3149138_ATTACH_EDA.PDF

PDF 2 MB Posted

Attached to
LGM 30 Cable Assembly Federal contract opportunity
Solicitation number
SPRHA221Q0226
Issued by
Defense Logistics Agency Aviation

View the file

Other files for this federal contract opportunity

Other files attached to LGM 30 Cable Assembly, newest first.
File Type Posted
SPRHA221Q0226.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING DATA LIST

DATE:

23 JUN 2020

REVISION: 4 *HISTORY*

CAGE:

07868

PAGE:

NSN:

6150004062753AH

DATA TECH:

Brumbaugh, Susan D

END ITEM:

LGM-30

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMAC/

MANUFACTURER NAME:

SPACE AND MISSILE SYSTEMS

REFERENCE NUMBER:

69D49204G1

NOUN:

CABLE ASSEMBLY,SPEC

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 07868 69D49204 D S D CABLE ASSEMBLY Brumbaugh, Susan D 23 JUN 2020

W/EO 03C0815-H

NAME: DATE:

L 07868 69D49204G1 D S D PARTS LIST Brumbaugh, Susan D 23 JUN 2020

W/ATT A

L 15226 S30042/4 AB S D HARNESS ASSEMBLY Brumbaugh, Susan D 23 JUN 2020

W/EO 18A0536-H, Addendum 1 & 2

L 07868 68C52771 A S D LIST, INTERCONNECTION

L 07868 68B48450 YY S D NAME PLATE MARKING Brumbaugh, Susan D 23 JUN 2020

W/EO 16A0130-H

L 07868 68D50425 F S D TERMINATION, RFI

HARDWARE

L 07868 67D53795 K S D TERMINATION, EMR

HARDWARE

L 07868 67A60772 K S D ADAPTER Brumbaugh, Susan D 23 JUN 2020

W/EO 19A0360-H

L 07868 67A60756 B S D SLEEVING Brumbaugh, Susan D 23 JUN 2020

W/EO 13A0064-H

L 15226 R3701 J S D CABLE, ELECTRICAL

L 07868 67A60221 H S D WIRE, ELECTRIC Brumbaugh, Susan D 23 JUN 2020

W/EOs 12A0738-H, 12A0847-H

L 07868 66A50856 N S D JAM NUT, MOUNTING Brumbaugh, Susan D 23 JUN 2020

W/EO 12A0842-H

L 98750 66A50855 T S D CONNECTOR, PLUG

L 07868 66A49679 G S D CABLE, MARKING Brumbaugh, Susan D 23 JUN 2020

W/EO 12A2554-H

L 07868 66A48037 D S D PLUG Brumbaugh, Susan D 23 JUN 2020

W/EO 12A0839-H

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

FURNISHED METHOD CODE LEGEND:

Page 1 of 5EDL Version 4Generated by PRPS using Jasper Reports on 01 Mar 2021

L 07868 66A49678 F S D TAPE, VINYL Brumbaugh, Susan D 23 JUN 2020

W/EO 12A1412-H

L 15226 S30042 V S D ENGINEERING AND QUALITY

STANDARD FOR ELECTRONIC

EQ

Brumbaugh, Susan D 23 JUN 2020

W/EO 18A0534-H

L 15226 S30042/5 K S D HARNESS INSTALLATION,

STANDARD PROCEDURE

L 15226 S30042/7 M S D AGE WIRING, REQUIREMENTS

FOR

W/EO 18A0043-H

L 15226 S30042/8 K S D PRINTED WIRING BOARDS,

REQUIREMENTS FOR

L 15226 S30042/9 T D PRINTED WIRING ASSY,

L 15226 S30042/11 A S D NASA CONTRACTS,

ELECTRICAL AND

ELECTRONIC FLIGHT E

L 15226 S30042/12 E S D ACE CABLE & CABLE

ASSEMBLIES

L 15226 S30042/13 E S D COAXIAL CABLE ASSEMBLY

L 15226 S30042/14 E S D MICROWAVE STRIPLINE

BOARD FABRICATION

REQUIREMENTS

L 15226 S30042/15 C S D MICROWAVE STRIPLINE

ASSEMBLY REQUIREMENT

L 15226 S30042/16 AA S D PRINTED WIRING BOARDS

MULTI-LAYER (PLATED)

