Solicitation_17234_Amendment_00001.pdf
PDF 155 KB Posted
- Attached to
- Environmental Chamber Federal contract opportunity
- Solicitation number
- 2015-N-17234
About this file
Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| In_and_Out_Processing_Policy.pdf | ||
| 2015-N-17234.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO.
00001
3. EFFECTIVE DATE
08/03/2015
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 3635 7. ADMINISTERED BY (If other than Item 6) CODE 3635
Ctrs for Disease Control & Prevention PGH
Office of Acquisition Services, Branch 4
PO Box 18070, 626 Cochrans Mill Rd
Pittsburgh, PA 15236-0070
Ctrs for Disease Control & Prevention PGH
Office of Acquisition Services, Branch 4
PO Box 18070, 626 Cochrans Mill Rd
Pittsburgh, PA 15236-0070
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
X
9A. AMENDMENT OF SOLICITATION NO.
2015-N-17234
9B. DATED (See Item 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (See Item 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGMENT
TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This solicitation amendment is issued to accomplish the following:
1. Provide all parties with Questions and Answers relevant to this acquisition.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY ___________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE 30-105 Prescribed by GSA
FAR (48 CFR) 53.243
ITEM 10A.
Environmental Chamber
Solicitation 2015-N-17234
Questions and Answers
1. Who is responsible for off-loading of the equipment from the truck(s)?
The chamber supplier is responsible for unloading all of the equipment from the truck. As stated in the Statement of Work in section (2)(b)(iii)(1), “The chamber project is to be “Turn Key” in which the vendor will supply the chamber, plus all labor required for the complete installation and startup, including one (1) day operator training.”
2. Who is responsible for rigging equipment into position?
The chamber supplier is rigging the equipment into position. As stated in the solicitation in section (2)(b)(iii)(1), “The chamber project is to be “Turn Key” in which the vendor will supply the chamber, plus all labor required for the complete installation and startup, including one (1) day operator training.”
3. What are the foundation requirements for the chamber and support equipment, including the level floor for the chamber and pads for outdoor equipment?
As stated in section (2)(a)(ii)(1) of the Statement of Work, the vendor shall provide, “The proper stable placement of the environmental chamber (building has a concrete floor).” With regard to any outdoor pads, section
(2)(b)(i)(6) states, that the remote condensing unit “shall be remote and mounted outside building on pre-fabricated pad.”
4. Will the necessary utilities required to run the chamber be provided by NIOSH if the utilities listed are not adequate to meet the specification? See my note (2.a.ii.3), does “provide any changes” mean [the chamber suppliers] are responsible for notifying you of the required utilities, or for actually making the site changes to the utilities listed if they are not adequate?
The Statement of Work states in section (2)(b)(iii)(1)(a), “The vendor shall be responsible for reviewing and verifying the physical requirements to install the chamber and to connect to the existing utilities available in the building (B-40) to make the chamber fully operational.” Section (2)(b)(iv) of the Statement of Work lists all of the utilities that will be provided by NPPTL/NIOSH. These utilities will be available within 10 ten feet of the chamber equipment. Therefore, if the utilities listed in section (2)(b)(iv) are not adequate to run the chamber, the chamber supplier will be required to “provide any changes required to operate your proposed equipment” as stated in section (2)(a)(ii)(3). “Any changes” is in reference to the utilities. The chamber supplier is required to ensure that the chamber is fully operational and meets the performance requirements. (NIOSH can provide the following utilities within 10 feet of the chamber city water hot and cold, compressed air, and sanitary sewer elevated above floor level, power 120V/1/60, 208V/1/60, 208V/3/60, 480V/3/60 ampacity as required by vendor’s product)
5. Where should the condensate pump be placed?
Section (2)(b)(iii)(c) states that the vendor will need to provide and install a small condensate pump to collect evaporator condensation and humidifier overflow and drainage to pump overhead to discharge to a sanitary sewer. The vendor will select where the pump unit will be placed to work with their equipment.
6. Are contractors able to access the rear of the building?
Yes. There is a pathway in the rear of the building that will be leveled for contractors to access the rear of the building. Some gravel will be put down and two (2) trees will be removed for better access.
7. Is the chamber supplier responsible for the connecting the compressor to the chamber when the compressor is outside?
Yes. The contractor is responsible for drilling through the metal wall in order to make the connection.
8. Where should the humidity exhaust be directed?
The humidity exhaust can be vented to the outside of the building.
9. Is the contractor required to supply any additional HVAC for the building?
No. There are window AC units currently in the building where the environmental chamber will be placed.
10. There is a trench in the floor where the environmental chamber will be placed. Will this be filled? Is it the contractor’s responsibility?
The trench will remain in the floor and NIOSH will install new metal grates. These grates will be leveled and welded down to the floor. As stated in the Statement of Work, it is the contractor’s responsibility to ensure “the proper stable placement of the environmental chamber.”
11. Can the trench in the floor be filled with concrete?
No. The trench will remain in the floor and new metal grates, as indicated above, will be provided by NIOSH and will be leveled and welded down to the floor.
12. There is an overhead crane in the building where the environmental chamber will be placed. Will the crane remain in operation?
No. The crane will remain in the building for the time being, however, it will be “parked” on the tracks so the crane will not reach the area where the environmental chamber will be located.
13. Does the pre-chamber have to be climate controlled?
Yes.
14. How can we get the equipment inside the building?
There is a garage door that can be used. The garage door is 12ft wide and 10ft high. The garage door is ground level.
File details come from the government source that posted it. Updated .