This performance work statement outlines preventative maintenance and repair services requirements for hoists and cranes located across various Army installations on the island of Oahu, Hawaii. The contractor shall provide quarterly preventative maintenance, load testing, recommendations for repair work and replacement parts with receipts, and scheduled, unscheduled, and emergency repair services. Key deliverables include quarterly preventative maintenance reports, load test reports, annual reports on repair work and replacement parts, receipts for parts, and documentation for unscheduled and emergency repair services. The contractor must develop a quality control plan and comply with various environmental, safety, security, and training requirements. Performance standards specify acceptable quality levels for each required service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 23-R-0018 P0001 Conform.pdf | ||
| 23-R-0018 P0001 Mod.pdf | ||
| TE 2 Quarterly Status Report Overhead Hoist.xlsx | XLSX spreadsheet | |
| TE 1 Overhead Hoist Inventory_Locations.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912CN23R0018 15-Sep-2023
b. TELEPHONE NUMBER
(808) 656-0941
8. OFFER DUE DATE/LOCAL TIME
03:00 PM 16 Oct 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912CN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MARIA OLIPAS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
413 CSB
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE WX3JN3 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
US ARMY GARRISON HI DIR OF PUB WKS DPW
JONATHAN LOSPOC
BLDG 104 947 WRIGHT AVE WAAF SERVICE CO
SCHOFIELD BARRACKS HI 96857-5013
TEL: 808-655-51411 FAX: 808-656-7771
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$12,500,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF103
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ADDENDUM TO 52.212-1
ADDENDUM to FAR 52.212-1
INSTRUCTIONS TO OFFEROR-COMMERCIAL ITEMS
Submittal Instructions
A. Proposal Submittal and Inquiries
1. Submission of proposals must be received electronically via email addressed to the Government point of contact (POC) Contract Specialist, Maria Olipas, Email: maria.d.olipas.civ@army.mil and with subject referencing Request for Proposal (RFP) Number W912CN23R0018. Proposals will not be accepted via other transmission methods, such as standard mail, fax, or drop off at this time. All solicitation and amendments issued will be posted on the Government Contract Opportunities website at https://SAM.gov/.
Once posted, all interested offerors are responsible to monitor the website until the closing date for any issued amendments. It is the responsibility of the offerors to ensure proposals are received and acknowledged by the Contract Specialist, on or before the deadline for submission of proposals as indicated in Block 8 of the SF 1449.
2. The POC for this acquisition is the Contract Specialist. Please include her on all correspondence at maria.d.olipas.civ@army.mil.
3. The deadline for the submission of questions is no later than 3:00 pm Hawaii Standard time on Friday, September 22, 2023. A summary of questions received and Government responses will be provided via an amendment to the solicitation and posted on the Government Contract Opportunities website. Questions received after 3:00 pm Hawaii Standard Time (HST) may not be answered. Questions must be submitted in writing via email to the Contract Specialist.
B. General Instructions
1. The RFP and evaluation of proposals will be conducted in accordance with FAR Subpart 12.6 Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services and FAR Subpart 13.5 Simplified Procedures for Certain Commercial Products and Commercial Services. Offerors will be evaluated using the criteria set forth in the Addendum to FAR 52.212-2. Non-compliance with the RFP may cause a proposal to not be considered for award.
2. The submission of documentation specified below will constitute the Offeror’s acceptance of the terms and conditions of the RFP, concurrence with the Performance Work Statement (PWS) and contract type.
3. It is the Government’s intent to award without discussions. Offerors are encouraged to present their best terms from a price and other factors standpoint. However, in accordance with FAR 52.212-1, the Government reserves the right to conduct discussions should it become necessary.
4. All referenced documents for this solicitation are available on the Government Contract Opportunities website at https://SAM.gov/.
