22-0070 SOW UPDATE.pdf

PDF 343 KB Posted

Attached to
DUMPSTERS FIVE (5) 20 YARD ROLL OFF, CGC VISE Federal contract opportunity
Solicitation number
70Z02822QMIAM007A
Issued by
Department of Homeland Security US Coast Guard

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work for

Removal of Fixed ATON Debris at Sector St Petersburg (20 yard Dumpsters)

PN 20524078

1.0 General

1.1 Scope: The scope of work for this project is for (5) 20 yard roll off dumpsters to be delivered and set for a 30 day period at 1301 Beach Drive SE, St. Petersburg FL for loading of marine grade pressure treated timbers, fiberglass pipe pieces, closed cell foam pieces, mixed metals, and other general construction debris. The marine grade pressure treated materials measure approximately 10-12 ft. in length and all loading will be performed by US Coast Guard Personnel. Loaded dumpsters will need delivered an approved dumpsite that accepts that specific material type and size.

Tamp Bay Cut B Range Rear structure: Multi pile wood standard construction 12 X

20 platform piles, deck and 50ft. tower.

Tampa Bay B Outbound Range Front Light: piles and platform

Florida Gulf Intracoastal Waterway ATON rebuilds: composite and wood piles, platforms and debris (30 ATONs est.)

from Sector St. Petersburg ATON yard.

1.2 Location of Site:

USCG Sector St. Petersburg

1301 Beach Drive SE

St. Petersburg, FL 33701

Figure 2. Debris for removal.

1.3 POC:

BOSN Tony Sciullo Anthony.R.Sciullo@uscg.mil (410) 251-7441

1.4 Period of Performance: The performance period of this contract shall be 60 days from contract award.

File details come from the government source that posted it. Updated .