This document is a Contract Data Requirements List (CDRL) outlining documentation that must be submitted by a contractor awarded the federal contract for a Circulation Heater with Panel under Solicitation Number W519TC-24-Q-2012 issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal. The CDRL requires the contractor to submit installation and preparation documentation including equipment characteristics, a tool list, pneumatic schematic, and equipment identification a minimum of 60 days prior to delivery, as well as a pre-shipment testing report no later than 10 days prior to delivery. The documentation must be provided in electronic or paper format to the specified address at Rock Island Arsenal. This ensures the government receives necessary technical data to facilitate installation and operation of the equipment prior to the delivery date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W519TC24Q2012 0001.pdf | ||
| W519TC24Q2012.pdf | ||
| RIPD E4000-24-3-12.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 5 Pages
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
Quench Tank Heater
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Characteristics
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in either electronic or paper format, no later than 30-calendar-days after award of the contract. The contractor shall provide this information in electronic format using Microsoft Excel format.
The specific data required is Weldable Metals, Input Voltage, Input Phase, Input Hz, Current Type, Rated Output, Net Width, Net Height, Net Length and Net Weight.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
Rock Island Arsenal
ATTN: TARA-IFF
Robert Mcclure Bldg 220-B-D28 Rock Island, IL 61299-6400
15. TOTAL
G. PREPARED BY
Tad Larson
H. DATE
17-Aug-2023
I. APPROVED BY
J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 5 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Tool List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in either electronic or paper format, a minimum of 60-calendar-days prior to delivery of equipment. The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
An itemized list of all fixtures, tools, and equipment, whether special or not, required to install, align, and maintain the equipment in this purchase description. NOTE: The contractor is responsible for providing special/custom tools and equipment necessary for installation, moving, and/or set-up as part of the equipment.
ATTN: TARA-IFF
Robert Mcclure Bldg 220-B-D28
Tad Larson
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 5 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Pneumatic Schematic
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information either in electronic or paper format, a minimum of 60-calendar-days prior to delivery of equipment. The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.
ATTN: TARA-IFF
Robert Mcclure Bldg 220-B-D28
Tad Larson
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 5 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Identification
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information either in electronic or paper format, a minimum of 60-calendar-days prior to delivery of equipment.
This document shall consist of the make & model of the equipment with a complete list of standard features, optional features being installed in order to meet the specification, and a list of optional features available for field installation but not included. Each section shall be clearly identified.
Also included will be any technical data or brochures applicable to the equipment being provided.
ATTN: TARA-IFF
Robert Mcclure Bldg 220-B-D28
Tad Larson
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 5 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Pre-Shipment Testing Report
3. SUBTITLE
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (1) copies of this information in paper format no later than 10-calendar-days prior to delivery of the equipment.
ATTN: TARA-IFF
Robert Mcclure Bldg 220-B-D28
Tad Larson
H. DATE