3.01_Solicitation_20120-0156.PDF
PDF 978 KB Posted
- Attached to
- UNION TAILPIECES Federal contract opportunity
- Solicitation number
- N00104-23-Q-FF74
About this file
This solicitation from the Department of the Navy seeks union tailpieces. Key details include:
-
The solicitation number is N00104-23-Q-FF74 and involves union tailpieces identified as National Item Identification Number 016825852.
-
Required quality assurance includes material traceability, certifications, inspection, and submission of inspection procedures. Items must meet preservation, packaging, packing and marking requirements.
-
Delivery is FOB destination with inspection and acceptance at origin. The period of performance involves a base year and four option years.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR EASE OF PROCESSING, PLEASE RETURN THIS
SHEET WHEN MAILING YOUR QUOTE.
Prescribed by GSA FAR (48 CFR) 53.215-1(a)
Additional provisions and representations are are not attached.
11. BUSINESS CLASSIFICATION
This RFQ is is not a small business-small purchase set aside [
18. TELEPHONE NO.(Type or Print)17. NAME AND TITLE OF SIGNER
16. DATE OF
QUOTATION
15. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
14. NAME AND ADDRESS OF QUOTERZIP Code) (Street, city, country, State and
(c) (d) (e) (f)
ITEM NO.
(a) andformthisonindicatesoquote,pleasetounableareyouIfoffers.notarefurnishedquotationsandinformation,forrequestaisThis contracttoorquotationthisofsubmissiontheofpreparationtheinincurredcostsanypaytogovernmentthecommitnotdoesrequestit.Thisreturn thistoattachedcertificationsand/orrepresenationsAnyquoter.byindicatedotherwiseunlessorigindomesticofareSuppliesservices.orsuppliesfor quoter.thebyconmpletedbemustQuotationsforRequest
SMALL OTHER THAN SMALL DISADVANTAGED WOMEN-OWNED
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE ON OR BE-
FORE CLOSE OF BUSINESS
5A. ISSUED BY (Date)6. DELIVERY BY
4. CERT.FOR NAT.DEF.
UNDER BDSA REG.2
AND/OR DMS REG.1
(See Schedule)OTHERFOB
DESTINATION
7. DELIVERY
(Name and telephone no.) (No collect calls)5B. FOR INFORMATION CALL:
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE 9. DESTINATION (Consignee and address, including ZIP Code)
RATING3. REQUISITION/PURCHASE REQUEST
NO.
2. DATE ISSUED1. REQUEST NO.
REQUEST FOR QUOTATIONS OF PAGESPAGE
(Date)
SCHEDULE12.
(THIS IS NOT AN ORDER)
(B)
SUPPLIES/SERVIES QUANTITY UNIT PRICEUNIT AMOUNT
PAYMENTPROMPTFORDISCOUNT13. % % % %
DAYSCALENDAR20DAYSCALENDAR10 DAYSCALENDAR30 DAYSCLAENDAR
IMPORTANT:
NOTE:
(Check appropriate boxes)
b. Small Business Size Standard ______
a. Standard Industrial Classification Code _______
PREVIOUS EDITION NOT USABLE
(Include area code)
(REV. 10-83) Approved by GSA/IRMS 9/92EXCEPTION TO STANDARD FORM 18 c.
M
M
X 1 60
N00104-23-Q-FF74 2023 AUG 30 20120-0156 (L1 TLL ) DO-A3
NAVSUP WEAPON SYSTEMS SUPPORT MECH
5450 CARLISLE PIKE 30 DAYS
MECHANICSBURG PA 17050-2411
C. D. BRYANT (717)605-6561 N743.48 X
SEE SCHEDULE
2023 SEP 29
LEVEL ONE
X
PAGES
OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
N00104-23-Q-FF74 2 60
0001 NSN 1HM 4730-01-682-5852 L1
UNION TAILPIECES SHELF LIFE 0-00
SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS
HM QUP ICQ PMT CD PM WM CUD CT UC LP IC UCL SP MK PACK UNIT PKWT UNIT PKCU OPI
N 001 AAA 31 1 00 00 NA B BD A ED O 00 EQQ 1.5 0.013 O
PACKAGING IS IN ACCORDANCE WITH MIL-STD-2073
SHIP TO
0001AA N00104-20-X-6586 N50286 2 EA
TP: 3
0001AB SEE DD FORM 1423 1 LO NSP
EXHIBIT "A"
SOLICITATION NOTES:
1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.
2. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use.
3. DD 1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg.
4. Consistent with FAR 52.216-18, "All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
5. NAVSUP WSS Mech will be considering past performance in the evaluation of offers. See Clauses DFARS 252.213-7000 and WSSTERMMZ01.
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: CAMERON.D.BRYANT@NAVY.MIL
N00104-23-Q-FF74 PAGE 3 OF 60
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
WSSTERMBA00
CONTACT INFORMATION
When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.
Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:
Code: ( <N743.48> ) Weapon System LRC: ( <WVQ> ) Telephone: ( <717-605-6561> ) E-Mail: ( <CAMERON.D.BRYANT@NAVY.MIL> )
In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.fct@navy.mil.
WSSTERMBZ04
IMPORTANT NOTICE REGARDING HAZARDOUS MATERIAL
FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data, is incorporated by reference in Section I in this solicitation ad required offerors to--
(1) identify any hazardous material (defined in FED STD 313 as an item or chemical which is a "health or physical hazard" per OSHA in 29 CFR 1910.1200) that will be delivered under a resultant contract, and
(2) provide a Material Safety Data Sheet meeting OSHA/FED STD 313 requirements for all hazardous material identified.
While not an all-inclusive listing of hazardous material, at a minimum, any it em with a four-digit Federal Supply Code (FSC), which correlates to the first four positions of the National Stock Number (NSN), of 6810, 6820, 6830, 6840, 6850, 7930, 8010, 8030, 8040, 9110, 9135, 9140, 9150, or 9160 is considered hazardous material and requires submission of a Material Safety Data Sheet or an appropriate representation that there is no hazardous material contained in the item.
Failure to provide the required information and documentation may render you ineligible for award. If you have questions about whether a solicited item is classified as hazardous, contact the NAVSUP WSS HAZMAT point of contact, NAVSUP WSS Code 0772, at (717)605-1361. (10-06)
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
CLIN: 0001
NIIN: 016825852 ACTIVITY USE ONLY: TDP VERSION NO.: 001
ITEM NAME: UNION TAILPIECES
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
N00104-23-Q-FF74 PAGE 4 OF 60
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.1.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
2.1.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.1.4 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.2
DRAWING NO. CAGE REV DOC TYPE DISTR CD SHEET NR REV TYPE SIZE
2621-791-01 96169 AA D3 0001 AA 49998 0070663
2621-791-01 96169 AA D3 0002 Z 49998 0093354
2621-791-01 96169 AA D3 0002.1 Z 49998 0121734
2621-791-01 96169 AA D3 0002.2 Z 49998 0164597
2621-791-01 96169 AA D3 0002.3 Z 49998 0104361
2621-791-01 96169 AA D3 0002.4 Z 49998 0090283
2621-791-01 96169 AA D3 0002.5 AA 49998 0067220
2621-791-01 96169 AA D3 0003 AA 49998 0053486
2621-791-01 96169 AA D3 0003.1 AA 49998 0090282
2621-791-01 96169 AA D3 0003.2 Z 49998 0115469
2621-791-01 96169 AA D3 0003.3 AA 49998 0101880
2621-791-01 96169 AA D3 0003.4 Z 49998 0164200
2621-791-01 96169 AA D3 0004 Z 49998 0086226
2621-791-01 96169 AA D3 0005 Z 49998 0059824
2621-791-01 96169 AA D3 0005.1 Z 49998 0066467
2621-791-01 96169 AA D3 0006 Z 49998 0052547
2621-791-01 96169 AA D3 0007 Z 49998 0052306
2621-791-01 96169 AA D3 0008 Z 49998 0064509
2621-791-01 96169 AA D3 0009 Z 49998 0050553
2621-791-01 96169 AA D3 0010 Z 49998 0052491
2621-791-01 96169 AA D3 0011 Z 49998 0046627
2621-791-01 96169 AA D3 0012 Z 49998 0057276
2621-791-01 96169 AA D3 0013 Z 49998 0054667
2621-791-01 96169 AA D3 0014 Z 49998 0064639
2621-791-01 96169 AA D3 0015 Z 49998 0050945
2621-791-01 96169 AA D3 0016 Z 49998 0052676
2621-791-01 96169 AA D3 0017 Z 49998 0055937
2621-791-01 96169 AA D3 0018 Z 49998 0049969
2621-791-01 96169 AA D3 0019 Z 49998 0044629
2621-791-01 96169 AA D3 0020 Z 49998 0054427
2621-791-01 96169 AA D3 0021 Z 49998 0058053
2621-791-01 96169 AA D3 0022 Z 49998 0069808