L 15226 S30042/17 J S D REQUIREMENTS FOR PRINTED

WIRING BOARDS

L 15226 S30042/18 S D HANDLING OF ELECTRONIC

PARTS AND ASSEMBLIES

L 15226 S30042/19 D D MK 12A AGE CABLE & CABLE

ASSEMBLIES

W/EO ICBM10C220

L 15226 S30042/20 V S D MACHINE SOLDERING OF

PRINTED WIRING ASSE

Page 2 of 5EDL Version 4Generated by PRPS using Jasper Reports on 01 Mar 2021

L 15226 S30042/1 E S D WIRE AND LEAD

PREPARATION,

L 15226 S30042/2 M S D SOLDERING TERMINATION,

PREP AND REQMNTS

W/EO 18A0535H

L 15226 S30042/3 M S D SHIELD TERMINATIONS,

L 15226 S30042/6 F S D ASSEMBLY OF TERMINAL

LOGS

W/EO 18A0537-H, Addendum 1

L 15226 S30042/10 C S D POINT TO POINT WIRING,

L 15226 118A1526 AD S D IDENTIFICATION MARKING Brumbaugh, Susan D 23 JUN 2020

W/EO 09A0419-H, 18A0636-H

L 15226 R6591 S D MARKING INK, PERMANENT,

(MACHINE APPLICATIONS)

