRING ASSY,

L 15226 S30042/11 A S NASA CONTRACTS,

ELECTRICAL AND

ELECTRONIC FLIGHT E

L 15226 S30042/12 E S ACE CABLE & CABLE

L 15226 S30042/13 E S COAXIAL CABLE ASSEMBLY

L 15226 S30042/14 E S MICROWAVE STRIPLINE

BOARD FABRICATION RE

L 15226 S30042/15 C S MICROWAVE STRIPLINE

ASSEMBLY REQUIREMENT

L 15226 S30042/16 AA S PRINTED WIRING BOARDS,

MULTILAYER (PLATED-

THROUGH

Page 5 of 6EDL Version 15Generated by PRPS using Jasper Reports on 20 Jan 2022

L 15226 S30042/17 J S PRINTED WIRING BOARDS,

MULTILAYER (PLATED-

THROUGH

L 15226 S30042/18 S HANDLING OF ELECTRONIC

PARTS AND ASSEMBLIES

L 15226 S30042/19 D S MK 12A AGE CABLE & CABLE

WITH EO ICBM10C220

L 15226 S30042/20 V S MACHINE SOLDERING OF

PRINTED WIRING ASSEMBLIES

L 15226 118A1519 D S POLYSULFIDE POTTED

COMPONENTS

L 15226 165A4417 P S SOLVENTS, CLEANING, HIGH

PURITY

STANDARD ENGINEERING TEXT

RELEASE OF THIS DATA TO A FOREIGN-OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

Page 6 of 6EDL Version 15Generated by PRPS using Jasper Reports on 20 Jan 2022

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

1156244445C

Text Box

Block D: NIIN: 00-239-2236; PN: 69C49442G1; Description: CABLE ASSEMBLY, SPECIAL PURPOSE, ELECTRICAL W5K (HRU 896/B) A Block 4: Contractor format acceptable.

A Paragraph 10.2 of DI-NDTI-80809B clarified as follows:

A

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

A

b. Materials used in the manufacture of the "First Article" shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.

A

c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

A Block 9: Data submittal shall be marked with the following on the cover page:

A DISTRIBUTION STATEMENT D: Distribution authorized to DOD and U.S. DOD contractors only for Intercontinental Ballistic Missiles (ICBM) administrative or operational use determined as of 05 Jan 2022. Other requests for this document shall be referred to MMIII Systems Directorate, Hill AFB, UT. 84056.

A WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DOD Directive 5230.25.

A DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Reset DD FORM 1423-1, FEB 2001 Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL 2 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

1156244445C

Text Box

Block D: NIIN: 00-239-2236; PN: 69C49442G1; Description: CABLE ASSEMBLY, SPECIAL PURPOSE, ELECTRICAL W5K (HRU 896/B) A Block 9: Data submittal shall be marked with the following on the cover page:

A DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for administrative and operational use determined as of 05 JAN 2022. Other requests for this document shall be referred to MMIII Systems Directorate, Hill AFB, UT. 84056

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25.

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Blocks 10, 11, 12 and 13: Contractor shall submit initial draft Counterfeit Prevention Plan within 60 days of contract award. Government approval/disapproval/comments will be provided to the contractor within 30 days after receipt, with contractor submittal of final counterfeit protection plan due 15 days after receipt of government comments.

Block 14: Document submission shall be made electronically using MS Office 2016 format. Those documents not compatible with MS Office 2016 shall be delivered in Adobe Acrobat.

5 CONTRACT REFERENCE:

A CONTRACT LINE ITEM NO:

B EXHIBIT:

TDP:

TM:

OTHER:

F CONTRACTOR:

2022-01-05T15:15:58-0700

CHENEY.DAVID.LEE.1537393579

2022-01-05T21:45:57-0700

MURRISON.RAY.D.JR.1513506828

CPP CONTRACTPR NO: PR# FD2020-22-00041

CPP TITLE OF DATA ITEM: Counterfeit Prevention Plan

CPP DATA ITEM NO: A002

CPP SYSTEMITEM: See Blk 16

CPP SUBTITLE:

CPP AUTHORITY Data Acquisition Document No: DI-MISC-81832

CPP REQUIRING OFFICE: 414 SCMS/GUEAA

cpp ADDRESSEE16 REMARKS: 414 SCMS/GUEAA cpp ADDRESSEE16 REMARKS_2: 6031 Gum Lane cpp ADDRESSEE16 REMARKS_3: Bldg 1228 cpp ADDRESSEE16 REMARKS_4: Hill AFB, UT 84056 cpp ADDRESSEE16 REMARKS_5: Attn: David Cheney cpp ADDRESSEE16 REMARKS_6:

cpp ADDRESSEE16 REMARKS_7: 414 SCMS/GUMAC cpp ADDRESSEE16 REMARKS_8: 6031 Gum Lane cpp ADDRESSEE16 REMARKS_9: Bldg 1228 cpp ADDRESSEE16 REMARKS_10: Hill AFB, UT 84056 cpp ADDRESSEE16 REMARKS_11: Attn: Kip Moellendorf cpp ADDRESSEE16 REMARKS_12:

cpp ADDRESSEE16 REMARKS_13:

cpp PREPARED BY: David Cheney cpp APPROVED BY: Ray Dean Murrison

17 PRICE GROUP: NSP

18 ESTIMATED TOTAL PRICE: $0

Draft16 REMARKS:

a ADDRESSEE16 REMARKS_33:

a ADDRESSEE16 REMARKS_37:

a ADDRESSEE16 REMARKS_38:

1 DATA ITEM NO3: A001

2 TITLE OF DATA ITEM3: Test/Inspection Report

3 SUBTITLE3: First Article Test Report

4 AUTHORITY Data Acquisition Document No3: DI-NDTI-80809B/T

5 CONTRACT REFERENCE3:

6 REQUIRING OFFICE3: 414 SCMS/GUEAA

9 DIST STATEMENT REQUIRED: See Blk 16

10 FREQUENCY: See Blk 16

12 DATE OF FIRST SUBMISSION: See Blk 16

14 DISTRIBUTION:

8 APP CODE: A

11 AS OF DATE: See Blk 16

13 DATE OF SUBSEQUENT SUBMISSION: See Blk 16 a ADDRESSEE16 REMARKS_23:

a ADDRESSEE16 REMARKS3: 809 MXSS/MXDEB

Repro16 REMARKS_19:

Reg16 REMARKS_19:

Draft16 REMARKS_19:

a ADDRESSEE16 REMARKS_19:

Repro16 REMARKS_18:

Reg16 REMARKS_18:

Draft16 REMARKS_18:

a ADDRESSEE16 REMARKS_18:

Repro16 REMARKS_17:

Reg16 REMARKS_17:

Draft16 REMARKS_17:

a ADDRESSEE16 REMARKS_17:

Repro16 REMARKS_16:

Reg16 REMARKS_16:

Draft16 REMARKS_16:

a ADDRESSEE16 REMARKS_16:

Repro16 REMARKS_15:

Reg16 REMARKS_15:

Draft16 REMARKS_15:

a ADDRESSEE16 REMARKS_15:

Repro16 REMARKS_14:

Reg16 REMARKS_14:

Draft16 REMARKS_14:

a ADDRESSEE16 REMARKS_14:

Repro16 REMARKS_13:

Reg16 REMARKS_13:

Draft16 REMARKS_13:

Repro16 REMARKS_12:

Reg16 REMARKS_12:

Draft16 REMARKS_12:

Repro16 REMARKS_11:

Reg16 REMARKS_11:

Draft16 REMARKS_11:

Repro16 REMARKS_10:

Reg16 REMARKS_10:

Draft16 REMARKS_10:

Repro16 REMARKS_9:

Reg16 REMARKS_9:

Draft16 REMARKS_9:

Repro16 REMARKS_8:

Reg16 REMARKS_8:

Draft16 REMARKS_8:

Repro16 REMARKS_7:

Repro16 REMARKS_6:

Reg16 REMARKS_6:

Draft16 REMARKS_6:

a ADDRESSEE16 REMARKS_63:

Repro16 REMARKS_5:

Reg16 REMARKS_5:

Draft16 REMARKS_5:

a ADDRESSEE16 REMARKS_53:

Repro16 REMARKS_4:

Reg16 REMARKS_4:

Draft16 REMARKS_4:

Repro16 REMARKS_3:

Reg16 REMARKS_3:

Draft16 REMARKS_3:

Repro16 REMARKS_2:

Reg16 REMARKS_2:

Draft16 REMARKS_2:

Reg16 REMARKS: 1

Repro16 REMARKS:

a ADDRESSEE16 REMARKS_20:

Draft16 REMARKS_20:

Reg16 REMARKS_20:

Repro16 REMARKS_20:

a ADDRESSEE16 REMARKS_21:

Draft16 REMARKS_21:

Reg16 REMARKS_21:

Repro16 REMARKS_21:

a ADDRESSEE16 REMARKS_22:

Draft16 REMARKS_22:

Reg16 REMARKS_22:

Repro16 REMARKS_22:

Draft16 REMARKS_23:

Reg16 REMARKS_23:

Repro16 REMARKS_23:

a ADDRESSEE16 REMARKS_24:

Draft16 REMARKS_24:

Reg16 REMARKS_24:

Repro16 REMARKS_24:

a ADDRESSEE16 REMARKS_25:

Draft16 REMARKS_25:

Reg16 REMARKS_25:

Repro16 REMARKS_25:

a ADDRESSEE16 REMARKS_26:

Draft16 REMARKS_26:

Reg16 REMARKS_26:

Repro16 REMARKS_26:

a ADDRESSEE16 REMARKS_27:

Draft16 REMARKS_27:

Reg16 REMARKS_27:

Repro16 REMARKS_27:

a ADDRESSEE16 REMARKS_28:

Draft16 REMARKS_28:

Reg16 REMARKS_28:

Repro16 REMARKS_28:

a ADDRESSEE16 REMARKS_29:

Draft16 REMARKS_29:

Reg16 REMARKS_29:

Repro16 REMARKS_29:

a ADDRESSEE16 REMARKS_30:

Draft16 REMARKS_30:

Reg16 REMARKS_30:

Repro16 REMARKS_30:

a ADDRESSEE16 REMARKS_31:

Draft16 REMARKS_31:

Reg16 REMARKS_31:

Repro16 REMARKS_31:

a ADDRESSEE16 REMARKS_32:

Draft16 REMARKS_32:

Reg16 REMARKS_32:

Repro16 REMARKS_32:

Draft16 REMARKS_33:

Reg16 REMARKS_33:

Repro16 REMARKS_33:

a ADDRESSEE16 REMARKS_34:

Draft16 REMARKS_34:

Reg16 REMARKS_34:

Repro16 REMARKS_34:

a ADDRESSEE16 REMARKS_35:

Draft16 REMARKS_35:

Reg16 REMARKS_35:

Repro16 REMARKS_35:

a ADDRESSEE16 REMARKS_36:

Draft16 REMARKS_36:

Reg16 REMARKS_36:

Draft16 REMARKS_37:

Reg16 REMARKS_37:

Draft16 REMARKS_38:

Repro16 REMARKS_36:

Repro16 REMARKS_37:

Reg16 REMARKS_38:

Repro16 REMARKS_38:

G PREPARED BY3: David Cheney

H DATE: 05JAN22

I APPROVED BY3: Ray Dean Murrison

J DATE: 05JAN22

Page: 1 of: 2

2022-01-05T15:12:03-0700

CHENEY.DAVID.LEE.1537393579

2022-01-05T21:55:08-0700

MURRISON.RAY.D.JR.1513506828

A CONTRACT LINE ITEM NO3:

B EXHIBIT3:

TDP3:

TM3:

OTHER3:

D SYSTEMITEM3: See Blk 16

E CONTRACTPR NO3: PR# FD2020-22-00041

F CONTRACTOR3:

Reg16 REMARKS cpp: 1 a ADDRESSEE16 REMARKS_13:

a ADDRESSEE16 REMARKS_12:

a ADDRESSEE16 REMARKS_11:

Reg16 REMARKS_7:

Draft16 REMARKS_7:

4-9 CONTRACT LINE ITEM NO:

4-9 EXHIBIT:

TDP4-9:

TM4-9:

OTHER4-9:

4-9 SYSTEMITEM: See Blk 16

4-9 CONTRACTPR NO: PR# FD2020-22-00041

4-9 CONTRACTOR:

4-9 REMARKS Continued: Block 10: ONE/R, Report shall be submitted concurrently with the "First Article" item either in the shipping container or separately if the report will not fit within the container unfolded. When shipped in the "First Article" container, report shall be enclosed in a paper or plastic envelope.

Block 11, 12, and 13: Defined in Contract

Block 14: Complete mailing address is:

809 MXSS/MXDEB (DODAAC: FB2029)

Bldg 849, Attn: Non-Accountable Bay Mark For: First Article Do Not Post Hill AFB, UT 84056-5713

Page_2: 2 of_2: 2 a ADDRESSEE16 REMARKS_10:

a ADDRESSEE16 REMARKS_9:

a ADDRESSEE16 REMARKS_83:

a ADDRESSEE16 REMARKS_73:

a ADDRESSEE16 REMARKS_43:

Draft16 REMARKS-cpp: 1 ofcpp: 1 a ADDRESSEE16 REMARKS_23FA: SEE BLOCK 16

7 DD 250 REQFA: SD

7 DD 250 REQ-CPP: DD

File details come from the government source that posted it. Updated .