C. Site Visit
1. Date/Time: Wednesday, September 20, 2023 at 9:00 am.
2. Meeting Location: 742 Santos Dumont Ave on Wheeler Army Airfield Parking Lot at the West End of Building 108. If you do not have military access, go to Lyman Gate on Schofield Barracks Hawaii first to get an Access Pass to get onto Wheeler Army Airfield. Please call Jonathan Lospoc at (808) 753- 1610 if further assistance is needed to get to the meeting location. RSVP no later than: Monday, September 18, 2023 at 3:00 p.m. HST. If you are interested in attending, please submit all attendee's names, e-mail addresses, cell phone, and work telephone numbers to Maria Olipas at maria.d.olipas.civ@army.mil no later than 3:00 p.m Hawaii Standard Time on Monday, September 18, 2023 at 3:00 p.m. HST.
3. The purpose of a site visit is to provide clarity on any questions that may arise for this requirement. If no interest is received by this time, the Government will cancel the planned site visit. Picture taking WILL NOT be allowed during the site visit. Attendance constitutes agreement to release the Government of liabilities due to any accidents or injury occurring during the site visit. Any discussions, remarks, and explanations that may be made by any Government representative during the site visit will not change the terms of the solicitation and the technical specifications unless the solicitation is amended in writing.
D. Proposal Preparation Instructions
1. In order to be considered for award, the Offeror’s proposal shall include the following:
a. Standard Form (SF) 1449 with price proposal, signed and dated.
b. Amendments to the solicitation or acknowledgements, if applicable, signed and dated.
c. Completed Certification in FAR 52.212-3 (if not entered in the System for Award Management (SAM) website).
d. Submittal of proposal in accordance with FAR 52.212-1, Addendum to FAR 52.212-1, FAR 52.212-2, and Addendum to FAR 52.212-2.
e. Proposals submitted shall ensure they address all Factors.
Factor 1 – Technical - Key Personnel Qualifications - Must provide widely accepted industry standard certifications sufficient to ensure all hoists, cranes, and associated equipment currently in use can be properly maintained and/or repaired, i.e. Specification 78, published by the Crane Manufacturers Association of America (CMAA).
Factor 2 - Price The basis of award is to the responsible contractor whose proposal is responsive to the terms and conditions of the solicitation and is the Lowest Price Technically Acceptable. The pricing schedule shall be submitted fully completed and error free. Proposals shall include price for all Contract Line Item Number (CLINs) on the Standard Form (SF) 1449 Continuation Sheets of the solicitation.
a. Pricing for each CLIN must be submitted in the proper format. The proper format consists of
QUANTITY * UNIT PRICE=AMOUNT/NET AMOUNT. Each CLIN should include the unit price, as well as the total amount. All amounts shall be rounded to the nearest hundredth decimal place ($X.XX). In the event of mathematical errors, the unit price will be used as the basis for computing price.
b. Prices shall not extend past the second decimal point for unit and extended amounts. The proposed price shall include all personnel, supplies, services, management, overhead, and other direct costs, G&A, and profit to fulfill the contractual requirements of the PWS and any Technical Exhibits/Attachments.
c. The offerors shall calculate the total overall price.
2. Proposal Contents. All information the offeror intends to have considered, including the offeror’s best price, shall be submitted with the initial proposal. The Government proposal evaluation will be limited to the information provided by the offeror and nothing will be assumed. Offerors are responsible for including sufficient details to permit a complete, thorough, and accurate evaluation of the submitted proposal. Proprietary information shall be clearly marked. Materials not directly related to the information requested shall not be included in the proposal. Any information not requested will be disregarded in the evaluation process.
3. Complete blocks 12, 17, and 30a-c of the SF 1449 as well as signing and acknowledging any amendments.
In doing so, the offeror accepts to the contract terms and conditions as written in the Request for Proposal.
4. All proposals shall remain valid for 120 calendar days.
5. Systems for Award Management (SAM) registration. Contractor shall have an active registration in SAM to be considered for award. To obtain information on SAM or to register with SAM, visit the website at https://SAM.gov.
6. Late Submissions. Offerors are responsible for submitting quotations so as to reach the Government POC designated in the solicitation by the time specified in the solicitation. If the offeror does not receive confirmation of receipt, it is the responsibility of the offeror to contact the POC to confirm their proposal has been received. Any proposal received after the specified submission deadline, may be considered for award.
ADDENDUM TO 52.212-2
ADDENDUM TO 52.212-2
BASIS OF AWARD
The basis for award will be Lowest Price Technically Acceptable (LPTA). The Technical Proposal will be evaluated and assigned a rating of acceptable or unacceptable.
There are two factors: 1) Technical and 2) Price. Submission of widely accepted industry certification serves as meaningful discriminators. During the evaluation, if an Offeror receives a consensus “unacceptable” for the technical factor, that Offeror will then be considered ineligible for further award consideration.
Price. Reasonableness will be based on competition. If only one proposal is received, historical data and similar requirements will be used to made the determination.
Past Performance will not be an evaluated factor, although the contracting officer may use past performance to assess contractor responsibility IAW FAR 9.1.
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS)
Base Operations
PREVENTATIVE MAINTENANCE AND REPAIR SERVICES FOR HOIST AND CRANES LOCATED
ON VARIOUS ARMY INSTALLATIONS, ISLAND OF OAHU
04/13/2023
Table of Contents
INTRODUCTION
1.1 Background
1.2 Objectives
1.3 Climatic Conditions
1.4 Facility Access
1.5 Traffic Flow
1.6 Drainage
1.7 Restoration of Landscape Damage
1.8 Dust Suppression
2.0 REQUIREMENTS
2.1 Description of Services
2.1.1 Non-Personal Services
2.1.2 General Information
2.1.3 Place of Performance and Hours of Operation
2.1.4 Federal Holidays
2.1.5 Travel/Temporary Duty
2.1.6 Emergency Services
2.1.7 Contract Administration and management
2.1.8 COR Functions
2.1.9 Quality Control (QC)
2.1.10 Subcontract Management
2.1.11 Contractor Employees
2.1.12 Business Relations
2.2 Work Management
2.2.1 Coordination
2.2.2 General Fund Enterprise Business System (GFEBS)
2.3 As-Builts and Geospatial Information System (GIS)
2.3.1 Maintain As-Builts
2.3.2 Real Property Records Updates
2.3.3 GIS
2.3.4 GIS Support Services
2.3.5 GIS Files
2.3.6 Other Documents
2.4 Historic Property or Archaeological Site
2.4.1 Repair and Replacement
2.5 Special Requirements
2.5.1 Security
2.5.2 Security Training
2.5.3 Safety
2.5.4 Training, Physical Requirements, or other Expertise Required
2.5.5 Environmental Requirements
2.5.6 Contingency Plans
2.6 Job Order Contract (JOC) Quality Assurance (QA)/Inspection Support
2.6.1 Project Support
3.0 PERFORMANCE REQUIREMENTS AND STANDARDS
3.1 High Level Objectives (HLO)
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs)
3.2 Transition
3.3 Service Contract Reporting (SCR)
4.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS) MATRIX
4.1 Quality Assurance
4.2 Quality Control Plan (QCP)
5.0 COMMON LEVELS OF SERVICE (CLS)
6.0 DELIVERABLES
7.0 RELATED DOCUMENTS.
7.1 Definitions and Acronyms
7.1.1 Definitions
7.1.2 Acronyms
7.2 Applicable Directives, Publications
7.3 Technical Exhibit (TE)
7.4 Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE)
7.4.1 Utilities
7.5 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE)
7.5.1 Contractor-Furnished Material and Responsibilities
7.5.2 Contractor-Furnished Items
7.5.3 Contractor Facilities
7.6 U.S. Department of Labor (DOL) Wage Determination (WD)
8.0 Specific Tasks
8.1 Quarterly Preventive Maintenance (PM)
8.2 Load Test
8.3 Recommendations of Repair Work/Replacement Parts.
8.4 Provide receipts for parts used.
8.5 Repair Work: Scheduled, Unscheduled and emergency repair Services.
W912CN23R0018
1.0 Introduction. This is a non-personal services contract to provide U.S. Army Garrison Hawaii (USAG-HI) Preventative Maintenance and Repair Services for Hoist and Cranes. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all Hoist & Crane Inspections, Preventive Maintenance (PM), Load Test Certification and Repair services as defined in this Performance Work Statement (PWS). The Government reserves the right to decrease or increase its inventory at any time during the contract period.
1.1 Background. The U.S. Army Garrison Hawaii (USAG-HI), Directorate of Public Works (DPW) requires PM and repairs of Hoists and Cranes located at various Army installations on the Island of Oahu, Hawaii. There are approximately (74) facilities requiring this service.
1.2 Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives.
The Contractor shall provide information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.
The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost effective ways to fulfill Preventative Maintenance and Repair of Hoist and Cranes and their component needs, emphasizing innovation and commercial best practices.
1.3 Climatic Conditions. N/A
1.4 Facility Access. The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the Fire Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection. The Fire Department will reset alarm systems to operational status.
1.5 Traffic Flow. The contractor shall maintain the free flow of traffic during surfaced area maintenance. The Contractor shall notify the Contracting Officer Representative (COR) and the Contracting Officer (KO), in writing, a minimum of fourteen (14) calendar days in advance of any scheduled closure of streets. Emergency road closures shall be coordinated with the Contracting Officer Representative (COR).
1.6 Drainage. Maintenance work performed under this contract shall not impede drainage.
1.7 Restoration of Landscape Damage. Trees or other landscape features damaged by the Contractor’s operations shall be restored at no additional cost to the Government. The COR will decide the method of restoration for trees or whether damaged trees will be removed.
1.8 Dust Suppression. The Contractor shall perform dust suppression as directed by the COR.
2.0 Requirements.
2.1 Description of Services. See Section 8.0
2.1.1 Non-Personal Services. The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 General Information
2.1.2.1 Period of Performance (PoP). See contract schedule for POP dates.
2.1.3 Place of Performance and Hours of Operation.
2.1.3.1 Place of Performance. The work to be performed under this contract will be performed at the locations listed in Technical Exhibit (TE 1).
2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 0700 – 1600 hours, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours.
2.1.4 Federal Holidays. The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth National Independence Day
2.1.4.1 The Contractor shall provide personnel support within two (2) hours of notification outside the normal hours of operation as required, including holidays, to support the Directorate of Public Works (DPW) mission. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the KO. The Program Manager shall be available after normal hours to serve as the central point of contact for Contractor operations. Contractor personnel shall not be scheduled for overtime work.
2.1.4.2 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or
b. Reschedule the work on any day mutually satisfactory.
2.1.4.3 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the KO if inclement weather suspends operations within five (5) hours. The Contractor shall resume operations with KO approval.
2.1.5 Travel/Temporary Duty. N/A
2.1.6 Emergency Services. N/A
2.1.6.1 The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR immediately, not later than (NLT) two (2) hours of the incident.
2.1.6.2 The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
2.1.7 Contract Administration and management.
2.1.7.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. The KO and COR will meet quarterly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by both the Program Manager and the KO. The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.
2.1.7.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.1.7.3 The following provides the roles and their respective authority during the performance of the contract:
2.1.7.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.
2.1.7.3.2 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform IAW the responsibilities and duties identified in the appointment letter.
2.1.7.3.2.1 COR Authority. A letter of designation will be issued to the COR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.1.7.3.3. The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.8 COR Functions. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;
maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.
2.1.9 Quality Control (QC). Quality Control is the responsibility of the Contractor. The Contractor shall provide a Quality Control Plan (QCP) five (5) business days before contract start. The Contractor shall provide and maintain a QCP that is acceptable to the KO. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.
2.1.9.1 The Contracting Officer Representative Tracking (CORT) Tool N/A
2.1.10 Subcontract Management. N/A
2.1.11 Contractor Employees.
2.1.11.1 Key Personnel.
2.1.11.1.1 The Contractor shall provide a Program Manager who is responsible for the performance of the work.
The Program Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The name of the Program Manager shall be provided by the Contractor to the KO. The Program Manager shall be available between 0700 - 1600 hours, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons. The Program Manager and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language. It is recommended that a local representative be available on the Island of Oahu.
2.1.11.1.2 N/A
2.1.11.1.3 All Contractor employees shall be legal U.S. residents. The Contractor shall immediately remove any employee that is not a legal U.S. resident. The Contractor personnel shall be able to communicate clearly in the English language. Contractor shall ensure employees are capable of obtaining installation access.
2.1.11.1.4 Qualification Standards. N/A
2.1.11.1.5 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
2.1.11.1.6 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
2.1.11.1.7 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.1.11.1.8 Organizational Conflict of Interest (OCI). N/A
2.1.12 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR and KO corrective action plans, timely identification of issues, and effective management of subcontractors within (10) days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.2 Work Management.
2.2.1 Coordination. The Contractor shall schedule and coordinate with the COR to minimize disruptions to the facility mission.
2.2.2 General Fund Enterprise Business System (GFEBS). N/A
2.2.2.1 GFEBS Certification. N/A
2.2.2.2 Preventive Maintenance Orders (PMO). N/A
2.2.2.3 Operations Work Orders (OWO). N/A
2.2.2.4 GFEBS Support. All Demand Maintenance Orders (DMO). N/A
2.2.2.4.1 Database Tasks/Requirements. N/A
2.3 As-Builts and Geospatial Information System (GIS). N/A
2.3.1 Maintain As-Builts. N/A
2.3.1.1 Support. N/A
2.3.1.2 Training. N/A
2.3.2 Real Property Records Updates. N/A
2.3.3 GIS. N/A
2.3.4 GIS Support Services. N/A
2.3.5 GIS Files. N/A
2.3.6 Other Documents. N/A
2.4 Historic Property or Archaeological Site. N/A
2.4.1 Repair and Replacement. N/A
2.5 Special Requirements.
2.5.1 Security.
2.5.1.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. The COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.
2.5.1.2 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.
2.5.1.3 Contractor Vehicle Registration. The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within five (5) working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section located in Building 199 Leilehua Golf Course Road, Bldg. 6508 Wahiawa, HI. 96786. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.5.1.4 The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or Security Office.
2.5.1.4.1 ACCESS TO ARMY INSTALLATIONS – PERSONNEL AND VEHICLES.
The Government recognizes the important roles companies like you play in our day-to-day operations. That is why USAG-Hawaii is enhancing the current access control solution called the Automated Installation Entry (AIE) Program. This program supports the security requirements while offering a streamlined access procedure for vendors, contractors, sub-contractors, suppliers and service providers. This program is available to new and existing personnel who require access to USAG-Hawaii and are not authorized to receive a Department of Defense CAC and desire a streamlined entry into the installation. Sponsorship and participation at each USAG-Hawaii location (e.g., Schofield Barracks, Wheeler Army Airfield, Fort Shafter, Tripler Army Medical Center, Pililaau Army Recreation Center and Pohakuloa Training Area is required.
AIE Credential holders may access the installation through any of the USAG-Hawaii Gates that size allows and will only be subject to random inspections.
Companies that choose not to participate in the AIE Program will have limited access through the Schofield Barracks Lyman gate, Fort Shafter’s Buckner Gate and Tripler Army Medical Center Main Gate. All employees will be required to go through the inspection area and will be subject to the standard access control procedures, security screenings, and/or vehicle inspections.
*Access control changes can occur at any time due to security requirements
Companies that service USAG-Hawaii facilities may initiate enrollment in the AIE Program by contacting the Contracting Officer’s Representative (COR).
If you have questions regarding the AIE Program at USAG-Hawaii, please contact Security Branch Operations, at 808-656-0232.
AIE Program Enrollment Process for Background Check and Process to obtain AIE Badge
Enroll your company by contacting the COR who will be the Sponsor. The COR will provide the excel spreadsheet for the list of contractor employee information. The following information is required from the contractor: last name, first name, date of birth, status, social security number, company name, and contract number. The COR will complete the Sponsor information and provide the list to the Directorate of Emergency Services (DES) Access Control Division. The DES will conduct the background check to vet personnel prior to arrival to pick up their AIE Badge, and will ensure a more efficient process while saving time.
The AIE Program performs background screening and credentialing.
DES will contact the COR (Sponsor) once the background checks have been validated to schedule a time for the contractor employees to go to one of the registration locations and complete the process to obtain the AIE Badge.
Contractor employees should bring an acceptable form of identification (see List A and List B) to the appointment.
Upon arrival, a photo will be taken to complete the process. Employees will be issued their AIE Badge, which they will use for access to the installation.
Forms of Acceptable Identification for picking up your credential:
List A - One (1) needed
U.S. Passport (unexpired)
Permanent Resident Card or Alien Registration Receipt Card (Form I-551)
Unexpired foreign passport, with I-551 stamp or attached Form I-94 indicating unexpired employment authorization
Unexpired Employment Authorization Document that contains a photograph (Form I-766, I-688, I688A, I-688B)
List B – Two (2) needed
Driver’s license or ID card issued by a state
ID Card issued by federal, state or local government agencies or entities
School ID card with a photograph
Voter’s registration card
U.S. Military card or draft record
Military Dependent’s ID card
U.S. Coast Guard Merchant Mariner Card
Native American tribal document
Driver’s license issued by a Canadian government authority
U.S. Social Security card issued by the Social Security Administration
Certification of Birth Abroad issued by the Department of State (Form FS-545 or Form DS-1350)
Original or certified copy of a birth certificate issued by a state, county, municipal authority or outlying possession of the United States bearing an official seal
U.S. Citizen ID Card (Form I-197)
ID Card for use of Resident Citizen in the United States (Form I-179)
Unexpired employment authorization document issued by DHS (other than those listed under List A)
2.5.1.5 Physical Security. N/A
2.5.2 Security Training.
2.5.2.1 iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. Training standards will be provided by the COR within five (5) calendar days of contract award.
Contractor personnel are to train all personnel within 30 days of award or within thirty (30) days of a hiring action.
Contractors are to report training to the COR within thirty (30) days of contract award or a hiring action.
IWATCH within the Army is a nation-wide modern version of a neighborhood watch program focused on the threat of terrorist activity. It is an antiterrorism awareness program that the contractor’s workforce, while on Army installations, must all be familiar with to promote and enhance reporting suspicious activity or behavior. The program has two elements: “passive” and “active.” The passive element is an individual’s situational awareness of his or her surroundings. The active element of iWatch involves individuals taking action to report suspicious behavior or activities to law enforcement for more investigation.
LEVEL I ANTITERRORISM (AT) STANDARDS
(a) Pursuant to Department of Defense Instruction Number 2000, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a Federally-controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion. The training is accessible from any computer and is available at https://jkodirect.jten.mil (enroll in course #JS-US007-14). The contractor is responsible for ensuring that all applicable employees have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate (s) to the Contracting Officer and the
Contracting Officer’s Representative (if appointed) within five working days after contract award or prior to access to a Federally-controlled installation or information system.
(b) In the event that the automated system at is not available https://jkodirect.jten.mil (enroll in course #JS- US007-14). (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor.
However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the Installation Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided the contracting officer or designee along with all associated cost or schedule impacts to the contract. Antiterrorism performance (Level 1 AT Awareness Training attendance and compliance) may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.
2.5.2.2 OPSEC Training. Per AR 530-1 Operations Security, the contractor employees shall complete Level I OPSEC Awareness training. New employees shall complete training within thirty (30) calendar days of their reporting for duty and annually thereafter.
2.5.2.3 DOD LEVEL I ANTITERRORISM (AT) STANDARDS
Pursuant to Department of Defense Instruction Number 2000, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each Contractor employee requiring access to a Federally-controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion.
Standard Contract Language Provision/Contract Clause Applicability and/or additional SOW language. Detailed information on each of these items are stated below. Applicable items to this contract action are indicated below.
1. AT Level I training. This standard language is for Contractor employees with an area of performance within an Army controlled installation, facility or area. All Contractor employees, to include Subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable and annually thereafter. The Contractor shall submit certificates of completion for each affected Contractor employee and Subcontractor employee, to the COR or to the contracting officer. AT level I awareness training is available at the following website: https://jko.jten.mil/
2. Access and general protection/security policy and procedures. This standard language is for Contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-Contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
2a. Access and general protection/security policy and procedures. This standard language is for Contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-Contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
2b. For Contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-Contractors employees shall comply with adjudication standards and procedures using the National
Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations .
3. AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language required US based Contractor employees and associated sub-Contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.
4. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the Contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
5. Threat Awareness Reporting Program. For all Contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), Contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.
