21-1457 SOW-3HB241.pdf

PDF 113 KB Posted

Attached to
HULL INSULATION RENEWAL Federal contract opportunity
Solicitation number
70Z02820Q3HB241
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to HULL INSULATION RENEWAL, newest first.
File Type Posted
21-1457 Hull Insulation 45761-P2.pdf PDF
21-1457 Hull Insulation 45761-P6.pdf PDF
21-1457 Hull Insulation 45761-P7.pdf PDF
21-1457 Hull Insulation 45761-P3.pdf PDF
21-1457 Hull Insulation 45761-P1.pdf PDF
21-1457 Hull Insulation 45761-P5.pdf PDF
21-1457 SOLICITIATION QA-3HB241.pdf PDF
21-1457 Hull Insulation 45761-P4.pdf PDF
21-1457 SOW-3HB241 A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/SPECIFICATION/WORK STATEMENT

FOR INSULATION RENEWAL ON 45 FOOT RB-M

PART I

SECTION A

Work Statement

In the performance of this contract, the contractor shall provide the services to perform insulation renewal on RB-M while the vessel is dry-docked at USCG Base Miami Beach

Industrial Production Facility located at 100 MacArthur Causeway Miami Beach, FL

33139.

The contact person for this contract is Mr. Tirrell Marsh, 305-535-4337 and LT Louis

Simione, 305-535-4332.

Scope of Services

The contractor shall furnish trained, qualified personnel and any required special tools or equipment necessary to complete the following work:

1. Install insulation in the entirety of the Machinery Space (Engine Room) Including

Demisters, frames 2-6 (entire engine room)

2. Installation material will be as follows:

a. Sound attenuation barrier: Pyrotek “QUADZERO” #17763007

b. Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation

4. Installation process is as follows:

Bulkhead > QUADZERO > Insulation Speed Washer > 2” Insul-Quick Hullboard >

Insulation Speed Washer > Trim Pin (if necessary) > Insulation Cap

5. Tape all boundaries.

6. All consumables, Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation and stud gun will be provided by the contractor.

7. USCG will provide Pyrotek insulation, pins and caps. Contractor will replace any damaged pins found upon insulation removal.

Contractor Performance Requirements

(1) Installation period of performance will be scheduled as determined by IPF Miami production schedule.

(2) Exact periods of performance will be scheduled by the COTR at least one week prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:

6:30 am to 3:00 pm

(3) If overtime is required, the contractor must notify the COTR 24 hours in advance and must be approved by Base Miami Beach officials.

File details come from the government source that posted it. Updated .