21R4131 Attachment F - Technical Offer Worksheetr1.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Special Time Charter: EODTEU1 FTX MCM DEC Federal contract opportunity
- Solicitation number
- N32205-21-R-4131
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPECIALTIME Fuel Consumption Temp.xlsx | XLSX spreadsheet | |
| 21R4131 RFP Final.pdf | ||
| SPECIALTIME PROFORMA 2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCM FTX - Tech Offer Work Sht.
| Attachment F - EODTEU1 MCM FTX December Spot Charter - TECHNICAL OFFER WORKSHEET | "ACK" - Offer to acknowledge requirement detail and indicate compliance | ||||
| N32205-21-R-4131 | "DET" - Offeror to provide full detail to describe how the requirement will be met. This shall be done in conjunction with general arrangements, deck plans, certifications as described in Part X. FAR 52.212.1 ADDITIONAL INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (3) TECHNICAL PROPOSAL. | ||||
| RFP SECTION/REQUIREMENT DESCRIPTION | ACK/DET | OFFER Section and PG # | |||
| PASSENGER VESSEL | |||||
| 1 | FLAG | U.S. Flag,Provide valid COD | |||
| DET | |||||
| 2 | CLASSIFICATION | One (1) USCG Inspected passenger vessel with no restrictions, to sustain 5 days underway navigation and conducting of operations with carriage of 10 passengers each vessel. |
| Provide a copy of valid COI | DET | |||
| 3 | DECK EQUIPMENT | 1) Shipboard crane, capable of launching and recovering a F580 zodiac boat, 1250 lbs., off/on to the deck. |
2) Near water deck (NTE 5 feet AWL) for small craft to load/unload gear and personnel.
3) Capability of refueling small craft, generators, and compressors with approx. 60 gallons of gasoline.
| DET | ||||
| 4 | STABILITY | The vessel shall have sufficient length and breadth to provide stability for the launch and recovery of the F580 in sea state 3 | DET | |
| 5 | VESSEL ENDURANCE | 5 days (7 – 11 Dec 2020) | ACK | |
| 6 | CREW REQUIREMENTS | All crew must be U.S. Citizens and properly documented for marine employment. |
Provide Crew Rating and Count
| DET | |||
| 7 | MESSING & BERTHING | Berthing for ten (10) passengers at sea for five (5) days on each vessel. |
Vessel to supply three (3) hot meals per person per day.
Provide crew berthing and passenger berthing count
| DET | |||
| 8 | VESSEL DECK SPACE | Minimum available desk space 690 square feet; if deck space is not continuous include adjoining or upper deck space and document deck square footage with dimension on a general arrangement drawing. |
The deck must be able to support the following Sponsor Mission Equipment to be loaded
1) One MILVAN (20’ L x 9’ H x 8.5’ W; weighing up to 15,000lbs) for storing and charging the lithium batteries of the MK 18 FOS Unmanned Underwater Vehicle (UUVS). These UUVS require 12’ clearance on one end to facilitate removal of the UUV.
2) One Expandable Small Air Mobile Shelter (ESAMS) (22’ L x 9’ H x 8’ W, weighing up to 10,000 lbs).
3) One Combat Rubber Raiding Craft CRRCS (12’ L x 6’ H x 2.5’ W; 265 lbs each).
4) One air compressor for chamber support and scuba charging (6’ L x 4’W, approximately 2,300 lbs.)
| DET | |||
| 9 | EXPLOSIVE STORAGE | 1) Confirm vessel ability and compliance to transport/carry a net explosive weight up to 20 lbs. of 1.1d and 1.4b |
2) Deck space and RSL available to store explosives
| 3) Coordinate with appropriate authorities to certify on load of said explosives. | DET | |||
| TUG | ||||
| 1 | FLAG | U.S. Flag,Provide valid COD | ||
| DET | ||||
| 2 | CLASSIFICATION | Tug |
Provide COI if applicable as per 46 CFR Subchapter M. 46 CFR 136.202
| DET | ||||
| 3 | DECK EQUIPMENT | Tug capable of transporting and mooring a barge at sea in up to 80 feet sea water (FSW) | ||
| DET | ||||
| 4 | STABILITY | The Tug shall have sufficient length and breadth to provide stability for operations during sea state 3 | DET | |
| 5 | VESSEL EBDURANCE | 5 days (7 – 11 Dec 2020) | ACK | |
| 6 | CREW REQUIREMENTS | All crew must be U.S. Citizens and properly documented for marine employment. |
Provide Crew Rating and Count
| DET | ||||
| RAMP BARGE | ||||
| 1 | FLAG | U.S. Flag,Provide valid COD | ||
| DET | ||||
| 2 | CLASSIFICATION | Barge | ACK | |
| 3 | DECK EQUIPMENT | Barge with ramp | ||
| DET | ||||
| 4 | STABILITY | The vessel shall have sufficient length and breadth to provide stability for the launch and recovery of the F580 in sea state 3 | DET | |
| 5 | VESSEL EBDURANCE | 5 days (7 – 11 Dec 2020) | ACK | |
| 6 | CREW REQUIREMENTS | All crew must be U.S. Citizens and properly documented for marine employment. |
Provide Crew Rating and Count
| DET | |||
| 7 | VESSEL DECK SPACE | 1) Provide 4,700 square feet deck space; include dimensions and drawings |
2) Minimum 850 long ton capacity.
| DET | |||
| PORT & PIER | |||
| 1 | PIER FACILITY | Pier facilitating on and off load of all sponsor-furnished mission equipment. |
The facility shall be within 25 miles of San Diego, California
Provide pier facility location.
Confirm if the facility is private or commercial and describe access control measures for personnel and deliveries of sponsor mission equipment.
| DET | ||||
| 2 | PIER CRANE | Pier crane that possesses a minimum of a 30 ton lift capacity. | DET |
File details come from the government source that posted it. Updated .