W/EO 18A1028-H

L 15226 118A1526/1 B S D IDENTIFICATION MARKING Brumbaugh, Susan D 23 JUN 2020

W/EO 18A0034-H

L 07868 68A51748 C S D CONNECTOR, RECEPTACLE,

ELECTRICAL

W/EO 12A0855-H, 16A0693-H

L 07868 68A51745 B S D CONTACTS, PIN AND SOCKET -

CRIMP STYLE, ELECTRICAL

W/EO 12A0853-H

L 07868 66A48000 A S D INSERT ARRANGEMENT,

ELECTRICAL CONNECTOR (JT

AND L

W/EO 12A0836-H

L 07868 66A48038 E D CONTACTS, PIN AND SOCKET -

CRIMP STYLE, ELECTRICAL

W/EO 12A0840-H

L 07868 66A48008 A S D CONNECTOR, PLUG,

ELECTRICAL - BAYONET

COUPLING, CR

W/EO 12A0837-H

Page 3 of 5EDL Version 4Generated by PRPS using Jasper Reports on 01 Mar 2021

L 07868 66A48033 A S D SHIELD, ELECTICAL

CONNECTOR, - RFI, RIGHT

ANGLE FO

L 07868 66A48034 A S D FERRULE, REDUCING - RFI

SHIELD

L 07868 66A48035 A S D SHIELD, ELECTRICAL

CONNECTOR - RFI, STRAIGHT,

FOR

L 07868 66A48036 A S D ADAPTER, ELECTRICAL

CONNECTOR TO RFI SHIELD

FOR MI

L 07868 66A50857 M S D CONNECTOR PLUG,

ELECTRICAL - BAYONET

COUPLING, CRI

W/EO 12A0843-H, ICBM12C391

L 07868 68A51749 E S D CONNECTOR, PLUG Brumbaugh, Susan D 23 JUN 2020

W/EO 12A0856-H

L 07868 67A55295 C S D BACKSHELL, ELECTRIC

CONNECTOR STRAIGHT,

SHORT, FOR

w/EO 12A0844H

L 07868 67A55296 C S D CLAMP, CABLE - STRAIN

RELIEF FOR MIL-C-38999 TYPE,

W/EO 12A0845-H

L 07868 67A55297 E S D ELBOW 90 DEGREES, ELECTIC

CONNECTOR - BACKSHELL

W/EO 12A0846-H

L 07868 68A51747 E S D CONNECTOR PLUG

ELECTRICAL BAYONET

COUPLING

L 15226 R2479 R S D INSULATION SLEEVING,

ELECTRICAL-POLYOLEFIN,

HEAT S

L 15226 R2164 D S D BRAID, WIRE - ROLLED FLAT

(TIN COATED COPPER AND N

L 15226 128A4792 C S D POLYSULFIDE POTTING AND

SEALING COMPOUNDS

L 04615 118A1519 D S D POLYSULFIDE POTTED

COMPONENTS

Page 4 of 5EDL Version 4Generated by PRPS using Jasper Reports on 01 Mar 2021

L 04615 921C258 B S D POTTING COMPOUND AND

INSTRUCTIONS

L 07868 66A49682 D S D COMPOUND, POTTING AND

CONFORMAL COATING,

POLYURETH

W/EO 16A0381-H

L 07868 74A54879 D S D COMPOUND POLYURETHANE,

ELECTRONIC PACKAGING

L 07868 68A49484 C S D RESINS, POLYURETHANE

L 15226 R2290 M S D FERRULE, HEAT SHRINKABLE

L 15228 MSP535130 A S D MATERIAL SPECIFICATION

FOR PROPRIETARY SOLVENTS

L 07868 67A60276 D S D CABLE, ELECTRICAL -

TWISTED POLYVINYLIDENE

FLUORID

STANDARD ENGINEERING TEXT

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

Page 5 of 5EDL Version 4Generated by PRPS using Jasper Reports on 01 Mar 2021

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

1156244445C

Text Box

Block D: NIIN: 00-406-2753; PN:69D49204G1; Description: Cable Assembly, Special Purpose, Electrical W5N (HRU887/B) A Block 4: Contractor format acceptable.

A Paragraph 10.2 of DI-NDTI-80809B clarified as follows:

A

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

A

b. Materials used in the manufacture of the "First Article" shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.

A

c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

A Block 9: Data submittal shall be marked with the following on the cover page:

A DISTRIBUTION STATEMENT D: Distribution authorized to DOD and U.S. DOD contractors only for Intercontinental Ballistic Missiles (ICBM) administrative or operational use determined as of 2/17/2021. Other requests for this document shall be referred to MMIII Systems Directorate, Hill AFB, UT. 84056.

A WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, USE., App. 2401 et seq. Violations of these export control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DOD Directive 5230.25.

A DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Reset DD FORM 1423-1, FEB 2001 Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

Final

Reg Repro

16. REMARKS

15. TOTAL 2 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

1156244445C

Text Box

Block D: NIIN: 00-406-2753; PN:69D49204G1; Description: Cable Assembly, Special Purpose, Electrical W5N (HRU887/B) A Block 9: Data submittal shall be marked with the following on the cover page:

A DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for administrative and operational use determined 2/17/2021. Other requests for this document shall be referred to MMIII Systems Directorate, Hill AFB, UT. 84056

WARNING: TThis document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25.

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Blocks 10, 11, 12 and 13: Contractor shall submit initial draft Counterfeit Prevention Plan within 60 days of contract award. Government approval/disapproval/comments will be provided to the contractor within 30 days after receipt, with contractor submittal of final counterfeit protection plan due 15 days after receipt of government comments.

Block 14: Document submission shall be made electronically using MS Office 2016 format. Those documents not compatible with MS Office 2016 shall be delivered in Adobe Acrobat.

5 CONTRACT REFERENCE:

A CONTRACT LINE ITEM NO:

B EXHIBIT:

TDP:

TM:

OTHER:

F CONTRACTOR:

2021-02-17T15:13:54-0700

LOVELESS.ALAN.JAMES.1518738301

2021-02-17T15:14:13-0700

LOVELESS.ALAN.JAMES.1518738301

CPP CONTRACTPR NO: PR# FD2020-21-00226

CPP TITLE OF DATA ITEM: Counterfeit Prevention Plan

CPP DATA ITEM NO: A002

CPP SYSTEMITEM: See Blk 16

CPP SUBTITLE:

CPP AUTHORITY Data Acquisition Document No: DI-MISC-81832

CPP REQUIRING OFFICE: 414 SCMS/GUEAA

cpp ADDRESSEE16 REMARKS: 414 SCMS/GUEAA cpp ADDRESSEE16 REMARKS_2: 6031 Gum Lane cpp ADDRESSEE16 REMARKS_3: Bldg 1227 cpp ADDRESSEE16 REMARKS_4: Hill AFB, UT 84056 cpp ADDRESSEE16 REMARKS_5: Attn: Alan Loveless cpp ADDRESSEE16 REMARKS_6:

cpp ADDRESSEE16 REMARKS_7: 414 SCMS/GUMAC cpp ADDRESSEE16 REMARKS_8: 6031 Gum Lane cpp ADDRESSEE16 REMARKS_9: Bldg 1227 cpp ADDRESSEE16 REMARKS_10: Hill AFB, UT 84056 cpp ADDRESSEE16 REMARKS_11: Attn: Kip Moellendorf cpp ADDRESSEE16 REMARKS_12:

cpp ADDRESSEE16 REMARKS_13:

cpp PREPARED BY: Alan Loveless cpp APPROVED BY: Alan Loveless

17 PRICE GROUP: NSP

18 ESTIMATED TOTAL PRICE:

Draft16 REMARKS:

a ADDRESSEE16 REMARKS_33:

a ADDRESSEE16 REMARKS_37:

a ADDRESSEE16 REMARKS_38:

1 DATA ITEM NO3: A001

2 TITLE OF DATA ITEM3: Test/Inspection Report

3 SUBTITLE3: First Article Test Report

4 AUTHORITY Data Acquisition Document No3: DI-NDTI-80809B/T

5 CONTRACT REFERENCE3:

6 REQUIRING OFFICE3: 414 SCMS/GUEAA

9 DIST STATEMENT REQUIRED: See Blk 16

10 FREQUENCY: See Blk 16

12 DATE OF FIRST SUBMISSION: See Blk 16

14 DISTRIBUTION:

8 APP CODE: A

11 AS OF DATE: See Blk 16

13 DATE OF SUBSEQUENT SUBMISSION: See Blk 16 a ADDRESSEE16 REMARKS_23:

a ADDRESSEE16 REMARKS3: 809 MXSS/MXDEB

Repro16 REMARKS_19:

Reg16 REMARKS_19:

Draft16 REMARKS_19:

a ADDRESSEE16 REMARKS_19:

Repro16 REMARKS_18:

Reg16 REMARKS_18:

Draft16 REMARKS_18:

a ADDRESSEE16 REMARKS_18:

Repro16 REMARKS_17:

Reg16 REMARKS_17:

Draft16 REMARKS_17:

a ADDRESSEE16 REMARKS_17:

Repro16 REMARKS_16:

Reg16 REMARKS_16:

Draft16 REMARKS_16:

a ADDRESSEE16 REMARKS_16:

Repro16 REMARKS_15:

Reg16 REMARKS_15:

Draft16 REMARKS_15:

a ADDRESSEE16 REMARKS_15:

Repro16 REMARKS_14:

Reg16 REMARKS_14:

Draft16 REMARKS_14:

a ADDRESSEE16 REMARKS_14:

Repro16 REMARKS_13:

Reg16 REMARKS_13:

Draft16 REMARKS_13:

Repro16 REMARKS_12:

Reg16 REMARKS_12:

Draft16 REMARKS_12:

Repro16 REMARKS_11:

Reg16 REMARKS_11:

Draft16 REMARKS_11:

Repro16 REMARKS_10:

Reg16 REMARKS_10:

Draft16 REMARKS_10:

Repro16 REMARKS_9:

Reg16 REMARKS_9:

Draft16 REMARKS_9:

Repro16 REMARKS_8:

Reg16 REMARKS_8:

Draft16 REMARKS_8:

Repro16 REMARKS_7:

Repro16 REMARKS_6:

Reg16 REMARKS_6:

Draft16 REMARKS_6:

a ADDRESSEE16 REMARKS_63:

Repro16 REMARKS_5:

Reg16 REMARKS_5:

Draft16 REMARKS_5:

a ADDRESSEE16 REMARKS_53:

Repro16 REMARKS_4:

Reg16 REMARKS_4:

Draft16 REMARKS_4:

Repro16 REMARKS_3:

Reg16 REMARKS_3:

Draft16 REMARKS_3:

Repro16 REMARKS_2:

Reg16 REMARKS_2:

