Solicitation 31310018R0035
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_5_Past_Performance_Survey.pdf | ||
| Attachment_4_Monthly_Letter_Status_Report_(MLSR)_Instructions_&_Template.pdf | ||
| ATTACHMENT_3_Instructions_and_Template___Contractor_Spending_Plan.pdf | ||
| Attachment_2__Billing_Instructions_for_Labor-Hour_or_Time-and-Materials_Contracts.pdf | ||
| Attachment_No__1_Subpart_2009_5_Organizational_Conflicts_of_Interest.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31310018R0035
SOLICITATION, OFFER AND AWARD
4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)
ORDER UNDER DPAS (15 CFR 700)
6. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
NEGOTIATED (RFP)
SEALED BID (IFB)
5. DATE ISSUED
1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES
1 90
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
10. FOR
INFORMATION
CALL:
CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the
SOLICITATION
9. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTRS., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICES/COSTS
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
11. TABLE OF CONTENTS
18. OFFER DATE17. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
15C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
15B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
14. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)
(See Section I, Clause No. 52.232.8)
13. DISCOUNT FOR PROMPT PAYMENT
designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
28. AWARD DATE
(Signature of Contracting Officer)
27. UNITED STATES OF AMERICA
25. PAYMENT WILL BE MADE BY
26. NAME OF CONTRACTING OFFICER (Type or print)
CODE 24. ADMINISTERED BY (If other than Item 7)
ITEM
(4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by government)
CODE
06/28/2018 X
NRCHQ
US NRC - HQ
ACQUISITION MANAGEMENT DIVISION
MAIL STOP TWFN-07B20M
WASHINGTON DC 20555-0001
Submitt electronically https://www.fedconnect.net
Reference Section L.8,L.9 1630 ET 07/30/2018
SHARLENE M. MCCUBBIN 301
Sharlene.McCubbin@nrc.gov
415-5392
PAGE(S)
SHARLENE M. MCCUBBIN
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (Rev. 9-97)
Prescribed by GSA - FAR (48 CFR) 53.214(c)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____0_________ calendar days (60 calendar days unless a different period is inserted
SECTION B - Supplies or Services/Prices
B.1 BRIEF PROJECT TITLE AND WORK DESCRIPTION
B.2 CONSIDERATION AND OBLIGATION-TIME-AND-MATERIALS CONTRACT
B.3 PRICE SCHEDULE
SECTION C - Description/Specifications SECTION D - Packaging and Marking
D.1 BRANDING
D.2 PACKAGING AND MARKING
SECTION E - Inspection and Acceptance
E.1 INSPECTION AND ACCEPTANCE BY THE NRC (SEP 2013)
SECTION F - Deliveries or Performance
F.1 PERIOD OF PERFORMANCE
F.2 PLACE OF DELIVERY-REPORTS
F.3 MONTHLY LETTER STATUS REPORT (MLSR)
SECTION G - Contract Administration Data
G.1 REGISTRATION IN FEDCONNECT® (JULY 2014)
G.2 ELECTRONIC PAYMENT (DEC 2017)
SECTION H - Special Contract Requirements
H.1 2052.209-70 CURRENT/FORMER AGENCY EMPLOYEE INVOLVEMENT. (OCT
1999)
H.2 2052.209-71 CONTRACTOR ORGANIZATIONAL CONFLICTS OF INTEREST
(REPRESENTATION). (OCT 1999)
H.3 2052.209-72 CONTRACTOR ORGANIZATIONAL CONFLICTS OF INTEREST.
(JAN 1993)
H.4 2052.215-70 KEY PERSONNEL. (JAN 1993)
H.5 CONTRACTING OFFICER’S REPRESENTATIVE AUTHORITY
(End of Clause)
H.6 2052.215-78 TRAVEL APPROVALS AND REIMBURSEMENT. (OCT 1999)
ALTERNATE 1 (OCT 1999)
H.7 2052.222-70 NONDISCRIMINATION BECAUSE OF AGE. (JAN 1993)
H.8 2052.242-70 RESOLVING DIFFERING PROFESSIONAL VIEWS. (OCT 1999) .30
H.9 2052.242-71 PROCEDURES FOR RESOLVING DIFFERING PROFESSIONAL
VIEWS. (OCT 1999)
H.10 AWARD NOTIFICATION AND COMMITMENT OF PUBLIC FUNDS
H.11 USE OF AUTOMATED CLEARING HOUSE (ACH) ELECTRONIC
PAYMENT/REMITTANCE ADDRESS
H.12 GREEN PURCHASING (SEP 2015 )
H.13 WHISTLEBLOWER PROTECTION FOR NRC CONTRACTOR AND
SUBCONTRACTOR EMPLOYEES
H.14 COMPLIANCE WITH U.S. IMMIGRATION LAWS AND REGULATIONS
H.15 ANNUAL AND FINAL CONTRACTOR PERFORMANCE EVALUATIONS
H.16 2052.204-70 SECURITY. (OCT 1999)
H.17 SECURITY REQUIREMENTS FOR INFORMATION TECHNOLOGY LEVEL I
OR LEVEL II ACCESS APPROVAL (JUL 2016)
SECTION I - Contract Clauses
I.1 52.203-14 DISPLAY OF HOTLINE POSTER(S). (OCT 2015)
I.2 52.216-7 ALLOWABLE COST AND PAYMENT. (JUN 2013)
I.3 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE. (NOV 2011)
I.4 52.219-14 LIMITATIONS ON SUBCONTRACTING. (JAN 2017)
I.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION. (JUL 2013)
I.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (OCT 2015)
I.7 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUL
2014)
I.8 52.232-7 PAYMENTS UNDER TIME-AND-MATERIALS AND LABOR-HOUR
CONTRACTS. (AUG 2012)
I.9 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR
AWARD MANAGEMENT. (JUL 2013)
I.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998)
I.11 COMPLIANCE WITH SECTION 508 OF THE REHABILITATION ACT OF 1973,
AS AMENDED (SEP 2013)
SECTION J - List of Documents, Exhibits and Other Attachments Attachment Title SECTION K - Representations, Certifications, and Other Statements of Bidders
K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS. (JAN 2018) 65
K.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS. (JUL
2013)
K.3 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING
DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL
LAW. (FEB 2016)
K.4 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS. (OCT 2014) ...71
K.5 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS. (FEB
1999)
K.6 GREEN PURCHASING (JUL 2016)
SECTION L - Instructions,Conditions, and Notices to Bidders
L.1 52.216-1 TYPE OF CONTRACT. (APR 1984)
L.2 52.233-2 SERVICE OF PROTEST. (SEP 2006)
L.3 2052.215-72 TIMELY RECEIPT OF PROPOSALS. (OCT 1999)
L.4 2052.215-73 AWARD NOTIFICATION AND COMMITMENT OF PUBLIC FUNDS
(OCT 1999)
L.5 2052.215-74 DISPOSITION OF PROPOSALS. (JAN 1993)
L.6 2052.216-70 LEVEL OF EFFORT. (JAN 1993)
L.7 EVALUATION OF OPTION TO EXTEND SERVICES (AUG 2011)
L.8 GENERAL INSTRUCTIONS FOR THE TECHNICAL AND COST PROPOSALS –
L.9 SUBMISSION OF QUESTIONS
L.10 TECHNICAL PROPOSAL INSTRUCTIONS
L.11 COST PROPOSAL INSTRUCTIONS
SECTION M - Evaluation Factors for Award
M.1 2052.215-79 CONTRACT AWARD AND EVALUATION OF PROPOSALS. (OCT
1999)
M.2 EVALUATION FACTORS
SECTION B - Supplies or Services/Prices
B.1 BRIEF PROJECT TITLE AND WORK DESCRIPTION
(a) The title of this project is: Risk-Informed Reviews of Instrumentation and Control Systems/Components
(b) Summary work description: The objective of this work is to provide support in developing the technical basis for integrating risk insights into the regulatory framework for I&C systems and components.
(End of Clause)
B.2 CONSIDERATION AND OBLIGATION-TIME-AND-MATERIALS CONTRACT
(a) The ceiling price to the Government for full performance under this contract is *TBD.
(b) The contract includes: (1) direct labor hours at specified fixed hourly rates, inclusive of wages, fringe, overhead, general and administrative expenses, and profit, totaling $*TBD; and (2) cost of travel totaling $NTE $8,000].
(c) The amount presently obligated by the Government with respect to this contract is
*TBD.
(d) It is estimated that the amount currently obligated will cover performance through
*TBD.
(e) This is an incrementally-funded contract and FAR 52.232-22 – “Limitation of Funds” applies.
(End of Clause)
B.3 PRICE SCHEDULE
Position / Level Burdened Labor Rates (FY 18-23)* Year 1 Year 2 Year 3 Year 4 TotalBurdened
Labor Rates* # of hours
Labor Rate
# of hours
Labor Rate
# of hours
Labor Rate
# of hours
Labor Rate
# of hours Total
Senior Level Staff
Principal Investigator/ Scientist
800 800 500 500 2,600
Mid-level Staff Principal Engineer 1 800 800 1,600
Principal Engineer 2 500 500 1,000
Total Labor 1,600 1,600 1,000 1,000 5,200 Travel (Cost Reimbursable) FOR BIDDING PURPOSES THE TRAVEL ESTIMATE HAS BEEN
PROVIDED
The Government will pay up to the rates specified in the Government Federal Travel Regulations (FTR) for travel destination. All travel must be approved in advance by the NRC Contracting Officer’s Representative. NO PAYMENT WILL BE MADE WITHOUT BACKUP
DOCUMENTATION/RECEIPTS. SEE SOW ENTITLED TRAVEL
$8,000.00
Total Labor and Travel
SECTION C - Description/Specifications
C.1 Title
RISK-INFORMED REVIEWS OF INSTRUMENTATION AND CONTROL
SYSTEMS AND COMPONENTS
C.2 Background
The U.S. Nuclear Regulatory Commission (NRC) staff expects license amendment requests to utilize diverse types of digital instrumentation and control (I&C) upgrades in operating reactors in the near future. Operating reactors are expected to implement digital systems using existing software-based technologies and newer field-programmable gate array (FPGA) technologies. The NRC also expects a new generation of non-light water reactor (non-LWR) applications with advanced reactor technologies and highly integrated, state-of-the-art digital systems.
The NRC’s current I&C regulatory infrastructure is based on Institute of Electrical and Electronics Engineers (IEEE) design and quality standards and defense-in-depth approaches. Within this infrastructure, the NRC staff routinely applies engineering judgment on safety importance, informed by operating experience, in evaluating individual designs against regulatory standards. In its staff requirements memorandum (SRM) to SECY 15-0106, “Proposed Rule: Incorporation By Reference of Institute of Electrical and Electronics Engineers Standard 603-2009, “IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations” (RIN 3150-AI98),” the Commission directed the NRC staff to modernize the NRC's l&C regulatory infrastructure. In response to this SRM, the NRC staff developed its Integrated Action Plan (IAP)1 to modernize the NRC’s digital I&C regulatory infrastructure.
As part of this effort, the NRC staff is aiming for a digital I&C regulatory infrastructure that is risk-informed, performance-based, and technology-neutral. Therefore, the NRC staff seeks additional technical methods and analytical tools to integrate risk insights into its technical reviews and inspections of digital systems. The use of risk insights may guide: (1) the degree to which designs should comply with regulatory standards; (2) the level of detail in license amendments or applications; and (3) the level of NRC regulatory focus in performing reviews and making decisions. To the extent practicable, the technical methods and analytical tools developed as part of this work should leverage existing risk-informed approaches.
A key technical challenge to be addressed is quantifying digital system reliability for the diverse types of technologies and system architectures used by reactors, and establishing probabilistic risk assessment (PRA) methods with sufficient quality to guide regulatory decisions on these digital I&C technologies. One aspect of this work is to develop potential methods and analytical tools for: (1) estimating failure frequencies of digital I&C systems; and (2) assessing and addressing uncertainties in these estimates.
The NRC has previously sponsored related research in this area. Methods and
1 “Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructure,” Revision 2, January 2018 (ADAMS Accession No. ML18016B023) analytical tools considered should build upon previous NRC-sponsored research efforts, including those identified below in Section C.3.
C.3 Objective
The objective of this work is to provide support in developing the technical basis for integrating risk insights into the regulatory framework for I&C systems and components.
C.4 Scope of Work/Tasks
This project will be divided in two stages to develop the technical basis for integrating risk insights into the regulatory framework for I&C systems and components. The first stage includes three major tasks: (1) assess the technical feasibility of risk-informed approaches and integrating risk insights into the regulatory review framework for I&C systems and components; (2) establish a risk-informed process that can be used to classify digital I&C systems and components with respect to risk insights and safety significance and to focus licensee and NRC resources on those I&C systems and components identified as being important to safety, taking into consideration the unique aspects of digital I&C systems (e.g., increased complexity, increased connectivity, different system architectures, combining of functions); and (3) establish potential methods and analytical tools for estimating failure frequencies of digital I&C systems and assessing and addressing uncertainties in these estimates. The second stage includes one major task, which is to develop recommendations for integrating risk insights into the digital I&C regulatory infrastructure, including license review approaches and inspection focus, in a manner that complements the NRC's deterministic approach and supports the NRC's traditional defense-in-depth philosophy. This will minimize regulatory uncertainty associated with the review of I&C upgrades for both operating reactors and new applications for future non-LWR designs.
A kick-off meeting will be held before the start of the major tasks to ensure the contractor fully understands the tasks, deliverables, and schedule. In addition, the contractor will support periodic progress review meetings every six months throughout the period of performance.
Task 1: The first task is to assess the technical feasibility of risk-informed approaches and integrating risk insights into the regulatory review framework for I&C systems and components. Task 1 includes four subtasks:
Subtask 1.1: Review and summarize state-of-the-art or state-or-the-practice approaches for integrating risk insights into regulatory reviews that are used in other relevant agencies or industries.
Subtask 1.2: Review and summarize current practices, lessons learned, and challenges for applying PRA and risk insights to nuclear power plant digital I&C systems for operating and new reactors.
Subtask 1.3: Identify potential regulatory and technical gaps associated with further integrating risk insights into the regulatory review framework for I&C systems and components. In particular, address challenges associated with applying Title 10 of the Code of Federal Regulations (10 CFR) 50.69 to digital
I&C systems and using applicable guidance provided in the Standard Review Plan (SRP).
Subtask 1.4: As applicable, identify requirements for methods, models, data, or analytical tools that need to be developed to establish a risk-informed regulatory framework for digital I&C systems.
The deliverable for Task 1 is a technical letter report that documents the assessment of the technical feasibility of risk-informed approaches and integrating risk insights into the regulatory review framework for I&C systems and components. This assessment will include findings from Subtask 1.1 through Subtask 1.4.
Task 2: The second task is to establish a risk-informed process that can be used to: (1) classify major I&C systems and components with respect to risk insights and safety significance; and (2) guide licensee and NRC resources using a graded approach to place a greater emphasis on those I&C systems and components identified as being important to safety. The risk-informed process should factor in the safety function the I&C systems and components support, along with its safety significance or risk importance with respect to other functions within the overall I&C architecture. Task 2 includes four subtasks:
Subtask 2.1: Establish a process for classifying major I&C systems and components in LWR designs (both boiling-water reactor (BWR) and pressurized-water reactor (PWR) designs)2 and non-LWR designs3 using risk insights and engineering judgement based on estimation of the likelihood and consequence of failures involving digital I&C systems and components. The deliverable for Subtask 2.1 is a technical letter report that documents the established risk-informed process.
Subtask 2.2: Use the risk-informed process established in Subtask 2.1 to classify the major I&C systems and components in a representative BWR design.
The contractor will work with the COR to select the representative BWR design and the major I&C systems and components to be classified. The deliverable for Subtask 2.2 is a technical letter report that documents: (1) the identification and risk-informed categorization of the selected major I&C systems and components in the selected representative BWR design; and (2) any lessons learned or gaps
2 The Nuclear Energy Institute (NEI) developed guidance on categorizing structures, systems, and components (SSCs) for licensees that choose to adopt 10 CFR 50.69. This guidance is documented in NEI 00-04 (Rev 0), “10 CFR 50.69 SSC Categorization Guideline” (ADAMS Accession No. ML052910035). 10 CFR 50.69 and NEI-00-04 represent one example of a risk-informed process that could be developed for LWR designs under Subtask 2.1. However, the contractor is not constrained to this example and may consider and adopt alternative approaches.
3 Southern Company has developed an approach for categorizing SSCs in advanced non-LWR designs as part of the Licensing Modernization Project with the Department of Energy (DOE). This approach is documented in SC-29980-102 (Draft Rev A), “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components” (ADAMS Accession No. ML17290A463). SC-29980-102 represents one example of a risk-informed process that could be developed for non-LWR designs under Subtask 2.1.
However, the contractor is not constrained to this example and may consider and adopt alternative approaches.
identified in using the risk-informed process established in Subtask 2.1 to classify the major I&C systems and components in a representative BWR design.
Subtask 2.3: Use the risk-informed process established in Subtask 2.1 to classify the major I&C systems and components in a representative PWR design.
The contractor will work with the COR to select the representative PWR design and the major I&C systems and components to be classified. The deliverable for Subtask 2.3 is a technical letter report that documents: (1) the identification and risk-informed categorization of the selected major I&C systems and components in the selected representative PWR design; and (2) any lessons learned or gaps identified in using the risk-informed process established in Subtask 2.1 to classify the major I&C systems and components in a representative PWR design.
Subtask 2.4: Use the risk-informed process established in Subtask 2.1 to classify the major I&C systems and components in one or more representative non-LWR designs. The contractor will work with the COR to select the representative non-LWR design(s)—which may focus on those that are judged most likely to be licensed and constructed—and the major I&C systems and components to be classified. The deliverable for Subtask 2.4 is a technical letter report that documents: (1) the identification and risk-informed categorization of the selected major I&C systems and components in the selected representative non-LWR design(s); and (2) any lessons learned or gaps identified in using the risk-informed process established in Subtask 2.1 to classify the major I&C systems and components in one or more representative non-LWR designs.
Deliverables for Subtask 2.1 through Subtask 2.4 are described above for each subtask.
The principal findings from Task 2 as a whole will be summarized and leveraged as part of Task 4.
Task 3: The third task is to assess potential methods and analytical tools for: (1) estimating failure frequencies of digital I&C systems; and (2) assessing and addressing uncertainties in these estimates. After completion of Tasks 1, 2, and 4, the contractor will continue to support periodic progress review meetings every six months for the remainder of the period of performance. Task 3 includes three subtasks:
Subtask 3.1: Perform an initial scoping study to investigate potential methods and analytical tools to gather component failure data and estimate failure frequencies for digital I&C systems applicable to nuclear power plant systems.
Methods and analytical tools considered should build upon previous NRC-sponsored research efforts, including but not limited to those documented in the following reports:
o NUREG/CR-6101, “Software Reliability and Safety in Nuclear Reactor Protection Systems.”
o NUREG/GR-0019, “Software Engineering Measures for Predicting Software Reliability in Safety Critical Digital Systems.”
o NUREG/CR-6848, “Preliminary Validation of a Methodology for Assessing Software Quality.”
o NUREG/CR-6901, “Current State of Reliability Modeling Methodologies for Digital Systems and Their Acceptance Criteria for Nuclear Power Plant Assessments.”
o NUREG/CR-6942, “Dynamic Reliability Modeling of Digital Instrumentation and Control Systems for Nuclear Reactor Probabilistic Risk Assessments.”
o NUREG/CR-6962, “Traditional Probabilistic Risk Assessment Methods for Digital Systems.”
o NUREG/CR-6985, “A Benchmark Implementation of Two Dynamic Methodologies for the Reliability Modeling of Digital Instrumentation and Control Systems.”
o NUREG/CR-6997, “Modeling a Digital Feedwater Control System Using Traditional Probabilistic Risk Assessment Methods.”
o NUREG/CR-7042, “A Large Scale Validation of a Methodology for Assessing Software Reliability.”
o NUREG/CR-7044, “Development of Quantitative Software Reliability Models for Digital Protection Systems of Nuclear Power Plants.”
o NUREG/CR-7151, “Development of a Fault Injection-Based Dependability Assessment Methodology for Digital I&C Systems o NUREG/CR-7234, “Development of A Statistical Testing Approach for Quantifying Safety-Related Digital System on Demand Failure Probability.”
Subtask 3.2: From the methods considered in Subtask 3.1, identify method(s) to use for risk-significant digital I&C systems and components. The COR will pre-approve the method(s) to be described in the NUREG/CR report.
Subtask 3.3: Characterize uncertainties in the failure frequency estimates developed by method(s) selected in Task 3.2 and describe methods to address these uncertainties in NRC regulatory decisions regarding digital I&C systems and components in nuclear power plants.
The deliverable for Task 3 is a NUREG/CR report that documents the findings from Subtask 3.1 through Subtask 3.3.
Task 4: The fourth task—which will be performed in the second stage after completion of Task 1 and Task 2—is to develop recommendations for integrating risk insights into the digital I&C regulatory infrastructure, including license review approaches and inspection focus, in a manner that complements the NRC’s deterministic approach and supports the NRC’s traditional defense-in-depth philosophy.
The deliverable for Task 4 is a technical letter report that summarizes and leverages the principal findings from Task 1 and Task 2 to develop recommendations for integrating risk insights into the digital I&C regulatory infrastructure.
C.5 Estimated Labor Categories, Key Personnel and Levels of Effort
Specialized experience for contractor personnel performing under this contract/order must meet the minimum requirements for education and experience. While each senior key staff member need not possess complete expertise in each of the identified areas, each of the identified areas of expertise must be covered by at least one senior key staff member.
NRC requests resumes for each individual proposed to fill these labor categories and reserves the right to approve/disapprove individuals proposed for each labor category.
The work must be coordinated by a principal investigator (PI) who will be the staff's primary point of contact throughout the performance of the contract/order.
Labor Categories, Requirements and Key Personnel. Personnel working under this contract/order shall meet the minimum requirements for experience and education, as follows:
Labor Category Position Minimum Requirements Key Personnel* (yes or no)
Principal Investigator and Senior Key Staff
Bachelor’s degree in nuclear engineering, electrical engineering, or reliability/risk engineering with in-depth expertise and a preferred minimum of 10 years of experience in the following areas:
• BWR, PWR, or advanced non-LWR (including high-temperature gas-cooled reactor, sodium-cooled reactor, molten salt reactor, and liquid metal cooled reactor) nuclear power plant designs.
• I&C systems and components used in the aforementioned reactor designs, including experience with analyzing failure modes and effects of failures on I&C safety functions.
• NRC’s I&C regulatory infrastructure.
• Risk-informed categorization and treatment of SSCs for nuclear reactors and related risk-informed RGs.
• PRA methods and related state-of-the-art research on estimation of software and digital I&C system failure frequency and reliability.
• Previously completed PRAs or reports that estimated risk associated with systems for safety critical applications.
Yes
Mid-Level Key Staff Bachelor’s degree in nuclear engineering, electrical engineering, or reliability/risk engineering with some experience in the
Yes
Labor Category Position Minimum Requirements Key Personnel* (yes or no) areas listed above for Senior Key Staff.
*See NRCAR 2052.215-70, “Key Personnel”
Level-of-Effort (in hours). The estimated number of hours required for each labor category, including base and option periods, are as follows:
Base Year Option 1 Option 2 Option 3 Labor Category
Estimated Hours
Estimated Hours
Estimated Hours
Estimated Hours
Total
Senior Key Staff
800 800 500 500 2600
Mid-level Key Staff
800 800 500 500 2600
C.6 Certification and License Requirements
N/A
C.7 Reporting Requirements
C.7.1 Monthly Letter Status Report (MLSR)
Contractor shall provide a Monthly Letter Status Report which consists of a technical progress report and financial status report. This report will be used by the NRC to assess the adequacy of the resources utilized by Contractor to accomplish the work contained in this SOW and to provide status of Contractor’s progress in achieving tasks and producing deliverables. The report shall include agreement/order summary information, work completed during the specified period, schedule for providing deliverables specified in Section C.7, problem identification and resolution, travel plans, and staff hour summary. Copies must be sent to the COR and AMD at ContractsPOT.Resource@nrc.gov.
The MLSR must include the following: agreement number; task order number, if applicable; job code number; title of the project; project period of performance; task order period of performance, if applicable; COR’s name, telephone number, and e-mail address; full name and address of the performing organization; principal investigator's name, telephone number, and e-mail address; and reporting period. The MLSR reports are due on the 20th of every month.
C.7.2 Final Report
A final report summarizing the work performed and the results and conclusions derived shall be submitted to the COR. The due date, number of report copies required, and format of the final report will be agreed upon by the NRC’s COR and Contractor’s Project Manager.
C.8 List of Deliverables mailto:ContractsPOT.Resource@nrc.gov
Task Number
Deliverable and Acceptance Criteria
Deliverable Format
Due Date
N/A Kick-off meeting and memorandum summarizing meeting.
Acceptance Criteria: Reach a mutual understanding about the tasks of the project
Microsoft Word
No later than (NLT) 1 week after the meeting.
N/A Support for periodic progress review meetings every 6 months during the period of performance.
Acceptance Criteria:
Support addresses all elements requested by
COR.
Microsoft Word or PowerPoint
Within 7 days after receipt of request from COR.
N/A Per SOW Section C.6.1, Monthly Letter Status Reports (MLSRs) Acceptance Criteria:
Report contains all required information
Microsoft Word
NLT than the 20th of the following month
1 Draft technical letter report (TLR) for Task 1 Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 9 months from the commencement of this agreement.
1 Final TLR for Task 1 Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 1 month after receipt of NRC comments on the draft TLR for Task 1 (NRC staff will provide comments within 1 month after receipt of the draft
TLR.)
2.1 Draft TLR for Subtask 2.1
Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 9 months from the commencement of this agreement.
2.1 Final TLR for Subtask 2.1
Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 1 month after receipt of NRC comments on the draft TLR for Subtask 2.1 (NRC staff will provide comments within 1 month after receipt of the draft
TLR.)
2.2 Draft TLR for Subtask 2.2
Acceptance Criteria: The TLR contains all required
Microsoft Word
NLT 2 months after finishing the draft TLR for Subtask 2.1.
Number
Deliverable and Acceptance Criteria
Deliverable Format
Due Date information.
2.2 Final TLR for Subtask 2.2
Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 1 month after receipt of NRC comments on the draft TLR for Subtask 2.2 (NRC staff will provide comments within 1 month after receipt of the draft
TLR.)
2.3 Draft TLR for Subtask 2.3
Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 2 months after finishing the draft TLR for Subtask 2.2.
2.3 Final TLR for Subtask 2.3
Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 1 month after receipt of NRC comments on the draft TLR for Subtask 2.3 (NRC staff will provide comments within 1 month after receipt of the draft
TLR.)
2.4 Draft TLR for Subtask 2.4
Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 3 months after finishing the draft TLR for Subtask 2.3.
2.4 Final TLR for Subtask 2.4
Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 1 month after receipt of NRC comments on the draft TLR for Subtask 2.4 (NRC staff will provide comments within 1 month after receipt of the draft
TLR.)
3 Draft NUREG/CR report for Task 3 Acceptance Criteria: The NUREG/CR contains all required information.
Microsoft Word
NLT 42 months from the commencement of this agreement.
3 Final NUREG/CR report for Task 3 Acceptance Criteria: The NUREG/CR contains all required information.
Microsoft Word
NLT 3 months after receipt of NRC comments on the Draft NUREG/CR (NRC staff will provide comments within 3 months after receipt the draft
NUREG/CR.)
4 Draft TLR for Task 4 Acceptance Criteria: The TLR contains all required information.
Microsoft Word
NLT 4 months after finishing the draft TLR for Subtask 2.4.
4 Final TLR for Task 4 Acceptance Criteria: The
Microsoft Word
NLT 1 month after receipt of NRC comments on the
Number
Deliverable and Acceptance Criteria
Deliverable Format
Due Date
TLR contains all required information.
Draft TLR (NRC staff will provide comments within 1 month after receipt of the draft
TLR.)
C.9 Required Materials/Facilities
N/A
C.10 Release of Publications
Any documents generated by the contractor under this contract/order shall not be released for publication or dissemination without CO and COR prior written approval.
C.11 Place of Performance
The work to be performed under this contract/order will be primarily performed at contractor’s facility.
C.12 Contractor Travel and Meeting Support
For estimating purposes, it is anticipated that the Principal Investigator and up to one additional contractor staff member will make up to four trips to NRC Headquarters during the period of performance to support meetings to present findings to NRC management and other public meetings (e.g., Advisory Committee on Reactor Safeguards (ACRS) Meetings) as directed by the NRC COR.
Contractor will be authorized travel expenses consistent with the Federal Travel Regulation (FTR) and the limitation of funds specified in the travel line item of this contract/order. All travel requires prior written Government approval from the CO, unless otherwise delegated to the COR.
C.13 Section 508 of the Rehabilitation Act – Electronic and Information Technology Standards
C.13.1 Introduction In December 2000, the Architectural and Transportation Barriers Compliance Board (Access Board), pursuant to Section 508(2)(A) of the Rehabilitation Act Amendments of 1998, established electronic and information technology accessibility standards for the federal government. Section 508(a)(1) requires that when federal departments or agencies develop, procure, maintain, or use electronic and information technology they shall ensure that the EIT allows federal employees with disabilities to have access to and use of information and data that is comparable to the access to and use of information and data by other Federal employees. The Section 508 requirement also applies to members of the public seeking information or services from a federal department or agency.
The Standards for Section 508 of the Rehabilitation Act (codified at 36 CFR § 1194) were revised by the Access Board, published on January 18, 2017 and minor corrections were made on January 22, 2018, effective March 23, 2018.
The Revised 508 Standards have replaced the term EIT with information and communication technology (ICT). ICT is information technology (as set forth in 40 U.S.C. 11101(6)) and other equipment, systems, technologies, or processes, for which the principal function is the creation, manipulation, storage, display, receipt, or transmission of electronic data and information, as well as any associated content.
Examples of ICT include, but are not limited to: Computers and peripheral equipment;
information kiosks and transaction machines; telecommunications equipment; customer premises equipment; multifunction office machines; software; applications; Web sites;
videos; and, electronic documents.
The text of the Standards for Section 508 of the Rehabilitation Act (aka Revised 508 Standards) can be found in 36 CFR § 1194.1 and in Appendices A, C and D of 36 CFR § 1194 (at https://www.ecfr.gov/cgi-bin/text-idx?SID=caeb8ddcea26ba5002c2eea047698e85&mc=true&tpl=/ecfrbrowse/Title36/36cf r1194_main_02.tpl).
C.13.2 General Requirements In order to help the NRC comply with Section 508 of the Rehabilitation Act of 1973, as amended (29 U.S.C. § 794d)(Section 508), the contractor shall ensure that its deliverables (both products and services), within the scope of this contract, are
1. in conformance with, and
2. support the requirements of the Standards for Section 508 of the Rehabilitation
Act, as set forth in Appendices A, C and D of 36 CFR § 1194.
C.13.3 Applicable Provisions of the Revised 508 Standards The following is an outline of the Revised 508 Standards that identifies what provisions are always applicable and which ones may be applicable.
Applicable to the Contract?
Provision of 36 CFR Part 1194
Yes Appendix A to Part 1194 – Section 508 of the Rehabilitation Act:
Application and Scoping Requirements
Yes o Section 508 Chapter 1: Application and Administration - sets forth general application and administration provisions
Yes o Section 508 Chapter 2: Scoping Requirements - containing scoping requirements (which, in turn, prescribe which ICT – and, in some cases, how many – must comply with the technical specifications)
No Appendix C to Part 1194 – Functional Performance Criteria and Technical Requirements
No o Chapter 3: Functional Performance Criteria – applies to ICT where required by 508 Chapter 2 (Scoping Requirements) and where otherwise referenced in any other chapter of the Revised 508 Standards
No o Chapter 4: Hardware No o Chapter 5: Software https://www.ecfr.gov/cgi-bin/text-idx?SID=caeb8ddcea26ba5002c2eea047698e85&mc=true&tpl=/ecfrbrowse/Title36/36cfr1194_main_02.tpl https://www.ecfr.gov/cgi-bin/text-idx?SID=caeb8ddcea26ba5002c2eea047698e85&mc=true&tpl=/ecfrbrowse/Title36/36cfr1194_main_02.tpl https://www.ecfr.gov/cgi-bin/text-idx?SID=caeb8ddcea26ba5002c2eea047698e85&mc=true&tpl=/ecfrbrowse/Title36/36cfr1194_main_02.tpl https://www.ecfr.gov/cgi-bin/text-idx?SID=8955408cf446edc7ae4a66a5261c22b3&mc=true&node=ap36.3.1194_12.a&rgn=div9 https://www.ecfr.gov/cgi-bin/text-idx?SID=8955408cf446edc7ae4a66a5261c22b3&mc=true&node=ap36.3.1194_12.a&rgn=div9 https://www.ecfr.gov/cgi-bin/text-idx?SID=8955408cf446edc7ae4a66a5261c22b3&mc=true&node=ap36.3.1194_12.c&rgn=div9 https://www.ecfr.gov/cgi-bin/text-idx?SID=8955408cf446edc7ae4a66a5261c22b3&mc=true&node=ap36.3.1194_12.c&rgn=div9
Applicable to the Contract?
Provision of 36 CFR Part 1194
No o Chapter 6: Support Documentation and Services (Always applies if Chapters 4 or 5 apply)
Yes o Chapter 7: Referenced Standards No Appendix D to Part 1194 – Electronic and Information Technology
Accessibility Standards as Originally Published on December 21, 2000 Refer to Chapter 2 (Scoping Requirements) first to confirm what provisions in Appendix C apply in a particular case.
Section E203.2 applies only to the NRC.
C.13.4 Exceptions
C.13.4.1 Undue Burden, Fundamental Alteration or Best Meets If the Contractor wishes to use the Undue Burden or Fundamental Alteration (section E202.6 of 36 CFR § 1194) or Best Meets (section E202.7 of 36 CFR § 1194) general exceptions the Contractor shall do the following:
1. provide the COR with all information necessary to support the agency’s documentation requirements, as identified in sections E202.6.2 and E202.7.1 of 36 CFR § 1194, respectively
2. request and obtain written approval from the COR for development and/or use, as applicable to the scope of the contract, of an alternative means for providing individuals with disabilities access to and use of the information and data, as specified in sections E202.6.3 and E202.7.2 of 36 CFR § 1194, respectively.
C.13.4.2 National Security Systems Unless a deliverable of this contract is identified in this contract as ICT to be operated by or for the NRC as part of a national security system, as defined by 40 U.S.C. 11103(a), use of the National Security Systems general exception (section E202.3 of 36 CFR § 1194) shall only be made by the Contractor when accompanied by advance written approval by the COR.
C.13.4.3 ICT Functions Located in Maintenance or Monitoring Spaces Unless a deliverable of this contract is identified in this contract as ICT that will be located in maintenance or monitoring spaces, use of the ICT Functions Located in Maintenance or Monitoring Spaces general exception (section E202.5 of 36 CFR § 1194) shall only be made by the Contractor when accompanied by advance written approval by the COR.
C.13.5 Additional Requirements
C.13.5.1 Electronic Content Deliverables For electronic content (as defined in section E103 of 36 CFR § 1194) deliverables of this contract:
1. If a deliverable is in the form of an Adobe Portable Document Format (PDF) file and is either Public Facing or Agency Official Communication (as defined in sections E103 and E205.3 of 36 CFR § 1194, respectively) the Contractor shall ensure that it conforms to both section E205.4 of 36 CFR § 1194 and ISO 14289-
1 (PDF/UA-1)
https://www.ecfr.gov/cgi-bin/text-idx?SID=8955408cf446edc7ae4a66a5261c22b3&mc=true&node=ap36.3.1194_12.d&rgn=div9 https://www.ecfr.gov/cgi-bin/text-idx?SID=8955408cf446edc7ae4a66a5261c22b3&mc=true&node=ap36.3.1194_12.d&rgn=div9
2. Unless the Contractor requests and obtains advance written approval from the COR for a specific deliverable or class of deliverables, the contractor shall ensure that
a. deliverables that are not Public Facing and not Agency Official Communication (as defined in sections E103 and E205.3 of 36 CFR § 1194, respectively) shall conform to section E205.4 of 36 CFR § 1194
b. deliverables that are in the form of PDF files, are not Public Facing and are not Agency Official Communication (as defined in sections E103 and E205.3 of 36 CFR § 1194, respectively) shall conform to section E205.4 of 36 CFR § 1194 and ISO 14289-1 (PDF/UA-1).
C.13.5.2 Section-508-Specific Deliverables The Contractor shall provide documentation required to support Contractor use, if needed, of general exceptions to the Revised 508 Standards, as specified in the Exceptions section, above.
C.13.5.3 Section 508 Inspection and Acceptance ICT delivered by the Contractor shall be Section 508 conformant, unless otherwise stipulated in the acquisition. However, on a case-by-case basis and when in the best interest of the NRC, the COR may choose to provide written approval to the Contractor for waiving selected Section 508-specific requirements for a specific deliverable after requesting and receiving an acceptable remediation plan from the Contractor.
The COR reserves the right to perform testing or validation of some or all of the Contractor’s ICT deliverables to confirm the conformance to the ICT accessibility requirements of this acquisition.
C.14 Applicable Publications (Current Editions)
1. “Integrated Action Plan to Modernize Digital Instrumentation and Controls
Regulatory Infrastructure,” Revision 2, January 2018.
2. 10 CFR 50.69, “Risk-Informed Categorization and Treatment of
Structures, Systems and Components for Nuclear Power Reactors.”
3. NEI 00-04 (Rev 0), “10 CFR 50.69 SSC Categorization Guideline.”
4. SC-29980-102 (Draft Rev A), “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components.”
5. RG 1.174, “An Approach for Using Probabilistic Risk Assessment in Risk- Informed Decisions on Plant-Specific Changes to the Licensing Basis.”
6. RG 1.177, “An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications.”
7. RG 1.200, “An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities.”
8. RG 1.201, “Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According to Their Safety Significance.”
9. Technical Specifications Task Force 505, “Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b.”
10. IEC 61226, ”Nuclear Power Plants - Instrumentation and Control Important to Safety - Classification of Instrumentation and Control Functions.”
11.50 FR 32138, “Severe Reactor Accidents Regarding Future Designs and Existing Plants.”
12.51 FR 30028, “Safety Goals for the Operation of Nuclear Power Plants.”
13.60 FR 42622, “Use of Probabilistic Risk Assessment Methods in Nuclear
Regulatory Activities; Final Policy Statement.”
14.NUREG/CR-6101, “Software Reliability and Safety in Nuclear Reactor
Protection Systems.”
15.NUREG/GR-0019, “Software Engineering Measures for Predicting
Software Reliability in Safety Critical Digital Systems.”
16.NUREG/CR-6848, “Preliminary Validation of a Methodology for Assessing
Software Quality.”
17.NUREG/CR-6901, “Current State of Reliability Modeling Methodologies for
Digital Systems and Their Acceptance Criteria for Nuclear Power Plant Assessments.”
18.NUREG/CR-6942, “Dynamic Reliability Modeling of Digital Instrumentation and Control Systems for Nuclear Reactor Probabilistic Risk Assessments.”
19.NUREG/CR-6962, “Traditional Probabilistic Risk Assessment Methods for Digital Systems.”
20.NUREG/CR-6985, “A Benchmark Implementation of Two Dynamic Methodologies for the Reliability Modeling of Digital Instrumentation and Control Systems.”
21.NUREG/CR-6997, “Modeling a Digital Feedwater Control System Using Traditional Probabilistic Risk Assessment Methods.”
22.NUREG/CR-7042, “A Large Scale Validation of a Methodology for Assessing Software Reliability.”
23.NUREG/CR-7044, “Development of Quantitative Software Reliability Models for Digital Protection Systems of Nuclear Power Plants.”
24.NUREG/CR-7151, “Development of a Fault Injection-Based Dependability Assessment Methodology for Digital I&C Systems
25.NUREG/CR-7234, “Development of A Statistical Testing Approach for Quantifying Safety-Related Digital System on Demand Failure Probability.”
C.15 Security Requirements
Performance under this contract/order will involve contractor personnel that develop and/or analyze sensitive information technology systems or data or otherwise have access to such systems or data (IT Level II).
SECTION D - Packaging and Marking
D.1 BRANDING
The Contractor is required to use the statement below in any publications, presentations, articles, products, or materials funded under this contract/order, to the extent practical, in order to provide NRC with recognition for its involvement in and contribution to the project. If the work performed is funded entirely with NRC funds, then the contractor must acknowledge that information in its documentation/presentation.
Work Supported by the U.S. Nuclear Regulatory Commission (NRC), Office of Office of Nuclear Regulatory Research, under Contract/order number *TBD.
(End of Clause)
D.2 PACKAGING AND MARKING
(a) The Contractor shall package material for shipment to the NRC in such a manner that will ensure acceptance by common carrier and safe delivery at destination.
Containers and closures shall comply with the Surface Transportation Board, Uniform Freight Classification Rules, or regulations of other carriers as applicable to the mode of transportation.
(b) On the front of the package, the Contractor shall clearly identify the contract number under which the product is being provided.
(c) Additional packaging and/or marking requirements are as follows: *TBD.
SECTION E - Inspection and Acceptance
52.246-6 INSPECTION - TIME-AND-MATERIAL AND LABOR-HOUR. (MAY 2001)
E.1 INSPECTION AND ACCEPTANCE BY THE NRC (SEP 2013)
Inspection and acceptance of the deliverable items to be furnished hereunder shall be made by the NRC Contracting Officer’s Representative (COR) at the destination, accordance with FAR 52.247-34 - F.o.b. Destination.
Contract Deliverables:
1. Will be determined at Time of Award
2. []
3. []
4. []
5. []
SECTION F - Deliveries or Performance
F.1 PERIOD OF PERFORMANCE
This contract shall commence on effective date and will expire 4 years from award.
(End of Clause)
F.2 PLACE OF DELIVERY-REPORTS
The items to be furnished hereunder shall be delivered, with all charges paid by the Contractor, to:
a. Name: Contracting Officer's Representative (COR) (1 electronic copy) - Refer to Section H. 8.
b.Contracting Officer (CO) (1 electronic copy)
(End of Clause)
F.3 MONTHLY LETTER STATUS REPORT (MLSR)
The contractor shall provide a Monthly Letter Status Report which consists of a technical progress report and financial status report. This report will be used by the Government to assess the adequacy of the resources proposed by the contractor to accomplish the work contained in this SOW and provide status of contractor progress in achieving tasks and producing deliverables. The report shall include contract/order summary information, work completed during the specified period, milestone schedule information, problem resolution, travel plans, and staff hour summary (See Attachment 4)
SECTION G - Contract Administration Data
G.1 REGISTRATION IN FEDCONNECT® (JULY 2014)
The Nuclear Regulatory Commission (NRC) uses Compusearch Software Systems’ secure and auditable two-way web portal, FedConnect®, to communicate with vendors and contractors. FedConnect® provides bi-directional communication between the vendor/contractor and the NRC throughout pre-award, award, and post-award acquisition phases. Therefore, in order to do business with the NRC, vendors and contractors must register to use FedConnect® at https://www.fedconnect.net/FedConnect. The individual registering in FedConnect® must have authority to bind the vendor/contractor. There is no charge for using FedConnect®. Assistance with FedConnect® is provided by Compusearch Software Systems, not the NRC. FedConnect® contact and assistance information is provided on the FedConnect® web site at https://www.fedconnect.net/FedConnect.
G.2 ELECTRONIC PAYMENT (DEC 2017)
The Debt Collection Improvement Act of 1996 requires that all payments except IRS tax refunds be made by Electronic Funds Transfer. Payment shall be made in accordance with FAR 52.232-33, entitled “Payment by Electronic Funds Transfer-System for Award Management.”
To receive payment, the contractor shall prepare invoices in accordance with NRC’s Billing Instructions. Claims shall be submitted through the Invoice Processing Platform (IPP) (https://www.ipp.gov/). Back up documentation shall be included as required by the NRC’s Billing Instructions.
SECTION H - Special Contract Requirements
H.1 2052.209-70 CURRENT/FORMER AGENCY EMPLOYEE INVOLVEMENT. (OCT
1999)
As prescribed at 2009.105-70, the contracting officer shall insert the following…