2020_PhaseIV_Goldiedivide_SOW_FY20_finalSOW.docx

DOCX document 1 MB Posted

Attached to
GOLDIE DIVIDE PHASE IV Federal contract opportunity
Solicitation number
140L6220Q0066
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

View the file

Other files for this federal contract opportunity

Other files attached to GOLDIE DIVIDE PHASE IV, newest first.
File Type Posted
Sol_140L6220Q0066_Amd_0001.pdf PDF
GoldieDividephaseIV_overview.pdf PDF
GoldieDividephaseIV_unitoverview.pdf PDF
Sol_140L6220Q0066.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C.1 General and Site-Specific Specifications

Project Name
Goldie Divide Phase IV TSI, Wildlife habitat improvement and Fuels reduction FY20
Scope of Contract
This contract is for manual thinning, piling and Lop and scatter for timber stand improvement, fuels reduction, and wildlife habitat improvement on approximately 633 acres of Ponderosa pine and Juniper in the NE Wyoming Black hills. Project area near Goldie Divide in Eastern Crook County is approximately 12 miles NW of Hulett, WY. This project area is comprised of 315 acres of lop and scatter and 318 acres of cut, pile for both TSI, Wildlife habitat and fuels reduction goals.

This is a request for quote from the contractors eligible to receive awards for Forestry contractors and/or National Hazardous Fuels Reduction IDIQ for cut, pile, as well as lop and scatter. Prices for the following bid items should be based on the Description provided below. Please use this Statement of Work to assist with quotes.

There is good public access to project area/s and no pre-bid meeting is scheduled, but a site visits maybe requested if there is enough interest from potential bidders. Bidders are highly encouraged to visit the project area prior to bid submission and base all quotes on site specific conditions and this prescription.

Location
Project Area in Western Crook county 12 NW of Hulett, WY accessible from Goldie Divide County rd. occurring on Bureau of Land Management Public domain lands located in parts of Township 56N Range 66W Sec. 22, 23, 27. Approximately 12 miles NW of Hulett, WY.

Access to the area is limited to existing established roads, or as directed by the Contracting Officer's Representative (COR). Access must be when dry or frozen; The Contractor at his expense will repair ruts and road damage caused by the Contractor. The Government assumes no obligation to plow snow or perform special maintenance to keep roads open. All garbage must be removed from the work sites. Overnight work camp is allowed on BLM managed lands, contractor must approve location with COR and abide by all fire restrictions and/or camping restrictions and follow leave no trace guidelines once camp is vacated

Public access is available to all units and contractor must be aware of property lines by a Avenza or onyx like app to make sure crew footprint remains on public lands.

Also, this area does receive significant snowpack and reduced access from January to April/May maybe limited to tracked UTVs/ or ATV off county-maintained roads. BLM assumes no responsibility for trespass or access issues under this Statement of work.

Performance Period
August 1, 2020 to July 31, 2021.
Description
The project will manually thin, pile Ponderosa Pine and juniper thru below mentioned prescription on 318 acres. Also, the project will cut all juniper by Lop and scatter on approximately 315 acres. The project’s goal is to reduce the risk of stand replacement wildfire and reduce competition of regeneration to improve health of cohort and overall stand resilience/health and improve wildlife habitat goals.

Contractor is expected to utilize Avenza or Georeferenced mapping programs to utilize georeferenced PDF maps and/or shape files of which government will provide for the bidding and completing of project at request.

Currently project is set-up for virtual boundary for all non-property line boundaries. For non-property line boundaries, it is expected of contractor to be utilizing Avenza, or other reliable GPS georeferenced maps programs to bid, and complete project to specifications and PDF maps given by government. However, if physical delineation is required by contractor, with a couple weeks’ notice government will then delineate boundary with Blue-White stripe and Pink Flagging based on contract maps. If contractor needs any lines reworked or re-delineated please notify NFO staff as far ahead as possible so fieldwork can be scheduled.