Draft16 REMARKS_2:

Reg16 REMARKS: 1

Repro16 REMARKS:

a ADDRESSEE16 REMARKS_20:

Draft16 REMARKS_20:

Reg16 REMARKS_20:

Repro16 REMARKS_20:

a ADDRESSEE16 REMARKS_21:

Draft16 REMARKS_21:

Reg16 REMARKS_21:

Repro16 REMARKS_21:

a ADDRESSEE16 REMARKS_22:

Draft16 REMARKS_22:

Reg16 REMARKS_22:

Repro16 REMARKS_22:

Draft16 REMARKS_23:

Reg16 REMARKS_23:

Repro16 REMARKS_23:

a ADDRESSEE16 REMARKS_24:

Draft16 REMARKS_24:

Reg16 REMARKS_24:

Repro16 REMARKS_24:

a ADDRESSEE16 REMARKS_25:

Draft16 REMARKS_25:

Reg16 REMARKS_25:

Repro16 REMARKS_25:

a ADDRESSEE16 REMARKS_26:

Draft16 REMARKS_26:

Reg16 REMARKS_26:

Repro16 REMARKS_26:

a ADDRESSEE16 REMARKS_27:

Draft16 REMARKS_27:

Reg16 REMARKS_27:

Repro16 REMARKS_27:

a ADDRESSEE16 REMARKS_28:

Draft16 REMARKS_28:

Reg16 REMARKS_28:

Repro16 REMARKS_28:

a ADDRESSEE16 REMARKS_29:

Draft16 REMARKS_29:

Reg16 REMARKS_29:

Repro16 REMARKS_29:

a ADDRESSEE16 REMARKS_30:

Draft16 REMARKS_30:

Reg16 REMARKS_30:

Repro16 REMARKS_30:

a ADDRESSEE16 REMARKS_31:

Draft16 REMARKS_31:

Reg16 REMARKS_31:

Repro16 REMARKS_31:

a ADDRESSEE16 REMARKS_32:

Draft16 REMARKS_32:

Reg16 REMARKS_32:

Repro16 REMARKS_32:

Draft16 REMARKS_33:

Reg16 REMARKS_33:

Repro16 REMARKS_33:

a ADDRESSEE16 REMARKS_34:

Draft16 REMARKS_34:

Reg16 REMARKS_34:

Repro16 REMARKS_34:

a ADDRESSEE16 REMARKS_35:

Draft16 REMARKS_35:

Reg16 REMARKS_35:

Repro16 REMARKS_35:

a ADDRESSEE16 REMARKS_36:

Draft16 REMARKS_36:

Reg16 REMARKS_36:

Draft16 REMARKS_37:

Reg16 REMARKS_37:

Draft16 REMARKS_38:

Repro16 REMARKS_36:

Repro16 REMARKS_37:

Reg16 REMARKS_38:

Repro16 REMARKS_38:

G PREPARED BY3: Alan Loveless

H DATE: 2/17/2021

I APPROVED BY3: Alan Loveless

J DATE: 2/17/2021

Page: 1 of: 2

2021-02-17T15:12:25-0700

LOVELESS.ALAN.JAMES.1518738301

2021-02-17T15:13:11-0700

LOVELESS.ALAN.JAMES.1518738301

A CONTRACT LINE ITEM NO3:

B EXHIBIT3:

TDP3:

TM3:

OTHER3:

D SYSTEMITEM3: See Blk 16

E CONTRACTPR NO3: PR# FD2020-21-00226

F CONTRACTOR3:

Reg16 REMARKS cpp: 1 a ADDRESSEE16 REMARKS_13:

a ADDRESSEE16 REMARKS_12:

a ADDRESSEE16 REMARKS_11:

Reg16 REMARKS_7:

Draft16 REMARKS_7:

4-9 CONTRACT LINE ITEM NO:

4-9 EXHIBIT:

TDP4-9:

TM4-9:

OTHER4-9:

4-9 SYSTEMITEM: See Blk 16

4-9 CONTRACTPR NO: PR# FD2020-21-00226

4-9 CONTRACTOR:

4-9 REMARKS Continued: Block 10: ONE/R, Report shall be submitted concurrently with the "First Article" item either in the shipping container or separately if the report will not fit within the container unfolded. When shipped in the "First Article" container, report shall be enclosed in a paper or plastic envelope.

Block 11, 12, and 13: Defined in Contract

Block 14: Complete mailing address is:

809 MXSS/MXDEB (DODAAC: FB2029)

Bldg 849, Attn: Non-Accountable Bay Mark For: First Article Do Not Post Hill AFB, UT 84056-5713

Page_2: 2 of_2: 2 a ADDRESSEE16 REMARKS_10:

a ADDRESSEE16 REMARKS_9:

a ADDRESSEE16 REMARKS_83:

a ADDRESSEE16 REMARKS_73:

a ADDRESSEE16 REMARKS_43:

Draft16 REMARKS-cpp: 1 ofcpp: 1 a ADDRESSEE16 REMARKS_23FA: SEE BLOCK 16

7 DD 250 REQFA: SD

7 DD 250 REQ-CPP: DD

Existing Packaging Statement of Work January 2019

SPECIAL PACKAGING INSTRUCTIONS RETRIEVAL & EXCHANGE SYSTEM (SPIRES)

Contractors may request the use of SPIRES website to view item packaging requirements or search for Special Packaging Instruction drawings via the following website: https://spires.wpafb.af.mil/

REUSABLE CONTAINERS

The contractor shall safeguard all received reusable shipping containers that meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets. The contractor shall dispose of and replace unserviceable containers with new containers that meet requirements of the AFMC Form 158. Contact the Administering Contracting Office (ACO) for disposition and replacement when Long Life Reusable Containers (LLRC) are received in an unserviceable condition.

REPORTING DISCREPANCIES

The contractor shall use Web Supply Discrepancy Report (WebSDR) to submit/reply to a Supply Discrepancy Report (SDR), when improperly packed assets are received/shipped in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings) from Department of Defense (DoD) components or contractor activities. The contractor shall request a WebSDR account via the following website:

https://www.transactionservices.dla.mil/daashome/homepage.asp (See Defense Logistics Management (DLMS) 4000.25-M, Volume 2, Supply Standard and Procedures, Chapter 17, Supply Discrepancy Reporting)

Exceptions when no damage has occurred are as follows:

- Items packaged before the current SPI date.

- An alternate pack may be used, provided the prime Air Force Sustainment Complex, Packaging Office at the Air Logistics Complex (ALC) approves and issues a waiver and deviation number, which would be annotated on the exterior container on the lower right hand portion of the identification side of the container.

- In accordance with Technical Order (TO) 00-85B-3, How to Package Air Force Spares, the contractor may substitute the next larger size fast pack, of the type I or type II to ship transportation priorities 1 and 2 shipments as long as there is no decrease in any of the container dimensions without the requirement of a waiver deviation.

TO 00-85B-3, para 4.2 can be accessed via the website:

- https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf

ASSIST Documents for Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions The contractor shall use the ASSIST website to access specification, standards, data item descriptions documents listed in this contract solicitation:

FAR 52-211-2 Availability of Specifications, Standards, and Data Item Descriptions listed in the Acquisition Streamlining and Standardization Information System https://quicksearch.dla.mil/ https://spires.wpafb.af.mil/ https://www.transactionservices.dla.mil/daashome/homepage.asp https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf https://quicksearch.dla.mil/%23/

Existing Packaging Statement Of Work (Cont)

AFSC

406 SCMS/GULAA

Attn: Shawn Peeler

DSN: 777-6411

COMM: 801-777-6411

E-mail: shawn.peeler.1@us.af.mil

APPLICABLE GOVERNMENT PACKAGING DOCUMENTS

NOTE: UTILIZE THE MOST RECENT REVISION

DLMS 4000.25, Defense Logistics Management Systems, Volume 2, Change 10, Supply Standards and Procedures, Chapter 17, Supply Discrepancy Reporting

TO 00-85B-3 How to Package Air Force Spares

Existing Packaging Statement Of Work (Cont)

APPLICABLE GOVERNMENT PACKAGING DOCUMENTS

File details come from the government source that posted it. Updated .