RFP 277-19-0531 Attachment 01c Delivery Schedule
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 277-19-0531
Attachment 1c, Delivery Schedule
Delivery Schedule – General Requirements List of Deliverables Based on Division of Technology Management (DTM) and Office of Communication (OC) Requirements:
| Item |
| Timeline |
| To |
| Section |
| 1 |
| Final Information Technology (IT) Plan |
| 60 calendar days after award |
| DTM thru Contracting Officer's Representative (COR) |
| II |
| 2 |
| IT and Web Cost Reports |
| Twice a year (July and November) |
| DTM Federal Information Technology Acquisition Reform Act (FITARA) Team thru COR |
| III |
| 3 |
| IT Investment Factsheet |
| 90 calendar days after award and update annually |
| DTM FITARA Team thru COR |
| III |
| 4 |
| Website Domain Registration |
| When registered and when requested |
| DTM FITARA Team thru COR |
| III |
| 5 |
| Privacy Threshold Analysis (PTA) |
| 30 calendar days after award |
| Privacy and Chief Information Security Officer (CISO) and Info.Privacy@samhsa.hhs.gov thru COR |
| V. A. 1. 5). b |
| 6 |
| Entity, data type and relationship diagrams |
| No later than 30 calendar days after award |
| CISO and Info.Privacy@samhsa.hhs.gov thru COR |
| V. A. 1. 5). c |
| 7 |
| Draft system’s Privacy Impact Assessments (PIAs) if full PIAs is needed |
| No later than 45 calendar days after contract effective date (CED) |
| Privacy Officer and Info.Privacy@samhsa.hhs.gov thru COR |
| V .A. 1. 5) .f |
| 8 |
| Encryption Key if applicable |
| When requested or at the end of the contract |
| Info.Privacy@samhsa.hhs.gov and COR |
| V. A. 1. 10) .h |
| 9 |
| IT security awareness and privacy training |
| Within 30 calendar days after CED and annually |
| COR and SAMHSA Training Officer |
| V. A. 3 |
| 10 |
| Read and sign Rules of Behavior |
| Within 35 calendar days after CED and annually |
| COR and SAMHSA Training Officer |
| V. A. 4 |
| 11 |
| Staff Roster |
| Within 30 calendar days after CED and when staffing changes |
| COR |
| V. A. 5. 2) |
| 12 |
| Initiate security assessment and authorization process |
| No later than 30 calendar days after CED |
| CISO thru COR |
| V. B. 2 |
| 13 |
| System Authorization to Operate (ATO) |
| Before system goes live |
| CIO and CISO |
| V. B. 2 |
| 14 |
| Information System Security Plan (ISSP) and supporting artifacts and documents listed on the ATO package and the Security Checklist. |
| Part of ATO package, before system goes live |
| CISO and security email box infosecurity@samhsa.hhs.gov |
| V. B. 2 |
| 15 |
| E-Authentication Questionnaire (Risk Assessment) |
| Within 30 calendar days after CED |
| CISO and infosecurity@samhsa.hhs.gov. Template can be requested by emailing CISO and ISSO. |
| V. B. 2. |
| 16 |
| Privacy and security kickoff meeting |
| Within four (4) weeks of CED |
| COR and CISO |
| Work plan |
| 17 |
| Annual Penetration Testing Summary Report |
| Annual |
| CISO and CTO |
| V. B. 2. 15) |
| 18 |
| Database, application, and operation system vulnerability scan reports |
| Every 30 days after ATO is granted |
| SAMHSA Security infosecurity@samhsa.hhs.gov |
| V. B. 3 |
| 19 |
| Vulnerability “Change Report” and Cloud Security Continuous Monitoring Reporting |
| Every 30 days after ATO is granted |
| SAMHSA Security infosecurity@samhsa.hhs.gov |
| V. B. 3 |
V. C. 4
| 20 |
| Permanent electronic records |
| 60 days prior to period of performance expiration |
| DTM |
| VI. B.5 |
| 21 |
| Records management training and provide Contractor Records Management Training Completion Memorandum |
| Within 30 days of contract award or new contract staff start date and then annually for the life of the contract. |
| COR |
VI. B. 11
| 22 |
| Electronic Systems Questionnaire |
| Responses within 4 weeks after the CED and 30 days prior to modifications to system |
| CIO during the kickoff meeting and Records Officer |
| VI. B. 12 |
| 23 |
| Content Development and Management Plan |
| Within 60 days after CED |
| OC and DTM thru COR |
Records Officer OC requirements V. A
| 24 |
| Web Content Approval |
| No later than 3 weeks prior to the planned initial posting of document |
| COR |
| OC requirements V. C |
| 25 |
| Web Content Migration Plan including a demo |
| Within 60 days after CED; demo within 30 days after CED |
| COR and DTM thru COR |
Records Officer OC requirements V. D
| 26 |
| Meeting on IT transition activities related to data, software, web content, and electronic records |
| Within 30 days after CED |
| COR, DTM, and OC |
| OC requirements V. E |
| 27 |
| Reports of actual Web-related IT costs |
| Twice a year (July and November) |
| OC and DTM thru COR |
(could be combined with quarterly IT cost report, see #2) OC requirements V.F
| 28 |
| Transition Task |
| Schedule meeting with COR and DTM to discuss transition activities |
| COR and DTM |
| Transition Task |
Delivery Schedule – Specific Requirements
Technical Support for Drug-Free Workplace Reference No. 277-19-0531 Attachment 1d Task 1: Contract Management and Administration Task 1.1: Develop and Finalize Work Plan
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 1. |
| 1.1 |
| Work Plan – |
1.1.a.) Draft Work Plan 1.1.b.) Final Work Plan 1.1.a.) 1 draft Work Plan
1.1.b.) 1 final Work Plan 1.1.a.) No later than 10 business days after Contract Effective Date (CED) & 1 business day before Contract Management Kick-off meeting 1.1.b.) On date requested by COR (approx. 10 business days after the requested revisions)
| 2. |
| 1.1 |
| 1.1.c.) Work Plan – Annual Review |
| 1 annual review of Work Plan per year, and provide recommended updates to Work Plan |
Recommended Work Plan updates - No later than 10 business days after start of contract year
| 3. |
| 1.1 |
| 1.1.d.) Work Plan – Updates |
| 1 updated Work Plan, as needed, per year |
| On date requested by COR |
Task 1.2: Contract Management Meetings
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 4. |
| 1.2 |
| Contract Management Kick-off meeting |
1.2.a.) Participate in Meeting
| Participation in 1 meeting (approximately 3 hours) |
| No later than 10 business days after CED |
| 5. |
| 1.2 |
| Contract Management Kick-off meeting |
1.2.b.) Agenda
| 1 meeting agenda |
| No later than 3 business days before Kick-off meeting |
| 6. |
| 1.2 |
| Contract Management Kick-off meeting |
1.2.c.) Meeting Summary
| 1 meeting summary |
| As requested by COR |
| 7. |
| 1.2 |
| IT Privacy & Security Kick-off meeting |
1.2.d.) Participate in Meeting
| Participation in 1 meeting (approximately 3 hours) |
| No later than 4 calendar weeks after CED |
| 8. |
| 1.2 |
| IT Privacy & Security Kick-off meeting |
1.2.e.) Agenda
| 1 meeting agenda |
| No later than 3 business days before the IT meeting |
| 9. |
| 1.2 |
| IT Privacy & Security Kick-off meeting |
1.2.f.) Meeting Summary
| 1 meeting summary |
| As requested by COR |
| 10. |
| 1.2 |
| Recurring Contract Management meetings |
1.2.g.) Participate in meetings
Participation in Meetings:
14 in Base yr; 12 in ea. option yr Approx. 1 hour per meeting
Approx. 2 in-person meetings per year 2 times per month (every 2 wks.) for first 2 months of contract, then monthly for remainder of contract; if determined necessary by COR, approx. 2 in-person meetings per yr
Task 1.3: Administrative Reports
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 11. |
| 1.3 |
| 1.3.a.) Monthly Progress Report |
consisting of 3 parts:
1) Narrative
2) Expenditures
3) Annual Summary of
Accomplishments – in the last monthly progress report for each year
12 reports per year (1 per month) (approximately 20 pages each, in electronic document format, Word and Excel) 11 monthly reports consisting of 2 parts: Narrative & Expenditures 1 monthly report at end of year consisting of 3 parts: Narrative, Expenditures, & Annual Summary of Accomplishments Monthly, approximately 5 work days before the voucher is due, no later than the same day the voucher is provided
| 12. |
| 1.3 |
| 1.3.b.) Information Technology (IT) |
Reports
| Quantity of reports - See Division of Technology Management (DTM) Delivery Schedule - General Requirements (Attachment 1c) |
| As specified in DTM Delivery Schedule - General Requirements (Attachment 1c) |
| 13. |
| 1.3 |
| 1.3.c.) Ad-hoc Administrative Reports |
| Approx. 6 reports per year |
| As requested by COR |
Task 2: Group and Workgroup Support
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 14. |
| 2 |
(Tasks 2.1 & 2.2) Meeting Support
Task 2.1: Technical SME Support
Deliverable 2.1.a.
Task 2.2: Logistical Support
Deliverable 2.2.a.
Deliverable 2.2.b. –
DTAB Transcript and Meeting Summary Package
· Approx. 18 meetings per yr (2 DTAB/SME, 3 DTAB, 12 SME, 1 ad-hoc meeting)
· Approximately: 16 out of 18 teleconference meetings;
2 out of 18 in-person meetings 2.1.a.) Technical SME Support:
· Total of approximately 20 technical SME support services per year, among all (approx.) 18 meetings 2.2.a.) Logistical Support:
· Total of approximately 54 logistical support services per year, among all (approx.) 18 meetings 2.2.b.) DTAB Transcript and Meeting Summary Package:
· 1 pkg. (transcript & meeting summary) for each of the approx. 5 DTAB meetings per year; approx. 5 packages per year 2.1.a.) Technical SME Support 2.2.a.) Logistical Support:
· As requested by COR 2.2.b.) DTAB Transcript and Meeting Summary Package:
· No later than 10 business days after the DTAB group convenes
| 15. |
| 2.3 |
| 2.3.a.) Meeting Expenditure Reports |
(tabular format, i.e., Word or Excel)
| Approx. 4 cost reports per year; quarterly by fiscal year; tabular format; approx. 2 pages each |
| As requested by COR |
Task 3: DFWP Annual Summary Report (ASR) and Agency Archives Data System Task 3.1: Operate and Maintain ASR/Archives System
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 16. |
| 3.1 |
| 3.1.a.) Ad-hoc Requests for IT Cost Information |
| Approximately 2 reports per year, in requested format |
| As requested by COR |
| 17. |
| 3.1 |
| Annual System Maintenance: |
3.1.b.) Archiving Historical Datasets 3.1.c.) Creating New Data Records
3.1.d.) Updating/Revising/Uploading Data and Files 3.1.b.) Annually, 1 time per yr 3.1.c.) Approximately 12 times per year
3.1.d.) Approximately 12 times per year 3.1.b.) 1 month prior to the next reporting period 3.1.c.) Complete as requested by COR, usually 1 business day after COR’s request 3.1.d.) Complete as requested by COR, usually 1 bus. day after COR’s request
| 18. |
| 3.1 |
| Data Collection Activity: |
3.1.e.) Review Data Collection Documents and Provide Recommended Revisions
3.1.f.) Revise Data Collection Documents
3.1.g.) Perform Data Collection 3.1.h.) Provide Technical Assistance on Data Entry 3.1.e.) 1 set of review and recommendations per yr 3.1.f.) Up to 3 sets of revised Documents 3.1.g.) 1 data collection per year, for a period of approx. 3 months, from approx. 150 federal agencies/entities 3.1.h.) 1 set of TA & follow-up per year, to approx. 120 federal agency DPCs 3.1.e., 3.1.f., 3.1.g.) Annually by fiscal year - on date specified on approved Annual Schedule (noted in Deliverable 3.2.1.b., Task 3.2.1.)
3.1.h.) Respond to requests no later than 1 business day after request
| 19. |
| 3.1 |
| Data Analyses: |
3.1.i.) Perform Data Analyses
| Approximately 2 data analyses requests per year |
| As requested by COR |
| 20. |
| 3.1 |
| Data Quality: |
3.1.j.) Perform Data Quality Control Checks 3.1.k.) Correct Data
3.1.j.) 1 set of data quality control checks, Qtrly (4 times per year) 3.1.k.) 1 set of corrections, Quarterly (4 times per year); and 1 set of routinely maintained data quality 3.1.j.) Quarterly, and as requested by COR 3.1.k.) Within 1 business day after discrepancy is identified; or 1 business day after COR’s request
| 21. |
| 3.1 |
| System Reiew: |
3.1.l.) Perform System Review 3.1.m.) System Recommendations 3.1.l.) Approx. 1 system review, per year
3.1.m.) Approx. 1 set of Recommendations, per year 3.1.l.) As requested by COR
3.1.m.) As requested by COR
| 22. |
| 3.1 |
| System Modifications/Enhancements: |
3.1.n.) System Updates
3.1.o.) System Upgrades 3.1.n.) 1 set of system updates and updated system documents, annually, by fiscal year 3.1.o.) 1 set of system upgrades, annually, by fiscal year 3.1.n.) As requested by COR, on date specified on approved Annual Schedule (noted in Deliverable 3.2.1.b., Task 3.2.1.)
3.1.o.) As requested by COR
| 23. |
| 3.1 |
| System Migration: |
3.1.p.) Work plan
3.1.q.) Obtain necessary approvals for system migration
3.1.r.) Complete the system migration
3.1.p.) 1 work plan
3.1.q.) 1 set of approvals for migration 3.1.r.) 1 completed system migration 3.1.p., 3.1.q., 3.1.r.)
If needed, as requested by COR, and approved by SAMHSA
Task 3.2: ASR/Archives Annual Data Reporting
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 24. |
| 3.2.1 |
| Develop Annual Schedule – |
for data collection and reporting of ASR/Archives
3.2.1.a.) Draft Annual Schedule 3.2.1.b.) Final Annual Schedule 3.2.1.a.) 1 draft schedule per year (approx. 3 pgs. in electronic Word format) 3.2.1.b.) 1 final schedule per yr;
or COR can accept draft as final schedule
(approx. 3 pgs. in electronic Word format)
3.2.1.a.) Oct. 15 (or business day closest to Oct. 15), or if needed, a later date set by the COR 3.2.1.b.) If requested by COR, due on date requested by COR
| 25. |
| 3.2.2 |
| Prepare and Submit |
DFWP ASR/Archives Annual Report 3.2.2.a.) Draft DFWP Annual Report – data tables and graphics overview 3.2.2.b.) Final DFWP Annual Report – data tables and graphics overview 3.2.2.a.) 1 draft system-generated report per year (approx. 30 pages, electronic document via email) 3.2.2.b.) 1 final report per year (approx. 30 pages, electronic document) 3.2.2.a.) Due on date specified on approved annual schedule noted in Deliverable 3.2.1.b., Task 3.2.1
3.2.2.b.) Due on date specified on approved annual schedule noted in Deliverable 3.2.1.b., Task 3.2.1
| 26. |
| 3.2.3 |
| 3.2.3.a.) Agency Profile Annual Report |
| 1 set of approximately 120 system generated reports (approx.10 pages each; annually; 1 per federal agency data submission) |
| Due on date specified on approved annual schedule noted in Deliverable 3.2.1.b., Task 3.2.1 |
| 27. |
| 3.2.4 |
| 3.2.4.a.) Ad-hoc Special Reports |
| Approx. 2 ad-hoc special topic reports per year (approx. 2 pages each) |
As requested by COR
| 28. |
| 3.2.5 |
| 3.2.5.a.) Consultation |
(Consultation/Technical Assistance) (by phone or email)
| 1 set of Consultation/TA responses to approximately 10 requests per year |
| Respond to requests no later than 1 business day after request |
Task 4: Certification and Maintenance of Federal Agency Drug-Free Workplace Program (DFWP) Plans
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 29. |
| 4 |
| Certification and Maintenance of Federal Agency DFWP Plans |
Agency Plans – Contacting Agencies 4.a.) Follow-up with agencies
4.b.) Identify new agencies 4.c.) Initiate new contact with agencies 4.d.) Follow-up with a portion of agencies monthly 4.a.) 1 set of completed follow-up with all agencies with pending plans 4.b.) 1 comprehensive list of agencies needing a certified plan or an updated plan 4.c.) 1 set of completed initiated new contact with agencies (approximately 5 agencies) 4.d.) 1 set of completed follow-up with approx. 1/3 of all agencies with pending plans 4.a. - 4.c.) Annually; No later than 1 month after ea. contract year start date: Report contractor’s progress in 2 deliverables:
1) 1st month’s Monthly Progress Report (Deliverable 1.3.a., Task 1.3, Monthly Progress Report) and
2) Verbally at 1st month’s Monthly Recurring Contract Management meeting (Deliverable 1.2.g., Task 1.2.)
4.d.) Monthly; Reporting contractor’s progress is due in 2 deliverables:
1) Monthly Progress Reports (Deliverable 1.3.a., Task 1.3.)
and
2) Verbally at Monthly Recurring Contract Management meetings (Deliverable 1.2.g., Task 1.2.)
| 30. |
| 4 |
| Certification and Maintenance of Federal Agency DFWP Plans – |
Reviewing & Producing Agency Plans –Collaborate & Consult with Agencies & DWP 4.e.) Consultation, responses to questions, technical assistance, and recommendations 4.f.) Plan review activity 4.e.) 1 complete set of responses to each requester 4.f.) 1 complete set of plan review activity (reviews, revisions, comments and discussions) 4.e.) Within one 1 business day of request 4.f.) To the agency, No later than 4 weeks after plan is received for review
| 31. |
| 4 |
| Certification and Maintenance of Federal Agency DFWP Plans |
Reviewing & Producing Agency Plans –
· Notify COR of Completed Plans
(certification-ready or concurrence-ready plans/TDP lists) 4.g.) Notification 4.h.) Comprehensive Package of
Review Activity
4.g.) 1 notification to COR of certification-ready or concurrence-ready plan/TDP list 4.h.) 1 complete final
Comprehensive Package of Review Activities 4.g. - 4.h.)
No later than 4 weeks after final ageny plan was received by contractor for review
| 32. |
| 4 |
| Certification and Maintenance of Federal Agency DFWP Plans |
Reviewing & Producing Agency Plans – 4.i.) Summary Report of ICG-EC Review
(consolidated comments of ICG-EC reviews of each agency plan with contractor’s final recommendations)
| 1 electronic summary report per agency plan reviewed (and includes the contractor’s final recommendations); approximately 1 per year |
| No later than 10 business days after receipt of ICG-EC reviews of an agency certification-ready plan from the COR |
Task 5: Reports to Congress
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 33. |
| 5 |
| Reports to Congress |
5.a.) Draft Report to Congress 5.b.) Final Report to Congress 5.a.) Approx. 1 draft rpt. per yr.
5.b.) Delivery of approx. 1 final report per year to SAMHSA, HHS, Congress and agency (package consisting of approx. 3 copies of 150 pgs.)
5.a.) Date requested by COR (approx. 15 bus. days after COR’s request).
5.b.) On date requested by COR
Task 6: DFWP Tools - Updates
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 34. |
| 6 |
| DFWP Tools documents: |
· Model Plan (approx. 40 pages)
· DFWP Plan Review form (approx. 15 pages)
· TDP guidance (approx. 10 pages)
· TDP template (approx. 1 page)
· TDP review checklist (approx. 3 pages)
· Other tools (plan & TDP tools) (approx. 2 pages) 6.a.) Review of DFWP Tools 6.b.) Revisions to DFWP Tools – according to comments & feedback 6.c.) Clearance documents
6.d.) Final DFWP Tools 6.a.) 1 review and 1 pkg. of recommended revisions and updates on requested tools; approx. 1 tool will be reviewed approx. 1 time per year, or up to 7 tools 6.b.) 1 package of revised tools – consisting of up to 7 revised documents; up to 3 versions of revisions per document; pilot testing & concept clearance packages as applicable; approx. 1 time per year
6.c.) 1 set of clearance documents (concept & content clearance), for up to 7 documents, approx. 1 time per yr.
6.d.) 1 package of final tool(s) in electronic format; up to 7 documents, & content clearance packages as applicable; approx. 1 time per year 6.a.) As requested by COR 6.b.) As requested by COR (approx. 10 bus. days after request) 6.c.) As requested by COR
6.d.) On due dates requested by the COR
| 35. |
| 6 |
| 6.e.) Recommend Efficiencies – |
recommendations on efficiencies in using DFWP tools 1 document of recommendations;
approx. 1 time per year As requested by COR
Task 7: Dissemination of Information to DFWP Stakeholders
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 36. |
| 7 |
| Dissemination of Information to DFWP Stakeholders |
Information Materials to Distribute
7.a.) Routine Distribution of Information Materials –
Federal Register Notice with link to HHS certified lab list 7.b.) Other Additional Distribution (approximately 2 items) 7.c.) Existing Mailing Lists – maintain and update
7.d.) New Mailing Lists – create & maintain 7.a.) Distribute 1 item
(Federal Register Notice) –
1 complete mailing – approximately 12 times per year, (approx.
150 on mailing list) 7.b.) Complete mailngs of approx. 2 other DFWP materials per year & notification to COR of completion
(approx. 150 on mailing list) 7.c.) Approx. 2 existing electronic mailing lists per yr;
Approx. 10 requests for updates to existing mailing lists per year
7.d.) Approx. 1 “other” electronic mailing list per yr;
Approx. 2 requests for mailing list updates per yr 7.a.) Complete mailing no later than 3 business days after contractor receives lab list; inform COR of completed mailing on same day mailing is completed
7.b.) DFWP Alert Notices: Complete mailing same day as COR’s request, and inform COR of completed mailing on same day mailing is completed.
Other DFWP-related Materials: Complete mailng no later than 3 business days after COR’s request, or as specified by the COR, and inform COR of completed mailing on same day mailing is completed.
7.c.) Update lists:
No later than 1 bus. day after
COR’s request
7.d.) Create lists: As requested by
COR; Updates:
No later than 1 bus. day after COR’s request
Task 8: Consultation and Training
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 37. |
| 8 |
| 8.a.) Respond to Requests for Briefings |
| Approx. 15 total requests per yr |
| On same day as request |
| 38. |
| 8 |
| 8.b.) Provide Briefings – |
coordinating briefings, developinag and updating briefing materials
Teleconference/in-person
| Approx. 15 total briefings per year to approx. 2 federal agency staff at each briefing |
| As requested by the COR |
| 39. |
| 8 |
| Tracking Briefings and Trainings – |
8.c.) Arrange, schedule, track briefings and training requests 8.d.) Report to COR on the status of briefings
8.e.) Other Additional Presentation/Training Materials 8.c.) 1 set of services
8.d.) Approx. 12 times per year in Monthly Progress Reports (Deliverable 1.3.a., Task 1.3) and
Verbally at Monthly Recurring Contract Management Meetings (Deliverable 1.2.g., Task 1.2) 8.e.) 1 package per year of other additional presentation/training materials, i.e., PowerPoint
(approx. 20 slides)
8.c.) Ongoing, as needed to track completion 8.d.) Monthly, Due in 2 Deliverables:
1) Monthly Progress Reports (Deliverable 1.3.a., Task 1.3) and
2) Verbally at Monthly Recurring Contract Management Meetings (Deliverable 1.2.g., Task 1.2) 8.e.) As requested by COR
Task 9: Subject Matter Expert (SME) Activities/Special Projects
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 40. |
| 9 |
| 9.a.) SME Special Projects |
| Approx. 5 projects per yr; approx. 5 SMEs may be requested |
| As requested by COR |
| 41. |
| 9 |
| 9.b.) Meetings |
| Approx. 18 meetings per year |
(2 DTAB/SME, 3 DTAB, 12 SME, 1 ad-hoc meeting); approx. 5 SMEs attending each meeting As requested by COR
| 42. |
| 9 |
| 9.c.) Groups and Workgroups – |
Technical support of SMEs serving on groups and workgroups
| Approx. 5 SMEs participate in approximately 6 groups/ workgroups (included in the list of meetings in Deliverable 9.b.) |
| As requested by COR |
| 43. |
| 9 |
| 9.d.) Special Projects Cost Report – |
Report all costs related to Special Projects
| Approx. 1 report per year, approx. 1 time per year |
| As requested by COR |
Task 10: Transition/Transfer Activities – Contract Closeout
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 44. |
| 10 |
| Transition Activities – |
10.a.) 90-Day Transition Plan – detailing activities for the last 90 days of the contract 10.b.) Initiate the Transition Activities and implement Transition Plan and schedule for the last 90 days before the contract expires 10.c.) Complete all Transition Activities and Implementation of Transition Plan and schedule for the last 90 days of the contract 10.d.) Notify the COR when closeout and turnover are completed 10.a.) One 90-day electronic Transition Plan 10.b.) 1 set of initiated transition activities and implemented Transition Plan 10.c.) 1 set of all completed transition activities 10.d.) 1 email notification to the COR when work activity closeout and turnover are completed 10.a.) When notified by COR, or no later than 6 monhs prior to the end of the contract 10.b.) No later than 90 calendar days before contract expires
10.c.) According to the 90-day Transition Plan schedule 10.d.) According to the 90-day Transition Plan schedule
| 45. |
| 10 |
| Transition Activities – |
10.e.) Continuation of Services and Support
| 1 (one) 90-day period of continued full support and services |
| During the transition period starting ninety (90) calendar days prior to contract expiration and ending on the day the contract expires |
| 46. |
| 10 |
| Transition Activities – |
10.f.) Close-out Meetings Approximately 5 meetings
(approximately 1 hour each) No later than 6 months before the contract expires, initiate the 1st Close-out meeting;
the Contractor shall participate in remaining Close-out meetings as needed during the 6-month period, as requested by the COR
| 47. |
| 10 |
| Transition Activities – |
10.g.) Training
| Approximately 3 trainings |
| Training during transition period starting 60 calendar days before contract end date, as requested by COR |
| 48. |
| 10 |
| Tranfer Activities – |
10.h.) IT System Transition/Transfer 10.i.) Transfer of Documentation, Files and Materials
10.h.) 1 complete transition/transfer of IT system to SAMSHA environment 10.i.) 1 complete package of transferred documentation, files and materials that can be retrieved electronically 10.h.) Start Transfer Activities: approx. 4 calendar months prior to contract end date, and as notified by COR;
Complete Transfer Activities: On the date noted in the Transition Plan schedule, approx. three (3) months prior to contract end.
10.i.) According to 90-day Transition Plan schedule
Optional Task 11: Supplemental SME Activities/Special Projects
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 49. |
| OPTIONAL Task 11 |
| Supplemental SME Activities/ |
Special Projects 11.a.) Special Projects (for up to 2 additional special projects)
· Approximately 2 additional special projects
· Could include approximately 5 additional SMEs that may consist of contractor staff and contractor consultants May be exercised up to 15 times per year.
As requested by the COR
Optional Task 12: Supplemental Meetings
| Item |
| Task |
| Description of Deliverable |
| Quantity/Item |
| Delivery Date |
| 50. |
| OPTIONAL Task 12 |
| Supplemental Meetings |
12.a.) Meeting Support For core Task 2 Group and Workgroup Support
(for up to 2 additional meetings and workgroups)
· Approx. 1 to 2 meetings
· Could include approx. 3 contractor staff and approx. 5 contractor consultant attendees May be exercised up to 15 times per year.
As requested by the COR