Detailed Unit Information
Unit#
Treatment
Acres
Unit 8
Goldie Divide Lop n Scatter
262
Unit 9
Goldie Divide Cut, Pile
61
Unit 10
Goldie Divide Cut, Pile
19
Unit 11
Goldie Divide Cut, Pile
24
Unit 12
Goldie Divide Lop n Scatter
53
Unit 13
Goldie Divide Cut, Pile
214
Total
633
Prescription
Lop and Scatter for Units 8 and 12

Lop and scatter all Juniper, all sizes. All slash in this unit must be completely severed from stump and must be cut down below 24” in height when fell upon ground.

Cut, Pile For all cut pile units, any Boles over 6” diameter will not be piled, instead contractor will delimb and severe portion of bole <6” diameter. All limbs and boles <6” dia. Will be piled. Delimbed Boles >6” diameter will be scattered away from piles randomly.

Only Ponderosa Pine and Juniper are to be cut under this project, no hardwoods or shrubs will be cut.

For Units 9 thru 11, and 13; Cut/Pile Cut all Juniper up to 16” DBH.

Cut, pile all Ponderosa Pine <8” DBH that are within 15’ of the bole (trunk) of a >8” DBH Ponderosa Pine. Where no >8” DBH exists, thin <8” DBH Pine trees to 15’ x 15’ spacing.

**Please be aware that there are small peripheral areas of cut, pile, units where there is not enough material to create piles. Where there are small residual amounts of slash from single trees on open peripheral areas of cut, pile units. Contractor may lop and scatter if there is not enough material in a 60’ radius of stump to construct a pile to specifications. In these peripheral areas slash must be under 24” height.

When selecting leave trees for 15’ x 15’ spacing, select the largest, healthiest, best crowns, the trees will have the following characteristics:

· No apparent damage to the main bole.

· Not chlorotic (crown fading).

· Demonstrates good vigor and is disease/bug free, and of good form.

· Has at least 40% percent Live crown ratio.

All standing dead that is <8” shall also be cut and piled to specs mentioned herein for cut/piled units.

All standing dead all sizes shall be cut in lop and scatter units.

Stump heights shall be cut flat (no punji sticks) and no more than 4” height on uphill side.

Slash and Piling spec’s

· Pile all cut material.

· Piled material must be cut to 6-foot lengths or less and De-limbed as needed to build compact piles. No voids should be present in piles.

· Piles should be constructed outside dripline (crown extent/edge) of leave trees.

· Pile size minimum 8’x8’-8’ to maximum 20’x20’-12’.

· Piles will be located 20’ from the property lines.

· The piles must be a minimum of 8 feet high by 8 feet wide by 8 feet long and constructed in a “haystack” or “tepee” style:

1. Start with the larger diameters (4-6 inches). The first 2 or 3 pieces will lay flat and all others should be piled like a haystack or tepee.

2. Stems up and needles towards the ground.

3. Place smaller material on the pile last (less than 4 inches).

4. Piles should be compact with few holes.

5. No ends should stick out abruptly from the pile.

6. Piles will be dirt free.

· Some areas may require exceptions to distance, or minimum and maximum slash pile sizes. The project inspector or COR must pre-approve and give written permission.

Definitions
Calendar Days - Every day shown on the calendar, Sundays and holidays included.

Contract Time - The number of calendar days allowed in the contract for completion of the contract work.

Leave Trees - Any tree that is selected or required to be left standing as provided in the specifications.

Over story Tree- Leave/reserve tree Ponderosa pine.

DBH- Diameter at breast height.

Dripline- Extent of over story trees canopy circumference, where rain would drop out of canopy “dripline”.

Slash - Any cut vegetation.

Spacing – The horizontal distance from the trunk of one leave tree to the trunk of the next nearest leave tree.

C.2 Inspection and Acceptance Bureau of Land Management, High Plains District, Wyoming Field Office: Newcastle Date: June 4, 2020

Thinning Inspection Procedure
The Contracting Officer or designated representative will make periodic inspections. The Contractor or representative is encouraged to observe the inspection and will receive inspection summaries upon request.
Measurement and Payment
The acreage was measured on a horizontal plane within the established boundaries.

Basis of Payment - After inspection of completed acreage, the Contracting Officer or designated representative will calculate the pay rate.

The pay rate will be calculated by multiplying the inspection percentage times the contract unit price per acre. When the percent of satisfactory thinning is 90 percent or greater, payment will be made at the contract unit price.