201001921740 _RudderStockRpr_65WYTL.doc

DOC document 73 KB Posted

Attached to
Shaft, Rudder Federal contract opportunity
Solicitation number
70Z08522Q49036B00
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to Shaft, Rudder, newest first.
File Type Posted
65-WYT_2200_1_1_-_A.pdf PDF
FAR Clauses 70Z08522P49036B00.pdf PDF
Overhaul Description.docx DOCX document
RFQ - 70Z08522Q49036B00.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JPH_0222

WORK ITEM 1: 65 WYTL Rudder Stock Repair

1. SCOPE

1.1 Intent. This supply item describes the requirements for the Contractor to receive a rudder stock removed from an operating USCG 65’ ice breaking harbor tug (WYTL).and inspect and repair them for future service.

1.2 Government-Furnished Property.

MTI
ITEM DESCRIPTION
NSN

P/N

CAGE

QTY (ea.)
ESTIMATED COST

($/UNIT)

Y
65 WYTL, Rudder Stock
2040-01-092-1740
1
TDB

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 65 WYT 2200-001, Rev A, Rudder

Coast Guard Publications Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes

Other References

American Welding Society (AWS) Specification D1.1 Structural Code, Steel, 2000 edition.

ASQ/ISO/IEC 17025:2005, General requirements for the Competence of Testing and Calibration Laboratories

ASTM E1003, Dated 15 Jan 2013, Standard Practice for Hydrostatic Leak Testing

ASTM B369, Dated 01 Apr 2009 (R 2016), Standard Specification for Copper-Nickel Alloy Castings

ASTM D6880/D6880M, Dated 2011, Standard Specification for Wood Boxes

ASTM D7478/D7478M, Dated 2011, Standard Specification for Heavy Duty Sheathed Wood Crates

MIL-PRF-16173E, Corrosion Preventive Compound Solvent Cutback, Cold Application, Dated 6/January/1993.

MIL-PRF-121G, Type 1, grade A, class II, Barrier materials, greaseproof, waterproof, flexible, heat-sealable

MIL-STD-129R, Feb 2014 Military Marking for Shipment and Storage

ISO/IEC 16388-2007 Information technology — Automatic identification and data capture techniques — Code 39 bar code symbology specification.

ISO 9001, Dated 15 Sep 2015, Quality Management Systems – Requirements

The Society for Protective Coatings, SSPC-SP 10, Near White Blast Cleaning, Sept. 2000 edition.

The Society for Protective Coatings, NACE NO. 5/SSPC-SP12, Joint Surface Preparation Standard.

3. REQUIREMENTS

3.1 General.

3.1.1 Tech rep. Not applicable.

3.1.2 Notifications & Inspections. The contractor shall be responsible for notifying the Contracting Officer in writing no less than seven (7) calendar days prior to the contractor being ready for any Quality Assurance (Q.A.) inspections or testing required herein.

3.1.3 Welding.

3.1.3.1 Weld Quality: All welds shall be thoroughly fused with base metal. Welds shall be free of craters, undercutting, overlaps, porosity, or cracks. All welding shall conform to AWS D1.1.

3.1.3.2 Welder Qualification: Welders shall have a valid qualification record certified by one or more of the following organizations. This qualification shall be for the same particular service application, filler material type, position of welding, and welding process.

· a) The American Welding Society

· b) The American Bureau of Shipping

· c) Department of the Navy

3.1.3.3 Contractor shall make welder certifications available to the Contract Administrator prior to contract award. A copy of the welder certifications shall also be available for the Coast Guard Quality Assurance Representative.

3.2 Rudder Stock Inspection and Repairs.

3.2.1 Ensure each stock/post is uniquely identified either by existing numbers/stamps on stock/post, or Contractor devised system of marking. Each stock/post shall undergo a full inspection as follows:

3.2.2 Visual Inspection.

3.2.2.1 Carefully inspect the stock/post for obvious damage. Document discovered damage in sketches, photos, etc.

3.2.3 Drawing compliance Inspection.

3.2.3.1 Inspect the stock/post for compliance to drawings. Measure all critical dimensions,

3.2.4 Final Rudder Stock Inspection Report.

3.2.4.1 Submit a final written report on each stock/post. Include all noteworthy discoveries, damage, and deficiencies. Include results of all tests. Include recommended repair options. Include recommendations to scrap a stock/post, if repairs are not feasible and are potentially more costly then fabricating a new replacement stock/post.

3.3 Additional Repairs. For line items of GFP table 1.2.

3.3.1 Since it is unknown what exactly will be required it can be assumed the following are representative examples of expected types of required work:

· Weld repairs on rudder blade plating.

· Steel plate renewal on rudder blades.

· Weld build up on stocks.

· Machining surfaces/holes/threads etc. to correct dimension (after weld build up).

· Procuring/fabricating and installing sleeves on rudder stocks.

· Fabricating keys and palm bolts.

4. QUALITY ASSURANCE

4.1 General. The contractor shall maintain an inspection system which shall insure that each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements. The inspection system shall be documented and meet the requirements of ISO 9001 and available for review by the Coast Guard.

4.2 Records. The contractor shall maintain records of all inspections and tests. The records at a minimum shall indicate the nature and number of observations made, the number and type of deficiencies found, and the corrective action taken.

4.3 Calibration system. The contractor as well as any subcontractors shall be required to maintain a test equipment calibration program in compliance with ASQ/ISO/IEC 17025. The program shall be documented and traceable to the National Institute of Standards (NIST).

4.4 Responsibility for inspection. The contractor shall be responsible for the performance of all inspection requirements specified herein. The Contractor shall provide space, personnel and test equipment for the conduct of all inspection requirements. All inspection and testing shall be performed at the contractors facility prior to the Coast Guards acceptance. The Coast Guard reserves the right to verify or have performed any of the inspections set forth herein where such inspections are deemed necessary to assure that supplies and services conform to prescribed requirements. The contractor shall notify the scheduled commencement of any inspections required by this specification.

4.5 Responsibility for compliance. All items shall meet the provisions of sections 3 & 5. The inspections set forth in this specification shall become part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.

4.6 Inspections and tests. The inspections/tests required here and in the appropriate subsection in section 3 are the minimum required and are not intended to supplant any controls, examination, inspections or tests normally employed by the contractor to assure the quality of the item in question. The following tests and inspections will be witnessed by an SFLC Quality Assurance Representative:

4.6.1 Completed rudder repair inspections, resultant from initial as-found inspections and reports. See section 3.3.

4.6.2 Preservation, packaging, packing and marking inspection. See section 5.

4.7 Failure responsibility. If the specified item fails to pass any inspection/test the contractor shall report the failure and the recommended fix to the Contracting Officer. If approved, the corrective action on the materials or processes shall be taken in accordance with this section.

· The Contracting Officer reserves the right to totally reject any failed item without considering any suggested corrective action.

· The inspection/testing shall be discontinued until all corrective action has been taken.

· After all corrective actions have been taken the inspection/tests shall be continued or repeated at the option of the Contracting Officer.

· Acceptance shall be withheld until re-inspection has been shown that the corrective action was successful and the item satisfactorily passes all inspections and tests.

· All corrective actions shall be documented as part of the contractor’s inspection system and submitted for approval to the Contracting Officer.

· Each corrective action report shall include, but not be limited to the cause of each defect, corrective action suggested, and the steps taken to prevent a recurrence of each defect.

4.8 Test & inspection reports. One copy of any required inspection, test or tolerance check done on each delivery order shall be sent to the Contracting Officer for review and approval prior to authorization of Quality Insurance Inspection.

4.8.1 Quality assurance representative. A copy of any test, inspection or tolerance report shall be turned over to the Quality Assurance Representative upon arrival at the contractor’s plant.

4.9 Packing inspection. The Contracting Officer shall be notified prior to the packaging and marking of the completed units in accordance with section 5.2 of this specification.

5. PRESERVATION, PACKING, MARKING, AND SHIPPING

5.1 Preservation. Each tested and approved rudder stock preserved as follows:

5.1.1 Items subject to corrosion, shall be coated with corrosion preventative compound, Grade 3 in accordance with MIL-C-16173. The preserved surfaces shall be wrapped with two layers of greaseproof barrier paper per MIL-PRF-121.

5.2 Packing. If shipping weight is less than 1000 pounds, packing shall comply with ASTM D6880/D6880M-11 Class 2 Style 2 with skid mounts. If the shipping weight is greater than 1000 pounds, the packing will comply with ASTM D7478/7478M Type 2, Class 2, Style A with skid mounts.

5.2.1 All components shall be protected from physical damage and mechanical malfunction. Cushioning materials, dunnage, blocking, bracing and strapping shall be applied as required to protect the item(s) and the enclosing media and restrict the movement of the item within the container. The materials selected for all blocking and bracing, and the design and application thereof, shall be compatible with the item and its bearing load limitations. Materials shall be as clean and as dry as practicable.

5.3 Marking. Each packaged crate/box shall have a water proof label securely attached or water proof stencil in the upper left-hand corner of the two longest sides (two opposite sides if square) of each box IAW MIL-STD-129R. The stencil marking shall be 3/4" -1" inch in height.

5.3.1 Marking layout.

STOCK NUMBER
2040-01-092-1740
ITEM NAME
Rudder Stock
PART NUMBER
65 WYT 2200-001
CONTRACT NUMBER
(See Contract Page 1)
DELIVERY ORDER NUMBER
(See Contract)
SHIPPING WEIGHT
As Determined by Contractor
QUANTITY & UNIT OF ISSUE
1 - EA
CONDITION CODE
CONDITION A
OTHER DATA AS DIRECTED
COAST GUARD SFLC MATERIAL

5.3.2 Bar coding. U.S. Coast Guard requires bar coding of the NSN, IAW ISO/IEC 16388-2007 Code 39 Symbology.

5.3.2.1 The Bar Code Label can be applied separately or as part of the marking required in 5.3.

5.4 Shipping. The Contractor shall ship, and deliver the parts and components to the government address specified in paragraph 5.4.1. Notify the Contracting Officer Representative (COR) and Contracting Officer about the shipment 7 days in advance. Provide timely shipping information to COR including the name of the shipping company, date of shipment leaving Contractor’s facility, and expecting arrival date and time at the government facility. No shipment shall arrive outside of government normal business hours as determined by the Contracting Officer.

5.4.1 Address. Unless otherwise specified, the Contractor shall ship, and deliver all parts to the following government addresses:

· U.S. Coast Guard

· Surface Forces Logistics Center

· 2401 Hawkins Point Rd. Bldg. 88

· Baltimore, MD 21226

6 NOTES

6.1 Document sources.

6.1.1 Government document sources.

· Department of Defense Single Stock Point (DODSSP)

Building 4, Section D

700 Robbins Avenue

Philadelphia, PA 19111-5094

215-697-2667/2179

FAX 215-697-1462

· DOD & Navy Publications & Forms (Other Than DODSSP)

Naval Publication and Forms Center

5801 Tabor Ave.

Philadelphia, PA 19120

215-697-2000

6.1.2 Coast Guard document sources.

· USCG Surface Forces Logistics Center

2401 Hawkins Point Road

Baltimore, MD. 21226-5000

Phone: 410-762-6171

ATTN: Contracting Branch, CPD1

6.1.3 Commercial document sources.

· Society of Automotive Engineers Inc. (SAE)

400 Commonwealth Drive

Warrendale, PA 15096

1-877-606-7323

FAX: 1-724-776-0790

· American Society for Testing & Materials (ASTM)

100 Barr Harbor Drive

West Conshohocken, PA 19428

610-832-9500

FAX: 610-832-9555

· American Society for Quality Control (ASQC)

611 East Wisconsin Ave.

Milwaukee, WI 53202

414-272-8575

FAX: 414-272-1734

· International Standard Organization (ISO)

1, ch. De la Voie-Creuse

CP 56 – CH-1211 Geneva 20

Switzerland

Phone +41 22 749 01 11

Fax: +41 22 733 34 30

File details come from the government source that posted it. Updated .