2621-791-01 96169 AA D3 0023 Z 49998 0055207
2621-791-01 96169 AA D3 0024 Z 49998 0071203
2621-791-01 96169 AA D3 0025 Z 49998 0048802
2621-791-01 96169 AA D3 0026 AA 49998 0056519
2621-791-01 96169 AA D3 0027 Z 49998 0061895
2621-791-01 96169 AA D3 0028 Z 49998 0056524
2621-791-01 96169 AA D3 0029 Z 49998 0080829
2621-791-01 96169 AA D3 0030 Z 49998 0063549
2621-791-01 96169 AA D3 0031 Z 49998 0053061
2621-791-01 96169 AA D3 0032 Z 49998 0197841
2621-791-01 96169 AA D3 0033 Z 49998 0069559
2621-791-01 96169 AA D3 0034 Z 49998 0084006
2621-791-01 96169 AA D3 0036 Z 49998 0074998
2621-791-01 96169 AA D3 0037 Z 49998 0048185
2621-791-01 96169 AA D3 0038 Z 49998 0103294
2621-791-01 96169 AA D3 0039 Z 49998 0064841
2621-791-01 96169 AA D3 0040 Z 49998 0069106
N00104-23-Q-FF74 PAGE 5 OF 60
2621-791-01 96169 AA D3 0042 Z 49998 0059514
2621-791-01 96169 AA D3 0043 Z 49998 0062066
2621-791-01 96169 AA D3 0044 Z 49998 0052595
2621-791-01 96169 AA D3 0045 Z 49998 0094080
2621-791-01 96169 AA D3 0046 Z 49998 0061060
2621-791-01 96169 AA D3 0047 Z 49998 0050774
2621-791-01 96169 AA D3 0048 Z 49998 0053692
2621-791-01 96169 AA D3 0049 Z 49998 0054295
2621-791-01 96169 AA D3 0050 Z 49998 0058088
2621-791-01 96169 AA D3 0051 Z 49998 0055648
2621-791-01 96169 AA D3 0052 Z 49998 0054047
2621-791-01 96169 AA D3 0053 Z 49998 0055390
2621-791-01 96169 AA D3 0054 Z 49998 0057634
2621-791-01 96169 AA D3 0055 Z 49998 0056363
2621-791-01 96169 AA D3 0056 Z 49998 0063501
2621-791-01 96169 AA D3 0057 Z 49998 0046034
2621-791-01 96169 AA D3 0058 Z 49998 0065654
2621-791-01 96169 AA D3 0059 Z 49998 0055675
2621-791-01 96169 AA D3 0060 Z 49998 0199599
2621-791-01 96169 AA D3 0061 Z 49998 0057992
2621-791-01 96169 AA D3 0062 Z 49998 0055608
2621-791-01 96169 AA D3 0063 Z 49998 0055675
2621-791-01 96169 AA D3 0064 Z 49998 0056999
2621-791-01 96169 AA D3 0065 Z 49998 0055555
2621-791-01 96169 AA D3 0066 Z 49998 0054117
2621-791-01 96169 AA D3 0067 Z 49998 0055593
2621-791-01 96169 AA D3 0068 Z 49998 0053492
2621-791-01 96169 AA D3 0069 Z 49998 0062483
2621-791-01 96169 AA D3 0071 Z 49998 0059039
2621-791-01 96169 AA D3 0072 Z 49998 0057042
2621-791-01 96169 AA D3 0073 Z 49998 0055653
2621-791-01 96169 AA D3 0074 Z 49998 0061472
2621-791-01 96169 AA D3 0075 Z 49998 0055622
2621-791-01 96169 AA D3 0076 Z 49998 0056689
2621-791-01 96169 AA D3 0077 Z 49998 0051541
2621-791-01 96169 AA D3 0078 Z 49998 0039921
2621-791-01 96169 AA D3 0079 Z 49998 0043778
2621-791-01 96169 AA D3 0080 Z 49998 0057374
2621-791-01 96169 AA D3 0081 Z 49998 0051848
2621-791-01 96169 AA D3 0082 Z 49998 0050606
2621-791-01 96169 AA D3 0083 Z 49998 0042659
2621-791-01 96169 AA D3 0084 Z 49998 0049678
2621-791-01 96169 AA D3 0085 Z 49998 0060403
2621-791-01 96169 AA D3 0086 Z 49998 0061140
2621-791-01 96169 AA D3 0087 Z 49998 0051633
2621-791-01 96169 AA D3 0088 Z 49998 0047765
2621-791-01 96169 AA D3 0089 Z 49998 0056335
2621-791-01 96169 AA D3 0090 Z 49998 0059338
2621-791-01 96169 AA D3 0091 Z 49998 0041021
2621-791-01 96169 AA D3 0092 Z 49998 0046426
2621-791-01 96169 AA D3 0093 Z 49998 0079254
DOCUMENT REFERENCES
SPEC NO. SLASH NO. PART NO REV DATE DISTR CD AMEND CHG NTC SUPP
ANSI/ASQ Z1.4 01 JAN 08 A
MIL-STD-792 F 19 MAY 06 A
ISO_9001 15 NOV 08 A
ISO10012 15 APR 03 A
ISO/IEC 17025 15 MAY 05 A
MIL-I-45208 A 24 JUL 81 A 1
MIL-STD-45662 A 01 AUG 88 A
SAE AMS-QQ-S-763 D 01 MAR 15 A
ANSI/NCSL Z540.3 26 MAR 13 A
0900-LP-001-7000 01 JAN 81 C 01
S9074-AQ-GIB-010/248 1 12 NOV 19 A
S9074-AR-GIB-010A/278 (CHG A) 14 FEB 13 A
3. REQUIREMENTS
3.1 <The Tail Piece must be made in accordance with EB drawing 2621-791-01 Piece 66A, unless amplified or modified
N00104-23-Q-FF74 PAGE 6 OF 60
herein.>
3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:
Part - <Tail Piece, piece number 66A of drawing 2621-791-01> Material - <QQ-S-763, class 304 cond A>
3.3 Testing Certification - Certifications are required for the following tests on the items listed below.
Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.
Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - <Tail Piece> Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763
