2.5GB ADDITIONAL TECH SG22APR227379.pdf

PDF 89 KB Posted

Attached to
2. 5GB WAVE SERVICE BETWEEN TYNDALL AFB, FL AND EGLIN AFB, FL Federal contract opportunity
Solicitation number
HC101322QA380
Issued by
Defense Information Systems Agency

View the file

Other files for this federal contract opportunity

Other files attached to 2. 5GB WAVE SERVICE BETWEEN TYNDALL AFB, FL AND EGLIN AFB, FL, newest first.
File Type Posted
HC101322QA380-0002_v1.zip ZIP file
HC101322QA380-0001.v1.pdf PDF
Vendor Block Diagram Sample and Maps.pdf PDF
HC101322QA380.v1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDITIONAL TECHNICAL SPECIFICATIONS

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END

TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR:

SG21APR227376; MEANING THAT THE PHYSICAL PATHS ARE TOTALLY SEPARATE

INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS.

ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR:

SG21APR227376. ***THE 50 METER SEPARATION IS WAIVED INSIDE BLDG 649 FOR

TYNDALL AFB, FL LOCATION.***

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR

TECHNICAL REVIEW SHOWING THE ROUTE FROM THE CIRCUIT SPECIFICATIONS:

COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS.

DRAWINGS MUST INCLUDE TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD). ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF PRESENCE (POP) FOR PROPOSAL

EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST BE

PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL.MI L) FOR

HISTORICAL PURPOSES.

SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.

SINGLE MODE FIBER MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY THAT THE

GOVERNMENT CAN CHANGE/REVISE CHANNELIZATION WITHOUT TELECOM PROVIDER

INTERVENTION.

NOTE 1 (JITTER): IN A STEADY-STATE CONDITION, THE PATTERN OF SYNCHRONOUS

TRANSPORT SIGNAL (STS) POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH THE

SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE NO MORE STRESSFUL (I.E., CREATE

MORE JITTER THROUGH THE DESYNCHRONIZER AS DESCRIBED IN TABLE 6 OF ANSI T1.105.03-

1994) THAN THE POINTER ADJUSTMENT SEQUENCE IN FIGURE 5 OF ANSI T1.105.03-1994.

DURING TRANSIENT EVENTS (WHICH SHALL OCCUR NO MORE THAN 2 TIMES PER DAY), THE

PATTERN OF STS POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH THE

SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE FOUR OR LESS PER HOUR.

ADDITIONALLY, THE MAXIMUM TIME INTERVAL ERROR (MTIE) OVER A PERIOD OF S SECONDS,

OR WANDER, SHALL NOT EXCEED (.01S + 10000) NANOSECONDS FOR VALUES OF S GREATER

THAN 10,000.

WAVELENGTH TRANSMISSION SERVICES: WAVELENGTH TRANSMISSION SERVICES FOR

RATES OF 2.5GBPS SHALL BE IN ACCORDANCE WITH ITU-T RECOMMENDATIONS

G.709(03/2003), G.707(12/03), G.957(03/06), G.692(10/98) & TELCORDIA GR253-IE4. THE PROVIDED

WAVELENGTH TRANSMISSION SERVICE SHALL NOT INHIBIT GOVERNMENT OPERATION OF

UNDERLYING PROTOCOLS AND TRANSPORT SYSTEMS SUCH AS, BUT NOT LIMITED TO,

SONET/SDH, IP, ATM, GIGABIT ETHERNET, AND ENCRYPTION. THE WAVELENGTH

TRANSMISSION SERVICE PROVIDED SHALL PASS ALL PAYLOAD, PATH AND LINE OVERHEAD

BYTES TRANSPARENTLY (UNTOUCHED/UNALTERED) AND WITHOUT MONITORING SDP TO SDP.

THERE SHALL NOT BE ANY LINE TERMINATING EQUIPMENT (LTE) BETWEEN SDP AND SDP.

SINGLE MODE FIBER MUST BE TERMINATED TO THE LINE SIDE OF THE FIBER TERMINATING

PATCH PANEL INSTALLED AT BOTH DISA IE1 PROVIDED SERVICE DELIVERY NODE LOCATIONS.

ONCE TELECOM PROVIDER HAS COMPLETED INSIDE WIRING FROM THEIR FIBER

DISTRIBUTION PANEL INSTALLED IN THEIR DWDM EQUIPMENT SUITE TO THE GOVERNMENT

SERVICE DELIVERY POINT (SDP) AT EACH LOCATION, THEY MUST ENSURE THE LIGHT LEVEL

READINGS (DB LOSS) ARE ADJUSTED TO READ -3 TO -9 LOSS. ADDITIONALLY, THESE LEVELS

MUST BE DOCUMENTED ON THE NOTICE OF COMPLETION (NOC) SENT TO DITCO. ***THE

VENDOR MUST TERMINATE SINGLE MODE FIBER AT BOTH LOCATIONS IAW UNIQUE

INSTALLATION FACTORS. THE SINGLE MODE FIBER MUST PASS A DOCUMENTED

SATISFACTORY 72 HOUR END TO END TEST IAW ITU STANDARD M.2101 PRIOR TO TURN-UP TO

THE GOVERNMENT.

CIRCUIT PARAMETERS:

1. VENDOR MUST MEET SVC DATE.

2. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: SINGLE-MODE INTERFACE REQUIREMENT/INTERFACE DATA RATE:

LINE CODING, FRAME FORMAT, PHYSICAL CONNECTOR, 2.5 GBPS, NRZ, SCRAMBLED PER ANSI

T1.104-1991

(R2003). ALL OPTIONS DEFINED SC CONNECTOR, SINGLE-MODE FIBER PER ANSI T1.105.06-

2002 (SR-0, SR-1, IR-1, IR-2, LR-1, LR-2, LR-3).

(B) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,

SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.

(C) ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR TO REPAIR ONCE TROUBLE-

CALL HAS BEEN REPORTED.

(D) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.

(E) SINGLE MODE FIBER TERMINATIONS "SC" CONNECTORS.

(F) NO NETWORK INTERFACE UNIT.

(G) DEDICATED PATH.

(H) CARRIER REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(I) THE VENDOR MUST CONDUCT A 72 HOUR SATISFACTORY END TO END TEST ON THE 2.5GB

WAVE SERVICE IAW ITU STANDARD M.2101. ADDITIONALLY, THE VENDOR TEST SET/SETS

MUST HAVE THE ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS MUST BE

EMAILED TO THE ACCEPTING AUTHORITY FOR REVIEW.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONAL CENTER.

(K) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE

DGOC:

PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB TEAM

PHONE: (C) 618-418-9813, (D) 418-9813, EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-

INFRASTRUCTURE-INTEGRATION-LEASE-BB-T@MAIL.MIL

ALT POC: ORGANIZATIONAL NUMBER (CASA RF CIRCUIT ACTIVATIONS)

PHONE: (C) 618-418-8691, (D) 418-8691

EMAIL: DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL

(L) THE VENDOR MUST PROVIDE THE LONG-HAUL CIRCUIT NUMBER AND THE 1-800 TROUBLE

REPORT NUMBER TO THE ACCEPTING AUTHORITY PRIOR TO THE GOVERNMENT ACCEPTING

SERVICE. INSIDE WIRING MUST BE COMPLETED AND TESTED PROPERLY IAW THE ORDER

PRIOR TO TURN-UP TO

THE GOVERNMENT.

3. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER

IAW UNIQUE INSTALLATION FACTORS.

4. INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS.

5. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

6. FOR UNSATISFACTORY SERVICE OR TO REPORT EQUIPMENT AND/OR CIRCUIT PROBLEMS

INVOLVING DISA PROVIDED TRANSPORT AND/OR EQUIPMENT, PLEASE CONTACT THE DISN

CUSTOMER CONTACT CENTER (DCCC) SCOTT AFB, IL. TOLL FREE: 1-855-868-9500, COML: 618-

418-9500, DSN: 312-418-9500.

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS:

LINE RATE: 2.5GB.

LINE CODE: NRZ.

FRAME FORMAT: SCRAMBLED IAW ANSI T1.104-1991 (R2003).

TEST AND ACCEPTANCE: FIBER OPTIC 2.5GB WAVE CIRCUITS SHALL PASS A FULLY

DOCUMENTED SATISFACTORY SOAK TEST BY THE GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-

418-8691, (D) 418-8691.

THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL MEET THE FOLLOWING

PERFORMANCE REQUIREMENTS ON A MONTHLY BASIS.

PERFORMANCE REQUIREMENT/PERFORMANCE SPECIFICATION: NON-DIVERSE/NON-

PROTECTED AVAILABILITY: GREATER THAN OR EQUAL TO 99.5% OR BETTER.

MONTHLY SHORT INTERRUPTION EVENT COUNT (SEIC): LESS THAN OR EQUAL TO 9%.

ERRORED SECONDS (ES): LESS THAN OR EQUAL TO 0.005%.

SEVERELY ERRORED SECONDS (SES): LESS THAN OR EQUAL TO 0.00035.

BACKGROUND BLOCK ERROR RATIO (BBER): LESS THAN OR EQUAL TO 5X 10-6.

BIT COUNT INTEGRITY (BCI)/PATTERN SLIP (PAT SLIP): LESS THAN OR EQUAL TO 1 PER 72

HOURS.

JITTER: SEE NOTE 1 (JITTER).

BER: LESS THAN OR EQUAL TO 1X10-12.

DELAY (ONE WAY): * LESSER OF 10 MSEC OR (0.01 X D MSEC) *

WHERE "D" IS THE SDP TO SDP TRANSMISSION DISTANCE, MEASURED SHORTEST GREAT

CIRCLE, IN KILOMETERS.

ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN

MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE

CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR

EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE

GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND

TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTOR’S PROPOSAL, DISA IE161

WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

File details come from the government source that posted it. Updated .