20Q0224_JA_NonComp_Redacted.pdf
PDF 177 KB Posted
- Attached to
- SOLE SOURCE - GEAR BOX/ ROPE DRUM (QTY 3) Federal contract opportunity
- Solicitation number
- N0016420Q0224
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SWIP Tracking No. SGXW204213
DON SAP Guide Enclosure (3) 1
MEMORANDUM TO THE FILE
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION
UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
IDENTIFICATION OF SOURCE:
Electro Lift Inc.
204 Sargeant Avenue P.O. Box 827 Clifton, NJ 07013
CAGE: 92748
I. BACKGROUND:
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
This action requests authority for sole source procurement of ASSY, Gear Box/ Rope Drum from Electro Lift Inc. The ASSY, Gear Box/Rope Drum from Electro Lift is an electrically powered lifting hoist incorporated into the design of the This component is the main item that allows the Davit to perform lifting operations. By winding and unwinding the main lifting cable around its drum the hoist is capable of lifting or lowering an attached load, similar to a crane. Purchase QTY 3 electric load hoist assemblies (less controls) from Electrolift. Each to include:
( The ASSY, Gear Box/ Rope Drum will be used in
Vendor: Electro Lift Inc.
Delivery Date: 14 weeks after award and approval. This sole source procurement is to be completed in
FY20.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION IS BASED ON THE FOLLOWING (select all that apply):
DON SAP Guide Enclosure (3) 2
A. X ONLY ONE RESPONSIBLE SOURCE (select all that apply):
1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
OR
3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.
B. X BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer.
Electro Lift was chosen to be the supplier of the ASSY, Gear Box/ Rope Drum because this particular item is currently on the fielded and has proven successful over their life. There are currently spare parts and supplies for this particular manufacturer and item in supply, if a different manufacturer or item is used approximately of spare parts will need to be discarded and replaced with new items. The modifications have been designed with this particular manufacturer and item number, if a different manufacturer and item number is used an additional and will be required to incorporate changes. This particular brand and item allows known maintenance procedures to be followed and to capitalize on current field knowledge. If another manufacturer or item is used, an additional of tech pub labor to create new maintenance drawings will be required. An approximate of training/ loss productivity will also be incurred.
C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.
Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
DON SAP Guide Enclosure (3) 3
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required:
4. If appropriate, include any additional pertinent information.
IV. CERTIFICATIONS/APPROVALS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
6/15/2020 Signature Name (Printed) / Phone # Date
B. Certification/Approval.
Upon the basis of the above statements and information justification, I hereby approve, as the Contracting Officer, the solicitation of the proposed procurement(s) using other than full and open competition.
Contracting Officer Signature Name (Printed) / Phone # Date
00'
WESSEL.D
ANIELE.M.
13702215
Digitally signed by
WESSEL.DANIELE
.M.1370221568 Date: 2020.06.17 14:21:39 -04'00'
File details come from the government source that posted it. Updated .