200 SOW - Chemical Water Treatment Service Contract.docx

DOCX document 48 KB Posted

Attached to
WRSU Water Treatment Services Federal contract opportunity
Solicitation number
75H71221R00005
Issued by
Department of Health and Human Services Indian Health Service

View the file

Other files for this federal contract opportunity

Other files attached to WRSU Water Treatment Services, newest first.
File Type Posted
Solicitation Attach C. Wage Determination AZ20200027.pdf PDF
Solicitation Attach A. intro.docx DOCX document
Solicitation Attach B. Provisions and Clauses.docx DOCX document
Solicitation Attach D. SOW Chemical Water Treatment Service.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHEMICAL WATER TREATMENT SERVICE CONTRACT FOR THE WHITERIVER INDIAN HEALTH SERVICE UNIT (WRSU)

A. INTRODUCTION:

The Contractor shall provide comprehensive chemical water treatment services for the Whiteriver Indian Health Service Unit (WRSU), 200 West Hospital Drive, Whiteriver, Arizona.

B. BACKGROUND:

WRSU requires experienced chemical water treatment services to operate reliably and safely in a cost effective manner. The WSRU systems requiring treatment include the Central Plant cooling towers, Central Plant steam boilers, Central Plant water softener, Central Plant Heating closed loop, Central Plant cooling closed loop Specialty Services Building (SSB) cooling tower, and SSB closed loop. System component details identified in Section E.

C. SCOPE OF REQUIREMENT:

The scope of work includes providing monthly onsite inspections, water testing, and chemical water treating for the Central Plant cooling towers, Central Plant steam boilers, Central Plant water softener, Central Plant heating closed loop, Central Plant cooling closed loop, SSB cooling tower, and SSB closed loop. The contractor shall also test and report the makeup water characteristics. The contractor shall chemically treat the water to keep systems free from scale, corrosion, and microbiological contamination. The contractor shall also treat the water to keep from freezing. The results of these inspections and testing along with the associated chemical treatment actions shall be summarized in a monthly report to the COR. The contractor shall provide all chemical testing reagents, testing kits, testing instrumentation, and treatment chemicals.

D. DELIVERABLES:

1. Proof of Qualifications: The contractor shall provide a qualification packet which shall include business capability, list of similar service contracts completed, licenses held, list of representative agreements, certifications held to include ISO, and a list of qualified technicians who will perform the work.

2. Chemical Water Testing: The contractor shall perform water testing for alkalinity (ppm as CaCO3), calcium hardness (ppm as CaCO3), conductivity (as μmhos), conductivity cycles (calculated), freeze point (°F), molybdenum (ppm as Mo), on-Trac (ppb), pH, and total hardness (ppm as CaCO3). The contractor shall provide all chemical testing reagents, testing kits, and testing instrumentation.

3. Chemical Water Treatment: The contractor shall chemically treat the water in the Central Plant cooling towers, Central Plant steam boilers, Central Plant heating closed loop, Central Plant cooling closed loop, SSB cooling tower, and SSB closed loop to ensure the water testing results are within the ranges as outline in Table 1 below. The contractor shall provide all chemicals required to successfully achieve the required water characterizes as identified in Table 1 below. Mild steel and copper coupons shall be provided and installed in all cooling tower and closed loop systems. The coupons shall be removed and tested on a 90-day cycle.

Table 1

4. Inspection: The contractor shall inspect the chemical feed, control equipment, and all treated mechanical systems. The contractor shall check and clean all controller sensors, probes, and flow switches. The contractor shall check for leaking the water systems of the cooling towers, boilers, and closed loops since leaking will result in loss of chemical treatment.

5. Water Treatment Equipment Testing: The contractor shall test all water treatment equipment including chemical pumps and blow-down valves to ensure proper operation.

6. Eddy Current Testing: The contractor shall perform eddy current testing on the chiller condensers during the first and fifth year of the contract. The results shall be reported to the COR.

7. Reporting: The contractor shall develop a report detailing the inspection results, testing results, chemical water treatment activities, water treatment equipment testing results, and chemical inventory. The report shall include the testing results compared to the requirements outline in Table 1. The reports shall be provided to the COR no later than 7 days after the monthly onsite visit.

8. Program Manuals: The contractor shall provide Program Manuals as a go-to reference resource for the facility engineer. Each manual shall contain: description of on-site products, SDS for all products and testing reagents, recommendations and limits for each treated system, clear instructions for actions needed to maintain system conformity, complete test procedures and instructions, and chemical feed equipment information.

E. ASSETS: The Contractor shall verify all locations and quantities.

Table 2

F. PERFORMANCE REQUIREMENTS: Performance shall be rated as outlined below.

Task
ID
SOW Ref.
Indicator
Standard
Acceptable Quality Level
Method of Surveillance
Incentive
Perform all preventative maintenance tasks safely.
1
B
Safe completion of required inspections, testing, and treatment
Contractor shall follow established safety regulations.
100%
a.
Exercise of Option Period.
Maintain a safe and clean work environment.
2
B
Maintain safe and clean work area to include clean equipment.
Contractor shall remove all trash and clean up spills
100%
a.
Exercise of Option Period.
Perform inspections.
3
C.4
Completion and submission of inspection report.
Contractor shall provide completed report no later than (NLT) 7 days after onsite visit.
95%
a. & b.
Exercise of Option Period.
Perform chemical water testing
4
C.2
Completion and submission of testing report.
Contractor shall provide completed report NLT 7 days after onsite visit.
95%
a. & b.
Exercise of Option Period.
Perform chemical water treatment.
5
C.3
Completion and submission of water treatment report.
Contractor shall provide completed report NLT 7 days after onsite visit.
95%
a. & b.
Exercise of Option Period.
Perform water treatment equipment testing.
6
C.5
Completion and submission of water treatment equipment testing report.
Contractor shall provide completed report NLT 7 days after onsite visit.
95%
a. & b.
Exercise of Option Period.
Submit a report detailing the results of ID #3-6.
7
C.7
Submission of acceptable report.
Contractor shall provide completed report NLT 7 days after onsite visit.
95%
a. & b.
Exercise of Option Period.
Submit accurate and timely billing.
8
N/A
Completion and submission of monthly invoicing.
Per contract.
95%
a. & b.
Exercise of Option Period..

G. DESIGNATED CONTRACTING OFFICERS REPRESENTATIVE (COR):

Dwayne Melton, Facility Engineer, WRSU, Facilities & Engineering Department, Telephone Number (928) 338-3591, email address: Dwayne.Melton@ihs.gov, is hereby designated the COR to monitor the requirements of this order on behalf of the government.

1. The Contracting Officer shall designate the COR representing the Government for the purpose of this contract in writing. Such designation will set forth the duties specifically delegated concerning the performance of this contract. A copy of the designation will be provided to the contractor.

2. The major responsibility of the COR is to ensure Contractor accountability, monitor contract performance, and assist the Contractor in the resolution of program problems encountered during the performance of this contract.

3. The COR shall be responsible for:

a) Monitoring the Contractor’s technical progress, including the surveillance and assignment of performance and recommending to the contracting Officer changes in requirements;

b) Interpreting Statement of Work;

c) Performing technical evaluation as required;

d) Performing technical inspection and acceptance required by the contract;

e) Assisting the contractor in the resolution of technical problems encountered during performance.

f) The COR’s responsibilities will be to coordinate with the contractor the technical aspects of this service and the review of performance hereunder. The COR does not have the authority to change or alter the order amount, terms and conditions.

H.
WRSU POINT OF CONTACT:

Dwayne Melton Facility Manager eering

Telephone: (928) 338-3591 Email: Dwayne.Melton@ihs.gov

WRSU Facilities & Engineering

400 W. Apache Drive

Whiteriver, AZ 85941 image1.emf image2.emf

File details come from the government source that posted it. Updated .