31500187 TEST WEIGHT SPECIFICATION.pdf
PDF 1 MB Posted
- Attached to
- TEST WEIGHT Federal contract opportunity
- Solicitation number
- SPMYM223Q2275
About this file
This specification document outlines requirements for the fabrication of stackable test weights to be used by the Puget Sound Naval Shipyard and Intermediate Maintenance Facility. A total of 20 steel test weights are required in four different weight classifications ranging from 1790 to 5920 pounds. Weights must be constructed according to the drawings and technical standards referenced, including dimensional and weight tolerances. Requirements include surface preparation, welding, corrosion protection, markings, and documentation submittals. The contractor must submit for approval a fabrication schedule, coatings specifications and safety data sheets, weight certification documents, welding procedures and operator qualifications. The government will inspect weights during fabrication and conduct a final acceptance inspection after delivery to Naval Submarine Base Bangor by the specified delivery date once documentation submittals are approved and any deficiencies are addressed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 31500187 CDRLs.pdf | ||
| 23Q2275 TEST WEIGHT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stackable Test Weight Specification
FOR
PUGET SOUND NAVAL SHIPYARD (PSNS) &
INTERMEDIATE MAINTENANCE FACILITY (IMF)
PREPARED BY:
Code 713
Bldg. 448, PSNS
Bremerton Washington 98314
SPECIFICATION PREPARED BY:
Project Engineer: Fearecia Maddox
Branch Head Supervisor: Bryan Lemos-Goncalves
1. SCOPE:
This specification is to provide requirements for the fabrication and documentation of crane test weights. The weights will be stackable in order to test cranes of different capacities. Each weight will be delivered to Naval Submarine Base – Bangor fully assembled, painted, tested, and ready for use.
2. REFERENCES:
American Society of Testing and Materials (ASTM) A-36: Standard Specification for Carbon Structural Steel
American Welding Society (AWS) D1.1: Structural Welding Code – Steel
Puget Sound Naval Shipyard (PSNS & IMF) Drawing 4C30685
The Society for Protective Coatings Surface Preparation (SSPC) SP-10: Near White Blast Cleaning
3. DESIGN AND FABRICATION REQUIREMENTS
3.1. Stackable Crane Test Weights:
3.1.1. A total of 20 steel test weights are to be constructed, per the drawings in Enclosure 1. The breakdown is as follows:
4 X 1790lbs 4 X 2230lbs 4 X 4970lbs 8 X 5920lbs
3.2. Drawing:
3.2.1. PSNS drawing 4C30685 shall be used for fabrication purposes.
3.3. Surface Texture:
3.3.1. Break all burrs and sharp edges; all surfaces must be smooth and without surface defects, flaws or waviness. All welds in sling channels must be ground smooth.
3.3.2. Special emphasis should be paid to surface texture of areas which will contact the synthetic rigging gear. These must be smooth and free of any sharp edges that could damage synthetic rigging gear.
3.4. Tolerances:
3.4.1. Dimensional tolerances for final fabrication are shown on drawing 4C30685.
3.4.2. The tolerance for the actual weights is based upon their combined value when placed in their intended stacking configuration. The intended stacking configurations and allowed final weight is as follows:
3.4.2.1. Stack A:
2 X 5920lbs 1 X 4970lbs 1 X 2230lbs As designed total: ~19,040lbs Allowed range: 19,000lbs to 20,000lbs
3.4.2.2. Stack B:
2 X 5920lbs 1 X 4970lbs 1 X 2230lbs 1 X 1790lbs As designed total: ~20,830lbs Allowed certified range: 20,000lbs to 21,000lbs
NOTE: As designed totals are approximate, and reflect rounding up each individual weight value to the nearest 10lbs from 3D modeled values to accommodate variances in steel construction and account for weight of paint.
3.4.3. The actual weight is the certified measured weight; see section 4.4.
3.4.4. Center of gravity shall be at geometric center of each weight ±2”.
3.4.5. Test weights shall be stackable and nest level with each other without apparent deformation.
3.5. Material: Weights shall be of all steel construction meeting ASTM A-36 requirements or alternate steel grade if approved by the government.
3.6. Welding: All welding performed for the fabrication of test weights shall be done in accordance with AWS D1.1. When plates are welded together, welding must be continuous to help prevent corrosion between plates. All welds will be visually examined per AWS D1.1.
3.7. Corrosion Protection:
3.7.1. Upon completion of fabrication, each test weight shall be blasted to Near-White Metal Blast Cleaning per SSPC-SP 10, primed and painted with a paint system that is used in 2B environmental zones per SSPC or equivalent and has an expected life of 10+ years. The weights shall be painted black with a paint suitable for exposure to an outdoor, marine environment, heat, and sun.
3.7.2. All paint used shall not contain lead, polychlorinated biphenyl (PCB), or chromates.
(Submittal Required)
3.8. Markings:
3.8.1. Stencil the actual weight (in pounds) of each test weight on a minimum of two opposing sides that are visible when weights are stacked. The markings shall be in a similar location on each test weight. Color of letters shall be white and a minimum of 2 inches tall.
3.8.2. Each test weight will have a name plate affixed to one side with “Property of PSNS&IMF” followed by a unique serial number in the format RTG-###. The serial numbers shall start at value RTG-001 and progress sequentially. The Contractor shall provide a list of the assigned serial numbers and each number’s associated certified weight (Submittal Required).
3.8.3. Mark vertical lines at the center of each side of each test weight to assist with stack alignment & centering of weights. Color of stripe shall match markings color as described in
3.8.1 and be a minimum of 1 inch wide, but not greater than 3 inches wide.
4. SUBMITTALS
4.1. The Contractor shall submit to the Contracting Officer all items of technical documentation listed in this specification. The contractor shall ensure that all submittals are entirely legible and suitable for reproduction. Compliance with the requirements of this specification will be determined by a review of the design and construction submittals by the Contracting Officer and by both field and acceptance inspections.
4.2. The Government shall have 10 working days to evaluate and respond to all submittals. If further communication or clarification is required, each party shall have 5 working days to respond.
4.3. Schedule:
4.3.1. The contractor shall submit a timeline schedule which identifies key milestone events in the fabrication of the test weights (Submittal Required). At a minimum, the schedule shall include dates for the following events:
A. Fabrication initiation.
B. In-process Government Representative field (on-site) inspection and testing.
C. Fabrication completion.
D. Delivery (Arrival at destination Silverdale, WA).
Delivery address is:
Naval Submarine Base - Bangor ATTN: Timothy Brown 360-396-4073 1034 Sculpin Circle N68436 Silverdale, WA 98315
4.4. Coatings: Provide original equipment manufacturers’ specifications and Safety Data Sheets
(SDS) for all primer and paint used on main paint system, stenciling and marking for each weight. (Submittal Required)
4.5. Weight Certification:
4.5.1. Certificate shall be hard copy original, indicating the measured weight of each test weight by serial number and be signed by the certifying official that is guaranteeing the accuracy of the document and measured weight. (Submittal Required)
4.5.2. The certificate shall indicate each test weight was measured using calibrated equipment traceable to the National Institute of Standards and Technology, with a minimum accuracy of +/-2% (i.e. indicated weight shall be within +/-2% of actual weight).
4.5.3. The certificate shall include the following for all of the calibrated measurement equipment used:
A. Original Equipment Manufacturer (OEM) B. Serial number C. Model number D. Accuracy E. Calibration date
4.6. Welding:
4.6.1. Contractor will submit Welding Procedure Specification (WPS) per AWS D1.1 for each material welded per the applicable welding process. All steel welds shall be of the pre-qualified type. Welding Procedure Qualification Test Report must be approved prior to any welding. (Submittal Required)
4.6.2. All records of visually examined welds will be submitted, including any reexamination of deficient welds found after rework if applicable. (Submittal Required)
4.6.3. Welding operator and/or welder certifications will be submitted for all WPS used.
Welding Personnel Qualifications must be approved by the Government prior to any welding. (Submittal Required)
Table 4.7: Submittal Summary
Specification Section
Submittal Required Description Due Date Number of Copies
4.2.1 Fabrication Schedule Describes major fabrication
milestones
30 days after contract award
4.5.1 Welding Procedure
Specification
Per. AWS D1.1/D1.2 10 days before Welding
4.5.2 Weld Examination Records of all visually examined
welds
10 days after Welding
4.5.3 Welding Operator
Certifications
Personnel qualifications 10 days before Welding
4.3 Paint SDS Safety Data Sheets 10 days before
shipping
3.7.2 Prohibited Materials
Guarantee
Guarantee that all paints used to not contain the prohibited ingredients
10 days before shipping
4.4.1 Weight Certification Signed certificate of weight
value
10 days before shipping
3.8.2 Serial Number List List of serial numbers and
weight profile and value
10 days before shipping
5. TEST, INSPECTION AND ACCEPTANCE TERMS
5.1. In-process Inspection and Testing (Field):
5.1.1. The Contractor shall inspect the test weights for form, fit, and function. The contractor shall ensure the test weights nest when stacked, including set A weights stacked on set B, and are level when lifted by the sling channels. Weight A.10 is not expected to stack on any other weights. After the Contractor’s preliminary inspection and operational test of each weight is complete, the Contactor shall notify the Government.
5.1.2. The contactor shall test the weights in the following manner to ensure adequate strength and construction:
5.1.2.1. Weights shall be lifted by synthetic slings only.
5.1.2.2. Stack A assembled and lifted.
5.1.2.3. Stack B assembled and lifted.
5.1.3. At the option of the Government, a site inspection will be conducted by the Government along with the Contractor. The Contractor will make the test weights available for Government witnessing of the inspection and operational testing. The Contractor will be prepared to stack / un-stack the test weights and lift test weights using slings in sling channels as needed during the visit. Upon completion of the field inspection and testing, a “punch” list of deficient items will be compiled and signed by the Government representative (if applicable) and forwarded to the Contracting Officer.
5.1.3.1. At the option of the Government, the Government may request photos of the weights during the manufacturing process instead of an in-person visitation. Details should include a representative sample of welds, different weight constructions, general dimensions, and photos of some of the lift tests performed to verify function.
5.2. Warranty: The Contractor's warranty shall apply only to those defects discovered by either the
Government or the Contractor within twelve (12) months after government acceptance.
5.3. Final Inspection and Acceptance (Destination):
5.3.1. Inspection and acceptance of the supplies or services to be furnished hereunder shall be made at destination by the receiving activity. Receiving activity shall execute acceptance certificate on the applicable inspection and receiving report form: DD Form 1155, Standard Form 44, DD form 250, or the Wide Area Workflow (WAWF) Receipt and Acceptance Receiving Report.
5.3.2. Following completion of Government inspection, final Government acceptance of the weights shall take place only after the following conditions are met:
5.3.2.1. Contractor receives Government approval for all submittal items.
5.3.2.2. The weights pass a final inspection by the Government.
5.3.2.3. All deficient items have been corrected or methods of resolution have been determined. Deficient items not corrected prior to the Government’s acceptance shall be carried as warranty items, which will be corrected by the Contractor.
File details come from the government source that posted it. Updated .