25-15-KB Addendum 1.pdf

PDF 576 KB Posted

Attached to
25-15-KB Resurfacing Pull-Off Site State and local contract opportunity
Solicitation number
86684
Issued by
Stafford County, Virginia

About this file

This is Addendum #1 to Invitation for Bid (IFB) No. 25-15-KB issued by Spotsylvania County for the Resurfacing Pull-Off Site project, dated February 14, 2025. The addendum provides clarifications regarding the Full Depth Reclamation (FDR) operations, specifically that the minimum cement mix shall be no less than 60 pounds per square yard, rather than the previously specified 0.1 LBS/SF. It also clarifies that a 4-foot section between the median and travel lanes of Brock Road will receive mill and overlay treatment only and will not be reclaimed. Additionally, the addendum confirms that no mix design will be required for the FDR operation.

The addendum includes an aerial notation attachment showing the project area, with a blue outlined section indicating the 4-foot area that will receive mill and overlay treatment. The aerial image shows the road section with surrounding undeveloped land and a parking area. The scale of the image is 1:564, with measurements shown in both feet (0-80 ft) and meters (0-20 m).

View the file

Other files for this state and local contract opportunity

Other files attached to 25-15-KB Resurfacing Pull-Off Site, newest first.
File Type Posted
25-15-KB Resurfacing Pull-Off Site.pdf PDF
25-15-KB Addendum 1.pdf PDF
25-15-KB Resurfacing Pull-Off Site.pdf PDF
25-15-KB Resurfacing Pull-Off Site.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1 IFB No. 25-15-KB Page 1 of 1

Addendum #1 to

Spotsylvania County

IFB 25-15-KB

Resurfacing Pull-Off Site

February 14, 2025

Addendum #1 to Invitation for Bid (IFB) No. 25-15-KB is issued in accordance with the IFB Terms & Conditions and is intended to provide additional information and clarification to Respondents.

Addendum #1 consists of one (1) item which is listed below, attached hereto and made a part hereof to IFB No. 25-15-KB.

ITEM 1 – Q&A

1. Section IV Scope of Work Item 5 – Can you please confirm/clarify the application rate of cement for the FDR operations? Currently at .1 LBS/SF.

ANSWER: Minimum cement mix to be used in the FDR portion of this project shall be no less than 60 pounds per square yard.

2. Section IV Scope of Work Item 10 – There is a 4’ +/- piece of the project that is between the median and travel lanes of Brock Road. Do we include that in our mill/overlay per WP-2 note or do we have to reclaim that area?

ANSWER: Yes, this area will receive mill and overlay only. This area will not be reclaimed, see Attachment A.

3. Mix Design – Section J.2 speaks to inspections/testing but doesn’t mention mix designs.

Will a mix design be required for the FDR Operation?

ANSWER: No, please see question 1 above.

ATTACHMENTS:

Attachment A – Aerial Notation

Respondents shall acknowledge receipt of this Addendum with Quote submission.

February 14, 2025 Katie Baird Date Senior Procurement Officer

253 Feet

None

Tax County Boundary

February 14, 2025 0 40 8020 ft

0 10 205 m

1:564

Addendum 1 Attachment A

IFB 25-15-KB
Resurfacing Pull-Off Site