Building #D1014, Men’s Bunkhouse
Old Whitehall Admin Site Lead Paint Removal Pictures
Building #1306, Women’s Bunkhouse
Building #D1501, Residential Garage
Building #D2301, Garage/Shop
Building #D2401, Horse Barn
| 01110 Summary of Work |
| 1 |
| 1 .1 DESCRIPTION |
| A. The work of this contract consists of the complete removal of lead-based paint from the exterior siding, trim, soffit, facia, and windows on buildings at the Old Whitehall Administrative Site. The work also includes all necessary preparatory work.... |
| B. All work will be performed under a single contract. |
| 1 .2 LOCATION |
| A. The Old Whitehall Administrative Site is located on the 600 block of West Legion Avenue in Whitehall, Montana. |
| 1 .3 CONTRACT START DATE |
| A. The Notice to Proceed will be at a mutually agreeable date expected to be on or about September 15, 2023 |
| 1 .4 CONTRACT TIME |
| A. The work of this contract shall be completed within 45 calendar days of the date of the Notice to Proceed. A seasonal shutdown may be issued if weather conditions do not permit work within specified tolerances. |
| 1 .5 CONTRACTOR'S USE OF PREMISES |
| A. Construction Camp: Establishment of a camp at the construction site will not be permitted. |
| B. Conduct operations to ensure the least inconvenience to the building occupants. |
| C. Confine storage of materials to areas designated at the pre-construction conference. |
| 1 .6 CONTRACTOR CERTIFICATION: |
| 1 .7 SPECIAL CONSTRUCTION REQUIREMENTS |
| A. The Old Whitehall Administrative Site was constructed as a ranger station between 1936 and 1938. Because of the historical significance of the buildings associated with the Whitehall Ranger Station, they have been formally determined to be eligibl... |
| B. Weekend and Holiday Work Restrictions: No on-site work shall be performed on weekends or federal holidays unless otherwise authorized by the Contracting Officer. |
| 1 .8 FIELD VERIFICATION |
| A. Field verify all dimensions affecting the work of this contract before ordering products. |
| 1 .9 TEMPORARY SERVICES |
| A. Electrical service, in the form of 120 volt, 15 amp receptacles, is available at no cost to the Contractor. Contractor is responsible for providing extension cords as needed. |
| B. No telephone service is available on site for Contractor’s use. |
| C. Potable water and sanitary facilities are available on the site during normal business hours. |
| 1 .10 TEMPORARY CONTROLS |
| A. HOUSEKEEPING: |
| 1. Keep project neat, orderly, and in a safe condition at all times. All construction debris be cleaned up at the end of each working day and placed in suitable containers. |
| 2. Provide containers for collecting construction debris. Forest Service trash receptacles shall not be used. |
| B. DISPOSAL: |
| 1. Dispose of construction debris in a legal manner off of Forest Service property. |
| 1 .11 CONSTRUCTION MATERIALS |
| A. All materials shall be Contractor-furnished. |
| 1 .12 PRECONSTRUCTION CONFERENCE |
| A. Before the start of construction, the Contracting Officer will arrange an on-site meeting with the Contractor. |
| 2 |
| 3 |
| 4 |
| 4 .1 SUMMARY OF WORK |
| A. Payment will be included in the bid item to which this work relates. |
02094 Lead Based paint