21-069_PWS_Redacted 1.pdf

PDF 542 KB Posted

Attached to
Scrubbers and Burners Federal contract opportunity
Solicitation number
N32253-21-R-0011
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a draft Performance Work Statement (PWS) and related Federal Contract Opportunity notice for scrubbers and burner maintenance on naval submarines. The PWS requires inspection, maintenance, and repair services for #1 and #2 CO2 scrubbers and #1 and #2 CO/H2 burners onboard 688-class submarines. Services include removal and installation of refurbished and new components, as well as operational testing. Interested parties are invited to respond to the related Sources Sought synopsis by submitting capability statements and supporting documentation by June 25, 2021 to determine contractor eligibility and procurement method for these services. The Naval Sea Systems Command is the contracting agency.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX

HRMC-511-21

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2019 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original

009-03 Toxic and Hazardous Substance; control 10/01/2019 Original

009-04 Quality Management System; provide 10/01/2019 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

03/06/2020 CH-2

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

07/24/2019 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original

009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original

009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original

009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original

009-20 Government Property; control 10/01/2017 Original

009-21 Logistics and Technical Data; provide 10/01/2018 Original

009-23 Interference; remove and install 10/01/2018 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

10/01/2019 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

10/01/2018 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2019 Original

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

01/14/2020 CH-1

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original

009-67 Integrated Total Ship Testing; manage 04/30/2018 Original

009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

10/01/2019 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2018 Original

009-74 Occupational, Safety and Health Plan; accomplish 01/14/2020 CH-1

009-80 Ship Facilities; maintain 11/18/2016 Original

009-81 Compartment Closeout; accomplish 10/01/2019 Original

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original

009-84 Threaded Fastener Requirements; accomplish 03/06/2020 CH-2

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

03/06/2018 Original

009-99 Ship Departure Report; provide 07/18/2014 Original

009-100 Ship's Stability; maintain 03/06/2018 Original

INDEX

HRMC-511-21

ITEM NO. TITLE

Hazardous Waste Produced on Naval Vessels; control077-11-001

No. One and No. 2 CO2 Scrubber Maintenance; accomplish515-11-001

No. One and No. 2 CO & H2 Burner Maintenance; accomplish515-11-002

SHIP: ITEM NO: 077-11-001

COAR: 26 PCN: EAMC-Q068

EAMC-Q067

CMP: NONE

PLANNER:

SSP: HRMC-511-21 1 of 5 ITEM NO: 077-11-001

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as

SHIP:

SSP: HRMC-511-21 2 of 5 ITEM NO: 077-11-001 hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

SHIP: )

SSP: HRMC-511-21 3 of 5 ITEM NO: 077-11-001

Cleaning Solvents _____ ____________ __________

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________ __________

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Rust Preventative)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic) _____ ____________ __________

Paints (Enamel, Latex, _____ ____________ __________

Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ __________ cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ __________ lead, chromium)

Sludges (Contaminated with _____ ____________ __ a known hazardous waste)

Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)

Lube/Fuel Oil Soaked Rags _____ ____________ __________

Paint/Flakes (Pressure Washing _____ ____________ __________

Ext Hull Surfaces)

Fuel Oil(Residual) _____ ____________ __________

SSP: HRMC-511-21 4 of 5 ITEM NO: 077-11-001

Bilge Water _____ ____________ __________

Oil/Water _____ ____________ __________

AFFF/Water _____ ____________ __________

MEK Contaminated Rags _____ ____________ __________

3.5.1 Provide zero dollars for managing and disposing of all

hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.

3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed

SSP: HRMC-511-21 5 of 5 ITEM NO: 077-11-001 the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: ITEM NO: 515-11-001

COAR: 26 PCN: EAMC-Q065

CMP: NONE

PLANNER:

SSP: HRMC-511-21 1 of 2 ITEM NO: 515-11-001

1. SCOPE:

1.1 Title: No. One and No. 2 CO2 Scrubber Maintenance; accomplish

1.2 Location of Work:

1.2.1 Auxiliary Machine Room (AMR)

1.3 Identification:

1.3.1 Quantity: (2 EA) Carbon Dioxide Removal Plant, Mark III-B units;

2. REFERENCES:

2.1 Standard Items, FY-22

2.2 S9515-AK-MMO-020 Rev 2, Carbon Dioxide Removal Plant Mark III-B Units Aboard 688 and 21 Class Submarines

2.3 Recommended Scrubber / Burner Repairs

2.4 SUBMEPP TEST, 532-5528 CO2 Removal System Simulated Operation

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1.

3.1.1 Provide the services of a qualified on-site representative to inspect, maintain and repair the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.2, using 2.3 and Original Equipment Manufacturer's (OEM) proprietary drawings and specifications for guidance.

3.2 Accomplish the removal of existing, and installation of refurbished components associated with the equipment listed in 1.3, in accordance with the requirements of 2.2, using 2.3 for guidance.

- Boiler Assemblies; Both Units

- Heater Boxes; Both Units

- 3hp Motors and new mechanical seals in MEA Pumps; Both Units

- 5hp Motors; Both Units

- Belt Guards; Both Units

- Control Panels; Both Units

3.3 Accomplish the removal of existing, and installation of new components associated with the equipment listed in 1.3, in accordance with the requirements of 2.2, using 2.3 for guidance. The following components shall be replaced with new:

- MEA Heat Exchanger; Both Units

- Level Control System; Both Units

- Absorber Packing; Both Units

- CO2 Flow Meter; Both Units

- Flex Hoses; Both Units

SHIP: ITEM NO: 515-11-002

COAR: 26 PCN: EAMC-Q066

CMP: NONE

PLANNER:

SSP: HRMC-511-21 1 of 2 ITEM NO: 515-11-002

1. SCOPE:

1.1 Title: No. One and No. 2 CO & H2 Burner Maintenance; accomplish

1.2 Location of Work:

1.2.1 Auxiliary Machine Room (AMR)

1.3 Identification:

1.3.1 Quantity: (2 EA) CO & H2 Burner, Mark V, Size 650 CFM;

2. REFERENCES:

2.1 Standard Items, FY-22

2.2 S9515-AS-MMM-010 Rev 6, CO & H2 Burner Mark IV-E Size 500 CFM

2.3 Recommended Scrubber / Burner Repairs

2.4 SUBMEPP TEST, 532-5208 CO/H2 Burner (Mark IV-E) Operational Test

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1.

3.1.1 Provide the services of a qualified on-site representative to inspect, maintain and repair the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.2, using 2.3 and Original Equipment Manufacturer's (OEM) proprietary drawings and specifications for guidance.

3.2 Accomplish the removal of existing, and installation of refurbished components associated with the equipment listed in 1.3, in accordance with the requirements of 2.2, using 2.3 for guidance

- Bypass Ducts; Both Units

- Heater Boxes; Both Units

- Fan Motors; Both Units

3.3 Accomplish the removal of existing, and installation of new components associated with the equipment listed in 1.3, in accordance with the requirements of 2.2, using 2.3 for guidance. The following components shall be replaced with new:

- TIC; Both Units

(V)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of the equipment listed in 1.3, located in 1.2 and in accordance with the requirements of 2.4.

3.4.1 Allowable system fluid leaks: None. All system fluid leaks resulting from the requirements of 3.1 through 3.3 shall be corrected by the contractor.

3.4.2 Submit one legible copy, in approved transferrable media, of a report certifying satisfactory work completion of this specification

SSP: HRMC-511-21 2 of 2 ITEM NO: 515-11-002 to the SUPERVISOR within 5 days of completion.

3.5 All reports with no time specific submission requirement, shall be submitted to the SUPERVISOR within 30 days of work completion.

4. NOTES:

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

File details come from the government source that posted it. Updated .