20210409 S53 ESSM Cell Covers min mod SOW updated.pdf

PDF 77 KB Posted

Attached to
FY21-21237_and_FY21-20057 Launcher Modified Cell Covers Federal contract opportunity
Solicitation number
N6339421Q0053
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This statement of work outlines requirements for the procurement of modified missile launcher cell covers. The contractor shall fabricate four prototype aft cell covers according to drawing 10706-A-001 for delivery by October 1, 2021. Additionally, the contractor must deliver 40 units of part number 6022687 by January 2022. Work is to be performed within the United States. Deliverables are to be sent to Naval Surface Warfare Center Port Hueneme Division in California for the prototypes and Naval Station Norfolk in Virginia for the production quantities. The related solicitation seeks these modified launcher cell covers to support maintenance of the MK 29 Guided Missile Launching System under number N6339421Q0053 from the Department of the Navy Naval Sea Systems Command. Point of contact information is provided for technical, contractual, and requirement-related inquiries.

View the file

Other files for this federal contract opportunity

Other files attached to FY21-21237_and_FY21-20057 Launcher Modified Cell Covers, newest first.
File Type Posted
FY21_21237_and_FY21_20057_Launcher_Modified_Cell_Covers Sol.pdf PDF
FY21-21237 _FY21_20057_ESSM Cell Covers Sole Source Justification_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work For

MK 29 Guided Missile Launching System Launcher Cell Covers

1 Scope: This task is to manufacture launcher cell covers and associated hardware required to support maintenance of the MK 29 GMLS. Shipment and delivery as stated below.

2 Applicable Documents:

2.1 Department of Defense Drawings (1):

Drawing 10706-A-001 AFT CELL COVER, BLK 2 for the prototype

2.2 Government Standards

MIL-STD-31000A, TECHNICAL DATA PACKAGES

2.3 Non-Government Standards and Other Publications.

ASME Y14.100-2017, ENGINEERING DRAWING PRACTICES

ASME Y14.5-2009, DIMENSIONING AND TOLERANCING

3 Requirements.

3.1 General. The contractor shall provide all resources necessary to accomplish the tasks and deliverables described in this Statement of Work (SOW). Build-to-print drawings are included in the procurement package in order to obtain competitive bids.

3.2 The contractor shall fabricate the following items in accordance with the drawings listed above;

1. AFT CELL COVER, BLK 2 Quantity of 4 EA

3.3 Shipping. The contractor shall fabricate any necessary transportation fixture and/or crates when shipping the final assembly/components to the point of delivery. If shipping charges apply (FOB Destination), please add the estimated shipping cost for ground freight shipments to your quote.

3.4 Place of Performance. Work to be done within the United States.

3.5 Meetings.

3.5.1 Post-award Kickoff Meeting. Within 10 business days of contract award, the Government will conduct a post-award kickoff teleconference.

3.5.2 Intermittent Project Status Reviews. At the sole discretion of the Government, intermittent project status reviews maybe conducted on an informal basis by telephone, teleconference, or on-site meeting.

3.6 Delivery, Deliverables and Furnished Items. Schedules for deliverables specified below. All deliverables shall be prepared and submitted according to format, content, and schedule described in the SOW.

3.7 Sample Items. We are requesting 4 prototypes of the Cell Cover P/N: 10706-A-001 to be delivered for inspection (First Article Test Inspection). Since manufacturing lead time for the prototypes is 100 days, we expect the delivery to be on or about 1 October 2021. The procurement of the production for the MinMod Cell Covers will be at least a year later.

Quantity of 40 of P/N 6022687 to be delivered in January 2022 due to 210 manufacturing lead time for the quantity of 40 of P/N 6022687.

3.8. Government Furnished Equipment: There is no Government Furnished Equipment

3.9 Point of Delivery. Material delivered to:

For Prototype Cell Covers:

Commander Naval Surface Warfare Center, Port Hueneme Division 4363 Missile Way, Bldg 1389, FL 2 Cube # B189, POC: Firozul Chowdhury (Phil), 805-228-8371 Port Hueneme, CA 93043-4307 *Please reference contract number upon shipping*

For quantity of 40 of P/N 6022687:

NMCLANT

BUILDING 476 – DOOR 39, ATTN: Mike Kurten PH: 757-887-4199/Cell: (757) 869-1151 or John Scribe/PH:

(757) 887-4467 Yorktown, VA 23691-5000

3.10 Government Points of Contact (POCs).

3.10.1 Technical POC. Julian Niderost, NSWC Division, Port Hueneme, Code S54, julian.niderost@navy.mil

3.10.2 Requirement Generator & Alternate Technical POC. Robert DeFeo, Code S54, robert.defeo@navy.mil

3.10.3 Contracting POC. Phil Chowdhury, NSWC PHD, Port Hueneme Code 0243, firozul.chowdhury@navy.mil mailto:julian.niderost@navy.mil mailto:robert.defeo@navy.mil

File details come from the government source that posted it. Updated .