The document is an Exhibit A Scope of Work for Geotechnical Services issued by the City of Sarasota, Florida. The City is seeking proposals from qualified firms to perform geotechnical soil and material testing services for various municipal projects, with the current contract expiring on February 8, 2025. The awarded supplier will provide comprehensive testing services including field and laboratory tests such as standard penetration tests, cone penetration tests, soil borings, triaxial tests, sieve analysis, and other material assessments. The contract term will be three years with an option to renew for two additional one-year periods by mutual agreement. Over the past several years, the City has spent approximately $90,000 annually for these geotechnical services.
The scope of work requires the consultant to handle all aspects of testing, including transportation, equipment, professional certifications, and personnel. Specific requirements include testing foundation excavations, field density testing, concrete and grout material testing, proof-rolling observations, ground water assessments, and environmental testing. The consultant must perform all work under the direct supervision of a Licensed Professional Engineer in Florida, following United States Bureau of Reclamation (USBR), American Society of Testing and Materials (ASTM), or American Association of State Highway and Transportation Officials (AASHTO) testing procedures. Deliverables will include digital and hard copy test results, sketches, electronic data files, AutoCAD exhibits, maps, and certified test results. Fees for services may be renegotiated at contract renewal, not to exceed the Bureau of Labor Statistics Employment Cost Index for experienced civil engineers in the Tampa-St. Petersburg-Clearwater area.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 25-11MC Exhibit B Proposal Requirements.pdf | ||
| 25-11MC Scoring criteria.xlsx | XLSX spreadsheet | |
| 25-11MC Terms and Conditions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Sarasota 25-11MC Exhibit A – Scope of Work Geotechnical Services
Exhibit A - SCOPE OF WORK
A. BACKGROUND
The City of Sarasota (City) is seeking proposals from qualified firms to perform geotechnical soil and material testing services for various projects. Tests will be for those required for City projects to assess the physical and chemical properties of the ground to determine its suitability for construction. Geotechnical testing will establish information for various construction projects in the planning, design, preconstruction, or construction phase of work.
The City’s current contract for these services will expire on February 8, 2025, and in accordance with City policy must be resolicited. Over the past several years, the City has spent approximately $90,000 annually for geotechnical services.
B. SCOPE OF WORK DESCRIPTION
The awarded supplier (hereinafter in this Scope of Work referred to as consultant), shall provide all labor, travel for vehicular transportation to and from each project site including collection and hauling of test specimens as required, licensing, professional certifications, supplies, equipment to provide geotechnical soil and material testing services to include field and lab tests on an as-needed basis. Field tests may include, but are not limited to, in situ testing such as standard penetration test (SPT) and cone penetration test (CPT), test pits, trenching, and soil borings. Lab tests may include, but are not limited to triaxial tests, sieve analysis, Atterberg limits tests, moisture content tests, shear strength tests and permeability tests.
C. AGREEMENT TERM
The term of the contract resulting from this solicitation shall be for three years with the option to renew for two one-year periods by mutual agreement.
D. SCOPE OF WORK REQUIREMENTS
The consultant shall provide the following:
1. Testing of foundation excavations to verify design bearing pressure.
2. Field density testing of backfill material compaction.
3. Field inspections of reinforced concrete structures.
4. Concrete and grout material testing services to ensure compliance of materials and placement methods with the contract documents.
5. Proof-rolling observations and corrective recommendations/measures if
Geotechnical Services necessary.
6. Ground water presence and corrective action recommendations if necessary.
7. Soil boring for soil type and rock identification.
8. Other related soil and material inspections, other specialty inspection services (masonry, steel reinforcement, asphaltic pavement, etc.) and testing services as directed by the City.
9. In-place density tests
10. Modified proctor tests
11. Three (3) point LBR tests
12. Compressive strength tests for concrete cylinders
13. Environmental testing and monitoring (e.g., asbestos, lead, water contamination, pollution and chemical testing)
14. Other tests as directed by the City.
15. All computer hardware, software, printers/plotters, scanners, copiers required to perform the work.
16. All necessary testing equipment and support personnel, including surveying services, to secure the data in the City’s prescribed format and content.
17. Provide all traffic control and maintenance required to perform the work.
18. Ensure traffic control and maintenance is performed in accordance with the requirements and standards of the jurisdiction having authority over the work site (e.g., Florida Department of Transportation, City Standard).
19. Obtain all necessary permits prior to commencing work within the public rights-of-way.
20. Provide copies of such permits to the City prior to commencing work.
21. Submit a request for reimbursement for any permit fees with its invoice to the City for the project.
22. For any work required on private property, obtain written permission from the property owner for authorization for Contractor and City staff to enter the premises.
23. Obtain City approval for all repairs to any infrastructure component necessitated by testing activities prior to the tests being performed (e.g., coring of asphaltic pavements).
24. Ensure all design-related test reports include conclusions and recommendations from a licensed professional.
Geotechnical Services
E. SPECIFICATIONS
The consultant shall meet the following specifications:
1. Perform all geotechnical and materials testing under the direct supervision of a Licensed Professional Engineer in the State of Florida.
2. Perform all testing in accordance with United States Bureau of Reclamation (USBR) or the American Society of Testing and Materials (ASTM) or American Association of State Highway and Transportation Officials (AASHTO) equivalent test.
3. Only use equipment to perform field and laboratory testing as described in the USBR, ASTM or AASHTO testing procedures.
4. Ensure all field and laboratory testing services is performed by personnel who are certified or licensed to perform the given service.
5. Perform all work in accordance with appropriate and applicable City, State, and Federal standards.
6. Include all safety and training and all other pertinent laboratory staff training.
F. DELIVERABLES
As applicable to the work, consultant shall provide deliverables for each test in the form as specified by the City to include, but not limited to the following:
1. Digital or hard copy test results including field notes
2. Sketches
3. Electronic data files
4. AutoCAD exhibits
5. Maps
6. Certified test results
7. Other deliverables applicable to the work and as requested by the City
8. Other test requirements as requested by the City of Sarasota.
G. ESCALATION/DE-ESCLATION
Fees for services may be renegotiated and mutually agreed upon at the time of contract renewal, not to exceed the Bureau of Labor Statistics Employment Cost Index WMU004530010200000017205100A3, average hourly wage for experienced level civil engineers in Tampa-St. Petersburg-Clearwater, FL for the most recent one-year
Geotechnical Services period. Sixty (60) days prior to the contract renewal date, Consultant may request a price adjustment in writing to the City for review and approval. If the Consultant fails to submit a price adjustment request at least sixty (60) days prior to the contract renewal date, current contract pricing will continue for the contract renewal period. No retroactive contract price adjustments will be allowed
[END]
Appendix A
Titles and Position
Part XI, Appendix A Titles and Position
Title Description Hourly Rate 1 Architect registered w/ 1+ years post registration experience 2 Architect Intern entry level w/ degree and intern registration or equivalent 3 Project Architect registered w/ 5+ years post registration experience 4 Senior Architect registered w/ 10+ years of post-registration experience 5 Chief Engineer PE w/ 20+ years of post registration experience 6 Engineer entry level PE 7 Engineering Intern entry level w/ engineering degree; EIT 8 Engineering Technician A.S. Degree w/ 1+ years of experience 9 Geotechnical Engineer P.E. with 5+ yrs exp. in geotechnical foundation construction engineering 10 Geotechnical Technician 3+ years exp.
11 Senior Engineer PE w/ 10+ years of post-registration experience 12 CADD/Computer Technician 13 CEI Project Administrator/CEI
Project C.E. degree plus 2 years of engineering experience in constr. of major road & bridge, or for non-degreed personnel 8 yrs of engring exp. If registered P.E., uses Project Engineer title. If non-registered, uses Project Administrator title. Please refer to CEI Scope of Services for additional details.
14 Contract Coordinator 15 Designer 5+ years of design experience, non-registered, non-degreed 16 Environmental Specialist B.S. degree in physical or natural sciences or engineering w/ 2+ year's exp.
17 GIS Specialist 18 Inspector H.S. graduate or equivalent +2 years experience in inspection 19 Landscape Designer 20 Planner BS degree in planning or equivalent/ 1+ years of experience 21 Secretary/Clerical entry level w/ HS degree or equivalent 22 Senior Designer 10 + years of design experience, non-registered, non-degreed 23 Senior Inspector HS degree + 4 years of experience 24 Senior Planner AICP, MS in planning or equivalent w/ 10+ years of experience 25 Field Crew Supervisor PSM (Professional Surveyor & Mapper) w/ 8+ years experience Certification in
Work Zone Traffic Control 26 Instrument Person HS grad plus 3 yrs experience in construction surveying 27 Rod Person/Chain Person HS grad with some survey exp. preferred 28 Survey Technician 29 Surveying Intern entry level w/ degree and LSIT or equivalent 30 Surveyor & Mapper Technician Aid entry level PSM
Proposed Title Proposed Description Hourly Rate
D o N o t P ro vid e R ates W ith Su b m issio n
Appendix B
Task Listing
Check Required Task Phase/Task 1 Pre-Design Services Phase
1A Data Collection and programming for the project.
1A1 Project coordination meetings with local agencies and owner representatives.
1A2 Review and Present to Stakeholders.
1A3 Preform neighborhood and community charettes as 1A4 Prepare a scope design concept or preliminary design 1B Site Analysis Services
1B1 Collecting site data - boundry surveying 1B2 Collecting site data - topographical surveying 1B3 Site studies - environmental 1B4 Site studies - Traffic 1C Preparation of site plans.
1D Meeting with public utilities 1E Permitting applications (approvals and presentations)
1F All other services as identified by the City Project Manager. See added sheet for additional services under
2 Preliminary Design/Development (Estimated 30%) Phase
2A Research the project and make recommendations to the City throughout this phase. City will provide the Project description.
2A1 Prepare a conceptual design and cost estimate.
2A2 Attend all public hearings and public meetings related to the project.
2A3 Conduct necessary field reviews.
2A4
Confer with the sponsor on project require-ments, programming, finances, schedules, early phases of the project, and other pertinent matters; meet with the concerned agencies and parties on matters affecting the project.
2A5 Collect data and undertake field investigations; geological engineering and surveys; and architectural, engineering, land surveys, and environmental stud-ies.
2A6
Plan, procure, and/or prepare necessary surveys, geological engineering investigations, field investigations, and architectural and engineering studies required for preliminary design considerations.
2A7
Develop design schematics, studies, sketches, and exhibits, lists of environmental and aesthetic considerations, project recommendations, preliminary layouts, and updated cost estimates.
2A8
Assist the City in the preparation of all neces-sary and required documents for State and federal grants, includ-ing Disadvantaged Business Enterprise (DBE) plan and goals, and exhibits.
2A9 Develop source documentation related to the design of the project.
2A10 Submit final preliminary phase documents and recommendations to City for review and approval prior to finalization by the Consultants.
2A11 Meet with Purchasing Division to review consultant checklist and requirements.
2A12 All other services as identified by the City Project Manager. See added sheet for additional services under
3 Intermediate Design (60-90%) Phase
3A
Refinement of schematics design with staff and advisory personnel. Scaled floor plans and elevations of the interior space utilizations by occupants, selections of building system. Discussion of cost effective and functional methods to promote the use of green materials through innovative architectural processes. Strive to meet LEED standards and Energy Star optimum rating standards whenever cost effective.
3B Schedule and attend meetings and design conferences to obtain informa-tion and to coordinate or resolve design matters.
3C Prepare necessary reports and recommendations.
3D Ensure red, green, and brown colored marked up plans and utility relocation schedules to all agencies are prepared and submitted as required.
3E
Prepare plans, specifications, and cost estimates as appropriate for 60% and 90% level of completion.
Conduct a detailed value engineering analysis, if applicable and if requested. Print, bind as necessary, and provide all necessary copies of engineering drawings and contract specifications.
3F All other services as identified by the City Project Manager. See added sheet for additional services under
4 Final Design (100%) Phase
4A Ensure red, green, and brown colored marked up plans and utility relocation schedules to all agencies are prepared and submitted as required.
4B Submit Permit Applications to and respond to all subsequent Requests for Additional Information from State, Federal, and Local reviewing agencies, as
4C Conduct necessary field reviews.
4D Attend public hearings and public meetings related to the project.
4E Provide all necessary land surveys and legal descriptions for right-of-way and easement acquisitions.
4F Prepare final construction plans, specifications and bid form and submit to City Staff for review and approval prior to finalization.
4G Preparation of final working drawings and specifications.
4H All other approvals as necessary to complete the project
4I All other services as identified by the City Project Manager. See added sheet for additional services under
5 Bidding and negotiations Phase
5A Provide the City specified number of plan sets, specifications, and the scope of work for this phase.
5B Assist the Purchasing Division with the preparation of all bid documents as requested.
5C Ensure that all bid document meet the Consultant Checklist provided by the Purchasing Division. Copy of the current Consultant Checklist is in Appendix A.
5D Be present at all pre-bid meetings.
5E Provides answers to question from the pre-bid meeting and addenda as requested
5F Be present at the bid opening at the discretion of the City.
5G Analyze bid results and provide a calculated and verified bid tab in a formatted as specified by the City.
5H Verify references and contactors qualification for the selected project.
5I Furnish recommendations on the award in writing.
5J Provide assistance to the City with negotiations, as
5K Prepare a complete set of conformed plans and specifications to include all changes made through
5L All other services as identified by the City Project Manager. See added sheet for additional services under
6 Constructions Phase
6A
Conduct a post bid/pre-construction conference and provide meeting minutes to the City for its review and approval prior to distribution unless otherwise directed by the City. The City may chose to record the minutes.
6B Review and forward for City approval all submittals for the project.
6C Provide construction staking of the project by a Florida licensed Land Surveyor.
6D
Provide construction inspection of the project by a fully qualified individual with experience in the specialty as required by the City and as approved by the City on one of the following basis:
6D1
A full time basis by at least one (1) individual. Full time shall be described such that the inspector will be present on the site between 87% and 100% of the time that the contractor is productively working.
6D2
A part time basis by at least one (1) individual. Part time shall be described such that the inspector will be present on the site between 14% and 86% of the time that the contractor is productively working.
6D3
An occasional basis by at least one (1) individual.
Occasional shall be described such that the inspector will be present on the site between 3% and 13% of the time that the contractor is productively working.
6E Provide quality control (testing) services utilizing a qualified testing laboratory located in the State of Florida as approved by the City.
6F
Conduct regularly scheduled project status meetings on a schedule determined by the City and provide meeting minutes to the City for its review and approval prior to distribution.
6G Review and recommend approval to the City, the contractor’s quantities and pay requests.
6G1
Furnish record drawings with no disclaimers, unless authorized by the City, based on the contractor’s redlined construction plans and surveys conducted by a Florida licensed Land Surveyor. Such record drawings shall be provided in both hard copy and electronic media acceptable to the City.
6H Construction Observation
6H1
Consultant shall observe the construction and ascertain to the best of the consultant’s ability that the project is constructed in accordance with approved plans and specifications.
6I All other services as identified by the City Project Manager. See added sheet for additional services under
Appendix C
Consultant Checklist
CONSULTANT CHECKLIST - BID DOCUMENT REQUIREMENTS LIST
1. Detailed Scope of Work
a. This should be a description of the project and what you are trying to accomplish.
b. Include contractor/vendor qualification.
c. You may use any numbering sequence, but you must use a sequence.
i. Numbering of paragraphs allows the bidder to refer to the section by section number, paragraph etc…
2. Liquidated Damages
a. Include the following clause:
i. The Contractor shall pay to the City the sum of written amount in Dollars ($NNN.NN) per calendar day liquidated damages for each and every day’s delay over and above the number of calendar days prescribed for completing the work.
b. Determine the liquidated damages by using the chart below:
i. The chart below is based on Federal Standard and Florida Department of Transportation.
ii. The chart is only a recommendation. The more critical the project the more severe the liquidated damages should be.
Estimated Project Cost Over
Estimated Project Cost But Less than
Daily Charge Per Calendar Day
$0.00 $50,000.00 $960.00 $50,000.00 $250,000.00 $965.00 $250,000.00 $500,000.00 $1245.00 $500,000.00 $2,500,000.00 $1665.00 $2,500,000.00 $5,000,000.00 $2715.00 $5,000,000.00 $10,000,000.00 $3450.00 $10,000,000.00 $15,000,000.00 $4870.00 $15,000,000.00 $20,000,000.00 $5820.00 $20,000,000.00 over $9198.00 plus .00005
3. Completion Days
a. Include the number of calendar days for delivery or completion of the project or product.
i. Include start day.
1. From Notice to Proceed or
2. Issuing of purchase order
b. This needs to include any mobilization or parts lead time.
i. Possible breakdown of days
ii. If the lead time for equipment and materials cannot be determined then the following information should be added:
“The number of days to complete this project will be (number of days here) days for substantial completion. Final completion will be (number of days here) days for a total project time of (number of days here). Additional lead time may be added for equipment and materials as approved by the City. The contractor/vendor will be required to provide documentation from the supplier of the lead time requirements.”
4. Length of Contract and renewal (May not apply if using section 3)
a. Under Florida State Statute
i. Renewal of contracts for commodities or contractual service may be renewed for a period not to exceed 3 years or the term of the original contract, whichever is longer (Example, two (2) initial years with two (2) one (1) year renewals.
ii. Renewal must be for the same terms and conditions as the initial contract unless escalation clauses are included. In which case an amendment must be approved.
b. All terms as for length of contract and number of renewals must be approved by the Purchasing Manager or designee.
5. Additions Insurance Requirements
a. List any additional insurance requirements that are not contained in the City’s terms and conditions.
b. The City requires at a minimum:
i. General Liability
ii. Auto
iii. Workers Compensation
c. Make sure you include any specific insurance, such as Builder’s Risk, Hazardous Liability, Liquor Liability and so on.
6. Bond Requirements
a. Some bids (usually construction) require bid, performance, or payment bonds.
b. Please note in the Scope of Work if any other bonds beyond the normal requirement may be needs.
7. Related Permits and Cost
a. Must include any pricing for all permits under State Statute or regulatory agencies as applies (i.e.
FAA, FDOT, etc…).
b. If permit is based on the construction cost percentage then inform the buyer.
c. Provide a chart or calculation formula for calculating the permit cost.
8. Technical Specifications
a. This needs to include a table of contents
b. Include page numbers as related to the title of the section (08330-1, 08330-2, etc.). This needs to be in the document header.
c. Do not include other footers. Such as project name or the directory where it can be found. The
Purchasing Division uses the footer for information about the bid.
d. Include plans. All drawings.
e. Be careful in using brand names.
i. Clarify that brand names are used for specifications only.
ii. Give details of the specification for name brands. Don’t just list the name brand.
iii. Provide provisions for approved alternates.
1. Include deadline for approved alternates. (example, 15 days before opening etc..)
f. Everything should be provided in an electronic format.
i. Include Word file and PDF file.
1. File names must be no more than 11 characters and cannot include special characters other than dashes.
ii. If specifications and plans are in multiple files you will need to provide a combined form that has all documents in the proper format and ordering. This should be in a PDF document with the exception of the bid form which may be in Excel.
9. Review City’s Standard Terms and Conditions
a. Note any conflict with the City’s Standard Terms and Conditions.
b. Note precedents in section 2 of the Terms and Conditions.
10. Post Bid Requirements
a. Provide a bid tabulation of ALL contactors/vendors that submitted bid
i. Analyze unit pricing for irregularities
b. Provide letter of recommendation for awarded vendor or justification why lowest bid should not be accept and why the next bid should be accepted.
c. Attend pre-construction meeting. This item may be provided by the Project Manager.
(Coordinate with Project Manager and Purchasing)
i. Provide agenda
ii. Provide follow up brief of pre-construction minutes
BID DOCUMENT REQUIREMENT SUMMARY (completed by Technical Specification Preparer)
1. Scope of Work Summary Brief summary
Reference page, section where noted in specs
2. Liquidated Damages $ Per Calendar Day Substantial Completion Days Calendar days
3. Final Completion Days Calendar days
4. Length of Contract and renewal
(May not apply if using section 3)
Initial term
Renewal terms
5. Additions Insurance Requirements Yes / No
6. Bond Requirements
7. Related Permits and Cost Check list of notable items
8. Technical Specifications ______ table of contents
Contractor/Vendor qualification (if applicable) page numbers formatted in header.
Footer blank Plans and Drawings included Brand Names include minimum specifications and “approved alternate” verbiage
Approved Alternate provision Provided electronic format
Word and PDF (all files combined) bid form which may be in Excel No special characters in titles
9. Review City’s Standard Terms and Conditions Note any conflict with the City’s Standard Terms and
Conditions.
List where items are located in documents
10. Engineer/Architect’s estimated project cost
Miscellaneous Notes:
| 25-11MC Exhibit A Scope of Work |
| Exhibit A - SCOPE OF WORK |
| A. BACKGROUND |
| B. SCOPE OF WORK DESCRIPTION |
| C. AGREEMENT TERM |
| D. SCOPE OF WORK REQUIREMENTS |
| E. SPECIFICATIONS |
| F. DELIVERABLES |
| G. ESCALATION/DE-ESCLATION |
3 Appendix for consultant10-18-2018
File details come from the government source that posted it. Updated .