Test - Non-Destructive Tests Item - <Weld Repair and/or Production Weld (as applicable)> Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification
3.4 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/
3.5 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing.
3.6 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings.
3.7 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order.
3.7.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor.
The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this configuration.
c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product.
d. Information about remedial action being taken to prevent reoccurrence of the non-conformance.
3.7.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail.
3.7.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II), and change justification.
N00104-23-Q-FF74 PAGE 7 OF 60
b. A complete description of the change to be made and the need for that change.
c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the engineering change.
3.8 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
3.9 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited.
3.9.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.
* QUALITY ASSURANCE REQUIREMENTS *
3.10 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.11 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-4
3.11.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order.
3.11.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.11.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.11.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.11.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.12 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.12.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the
N00104-23-Q-FF74 PAGE 8 OF 60
supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition.
3.12.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative.
3.13 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.13.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.13.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract.
3.13.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract.
3.13.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government.
3.13.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.14 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.14.1 Visual examination upon receipt to detect damage during transit.
3.14.2 Inspection for completeness and proper type.
3.14.3 Verification of material quality received.
3.14.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.14.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.14.6 Identification and protection from improper use or disposition.
3.14.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use.
3.14.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained.
3.14.9 Material returned to the contractor must be handled as GFM.
3.15 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order.
N00104-23-Q-FF74 PAGE 9 OF 60
3.15.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.
3.16 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.
3.16.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements.
Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order.
In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.
3.16.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material.
3.16.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material.
3.17 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply:
3.17.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required.
Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied.
3.17.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified.
The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below.
TRACEABILITY MARKING ________________________________________________
(marking on finished item)
IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO
HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER ____________________
(when applicable)
_________________________________________ DATE _____________________
(name and signature of auth. co. rep.)