2.5.3 Safety. The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.5.3.1 Safety Plan. Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work.
Revisions shall be submitted five (5) calendar days prior to the effective date of change.
2.5.3.2 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.
2.5.3.3 SAFETY REQUIREMENTS
(a) The Contractor shall implement a safety program conforming to the requirements of Federal, State and Local laws, rules and regulations. The program shall include, but is not limited to, the following, as applicable:
(1) U.S. Department of Labor Occupational Safety and Health Standards, at:
http://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910
(2) U.S. Army Corps of Engineers, Safety and Health Requirements Manual Engineering Manual 385-1-1, 15 SEP 08, " at http://www.mvs.usace.army.mil/safety/2008_EM385_1_1FINAL.pdf
(3) Unified Facilities Criteria, Fire Protection Engineering for Facilities, UC 3-600-01, 14 Jul 09, at http://www.wbdg.org/ccb/DOD/UFC/ufc_3_600_01.pdf
(4) Air Force Instruction 32-2001, Fire Emergency Services Program, 10 Nov 10, at http://www.e-publishing.af.mil/shared/media/epubs/AFI32-2001.pdf.
(b) The contractor must submit a safety plan and job hazard analysis in accordance with EM 385-1-1, 15 SEPT 08, for all construction projects. The safety plan shall be submitted within (30) days of award or (7) working days prior to commencement of on-site work, whichever occurs first.
(c) For service, supply, and research and development contracting actions. Compliance with this manual shall be a contract requirement for such activities unless technical representatives (in coordination with safety and health professionals) advise that special precautions are not appropriate due to extremely limited scope of services or similar. However, it is understood that this manual in its entirety may be too complex for the type of work being performed under these contracts. These contractors may reference Appendix A, paragraph (11) of Health Requirements Manual Engineering Manual 385-1-1, 15 SEP 08, " at http://www.mvs.usace.army.mil/safety/2008_EM385_1_1FINAL.pdf for limited scope Accident Prevention Plan
(APP).
2.5.3.4 ACCIDENT PREVENTION AND SAFETY REQUIREMENTS
(a) The contractor is responsible for implementing standard commercial practices for accident prevention and safety practices and compliance with para. b of this clause when performing the requirements stipulated in the statement of work or performance work statement of this contract. Therefore, upon commencement of work, the Contractor shall initiate an accident prevention and safety program applicable to the work to be performed under this contract.
Further, the Contractor shall conduct a safety orientation for all employees immediately following their employment under this contract. The Contractor shall provide all occupational health services to his employees. Contractor employees shall be instructed to notify the Contractor's Project Manager of potential or existing occupational health hazards that require attention.
(b) The Contractor shall comply with the requirements of the Department of Labor Occupational Safety and Health Act (OSHA) and the Hawaii Occupational Safety and Health Law as administered by the Division of Occupational Safety and Health, Department of Labor and Industrial Relations, State of Hawaii.
(c) Government emergency vehicles and medical personnel may be used in emergency situations affecting Contractor personnel whose life may be in danger. Government facilities may be used in these instances as the first point of treatment. Transfer to other than Government medical treatment facilities shall be affected as soon as possible and as determined by attending medical authorities. Contractor employees and not the Government will bear all medical expenses.
(d) The Federal OSHA (Public Law 91-596) requires the reporting of all occupational injuries and illnesses. This OSHA requirement applies to all Contractors as well as subcontractor personnel.
(1) When required, the Government will prepare for the Contractor DD Form 689, Individual Sick Slip (in trip) for presentation to the medical treatment facility.
(2) DA Form 285, "United States Army Accident Investigation Report" be furnished by the Government, will be utilized by the Contractor to report all occupational injuries and illnesses whether there is lost time or no lost time, in accordance with Army Regulations 385-40.
(3) The Contracting Officer’s Representative of the Contracting Officer or his authorized representative will investigate the accident and complete DA Form 285 within seven (7) calendar days, and forward the original and two (2) copies of the form through the Contracting Office to the Installation Safety Officer.
2.5.4 Training, Physical Requirements, or other Expertise Required.
2.5.4.1 The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of H.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .