20Q0117_NonComp_Redacted.pdf
PDF 297 KB Posted
- Attached to
- SOLE SOURCE - REPAIR Federal contract opportunity
- Solicitation number
- N0016420Q0117
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DON SAP Guide Enclosure (3) 2 the agency's requirement. A functional qualification test with an alternate vendor's parts would be required to verify that the parts meet functional requirements. EMI, temperature, and vibration qualification tests would have to be conducted for any alternate vendors.
The Government invested funds in order to sustain, re-procure, maintain, repair and upgrade the system . These buys include sole source procurements to OEM for critical components. These efforts will also reduce repair turnaround time. .
2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
OR
Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).
3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.
B. ___ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer.
C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.
Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
File details come from the government source that posted it. Updated .