3.17.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited.
3.17.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.
3.17.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.18 Material Handling - The written material control process must include the following:
3.18.1 All raw materials must have traceability markings (except as specified below).
N00104-23-Q-FF74 PAGE 10 OF 60
3.18.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.
3.18.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process.
3.18.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.
3.18.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.
3.18.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
3.19 Receiving inspection -
3.19.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location.
3.19.2 Receiving Inspection must include as a minimum -
Verification that the traceability marking on the material agrees with that on the certification test reports.
Verification that certification test reports are legible and complete.
Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.
3.20 Discrepancy reporting -
3.20.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative
(QAR).
3.21 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance.
3.21.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size).
SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.
3.21.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above.
3.21.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility.
3.21.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is
N00104-23-Q-FF74 PAGE 11 OF 60
legible.
3.22 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor.
Note: These requirements do not apply to tack/spot welds.
3.22.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).
3.22.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'')
3.22.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the contract.
3.22.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application.
3.22.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA.
3.22.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data.
3.22.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element.
3.22.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of
S9074-AR-GIB-010A/278.
3.22.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval.
3.22.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF.
3.22.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following:
a) Filler Metal LOT number(s)
b) Specification and Type
c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements.
d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption.
3.22.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor.
N00104-23-Q-FF74 PAGE 12 OF 60
3.23 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information:
1. Contractor's name, address and date.
2. The contract/purchase order number (for example: N00104-11-P-FA12)
3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC
(for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable).
4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable).
5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable).
6. Manufacturer's compound number ("N/A" when Not Applicable).
7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable).
8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily.
9. Contractor's or authorized personnel's signature.
WSSTERMCZ05
CONFIGURATION MANAGEMENT - MARITIME (APRIL 2023)
1.0 Configuration Management
1.1 The cognizant systems command (SYSCOM), Naval Sea Systems Command (NAVSEA) or Naval Information Warfare Systems Command (NAVWAR), Program Manager will maintain configuration control and change authority for all items in this contract.
1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
NOTE: Additional information and guidance relative to engineering changes and variances may be obtained by contacting the cognizant SYSCOM Program Office.
2.0 Engineering Changes
2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as either Class I (Major) or Class II (Minor). For detailed classification criteria refer to DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS-80639E, Engineering Change Proposal (ECP).
2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant SYSCOM Program Office prior to any Class I ECP submission. The Contractor must notify the NAVSUP WSS Procurement Contracting Officer (PCO) of any pending or approved Class I engineering changes with another Government activity that the Contractor proposes to incorporate under this contract. The cognizant SYSCOM Program Office will approve or disapprove of Class I changes.
Any approved Class I change may necessitate contract changes by the contracting officer, which changes may be handled under the Changes clause of this contract, FAR 52.243-1 The Contractor must not implement a Class I change on this contract until a contract modification is issued by the NAVSUP WSS PCO.
2.1.2 Class II (Minor) Changes: Class II changes must be submitted to the cognizant Defense Contract Management Agency (DCMA) Contract Management Office (CMO), or to the Supervisor of Shipbuilding (SUPSHIP) Groton, for concurrence in classification and may be implemented only upon receiving DCMA, SUPSHIP, or NAVSEA/NAVWAR Technical Warrant Holder (TWH) concurrence. On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit the Class II (Minor) change to the NAVSUP WSS PCO for approval or disapproval. Class II changes must be made at no additional cost to the Government.
2.5 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.
3.0 Variances
3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure
N00104-23-Q-FF74 PAGE 13 OF 60
WSSTERMCZ05 (CONT)
CONFIGURATION MANAGEMENT - MARITIME (APRIL 2023)
from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline.
RFVs are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Variance requests must be prepared in accordance with DI-SESS-80640E - Request for Variance
(RFV).
3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests via DCMA or SUPSHIP and the NAVSUP WSS PCO, to the SYCOM Program Office or their delegated representative, for approval or disapproval.
All approved critical/major variances require a contract modification by the NAVSUP WSS PCO prior to final inspection and acceptance of the items.
3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until the request is approved by the cognizant DCMA CMO, SUPSHIP, or SYSCOM TWH.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .