24R4084 - ATTACHMENT E.xls
XLS spreadsheet 51 KB Posted
- Attached to
- 37-Day Dry Cargo Time Charter Federal contract opportunity
- Solicitation number
- N3220524R4084
About this file
This document is an attachment to a Request for Proposals (RFP) for a 37-day Dry Cargo Time Charter. The RFP is being issued by the Department of the Navy Military Sealift Command, with a port rotation of Norfolk - Pituffik - Norfolk.
The RFP specifies the required vessel characteristics, including a minimum cargo capacity of 168 TEUs with 10 reefer plugs and 125,000 cubic feet of below-deck breakbulk capacity, as well as minimum crane capacity, speed, range, and other technical requirements. Offerors are required to provide responses indicating their ability to meet each of the detailed requirements listed in the attachment, along with the location of that information in their proposal. The charter period is 37 days with a laydate of July 7, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 24R4084 A0002 Reopen.pdf | ||
| 24R4084 RFP.pdf | ||
| DRYTIME Fuel Consumption Temp.xlsx | XLSX spreadsheet | |
| Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP RESPONSE
| Technical Evaluation responses for: | 37-day Dry Cargo Time Charter | |||||||||||||||||||||||||||||||||||||||||||||
| RFP Number: | TBD | |||||||||||||||||||||||||||||||||||||||||||||
| Port Rotation: | Norfolk - Pituffik - Norfolk | |||||||||||||||||||||||||||||||||||||||||||||
| Charter Days: | 37 | |||||||||||||||||||||||||||||||||||||||||||||
| Layday: | 7-Jul-24 | |||||||||||||||||||||||||||||||||||||||||||||
| DETAIL | DETAIL | DETAIL | DETAIL | DETAIL | ACK | DETAIL | DETAIL | ACK | ACK | ACK | DETAIL | DETAIL | ACK | ACK | ACK | ACK | ACK | ACK | DETAIL | DETAIL | DETAIL | ACK | ACK | ACK | ACK | ACK | DETAIL | DETAIL | DETAIL | DETAIL | DETAIL | DETAIL | ACK | ACK | ACK | ACK | ACK | ACK | DETAIL | |||||||
| Box 1A | Box 1A | Box 1B | Box 1B | Box 1C | Box 1D | Box 1D | Box 1E | Box 1F | Box 1G | Box 1H | Box 1I | Box 1J | Box 1K | Box 1L | Box 1M | Box 2 | Box 3 | Box 4 | Box 5 | Box 5 | Box 5 | Box 6A | Box 6B | Box 6C, Part V(i) | Box 6D. Part V(j) | Box 6E, Part V(l) | Box 6F, Part V(m)1. | Box 6F, Part V(m)2. | Box 6F, Part V(m)3. | Box 6F, Part V(m)4. | Box 6F, Part V(m)6. | Box 6F, Part V(m)7. | Box 6G, | |||||||||||||
| Part V(o) | Box 6H | Box 6I | Box 6J | Box 6K | Box 6L | Box 6M | ||||||||||||||||||||||||||||||||||||||||
| VESSEL NAME: | Flag | Self-Sustaining | Cargo Capacity: TEU | Cargo Capacity: Cubic Feet | Flat Racks | Cranes | Crane Capacity | Length Overall | Laden Draft | Speed of Advance | Range | Ice Class | Holds | Navigation Equiptment | Terms of Carriage | Cargo List | Place / Range of Delivery | Place / Range of Redelivery | Charter Period | Layday | Vessel ETA | Vessel Itinerary | Health & Safety Requirements | Documenta-tion | Lashing Gear | Spreader Bar | Self-sustaining | DOC | SMC | ISSC | COI | IMDG | 835's | Fully Bunkered | Classified Requirement | Stow Plan | Ice Pilot | Position Reports | Qualifications | Attachment E completed in entirety, submitted | ||||||
| OWNERS: | US / FF | YES | Minimum 168 TEU with minimum 10 reefer plugs | 125,000 cubic feet of below-deck breakbulk capacity | Minimim capacity 15 | Minimum 2 cranes | Minimum capacity 45 LT; one or twin crane minimum capacity 75 LT | Max LOA 550 feet | Max laden draft 28 ft | Minimum laden SOA 15 KN | 10,000 NM range | ice class and documentation | Min. tween deck height 9 FT; min. tank top deck height 13 F | YES | YES | Unavailible | Norfolk, VA | Norfolk, VA | 37 Days | 7-Jul-2023 | Provide | Provide | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | YES | COMMENTS | |||||
| Instructions: please answer in all highlighted cells with ability to meet reqwuirement (YES or NO), where the information can be found in the proposal, and information detail if required. | YES or NO | |||||||||||||||||||||||||||||||||||||||||||||
| Where information is found in proposal | ||||||||||||||||||||||||||||||||||||||||||||||
| Details on information (if no details are necessary, write N/A) |
File details come from the government source that posted it. Updated .