3.01_Solicitation_26056-0036.pdf
PDF 916 KB Posted
- Attached to
- SCREWCAP, SOCKETHEAD Federal contract opportunity
- Solicitation number
- N0010426QFD36
About this file
Request for Quotations Summary
This is a Request for Quotations (RFQ) document issued by NAVSUP Weapon Systems Support for procurement of self-locking socket head cap screws. The procurement is for 21 units (NSN 1HM 5305-01-545-0455) designated as Critical Safety Items (Level I) for use in shipboard systems, with delivery required within 365 days of contract effective date and final delivery by May 4, 2026.
The screws must be manufactured per MIL-DTL-1222 specifications in K-MONEL material, Grade 500 per QQ-N-286, measuring 5/8 inch diameter by 2 1/2 inches long with 11 UNRC threads in 3A fit class, solution annealed and age hardened condition, with chamfered ends and self-locking elements per MIL-DTL-18240. Quotations must be FOB Destination to Portsmouth Naval Shipyard (N50286) at Kittery, Maine, with inspection and acceptance at the contractor's plant. The procurement requires compliance with rigorous quality assurance requirements including ISO 9001 quality system certification, MIL-I-45208 or equivalent, calibration per MIL-STD-45662 or ISO 10012, comprehensive material certification and traceability, liquid penetrant inspection, ultrasonic inspection on starting material, mechanical property testing (tensile, yield, elongation, hardness, wedge tensile), zero-defect acceptance sampling, and submission of objective quality evidence via WAWF. Contractors must provide one additional fastener per heat/lot for government testing and maintain complete documentation. The contractor is responsible for all packaging per MIL-STD-2073, preservation, and marking requirements, with Government Source Inspection at origin and special emphasis material certificate of compliance required prior to shipment.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR EASE OF PROCESSING, PLEASE RETURN THIS
SHEET WHEN MAILING YOUR QUOTE.
Prescribed by GSA FAR (48 CFR) 53.215-1(a)
Additional provisions and representations are are not attached.
11. BUSINESS CLASSIFICATION
This RFQ is is not a small business-small purchase set aside [
18. TELEPHONE NO.(Type or Print)17. NAME AND TITLE OF SIGNER
16. DATE OF
QUOTATION
15. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
14. NAME AND ADDRESS OF QUOTERZIP Code) (Street, city, country, State and
(c) (d) (e) (f)
ITEM NO.
(a) andformthisonindicatesoquote,pleasetounableareyouIfoffers.notarefurnishedquotationsandinformation,forrequestaisThis contracttoorquotationthisofsubmissiontheofpreparationtheinincurredcostsanypaytogovernmentthecommitnotdoesrequestit.Thisreturn thistoattachedcertificationsand/orrepresenationsAnyquoter.byindicatedotherwiseunlessorigindomesticofareSuppliesservices.orsuppliesfor quoter.thebyconmpletedbemustQuotationsforRequest
SMALL OTHER THAN SMALL DISADVANTAGED WOMEN-OWNED
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE ON OR BE-
FORE CLOSE OF BUSINESS
5A. ISSUED BY (Date)6. DELIVERY BY
4. CERT.FOR NAT.DEF.
UNDER BDSA REG.2
AND/OR DMS REG.1
(See Schedule)OTHERFOB
DESTINATION
7. DELIVERY
(Name and telephone no.) (No collect calls)5B. FOR INFORMATION CALL:
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE 9. DESTINATION (Consignee and address, including ZIP Code)
RATING3. REQUISITION/PURCHASE REQUEST
NO.
2. DATE ISSUED1. REQUEST NO.
REQUEST FOR QUOTATIONS OF PAGESPAGE
(Date)
SCHEDULE12.
(THIS IS NOT AN ORDER)
(B)
SUPPLIES/SERVIES QUANTITY UNIT PRICEUNIT AMOUNT
PAYMENTPROMPTFORDISCOUNT13. % % % %
DAYSCALENDAR20DAYSCALENDAR10 DAYSCALENDAR30 DAYSCLAENDAR
IMPORTANT:
NOTE:
(Check appropriate boxes)
b. Small Business Size Standard ______
a. Standard Industrial Classification Code _______
PREVIOUS EDITION NOT USABLE
(Include area code)
(REV. 10-83) Approved by GSA/IRMS 9/92EXCEPTION TO STANDARD FORM 18 c.
M
M
X 1 53
N00104-26-Q-FD36 2026 APR 18 26056-0036 (L11A26 ) DO-A3
NAVSUP WEAPON SYSTEMS SUPPORT MECH
5450 CARLISLE PIKE 365 DAYS
MECHANICSBURG PA 17050-2411
A. M. BOYER (717)605-1234 N743.23 X
SEE SCHEDULE
2026 MAY 04
LEVEL ONE
X
PAGES
OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
N00104-26-Q-FD36 2 53
0001 NSN 1HM 5305-01-545-0455 L1
SCREWCAP,SOCKETHEAD SHELF LIFE 0-00
SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS
HM QUP ICQ PMT CD PM WM CUD CT UC LP IC UCL SP MK PACK UNIT PKWT UNIT PKCU OPI
N 001 AAA EK 1 00 00 00 0 D3 A ED O 00 EQQ 0.0 0.001 O
PACKAGING IS IN ACCORDANCE WITH MIL-STD-2073
SHIP TO
0001AA N00104-26-X-3124 N50286 21 EA
TP: 3
0001AB SEE DD FORM 1423 1 LO NSP
EXHIBIT "A"
0001AC PRODUCTION LOT TEST 1 LO NSP
(GOVERNMENT - DESTRUCTIVE)
SOLICITATION NOTES:
1. DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg.
2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference to N00102 within this order should be updated to N50286.
3. The following proposed delivery schedule applies:
Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery.
PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract.
4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS).
6. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF).
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: ALANA.M.BOYER2.CIV@US.NAVY.MIL
N00104-26-Q-FD36 PAGE 3 OF 53
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
WSSTERMBA00
CONTACT INFORMATION
When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.
Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:
Code: ( <N743.23> ) Weapon System LRC: ( <WVF> ) Telephone: ( <N/A> ) E-Mail: ( <ALANA.M.BOYER2.CIV@US.NAVY.MIL> )
In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.fct@navy.mil.
WSSTERMBZ04
IMPORTANT NOTICE REGARDING HAZARDOUS MATERIAL
FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data, is incorporated by reference in Section I in this solicitation ad required offerors to--
(1) identify any hazardous material (defined in FED STD 313 as an item or chemical which is a "health or physical hazard" per OSHA in 29 CFR 1910.1200) that will be delivered under a resultant contract, and
(2) provide a Material Safety Data Sheet meeting OSHA/FED STD 313 requirements for all hazardous material identified.
While not an all-inclusive listing of hazardous material, at a minimum, any it em with a four-digit Federal Supply Code (FSC), which correlates to the first four positions of the National Stock Number (NSN), of 6810, 6820, 6830, 6840, 6850, 7930, 8010, 8030, 8040, 9110, 9135, 9140, 9150, or 9160 is considered hazardous material and requires submission of a Material Safety Data Sheet or an appropriate representation that there is no hazardous material contained in the item.
Failure to provide the required information and documentation may render you ineligible for award. If you have questions about whether a solicited item is classified as hazardous, contact the NAVSUP WSS HAZMAT point of contact, NAVSUP WSS Code 0772, at (717)605-1361. (10-06)
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
CLIN: 0001
NIIN: 015450455 ACTIVITY USE ONLY: TDP VERSION NO.: 006
ITEM NAME: SCREWCAP,SOCKETHEAD
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
N00104-26-Q-FD36 PAGE 4 OF 53
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.3
DOCUMENT REFERENCES
SPEC NO. SLASH NO. PART NO REV DATE DISTR CD AMEND CHG NTC SUPP
ANSI/ASQ Z1.4 01 JAN 08 A
QQ-N-286 G 07 DEC 00 A
ASTM-A574 01 DEC 21 A
ASTM-F606 15 NOV 19 A
MIL-STD-792 F 19 MAY 06 A
MIL-DTL-1222 J 08 DEC 00 A
ISO_9001 15 NOV 08 A
ISO10012 15 APR 03 A
ISO/IEC 17025 15 MAY 05 A
MIL-DTL-18240 F 13 MAR 00 A 1
QPL 18240 QPD 08 DEC 20 A
MIL-I-45208 A 24 JUL 81 A 1
MIL-STD-45662 A 01 AUG 88 A
ANSI/NCSL Z540.3 26 MAR 13 A
T9074-AS-GIB-010/271 1 11 SEP 14 A
3. REQUIREMENTS
3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in MIL-DTL-1222, except as amplified or modified herein. MIL-DTL-1222 ordering data information is provided below.
(a) Studs, bolts, hex cap screws, socket head cap screws, and nuts; MIL-DTL-1222.
(b) Part Number - <N/A>
Configuration - <SCREW> Type - <II> Style - <N/A> Grade - <500 (QQ-N-286)> Condition - <Solution Annealed and Age Hardened> Size - <5/8 inch> Length - <2 1/2 inches> Thread Series - <11 UNRC> Class of Fit - <3A> End Configuration - <Chamfered>
(c) Issue of DoDISS is specified elsewhere in the Contract/Purchase Order.
(d) Heat Treatment must be performed in accordance with applicable specifications.
(e) Type of Coating - <N/A>
(f) Aluminum alloy fasteners must be coated in accordance with MIL-DTL-1222, unless otherwise specified in paragraph
(e) above.
(g) Externally threaded titanium alloy fasteners must be anodized in accordance with MIL-DTL-1222, unless otherwise specified in paragraph (e) above.
(h) Cut or ground threads <are permitted.> .
(i) See ordering data item (b) above as applicable.
(j) Bearing Surfaces - <N/A>
(k) Self-Locking element - <is required and must be in accordance with MIL-DTL-18240.>
(l) Marking must be as specified in paragraph 3.13 of MIL-DTL-1222.
(m) Chemical, Mechanical, and Non-Destructive test results must be as specified elsewhere in this Contract/Purchase Order.
(n) Resubmittal of fastener lots that failed an examination is not allowed unless specifically approved by the PCO.
(o) Retesting of mechanical properties is not allowed unless specifically approved by the PCO.
N00104-26-Q-FD36 PAGE 5 OF 53
(p) Rework and resubmittal of lots must be in accordance with MIL-DTL-1222.
(q) Inspection of defects must be in accordance with MIL-DTL-1222, unless otherwise specified elsewhere in this Contract/Purchase Order.
(r) Acceptance criteria for inspection of defects must be in accordance with MIL-DTL-1222, unless otherwise specified in this Contract/Purchase Order.
(S) Non-Destructive Testing must be in accordance with MIL-DTL-1222, unless otherwise specified elsewhere in this Contract/Purchase Order.
(t) Mechanical testing must be performed after final heat treatment, unless otherwise specified elsewhere in this Contract/Purchase Order.
(u) Preservation, packaging, and packing requirements must be as specified elsewhere in the contract/purchase order.
(v) - (bb) Substituting material grades is not allowed unless specifically approved by the PCO.
3.2 The Unit of Issue is EACH.
The Contractor is required to provide one additional fastener for each uniquely identified heat/lot of material in each shipment. Complete traceability must be maintained on this extra fastener.
3.3 Testing Certification - Certifications are required for the following tests on the items listed below.
Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below.
Test - <Liquid Penetrant Inspection> Item - <Self-Locking Socket Head Cap Screw> Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222
Attribute - Annealing and Age Hardening Item - <Self-Locking Socket Head Cap Screw> Performance - QQ-N-286
Test - Ultrasonic Inspection on Starting Material Item - <All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract> Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286
3.4 K-MONEL Fasteners - Material must be heat treated per QQ-N-286.
3.4.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286.
3.4.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only.
3.5 K-MONEL Fasteners - K-MONEL externally threaded fasteners must have mechanical properties determined in accordance with MIL-DTL-1222. Test results must include Tensile, Yield, Elongation and Hardness as required by MIL-DTL-1222. (The Hardness tests must be performed on a full size fastener.)
3.5.1 Studs require an Axial Tensile test in accordance with MIL-DTL-1222.
3.5.2 Headed fasteners require a Wedge Tensile test as specified elsewhere in this contract/purchase order.
3.6 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories:
Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889
FAX: (304) 526-5973
Metallurgical Consultants, Inc.
Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351
FAX: (713) 526-2964
N00104-26-Q-FD36 PAGE 6 OF 53
Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032
FAX: (301) 227-5576
Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave.
Monroe, NC 28110 Phone: (704) 289-4511
FAX: (704) 289-4269
Westmoreland Mechanical Testing and Research Inc.
Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388
Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194
FAX: 011-49-0203-9994415
ThyssenKrupp VDM USA, Inc.
Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683
3.7 Wedge Tensile Test Specimens (Headed fasteners) - A wedge tensile test must be conducted on a Full Size Fastener for each production lot and reported aspart of the Mechanical Properties. The required specimens for the Wedge Tensile Test must be separate fasteners from those required for the Yield Test.
3.7.1 Testing for Socket Head Cap Screws must be in accordance MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1.
3.7.2 Testing for all other Headed Fasteners with a nominal diameter greater than 1/4-inch must be in accordance with ASTM-F606 for grades 5, 8, B7, and B16.For all other grades, the following wedge angles must be used.
a. Except as specified in item c below, fasteners with a nominal diameter of 1/4-inch through 1-inch (inclusive) must be tested with a ten degree wedge.
b. Except as specified in item c below, fasteners with a nominal diameter over 1-inch must be tested with a six degree wedge.
c. Fasteners that are of grades 8, B7, B16, 410, 416, 416Se, 431, and 630 and are threaded within one diameter to the underside of the head must be tested as follows:
Sizes 1/4 inch through 3/4 inch (inclusive) Use a six degree wedgeSizes over 3/4 inch Use a four degree wedge
d. Fasteners which have passed testing with wedge angles greater than those specified should be considered acceptable.
3.7.3 For fasteners having a length less than the minimum specified in Table 1 of ASTM-F606, one "test specimen fastener" must be manufactured from each lot of fasteners and tested to represent that lot. The length of these test specimen fasteners must meet the minimum specified in table 1 of ASTM-F606 but must not exceed it by more than 1/4 inch. Test specimen fasteners must be the same type, style, and diameter as the production lot and must be manufactured from the same starting material, using the same manufacturing techniques as the production lot, and must be heat treated (if required) along with the production lot.
3.8 Thread Forming - The following provides the official interpretation of paragraph 4.5.2.7 of MIL-DTL-1222.
3.8.1 In order to qualify for "Alternate Mechanical Testing" found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof stress testing on finished fasteners, all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows:
N00104-26-Q-FD36 PAGE 7 OF 53
a. Proper product lot control and traceability must be in place.
b. No heat treatment (including hot heading and hot forming), cold forming, drawing, rolling and thread rolling may be performed on the starting bar, fastener blanks or finished fasteners after the completion of the mechanical testing on the starting bar.
c. and d. The proper size starting bar must be selected to ensure mechanical properties of finished fasteners are represented by the mechanical properties of the starting bar.
e. The mandatory testing, axial tensile (studs) and wedge tensile (screws and bolts) must be performed on full sized fasteners. Note that there is a typographical error in paragraph 4.5.2.7 and that the axial load test is a mandatory test that must be performed on studs as required in paragraph 4.5.2.7.e.
3.8.2 Thread rolling is a cold working process and is not considered to be a machining or grinding operation.
Therefore, fasteners which have rolled threads do not satisfy the provisions of MIL-DTL-1222J paragraph 4.5.2.7.b and are not eligible for the "Alternate Mechanical Testing" provision.
3.8.3 Thread rolling alone is not a sufficient cold working process to qualify a fastener to be in the cold worked (CW) condition. This condition is only applicable to some 300 series stainless steel studs, screws and nuts. These CW condition fasteners must be manufactured from cold worked bar stock or be cold headed in order to qualify. The threads may subsequently be rolled, machined or ground. Testing of the finished fasteners and/or reporting of the starting bar stock material properties is subject to the same provisions found in MIL-DTL-1222J paragraph 4.5.2.7 and discussed above.
3.9 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order.
3.9.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor.
The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this configuration.
c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product.
d. Information about remedial action being taken to prevent reoccurrence of the non-conformance.
3.9.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail.
3.9.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II), and change justification.
b. A complete description of the change to be made and the need for that change.
c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the engineering change.
3.10 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the
N00104-26-Q-FD36 PAGE 8 OF 53
procurement document, including any/all invoked specifications and drawings.
3.11 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
* QUALITY ASSURANCE REQUIREMENTS *
3.12 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.13 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.
3.13.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order.
3.13.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.13.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.13.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.13.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.14 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.14.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition.
3.14.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative.
3.15 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.15.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase
N00104-26-Q-FD36 PAGE 9 OF 53
document.
3.15.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract.
3.15.3 The prime contractor must ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract.
3.15.4 The prime contractor must evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government.
3.15.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.16 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.16.1 Visual examination upon receipt to detect damage during transit.
3.16.2 Inspection for completeness and proper type.
3.16.3 Verification of material quality received.
3.16.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.16.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.16.6 Identification and protection from improper use or disposition.
3.16.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use.
3.16.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained.
3.16.9 Material returned to the contractor must be handled as GFM.
3.17 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements.
3.17.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein.
3.18 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.
3.19 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply:
3.19.1 Quantitative chemical and mechanical analysis of material is required <in accordance with MIL-DTL-1222> .Test reports must be traceable to traceability marking on the material. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied.
3.19.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and
N00104-26-Q-FD36 PAGE 10 OF 53
mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified.
The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification for chemical composition must be overstamped and/or annotated with the unique traceability marking used with the altered material and at a minimum contain the information below.
TRACEABILITY MARKING ________________________________________________
(marking on finished item)
IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO
HEAT/LOT NUMBER ________________ AND HEAT TREAT NUMBER ________________________
(when applicable)
_________________________________________ DATE _____________________
(name and signature of auth. co. rep.)
3.19.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited.
3.19.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.
3.19.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.20 Material Marking for Traceability and Identification - The following are the minimum marking requirements.
Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order.
In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability marking must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.
3.20.1 Fasteners must be marked in accordance with <MIL-DTL-1222> . The method of marking must be types I, II, III, V, VIII or IX of MIL-STD-792 except for grades 410, 416 and 431 in the H condition and grades 8, 630, A574, and 4340 which must be marked by method II when marking is applied after the final heat treatment. Markings on fasteners that are to be coated must be marked prior to coating and have a minimum depth of 4 mils. Traceability marking must be legible after the application of protective compounds.
3.20.2 Marking is required for all fasteners regardless of size and must include the material symbol, the manufacturer's identification symbol, and the traceability marking. Marking must be applied on the head of headed fastener (top preferred, side location if necessary). Where no contract invoked specification requirement exists for this marking, self-locking fasteners must be marked with six dots approximately .032" diameter, raised or depressed by approximately .010" located on the top perimeter of the head of the fastener in an arc or circular pattern. The six dots must be distinguishable from all other required markings.
3.21 Material Handling - The written material control process must include the following:
3.21.1 All raw materials must have traceability markings (except as specified below).
3.21.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.
3.21.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process.
3.21.4 Purchase orders for raw material must specify that the material be traceable to material certification test reports by the traceability marking on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.
3.21.5 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must
N00104-26-Q-FD36 PAGE 11 OF 53
specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
3.22 Receiving inspection -
3.22.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location.
3.22.2 Receiving Inspection must include as a minimum -
Verification that the traceability marking on the material agrees with that on the certification test reports.
Verification that certification test reports are legible and complete.
Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.
3.23 Discrepancy reporting -
3.23.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records will be maintained and available for review by the government Quality Assurance Representative
(QAR).
3.24 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance.
3.24.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size).
SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.
3.24.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above.
3.24.3 All data concerning material verification (chemical and mechanical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility.
3.24.4 All metallic material must be 100% inspected for traceability marking and that the marking is legible.
3.25 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information:
1. Contractor's name, address and date.
2. The contract/purchase order number (for example: N00104-11-P-FA12)
3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC
(for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable).
4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable).
5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable).
6. Manufacturer's compound number ("N/A" when Not Applicable).
7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable).
8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily.
9. Contractor's or authorized personnel's signature.
WSSTERMCZ05
CONFIGURATION MANAGEMENT - MARITIME
1.0 Configuration Management
1.1 The cognizant systems command (SYSCOM), Naval Sea Systems Command (NAVSEA) or Naval Information Warfare Systems
N00104-26-Q-FD36 PAGE 12 OF 53
WSSTERMCZ05 (CONT)
CONFIGURATION MANAGEMENT - MARITIME
Command (NAVWAR), Program Manager will maintain configuration control and change authority for all items in this contract.
1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.
2.0 Engineering Changes
2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as either Class I (Major) or Class II (Minor). For detailed classification criteria refer to DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS-80639E, Engineering Change Proposal (ECP).
NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.
2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant SYSCOM Program Office prior to any Class I ECP submission. The Contractor must notify the Procurement Contracting Officer (PCO) of any pending or approved Class I engineering changes with another Government activity that the Contractor proposes to incorporate under this contract. The cognizant SYSCOM Program Office will approve or disapprove of Class I changes. Any approved Class I change may necessitate contract changes by the PCO, which changes may be handled under the Changes clause of this contract, FAR 52.243-1 The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.
2.1.2 Class II (Minor) Changes: Class II changes must be submitted to the cognizant Defense Contract Management Agency (DCMA) Contract Management Office (CMO), or to the Supervisor of Shipbuilding (SUPSHIP) Groton, for concurrence in classification and may be implemented only upon receiving DCMA, SUPSHIP, or NAVSEA/NAVWAR Technical Warrant Holder (TWH) concurrence. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit the Class II (Minor) change to the PCO for approval or disapproval. Class II changes must be made at no additional cost to the Government.
2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.
3.0 Variances
3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline.
RFVs are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Variance requests must be prepared in accordance with DI-SESS-80640E - Request for Variance
(RFV).
NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.
3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests via DCMA or SUPSHIP and the PCO, to the SYCOM Program Office or their delegated representative, for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.
3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until the request is approved by the cognizant DCMA CMO, SUPSHIP, or SYSCOM TWH. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit minor variance requests via DCMA or SUPSHIP and the PCO, to the
N00104-26-Q-FD36 PAGE 13 OF 53
WSSTERMCZ05 (CONT)
CONFIGURATION MANAGEMENT - MARITIME
SYSCOM Program Office or their delegated representative, for approval or disapproval.
3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a major/critical or minor variance.
(12-23)
PART I - THE SCHEDULE
SECTION D
PACKAGING AND MARKING
CLIN: 0001
NIIN: 015450455 ACTIVITY USE ONLY: TDP VERSION NO.: 006
ITEM NAME: SCREWCAP,SOCKETHEAD
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
252.211-7003
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)
(a) Definitions. As used in this clause-
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means-
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier' means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .