Attach_01c_Delivery_Schedule.doc

DOC document 345 KB Posted

Attached to
Technical Support for Drug-Free Workplace Federal contract opportunity
Solicitation number
277-19-0531
Issued by
Department of Health and Human Services Substance Abuse and Mental Health Services Administration

About this file

RFP 277-19-0531 Attachment 01c Delivery Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Technical Support for Drug-Free Workplace, newest first.
File Type Posted
ASR_Summary_Form_Sample.pdf PDF
RFP_277-19-0531_Amendment_1.pdf PDF
Attach_10_Contact_Points.docx DOCX document
Attach_05a_Privacy_System_Notice__09-30-0036.docx DOCX document
Attach_07_Proposal_Intent_Response.docx DOCX document
Attach_09_Government_Notice.docx DOCX document
Attach_02_QASP.doc DOC document
Attach_08_Packaging_and_Delivery__of_Proposals_via_eCPS.docx DOCX document
RFP_277-19-0531_Transmittal_Ltr.pdf PDF
RFP_277-19-0531_Tech_Support_DFW.pdf PDF
Attach_03_Voucher_Review_Sheet.docx DOCX document
Attach_11&12_Client_Letter_&_Contractor_Perf_Form.docx DOCX document
Attach_14_IT_Worksheets.xlsm XLSM spreadsheet
Attach_05b_Privacy_System_Notice__09-30-0049.docx DOCX document
Attach_13_Breakdown_Estimated_Costs.docx DOCX document
Attach_06_Disclosure_of_Lobbying_Activities_revised.docx DOCX document
Attach_15_Summary_of_Cost_and_Hours_Spreadsheet.xlsx XLSX spreadsheet
Attach_17_Section_508_Template.docx DOCX document
Attach_04_Billing_Instructions.docx DOCX document
Attach_01a_PWS.doc DOC document
Attach_01b_General_Requirements.docx DOCX document
Attach_16_Sealed_Proposal_Cover_Page.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 277-19-0531

Attachment 1c, Delivery Schedule

Delivery Schedule – General Requirements List of Deliverables Based on Division of Technology Management (DTM) and Office of Communication (OC) Requirements:

Item
Timeline
To
Section
1
Final Information Technology (IT) Plan
60 calendar days after award
DTM thru Contracting Officer's Representative (COR)
II
2
IT and Web Cost Reports
Twice a year (July and November)
DTM Federal Information Technology Acquisition Reform Act (FITARA) Team thru COR
III
3
IT Investment Factsheet
90 calendar days after award and update annually
DTM FITARA Team thru COR
III
4
Website Domain Registration
When registered and when requested
DTM FITARA Team thru COR
III
5
Privacy Threshold Analysis (PTA)
30 calendar days after award
Privacy and Chief Information Security Officer (CISO) and Info.Privacy@samhsa.hhs.gov thru COR
V. A. 1. 5). b
6
Entity, data type and relationship diagrams
No later than 30 calendar days after award
CISO and Info.Privacy@samhsa.hhs.gov thru COR
V. A. 1. 5). c
7
Draft system’s Privacy Impact Assessments (PIAs) if full PIAs is needed
No later than 45 calendar days after contract effective date (CED)
Privacy Officer and Info.Privacy@samhsa.hhs.gov thru COR
V .A. 1. 5) .f
8
Encryption Key if applicable
When requested or at the end of the contract
Info.Privacy@samhsa.hhs.gov and COR
V. A. 1. 10) .h
9
IT security awareness and privacy training
Within 30 calendar days after CED and annually
COR and SAMHSA Training Officer
V. A. 3
10
Read and sign Rules of Behavior
Within 35 calendar days after CED and annually
COR and SAMHSA Training Officer
V. A. 4
11
Staff Roster
Within 30 calendar days after CED and when staffing changes
COR
V. A. 5. 2)
12
Initiate security assessment and authorization process
No later than 30 calendar days after CED
CISO thru COR
V. B. 2
13
System Authorization to Operate (ATO)
Before system goes live
CIO and CISO
V. B. 2
14
Information System Security Plan (ISSP) and supporting artifacts and documents listed on the ATO package and the Security Checklist.
Part of ATO package, before system goes live
CISO and security email box infosecurity@samhsa.hhs.gov
V. B. 2
15
E-Authentication Questionnaire (Risk Assessment)
Within 30 calendar days after CED
CISO and infosecurity@samhsa.hhs.gov. Template can be requested by emailing CISO and ISSO.
V. B. 2.
16
Privacy and security kickoff meeting
Within four (4) weeks of CED
COR and CISO
Work plan
17
Annual Penetration Testing Summary Report
Annual
CISO and CTO
V. B. 2. 15)
18
Database, application, and operation system vulnerability scan reports
Every 30 days after ATO is granted
SAMHSA Security infosecurity@samhsa.hhs.gov
V. B. 3
19
Vulnerability “Change Report” and Cloud Security Continuous Monitoring Reporting
Every 30 days after ATO is granted
SAMHSA Security infosecurity@samhsa.hhs.gov
V. B. 3

V. C. 4

20
Permanent electronic records
60 days prior to period of performance expiration
DTM
VI. B.5
21
Records management training and provide Contractor Records Management Training Completion Memorandum
Within 30 days of contract award or new contract staff start date and then annually for the life of the contract.
COR

VI. B. 11

22
Electronic Systems Questionnaire
Responses within 4 weeks after the CED and 30 days prior to modifications to system
CIO during the kickoff meeting and Records Officer
VI. B. 12
23
Content Development and Management Plan
Within 60 days after CED
OC and DTM thru COR

Records Officer OC requirements V. A

24
Web Content Approval
No later than 3 weeks prior to the planned initial posting of document
COR
OC requirements V. C
25
Web Content Migration Plan including a demo
Within 60 days after CED; demo within 30 days after CED
COR and DTM thru COR

Records Officer OC requirements V. D

26
Meeting on IT transition activities related to data, software, web content, and electronic records
Within 30 days after CED
COR, DTM, and OC
OC requirements V. E
27
Reports of actual Web-related IT costs
Twice a year (July and November)
OC and DTM thru COR

(could be combined with quarterly IT cost report, see #2) OC requirements V.F

28
Transition Task
Schedule meeting with COR and DTM to discuss transition activities
COR and DTM
Transition Task

Delivery Schedule – Specific Requirements

Technical Support for Drug-Free Workplace Reference No. 277-19-0531 Attachment 1d Task 1: Contract Management and Administration Task 1.1: Develop and Finalize Work Plan

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
1.
1.1
Work Plan –

1.1.a.) Draft Work Plan 1.1.b.) Final Work Plan 1.1.a.) 1 draft Work Plan

1.1.b.) 1 final Work Plan 1.1.a.) No later than 10 business days after Contract Effective Date (CED) & 1 business day before Contract Management Kick-off meeting 1.1.b.) On date requested by COR (approx. 10 business days after the requested revisions)

2.
1.1
1.1.c.) Work Plan – Annual Review
1 annual review of Work Plan per year, and provide recommended updates to Work Plan

Recommended Work Plan updates - No later than 10 business days after start of contract year

3.
1.1
1.1.d.) Work Plan – Updates
1 updated Work Plan, as needed, per year
On date requested by COR

Task 1.2: Contract Management Meetings

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
4.
1.2
Contract Management Kick-off meeting

1.2.a.) Participate in Meeting

Participation in 1 meeting (approximately 3 hours)
No later than 10 business days after CED
5.
1.2
Contract Management Kick-off meeting

1.2.b.) Agenda

1 meeting agenda
No later than 3 business days before Kick-off meeting
6.
1.2
Contract Management Kick-off meeting

1.2.c.) Meeting Summary

1 meeting summary
As requested by COR
7.
1.2
IT Privacy & Security Kick-off meeting

1.2.d.) Participate in Meeting

Participation in 1 meeting (approximately 3 hours)
No later than 4 calendar weeks after CED
8.
1.2
IT Privacy & Security Kick-off meeting

1.2.e.) Agenda

1 meeting agenda
No later than 3 business days before the IT meeting
9.
1.2
IT Privacy & Security Kick-off meeting

1.2.f.) Meeting Summary

1 meeting summary
As requested by COR
10.
1.2
Recurring Contract Management meetings

1.2.g.) Participate in meetings

Participation in Meetings:

14 in Base yr; 12 in ea. option yr Approx. 1 hour per meeting

Approx. 2 in-person meetings per year 2 times per month (every 2 wks.) for first 2 months of contract, then monthly for remainder of contract; if determined necessary by COR, approx. 2 in-person meetings per yr

Task 1.3: Administrative Reports

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
11.
1.3
1.3.a.) Monthly Progress Report

consisting of 3 parts:

1) Narrative

2) Expenditures

3) Annual Summary of

Accomplishments – in the last monthly progress report for each year

12 reports per year (1 per month) (approximately 20 pages each, in electronic document format, Word and Excel) 11 monthly reports consisting of 2 parts: Narrative & Expenditures 1 monthly report at end of year consisting of 3 parts: Narrative, Expenditures, & Annual Summary of Accomplishments Monthly, approximately 5 work days before the voucher is due, no later than the same day the voucher is provided

12.
1.3
1.3.b.) Information Technology (IT)

Reports

Quantity of reports - See Division of Technology Management (DTM) Delivery Schedule - General Requirements (Attachment 1c)
As specified in DTM Delivery Schedule - General Requirements (Attachment 1c)
13.
1.3
1.3.c.) Ad-hoc Administrative Reports
Approx. 6 reports per year
As requested by COR

Task 2: Group and Workgroup Support

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
14.
2

(Tasks 2.1 & 2.2) Meeting Support

Task 2.1: Technical SME Support

Deliverable 2.1.a.

Task 2.2: Logistical Support

Deliverable 2.2.a.

Deliverable 2.2.b. –

DTAB Transcript and Meeting Summary Package

· Approx. 18 meetings per yr (2 DTAB/SME, 3 DTAB, 12 SME, 1 ad-hoc meeting)

· Approximately: 16 out of 18 teleconference meetings;

2 out of 18 in-person meetings 2.1.a.) Technical SME Support:

· Total of approximately 20 technical SME support services per year, among all (approx.) 18 meetings 2.2.a.) Logistical Support:

· Total of approximately 54 logistical support services per year, among all (approx.) 18 meetings 2.2.b.) DTAB Transcript and Meeting Summary Package:

· 1 pkg. (transcript & meeting summary) for each of the approx. 5 DTAB meetings per year; approx. 5 packages per year 2.1.a.) Technical SME Support 2.2.a.) Logistical Support:

· As requested by COR 2.2.b.) DTAB Transcript and Meeting Summary Package:

· No later than 10 business days after the DTAB group convenes

15.
2.3
2.3.a.) Meeting Expenditure Reports

(tabular format, i.e., Word or Excel)

Approx. 4 cost reports per year; quarterly by fiscal year; tabular format; approx. 2 pages each
As requested by COR

Task 3: DFWP Annual Summary Report (ASR) and Agency Archives Data System Task 3.1: Operate and Maintain ASR/Archives System

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
16.
3.1
3.1.a.) Ad-hoc Requests for IT Cost Information
Approximately 2 reports per year, in requested format
As requested by COR
17.
3.1
Annual System Maintenance:

3.1.b.) Archiving Historical Datasets 3.1.c.) Creating New Data Records

3.1.d.) Updating/Revising/Uploading Data and Files 3.1.b.) Annually, 1 time per yr 3.1.c.) Approximately 12 times per year

3.1.d.) Approximately 12 times per year 3.1.b.) 1 month prior to the next reporting period 3.1.c.) Complete as requested by COR, usually 1 business day after COR’s request 3.1.d.) Complete as requested by COR, usually 1 bus. day after COR’s request

18.
3.1
Data Collection Activity:

3.1.e.) Review Data Collection Documents and Provide Recommended Revisions

3.1.f.) Revise Data Collection Documents

3.1.g.) Perform Data Collection 3.1.h.) Provide Technical Assistance on Data Entry 3.1.e.) 1 set of review and recommendations per yr 3.1.f.) Up to 3 sets of revised Documents 3.1.g.) 1 data collection per year, for a period of approx. 3 months, from approx. 150 federal agencies/entities 3.1.h.) 1 set of TA & follow-up per year, to approx. 120 federal agency DPCs 3.1.e., 3.1.f., 3.1.g.) Annually by fiscal year - on date specified on approved Annual Schedule (noted in Deliverable 3.2.1.b., Task 3.2.1.)

3.1.h.) Respond to requests no later than 1 business day after request

19.
3.1
Data Analyses:

3.1.i.) Perform Data Analyses

Approximately 2 data analyses requests per year
As requested by COR
20.
3.1
Data Quality:

3.1.j.) Perform Data Quality Control Checks 3.1.k.) Correct Data

3.1.j.) 1 set of data quality control checks, Qtrly (4 times per year) 3.1.k.) 1 set of corrections, Quarterly (4 times per year); and 1 set of routinely maintained data quality 3.1.j.) Quarterly, and as requested by COR 3.1.k.) Within 1 business day after discrepancy is identified; or 1 business day after COR’s request

21.
3.1
System Reiew:

3.1.l.) Perform System Review 3.1.m.) System Recommendations 3.1.l.) Approx. 1 system review, per year

3.1.m.) Approx. 1 set of Recommendations, per year 3.1.l.) As requested by COR

3.1.m.) As requested by COR

22.
3.1
System Modifications/Enhancements:

3.1.n.) System Updates

3.1.o.) System Upgrades 3.1.n.) 1 set of system updates and updated system documents, annually, by fiscal year 3.1.o.) 1 set of system upgrades, annually, by fiscal year 3.1.n.) As requested by COR, on date specified on approved Annual Schedule (noted in Deliverable 3.2.1.b., Task 3.2.1.)

3.1.o.) As requested by COR

23.
3.1
System Migration:

3.1.p.) Work plan

3.1.q.) Obtain necessary approvals for system migration

3.1.r.) Complete the system migration

3.1.p.) 1 work plan

3.1.q.) 1 set of approvals for migration 3.1.r.) 1 completed system migration 3.1.p., 3.1.q., 3.1.r.)

If needed, as requested by COR, and approved by SAMHSA

Task 3.2: ASR/Archives Annual Data Reporting

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
24.
3.2.1
Develop Annual Schedule –

for data collection and reporting of ASR/Archives

3.2.1.a.) Draft Annual Schedule 3.2.1.b.) Final Annual Schedule 3.2.1.a.) 1 draft schedule per year (approx. 3 pgs. in electronic Word format) 3.2.1.b.) 1 final schedule per yr;

or COR can accept draft as final schedule

(approx. 3 pgs. in electronic Word format)

3.2.1.a.) Oct. 15 (or business day closest to Oct. 15), or if needed, a later date set by the COR 3.2.1.b.) If requested by COR, due on date requested by COR

25.
3.2.2
Prepare and Submit

DFWP ASR/Archives Annual Report 3.2.2.a.) Draft DFWP Annual Report – data tables and graphics overview 3.2.2.b.) Final DFWP Annual Report – data tables and graphics overview 3.2.2.a.) 1 draft system-generated report per year (approx. 30 pages, electronic document via email) 3.2.2.b.) 1 final report per year (approx. 30 pages, electronic document) 3.2.2.a.) Due on date specified on approved annual schedule noted in Deliverable 3.2.1.b., Task 3.2.1

3.2.2.b.) Due on date specified on approved annual schedule noted in Deliverable 3.2.1.b., Task 3.2.1

26.
3.2.3
3.2.3.a.) Agency Profile Annual Report
1 set of approximately 120 system generated reports (approx.10 pages each; annually; 1 per federal agency data submission)
Due on date specified on approved annual schedule noted in Deliverable 3.2.1.b., Task 3.2.1
27.
3.2.4
3.2.4.a.) Ad-hoc Special Reports
Approx. 2 ad-hoc special topic reports per year (approx. 2 pages each)

As requested by COR

28.
3.2.5
3.2.5.a.) Consultation

(Consultation/Technical Assistance) (by phone or email)

1 set of Consultation/TA responses to approximately 10 requests per year
Respond to requests no later than 1 business day after request

Task 4: Certification and Maintenance of Federal Agency Drug-Free Workplace Program (DFWP) Plans

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
29.
4
Certification and Maintenance of Federal Agency DFWP Plans

Agency Plans – Contacting Agencies 4.a.) Follow-up with agencies

4.b.) Identify new agencies 4.c.) Initiate new contact with agencies 4.d.) Follow-up with a portion of agencies monthly 4.a.) 1 set of completed follow-up with all agencies with pending plans 4.b.) 1 comprehensive list of agencies needing a certified plan or an updated plan 4.c.) 1 set of completed initiated new contact with agencies (approximately 5 agencies) 4.d.) 1 set of completed follow-up with approx. 1/3 of all agencies with pending plans 4.a. - 4.c.) Annually; No later than 1 month after ea. contract year start date: Report contractor’s progress in 2 deliverables:

1) 1st month’s Monthly Progress Report (Deliverable 1.3.a., Task 1.3, Monthly Progress Report) and

2) Verbally at 1st month’s Monthly Recurring Contract Management meeting (Deliverable 1.2.g., Task 1.2.)

4.d.) Monthly; Reporting contractor’s progress is due in 2 deliverables:

1) Monthly Progress Reports (Deliverable 1.3.a., Task 1.3.)

and

2) Verbally at Monthly Recurring Contract Management meetings (Deliverable 1.2.g., Task 1.2.)

30.
4
Certification and Maintenance of Federal Agency DFWP Plans –

Reviewing & Producing Agency Plans –Collaborate & Consult with Agencies & DWP 4.e.) Consultation, responses to questions, technical assistance, and recommendations 4.f.) Plan review activity 4.e.) 1 complete set of responses to each requester 4.f.) 1 complete set of plan review activity (reviews, revisions, comments and discussions) 4.e.) Within one 1 business day of request 4.f.) To the agency, No later than 4 weeks after plan is received for review

31.
4
Certification and Maintenance of Federal Agency DFWP Plans

Reviewing & Producing Agency Plans –

· Notify COR of Completed Plans

(certification-ready or concurrence-ready plans/TDP lists) 4.g.) Notification 4.h.) Comprehensive Package of

Review Activity

4.g.) 1 notification to COR of certification-ready or concurrence-ready plan/TDP list 4.h.) 1 complete final

Comprehensive Package of Review Activities 4.g. - 4.h.)

No later than 4 weeks after final ageny plan was received by contractor for review

32.
4
Certification and Maintenance of Federal Agency DFWP Plans

Reviewing & Producing Agency Plans – 4.i.) Summary Report of ICG-EC Review

(consolidated comments of ICG-EC reviews of each agency plan with contractor’s final recommendations)

1 electronic summary report per agency plan reviewed (and includes the contractor’s final recommendations); approximately 1 per year
No later than 10 business days after receipt of ICG-EC reviews of an agency certification-ready plan from the COR

Task 5: Reports to Congress

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
33.
5
Reports to Congress

5.a.) Draft Report to Congress 5.b.) Final Report to Congress 5.a.) Approx. 1 draft rpt. per yr.

5.b.) Delivery of approx. 1 final report per year to SAMHSA, HHS, Congress and agency (package consisting of approx. 3 copies of 150 pgs.)

5.a.) Date requested by COR (approx. 15 bus. days after COR’s request).

5.b.) On date requested by COR

Task 6: DFWP Tools - Updates

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
34.
6
DFWP Tools documents:

· Model Plan (approx. 40 pages)

· DFWP Plan Review form (approx. 15 pages)

· TDP guidance (approx. 10 pages)

· TDP template (approx. 1 page)

· TDP review checklist (approx. 3 pages)

· Other tools (plan & TDP tools) (approx. 2 pages) 6.a.) Review of DFWP Tools 6.b.) Revisions to DFWP Tools – according to comments & feedback 6.c.) Clearance documents

6.d.) Final DFWP Tools 6.a.) 1 review and 1 pkg. of recommended revisions and updates on requested tools; approx. 1 tool will be reviewed approx. 1 time per year, or up to 7 tools 6.b.) 1 package of revised tools – consisting of up to 7 revised documents; up to 3 versions of revisions per document; pilot testing & concept clearance packages as applicable; approx. 1 time per year

6.c.) 1 set of clearance documents (concept & content clearance), for up to 7 documents, approx. 1 time per yr.

6.d.) 1 package of final tool(s) in electronic format; up to 7 documents, & content clearance packages as applicable; approx. 1 time per year 6.a.) As requested by COR 6.b.) As requested by COR (approx. 10 bus. days after request) 6.c.) As requested by COR

6.d.) On due dates requested by the COR

35.
6
6.e.) Recommend Efficiencies –

recommendations on efficiencies in using DFWP tools 1 document of recommendations;

approx. 1 time per year As requested by COR

Task 7: Dissemination of Information to DFWP Stakeholders

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
36.
7
Dissemination of Information to DFWP Stakeholders

Information Materials to Distribute

7.a.) Routine Distribution of Information Materials –

Federal Register Notice with link to HHS certified lab list 7.b.) Other Additional Distribution (approximately 2 items) 7.c.) Existing Mailing Lists – maintain and update

7.d.) New Mailing Lists – create & maintain 7.a.) Distribute 1 item

(Federal Register Notice) –

1 complete mailing – approximately 12 times per year, (approx.

150 on mailing list) 7.b.) Complete mailngs of approx. 2 other DFWP materials per year & notification to COR of completion

(approx. 150 on mailing list) 7.c.) Approx. 2 existing electronic mailing lists per yr;

Approx. 10 requests for updates to existing mailing lists per year

7.d.) Approx. 1 “other” electronic mailing list per yr;

Approx. 2 requests for mailing list updates per yr 7.a.) Complete mailing no later than 3 business days after contractor receives lab list; inform COR of completed mailing on same day mailing is completed

7.b.) DFWP Alert Notices: Complete mailing same day as COR’s request, and inform COR of completed mailing on same day mailing is completed.

Other DFWP-related Materials: Complete mailng no later than 3 business days after COR’s request, or as specified by the COR, and inform COR of completed mailing on same day mailing is completed.

7.c.) Update lists:

No later than 1 bus. day after

COR’s request

7.d.) Create lists: As requested by

COR; Updates:

No later than 1 bus. day after COR’s request

Task 8: Consultation and Training

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
37.
8
8.a.) Respond to Requests for Briefings
Approx. 15 total requests per yr
On same day as request
38.
8
8.b.) Provide Briefings –

coordinating briefings, developinag and updating briefing materials

Teleconference/in-person

Approx. 15 total briefings per year to approx. 2 federal agency staff at each briefing
As requested by the COR
39.
8
Tracking Briefings and Trainings –

8.c.) Arrange, schedule, track briefings and training requests 8.d.) Report to COR on the status of briefings

8.e.) Other Additional Presentation/Training Materials 8.c.) 1 set of services

8.d.) Approx. 12 times per year in Monthly Progress Reports (Deliverable 1.3.a., Task 1.3) and

Verbally at Monthly Recurring Contract Management Meetings (Deliverable 1.2.g., Task 1.2) 8.e.) 1 package per year of other additional presentation/training materials, i.e., PowerPoint

(approx. 20 slides)

8.c.) Ongoing, as needed to track completion 8.d.) Monthly, Due in 2 Deliverables:

1) Monthly Progress Reports (Deliverable 1.3.a., Task 1.3) and

2) Verbally at Monthly Recurring Contract Management Meetings (Deliverable 1.2.g., Task 1.2) 8.e.) As requested by COR

Task 9: Subject Matter Expert (SME) Activities/Special Projects

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
40.
9
9.a.) SME Special Projects
Approx. 5 projects per yr; approx. 5 SMEs may be requested
As requested by COR
41.
9
9.b.) Meetings
Approx. 18 meetings per year

(2 DTAB/SME, 3 DTAB, 12 SME, 1 ad-hoc meeting); approx. 5 SMEs attending each meeting As requested by COR

42.
9
9.c.) Groups and Workgroups –

Technical support of SMEs serving on groups and workgroups

Approx. 5 SMEs participate in approximately 6 groups/ workgroups (included in the list of meetings in Deliverable 9.b.)
As requested by COR
43.
9
9.d.) Special Projects Cost Report –

Report all costs related to Special Projects

Approx. 1 report per year, approx. 1 time per year
As requested by COR

Task 10: Transition/Transfer Activities – Contract Closeout

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
44.
10
Transition Activities –

10.a.) 90-Day Transition Plan – detailing activities for the last 90 days of the contract 10.b.) Initiate the Transition Activities and implement Transition Plan and schedule for the last 90 days before the contract expires 10.c.) Complete all Transition Activities and Implementation of Transition Plan and schedule for the last 90 days of the contract 10.d.) Notify the COR when closeout and turnover are completed 10.a.) One 90-day electronic Transition Plan 10.b.) 1 set of initiated transition activities and implemented Transition Plan 10.c.) 1 set of all completed transition activities 10.d.) 1 email notification to the COR when work activity closeout and turnover are completed 10.a.) When notified by COR, or no later than 6 monhs prior to the end of the contract 10.b.) No later than 90 calendar days before contract expires

10.c.) According to the 90-day Transition Plan schedule 10.d.) According to the 90-day Transition Plan schedule

45.
10
Transition Activities –

10.e.) Continuation of Services and Support

1 (one) 90-day period of continued full support and services
During the transition period starting ninety (90) calendar days prior to contract expiration and ending on the day the contract expires
46.
10
Transition Activities –

10.f.) Close-out Meetings Approximately 5 meetings

(approximately 1 hour each) No later than 6 months before the contract expires, initiate the 1st Close-out meeting;

the Contractor shall participate in remaining Close-out meetings as needed during the 6-month period, as requested by the COR

47.
10
Transition Activities –

10.g.) Training

Approximately 3 trainings
Training during transition period starting 60 calendar days before contract end date, as requested by COR
48.
10
Tranfer Activities –

10.h.) IT System Transition/Transfer 10.i.) Transfer of Documentation, Files and Materials

10.h.) 1 complete transition/transfer of IT system to SAMSHA environment 10.i.) 1 complete package of transferred documentation, files and materials that can be retrieved electronically 10.h.) Start Transfer Activities: approx. 4 calendar months prior to contract end date, and as notified by COR;

Complete Transfer Activities: On the date noted in the Transition Plan schedule, approx. three (3) months prior to contract end.

10.i.) According to 90-day Transition Plan schedule

Optional Task 11: Supplemental SME Activities/Special Projects

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
49.
OPTIONAL Task 11
Supplemental SME Activities/

Special Projects 11.a.) Special Projects (for up to 2 additional special projects)

· Approximately 2 additional special projects

· Could include approximately 5 additional SMEs that may consist of contractor staff and contractor consultants May be exercised up to 15 times per year.

As requested by the COR

Optional Task 12: Supplemental Meetings

Item
Task
Description of Deliverable
Quantity/Item
Delivery Date
50.
OPTIONAL Task 12
Supplemental Meetings

12.a.) Meeting Support For core Task 2 Group and Workgroup Support

(for up to 2 additional meetings and workgroups)

· Approx. 1 to 2 meetings

· Could include approx. 3 contractor staff and approx. 5 contractor consultant attendees May be exercised up to 15 times per year.

As requested by the COR

PAGE