RFP_No._19CA5218R0008.pdf
PDF 1 MB Posted
- Attached to
- U. S. Embassy Residential Property Windows & Doors Replacement Federal contract opportunity
- Solicitation number
- 19CA5218R0008
- Issued by
- Department of State US Embassy Ottawa
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_A001_&_Q&As.pdf | ||
| Presolicitation_Notice.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 19CA5218R0008 U.S. Embassy Residential Property Windows and Doors Replacement
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
19CA5218R0008
TYPE OF SOLICITATION
SEALED BID (IFB)
X NEGOTIATED (RFQ)
3. DATE ISSUED
May 17, 2018
PAGE OF
PAGES
1 61
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
PR7087974
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
U.S. Embassy Ottawa General Services Office P.O. Box 866, Station B Ottawa, ON, K1P 5T1
U.S. Embassy Ottawa General Services Office 207 Bank Street, Suite 418 Ottawa, ON, Canada K2P 2N2
9. FOR INFORMATION
CALL:
A. NAME
Ryan Ruta Alma Andico
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 613-688-5450 613-688-5310
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Section A - Cover Sheet - SF-1442, Solicitation, Offer and Award Section B – Price Section C – Scope of Work Section D – Packaging and Marking Section E – Inspection and Acceptance Section F – Deliveries/Performance Section G – Administrative Data Section H – Special Requirements Section I – Clauses Section J – List of Attachments Section K – Representations, Certifications, and Other Statements of Offerors or Quoters Section L – Instructions, Conditions, and Notices to Offerors or Quotes Section M – Evaluation Factors for Award
Attachments:
Attachment 1: Sample Letter of Bank Guaranty Attachment 2: Breakdown of Price by Divisions of Specifications Attachment 3: Drawings Attachment 4: Specifications Attachment 5: Canada Authority for Release of Information
11. The Contractor shall provide all labor, materials, tools, transportation, equipment, supervision and services for the U.S. Embassy Residential Property Windows and Doors Replacement, in accordance with the work specifications and terms and conditions stipulated under this contract.
The Contractor shall begin performance within 10 calendar days and complete it within 60 calendar days after receiving the notice to proceed.
Thi f i d i d t
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT
BONDS? (If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and (Refer to Section J.B) copies to perform the work required are due at the place specified in Item 8 no later than 4:00 PM (hour) local time on June 20, 2018. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by referenced.
D. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within 90 calendar days after the date offers are due. Offers shall remain valid until August 31, 2018 (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS Total Firm-Fixed Price -- CAD$ ……………… (including HST)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
ADATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
See Block 17
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(2 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE
Block 31
27. PAYMENT WILL BE MADE BY
Financial Management Center
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31.A. NAME OF CONTRACTING OFFICER (TYPE OR PRINT)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
STANDARD FORM 1442 BACK
TABLE OF CONTENTS
A. SF-1442 COVER PAGE
B. PRICE
C. SCOPE OF WORK
D. PACKAGING AND MARKING
E. INSPECTION AND ACCEPTANCE
F. DELIVERIES OR PERFORMANCE
G. ADMINISTRATIVE DATA
H. SPECIAL REQUIREMENTS
I. CLAUSES
J. LIST OF ATTACHMENTS
K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
OR QUOTERS
L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR QUOTERS
M. EVALUATION FACTORS FOR AWARD
ATTACHMENTS
ATTACHMENT 1: Sample Letter of Bank Guaranty ATTACHMENT 2: Breakdown of Price by Divisions of Specifications ATTACHMENT 3: Drawings ATTACHMENT 4: Specifications ATTACHMENT 5: DS-7673, Canada Authority for Release of Information
SECTION B - SUPPLIES OR SERVICES
AND PRICES/COSTS
B.1 CONTRACT PRICE
The Contractor shall complete all work (including furnishing all labor, material, equipment and services) required under this contract for the following firm fixed price and within the time specified.
This price shall include all labor, materials, overhead (including insurance required by FAR 52.228-3, Workers’ Compensation and War-Hazard Insurance, which shall be a direct reimbursement), and profit.
All prices shall be in Canadian dollars.
Total Price (including all labor, materials, overhead and profit) -- CAD$ ______________
HST -- CAD$ ______________
Total B.1 -- CAD$ ______________
B.2 VALUE ADDED TAX
VALUE ADDED TAX (VAT). The Contractor shall include VAT as a separate charge on the Invoice and as a separate line item in Section B.
B.3 TYPE OF CONTRACT
This is a firm, fixed- price contract payable entirely in the currency indicated in the SF-1442. No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The Government will not adjust the contract price due to fluctuations in currency exchange rates. The Government will only make changes in the contract price or time to complete due to changes made by the Government in the work to be performed, or by delays caused by the Government.
The Government will make payments based on quantities and unit prices only to the extent specifically provided in the contract.
SECTION C - DESCRIPTION/SPECIFICATIONS
STATEMENT OF WORK
C.1 CHARACTER AND SCOPE OF WORK
The Contractor shall furnish and install all materials required by this contract. The contract Specifications/Statement of Work are set forth in Section J as Attachment 4.
C.2 DRAWINGS
In case of differences between small and large-scale drawings, the latter will govern. Where a portion of the work is drawn in detail and the remainder of the work is indicated in outline, the parts drawn in detail shall apply also to all other portions of the work.
SECTION D - PACKAGING AND MARKING
D.1 The Contractor shall mark materials delivered to the site as follows:
(Reserved)
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at:
http://acquisition.gov/far/index.html or http://farsite.hill.af.mil/vffara.htm. These addresses are subject to change.
If the Federal Acquisition Regulation (FAR) is not available at the locations indicated above, use the Department of State Acquisition website at http://www.statebuy.state.gov/ to access the links to the FAR.
You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.
The following Federal Acquisition Regulation clause(s) is/are incorporated by reference (48 CFR CH. 1):
CLAUSE TITLE AND DATE
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
(JUL 2016)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JUL 2013)
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
E.2 QUALITY ASSURANCE
The Contractor shall institute an appropriate inspection system set forth in a Quality Assurance Plan. The plan shall include checklists of duties to be carried out, ensuring these duties are carried out by the supervisory staff and senior employees, and carrying out weekly inspections to determine whether the various services are being performed according to the contract. The Contractor shall provide copies of the weekly inspection reports to the COR.
The Contractor shall correct and improve promptly any shortcomings and substandard conditions noted during inspections. The Contractor shall bring any conditions beyond the responsibility of the Contractor to the attention of the Contracting Officer or COR.
E.2.1 MONTHLY REPORT: The Contractor shall submit to the COR a monthly progress report, along with the monthly invoice, summing up observations resulting from the inspections, progress, difficulties or irregularities encountered, resolution of problems, measures taken to improve conditions, recommendations, and other matters related to this contract.
E.2.2. INSPECTION BY GOVERNMENT: The COR, or his/her authorized representatives, will inspect from time to time the services being performed and the supplies furnished to determine whether work is being performed in a satisfactory manner, and that all supplies are of acceptable quality and standards.
The Contractor shall be responsible for any countermeasures or corrective action, within the scope of this contract, which may be required by the Contracting Officer as a result of such inspection.
E.3 SUBSTANTIAL COMPLETION
E.3.1 DEFINITIONS
(a) "Substantial Completion" means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:
1. do not interfere with the intended occupancy or utilization of the work, and
2. can be completed or corrected within the time period required for final completion.
(b) The "date of substantial completion" means the date determined by the Contracting Officer or authorized Government representative as of which substantial completion of the work has been achieved.
E.3.2 USE AND POSSESSION UPON SUBSTANTIAL COMPLETION
The Government shall have the right to take possession of and use the work upon substantial completion. Upon notice by the Contractor that the work is substantially complete (a Request for Substantial Completion) and an inspection by the Contracting Officer or an authorized Government representative (including any required tests), the Contracting Officer shall furnish the Contractor a Certificate of Substantial Completion. The certificate shall be accompanied by a Schedule of Defects listing items of work remaining to be performed, completed or corrected before final completion and acceptance. Failure of the Contracting Officer to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract. The Government's possession or use upon substantial completion shall not be deemed an acceptance of any work under the contract.
E.4 FINAL COMPLETION AND ACCEPTANCE
E.4.1 DEFINITIONS
(a) "Final completion and acceptance" means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.
(b) The "date of final completion and acceptance" means the date determined by the
Contracting Officer when final completion of the work has been achieved, as indicated by written notice to the Contractor.
E.4.2 FINAL INSPECTION AND TESTS
The Contractor shall give the Contracting Officer at least five (5) days advance written notice of the date when the work will be fully completed and ready for final inspection and tests.
Final inspection and tests will be started not later than the date specified in the notice unless the Contracting Officer determines that the work is not ready for final inspection and so informs the Contractor.
E.4.3 FINAL ACCEPTANCE
If the Contracting Officer is satisfied that the work under the contract is complete (with the exception of continuing obligations), the Contracting Officer shall issue to the Contractor a notice of final acceptance and make final payment upon:
(a) satisfactory completion of all required tests,
(b) a final inspection that all items by the Contracting Officer listed in the Schedule of Defects have been completed or corrected and that the work is finally complete (subject to the discovery of defects after final completion), and
(c) submittal by the Contractor of all documents and other items required upon completion of the work, including a final request for payment (Request for Final Acceptance).
SECTION F - DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at:
http://acquisition.gov/far/index.html or http://farsite.hill.af.mil/vffara.htm. These addresses are subject to change.
If the Federal Acquisition Regulation (FAR) is not available at the locations indicated above, use the Department of State Acquisition website at http://www.statebuy.state.gov/ to access the links to the FAR.
You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.
The following Federal Acquisition Regulation clauses are incorporated by reference (48 CFR CH. 1):
CLAUSE TITLE AND DATE
52.242-14 SUSPENSION OF WORK (APR 1984)
F.2 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to:
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use no later than 60 calendar days. The time stated for completion shall include final cleanup of the premises and completion of “punch list” items.
F.3 LIQUIDATED DAMAGES
F.3.1 52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor shall pay liquidated damages to the Government in the amount of CAD$300.00 for each day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Default clause.
F.3.2. ASSESSMENT AND APPORTIONMENT OF LIQUIDATED DAMAGES
Liquidated damages will be assessed from the completion date indicated in the contract or extensions thereof to the date of substantial completion as actually achieved by the Contractor, as determined by the Contracting Officer.
F.4 CONTRACTOR'S SUBMISSION OF CONSTRUCTION SCHEDULES
(a) The time for submission of the schedules referenced in Section I, 52.236-15, "Schedules for Construction Contracts", paragraph (a), is hereby modified to reflect the due date for submission as "ten (10) days after receipt of an executed contract".
(b) These schedules shall include the time by which shop drawings, product data, samples and other submittals required by the contract will be submitted for approval.
(c) The Contractor shall revise such schedules (1) to account for the actual progress of the work,
(2) to reflect approved adjustments in the performance schedule, and (3) as required by the Contracting Officer to achieve coordination with work by the Government and any separate contractors used by the Government. The Contractor shall submit a schedule which sequences work so as to minimize disruption at the job site.
(d) All schedules shall be in the English language and any system of dimensions (English or metric) shown shall be consistent with that used in the contract. No extension of time shall be allowed due to a delay by the Government in approving such deliverables if the Contractor has failed to act promptly and responsively in submitting its deliverables. The Contractor shall identify each deliverable as required by the contract.
F.5 ACCEPTANCE OF SCHEDULE
When the Government has accepted any time schedule, it shall be binding upon the Contractor.
The completion date is fixed and may be extended only by a written contract modification signed by the Contracting Officer. Acceptance or approval of any schedule or revision thereof by the Government shall not (1) extend the completion date or obligate the Government to do so, (2) constitute acceptance or approval of any delay, or (3) excuse the Contractor from or relieve the Contractor of its obligation to maintain the progress of the work and achieve final completion by the established completion date.
F.6 NOTICE OF DELAY
If the Contractor receives a notice of any change in the work, or if any other conditions arise which are likely to cause or are actually causing delays which the Contractor believes may result in late completion of the project, the Contractor shall notify the Contracting Officer. The Contractor’s notice shall state the effect, if any, of such change or other conditions upon the approved schedule, and shall state in what respects, if any, the relevant schedule or the completion date should be revised. The Contractor shall give this notice not more than ten (10) days after the first event-giving rise to the delay or prospective delay. Only the Contracting Officer may make revisions to the approved time schedule.
F.7 NOTICE TO PROCEED
(a) After receiving and accepting any bonds or evidence of insurance, the Contracting Officer will issue the Contractor a Notice to Proceed. The Contractor shall then prosecute the work commencing and completing performance not later than the time period established in the contract.
(b) It is possible that the Contracting Officer may elect to issue the Notice to Proceed before receipt and acceptance of any bonds. Issuance of a Notice to Proceed by the Government before receipt of the required bonds or policies shall not be a waiver of the requirement to furnish these documents.
F.8 WORKING HOURS
All work shall be performed during 8:00 A.M. to 5:00 P.M., Monday to Friday excluding official Canadian and American holidays identified below. Other hours, if requested by the Contractor, may be approved by the Contracting Officer's Representative. The Contractor shall give 24 hours in advance to COR who will consider any deviation from the hours identified above. Changes in work hours will not be a cause for a price increase.
(a) The Department of State observes the following days* as holidays:
New Year's Day Canada & US Martin Luther King's Birthday US Washington’s Birthday US Good Friday Canada Easter Monday Canada
Victoria Day Canada Memorial Day US Quebec National Day (Quebec only) Canada Canada Day Canada Independence Day US Civic Day Canada Labor Day Canada & US Thanksgiving Day / Columbus Day Canada & US Remembrance Day / Veterans Day Canada & US Thanksgiving Day US Christmas Day Canada & US Boxing Day Canada
*Any other day designated by Federal law, Executive Order or Presidential Proclamation.
When any such day falls on a Saturday, the preceding Friday is observed; when any such day falls on a Sunday, the following Monday is observed. Observance of such days by Government personnel shall not be cause for additional period of performance or entitlement to compensation except as set forth in the contract. If the Contractor's personnel work on a holiday, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, unless authorized pursuant to an overtime clause elsewhere in this contract.
F.9 EXCUSABLE DELAYS
The Contractor will be allowed time, not money, for excusable delays as defined in FAR 52.249- 10, Default. Examples of such cases include:
(l) acts of God or of the public enemy,
(2) acts of the United States Government in either its sovereign or contractual capacity,
(3) acts of the government of the host country in its sovereign capacity,
(4) acts of another contractor in the performance of a contract with the Government,
(5) fires,
(6) floods,
(7) epidemics,
(8) quarantine restrictions,
(9) strikes, (l0) freight embargoes,
(11) delays in delivery of Government furnished equipment, and
(12) unusually severe weather.
In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor, and the failure to perform. Furthermore, the failure:
(1) must be one that the Contractor could not have reasonably anticipated and taken adequate measures to protect against,
(2) cannot be overcome by reasonable efforts to reschedule the work, and
(3) directly and materially affects the date of final completion of the project.
F.10 PRE-CONSTRUCTION CONFERENCE
A preconstruction conference will be held 10 days after contract award at the CMR, 500 Lisgar Road, Rockcliffe Park, Ottawa to discuss the schedule, submittals, notice to proceed, mobilization and other important issues that affect construction progress. See FAR 52.236-26, Pre-Construction Conference in Section I.
F.11 DELIVERABLES
The following items shall be delivered under this contract:
Description Quantity Delivery Date Deliver To:
H.1.2. Bonds/Insurance 1 10 days after award CO H.11.1. Safety Plan 1 10 days after award COR E.2. Quality Assurance Plan 1 10 days after award COR F.4. Construction Schedule 1 10 days after award COR H.14.1. Submittal Register 1 10 days after award COR F.10. Pre-Construction Conference 1 10 days after award COR H.13.2. Biographic Data on Personnel
1 10 days after award COR
E.2.2. Inspection Reports 1 3 days after end of weekly period
COR
G.3.2 Payment Request 1 Last day of each month
COR
E.2.1. Monthly Progress Report 1 7th day of the following month
COR
F.4.(c). Updates to Construction Schedule
1 Last day of each month
COR
E.3.2. Request for Substantial Completion
1 5 days before inspection
COR
H.4.4. As-built Drawings and Warranties
1 After final completion but before final acceptance
COR
E.4.2. Request for Final Acceptance 1 5 days before inspection
COR
F.6 Notice of Delay 1 Within 10 days after event
CO
F.8 Additional Hours 1 No later than 24 hours in advance of need
COR
H.2.4 Evidence of Insurance 1 10 days after award CO H.17.2 Differing Site Condition 1 Within 10 days of occurrence
CO
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 AUTHORITY OF CONTRACTING OFFICER
All work shall be performed under the general direction of the Contracting Officer, who alone shall have the power to bind the Government and to exercise the rights, responsibilities, authorities and functions vested by the contract.
G.2 MONITORING OF THE CONTRACTOR
G.2.1. 652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG
1999)
(a) The Contracting Officer may designate in writing one or more Government employees, by position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer and this authority is delegated in the designation.
(b) The COR for this contract is the Facility Management Section (FMS), Senior Project
Manager.
G.2.2 DUTIES
The COR is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation required by the contract.
The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract. The COR is designated as the authority to act for the Contracting Officer in matters concerning technical clarification, random inspection of Contractor performance to ensure compliance with contract specifications and acceptance of the Contractor's performance under this contract. The COR will coordinate all work with the Contractor during the term of this contract. The COR is not authorized to alter the contract's terms, or conditions, including the design to budget parameter. Such changes must be authorized by the Contracting Officer in a written modification to the contract. Reference to the project architect within documents incorporated into this contract shall be read to mean COR.
G.3 PAYMENT
G.3.1 GENERAL
Payments are subject to FAR 52.232-5, "Payments Under Fixed-Price Construction Contracts".
G.3.2 DETAIL OF PAYMENT REQUESTS
Each application for payment shall cover the value of labor and materials completed and in place, including a prorated portion of overhead and profit. The Government will make payments no more frequently than monthly, unless otherwise provided in this contract. The Contractor shall submit invoices by email to OttawaInvoices@state.gov following the invoicing instructions to be provided upon award of the contract.
G.3.3 PAYMENTS TO SUBCONTRACTORS
The Contractor shall make timely payment from the proceeds of the progress or final payment for which request is being made to subcontractors and suppliers following the Contractor's contractual arrangements with them.
G.3.4 EVALUATION BY THE CONTRACTING OFFICER
Following receipt of the Contractor's request for payment, and on the basis of an inspection of the work, the Contracting Officer shall make a determination as to the amount that is then due. If the Contracting Officer does not approve payment of the full amount applied for, less the retainage addressed in FAR 52.232-5, the Contracting Officer shall advise the Contractor of the reasons.
G.3.5 ADDITIONAL WITHHOLDING
The Government may withhold from payments due the Contractor any amounts as may be considered necessary to cover --
(a) Wages or other amounts due the Contractor's employees on this project;
(b) Wages or other amounts due employees of subcontractors on this project;
(c) Amounts due suppliers of materials or equipment for this project; and
(d) Any other amounts for which the Contractor may be held liable under this contract, including but not limited to the actual or prospective costs of correction of defective work and prospective liquidated damage when the Contractor has failed to make adequate progress.
This withholding is independent of monies retained by the Government under FAR
52.232-5, or otherwise as permitted to be retained under this contract.
G.3.6. PAYMENT
Under the authority of 52.232-27(a) the 14 day period identified in FAR 52.232-
27(a)(1)(i)(A) is hereby changed to 30 days.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 BOND/IRREVOCABLE LETTERS OF CREDIT REQUIREMENTS
H.1.1 BONDS/IRREVOCABLE LETTERS OF CREDIT REQUIRED
The Contractor shall furnish (1) a performance and guaranty bond and a payment bond on forms provided by and from sureties acceptable to the Government, each in the amount of 20% of the contract price, or (2) comparable alternate performance security (irrevocable letter of credit) approved by the Government such as letter of credit/guaranty shown in Section J.
H.1.2 TIME FOR SUBMISSION
The Contractor shall provide the bonds or alternate security as required by the paragraph H.1.1 above within ten (10) days after contract award. Failure to submit (1) the required bonds or other security acceptable to the Government in a timely manner; (2) bonds from an acceptable surety; or (3) bonds in the required amount, may result in rescinding or termination of the contract by the Government. If the contract is terminated, the Contractor will be liable for those costs as described in FAR 52.249-10, "Default (Fixed-Price Construction).
H.1.3 COVERAGE
The bonds or alternate performance security shall guarantee the Contractor's execution and completion of the work within the contract time and the correction of any defects after completion as required by this contract, the payment of all wages and other amounts payable by the Contractor under its subcontracts or for labor and materials, and the satisfaction or removal of any liens or encumbrances placed on the work.
H.1.4 DURATION OF COVERAGE
The required performance and payment securities shall remain in effect in the full amount required until final acceptance of the project by the Government. Upon final acceptance, the penal sum of the performance security only shall be reduced to 10% of the contract price. The performance security shall remain in effect for one year after the date of final completion and acceptance, and the Contractor shall pay any premium required for the entire period of coverage. The requirement for payment security terminates at final acceptance.
H.1.5 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
The Contractor shall promptly furnish additional security required to protect the Government and persons supplying labor or materials under this contract if --
(a) Any surety upon any bond, or issuing financial institution for other security, furnished with this contract becomes unacceptable to the Government;
(b) Any surety fails to furnish reports on its financial condition as required by the Government;
or
(c) The contract price is increased so that the penal sum of any bond becomes inadequate in the opinion of the Contracting Officer; or
(d) An irrevocable letter of credit (ILC) used as security will expire before the end of the period of required security. If the Contractor does not furnish an acceptable extension or replacement ILC, or other acceptable substitute, at least 30 days before an ILC’s scheduled expiration, the Contracting Officer has the right to immediately draw on the ILC.
H.2 INSURANCE
H.2.1 AMOUNT OF INSURANCE
The Contractor is required by FAR 52.228-5 to provide whatever insurance is legally necessary.
The Contractor, shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:
General Liability (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury)
General Liability:
(1) Bodily injury on or off site stated in Canadian dollars:
Per Occurrence $3,000,000 Cumulative $3,000,000
(2) Property damage on or off site in Canadian dollars:
Per Occurrence $3,000,000 Cumulative $3,000,000
The foregoing types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.
The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its officers, agents, servants, and employees, or any other person, arising from and incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising there from, except in the instance of gross negligence on the part of the Government.
The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.
H.2.2 GOVERNMENT AS ADDITIONAL INSURED
The general liability policy required of the Contractor shall name "the United States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.
H.2.3 INSURANCE-RELATED DISPUTES
Failure to agree to any adjustment contemplated under this contract regarding insurance shall be a dispute within the meaning of the clause in Section I, 52.233-1, Alternate I, "Disputes". Nothing in this clause shall excuse the Contractor from proceeding with the work.
H.2.4 TIME FOR SUBMISSION OF EVIDENCE OF INSURANCE
The Contractor shall provide evidence of the insurance required under this contract within ten
(10) days after contract award. Failure to timely submit this evidence, in a form acceptable to the Contracting Officer, may result in rescinding or termination of the contract by the Government.
H.3 DEFINITIONS
In addition to the definitions provided in Section I, FAR 52.202-1 and DOSAR 652.202-70, the following definitions shall apply when used in connection with this contract:
(a) “Contract Drawings or Drawings,” where indicated by the context, means those drawings specifically listed in the construction contract or as later incorporated into the contract by contract modification.
(b) “Day” means a calendar day unless otherwise specifically indicated.
(c) “Host Country” means the country in which the project is located.
(d) “Material” means all materials, fixtures and other articles incorporated in, or which are intended to remain with, the project.
(e) “Notice to Proceed” means a written notice to the Contractor from the Contracting Officer authorizing the Contractor to proceed with the work under the contract as of a date set forth in the Notice.
(f) “Other Submittals” includes progress schedules, shop drawings, testing and inspection reports, and other information required by the contract to be submitted by the Contractor for information or approval by the Government.
(g) “Project Data” includes standard drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract.
(h) “Samples” are physical examples which illustrate materials, equipment or workmanship and establish standards by which the work will be judged.
(i) “Schedule of Defects” means the list of items, prepared in connection with substantial completion of the work or early occupancy or utilization of a portion thereof, which the Contracting Officer has designated as remaining to be performed, completed or corrected before the work will be accepted by the Government.
(j) “Separate Contractor” means a contractor, other than the Contractor or any of its subcontractors, to whom the Government has awarded a contact for construction of a portion of the project.
(k) “Work” means any and all permanent construction which is intended to be incorporated into the finished project and required to be performed or otherwise provided by the Contractor under this contract, unless otherwise indicated by the context.
H.4 OWNERSHIP AND USE OF DOCUMENTS
H.4.1 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND MODELS
(a) OWNERSHIP. All specifications, drawings, and copies thereof, and models, are the property of the Government.
(b) USE AND RETURN. The Contractor shall not use or allow others to use the documents described in (a) above on other work. The Contractor shall return or account for the signed contractor set and additional copies provided to or made by the Contractor upon final completion of the work.
H.4.2 SUPPLEMENTAL DOCUMENTS
The Contracting Officer shall furnish from time to time such detailed drawings and other information as is considered necessary, in the opinion of the Contracting Officer, to interpret, clarify, supplement, or correct inconsistencies, errors or omissions in the Contract documents, or to describe minor changes in the work not involving an increase in the contract price or extension of the contract time. The Contractor shall comply with the requirements of the supplemental documents, and unless the Contractor makes objection within 20 days, their issuance shall not provide for any claim for an increase in the Contract price or an extension of contract time.
H.4.3 RECORD DOCUMENTS
The Contractor shall maintain at the project site:
a current marked set of Contract drawings and specifications indicating all interpretations and clarifications, contract modifications, change orders, or any other departure from the contract requirements approved by the Contracting Officer; and a complete set of record shop drawings, product data, samples and other submittals as approved by the Contracting Officer.
H.4.4 "AS-BUILT" DOCUMENTS
After final completion of the work, but before final acceptance, the Contractor shall provide:
complete set of "as-built" drawings, based on the record set of drawings, marked to show the details of construction as actually accomplished; and record shop drawings and other submittals, in the number and form as required by the specifications.
H.5 GOVERNING LAW
The laws of the United States shall govern the contract and its interpretation.
H.6 LANGUAGE PROFICIENCY
The manager assigned by the contractor to superintend the work on-site, as required by Section I, 52.236-6, "Superintendence by the Contractor", shall be fluent in written and spoken English.
H.7 LAWS AND REGULATIONS
H.7.1 COMPLIANCE REQUIRED
The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, and with the lawful orders of any governmental authority having jurisdiction. Host country authorities may not enter the construction site without the permission of the Contracting Officer. Unless otherwise directed by the Contracting Officer, the Contractor shall comply with the more stringent of the requirements of such laws, regulations and orders and of the contract. In the event of a conflict between the contract and such laws, regulations and orders, the Contractor shall promptly advise the Contracting Officer of the conflict and of the Contractor's proposed course of action for resolution by the Contracting Officer.
H.7.2 LABOR, HEALTH AND SAFETY LAWS AND CUSTOMS
The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.
H.7.3 SUBCONTRACTORS
The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits.
H.7.4 EVIDENCE OF COMPLIANCE
The Contractor shall submit proper documentation and evidence satisfactory to the
Contracting Officer demonstrating compliance with this clause when directed by the Contracting
H.8 RESPONSIBILITY OF CONTRACTOR
H.8.1 DAMAGE TO PERSONS OR PROPERTY
The Contractor shall be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence, and shall take proper safety and health precautions to protect the work, the workers, the public, and the property of others.
H.8.2 RESPONSIBILITY FOR WORK PERFORMED
The Contractor shall be responsible for all materials delivered and work performed until final completion and acceptance of the entire work, except for any completed unit of work which may have been accepted in writing under the contract.
H.9 CONSTRUCTION OPERATIONS
H.9.1 OPERATIONS AND STORAGE AREAS
(a) CONFINEMENT TO AUTHORIZED AREAS. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer.
(b) VEHICULAR ACCESS. The Contractor shall, and in accordance with any regulations prescribed by the Contracting Officer, use only established site entrances and roadways.
H.9.2 USE OF PREMISES
(a) Occupied Premises. If the premises are occupied, the Contractor, its subcontractors, and their employees shall comply with the regulations promulgated by the Government governing access to, operation of, and conduct while in or on the premises and shall perform the work required under this contract in such a manner as not to unreasonably interrupt or interfere with the conduct of Government business.
(b) Requests from occupants. The Contractor shall refer any request from occupants of existing buildings to change the sequence of work to the Contracting Officer for determination.
(c) Access limited. The Contractor, its subcontractors and their employees shall not have access to or be admitted into any building or portion of the site outside the areas designated in this contract except with the permission of the Contracting Officer.
H.10 TEMPORARY FACILITIES AND SERVICES
The Contractor may erect temporary buildings (such as, storage sheds, shops, offices) and utilities only with the approval of the Contracting Officer. The cost of these temporary buildings is included in the contract fixed price. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
H.11 SAFETY
H.11.1 DOSAR 652.236-70 ACCIDENT PREVENTION (APR 2004)
(a) General. The Contractor shall provide and maintain work environments and procedures which will safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities; avoid interruptions of Government operations and delays in project completion dates; and, control costs in the performance of this contract. For these purposes, the Contractor shall:
(1) Provide appropriate safety barricades, signs and signal lights;
(2) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and,
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for this purpose are taken.
(4) For overseas construction projects, the Contracting Officer shall specify in writing additional requirements regarding safety if the work involves:
(i) Scaffolding;
(ii) Work at heights above two (2) meters;
(iii) Trenching or other excavation greater than one (1) meter in h;
(iv) Earth moving equipment;
(v) Temporary wiring, use of portable electric tools, or other recognized electrical hazards. Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits; other electrical hazards may also require the use of a GFCI;
(vi) Work in confined spaces (limited exits, potential for oxygen less that 19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.);
(vii) Hazardous materials – a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive or unstable, or any operations which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.; or
(viii) Hazardous noise levels.
(b) Records. The Contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft of property, materials, supplies, or equipment. The Contractor shall report this data in the manner prescribed by the Contracting Officer.
(c) Subcontracts. The Contractor shall be responsible for its subcontractors’ compliance with this clause.
(d) Written program. Before commencing work, the Contractor shall:
(1) Submit a written plan to the Contracting Officer for implementing this clause. The plan shall include specific management or technical procedures for effectively controlling hazards associated with the project; and,
(2) Meet with the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
(e) Notification. The Contracting Officer shall notify the Contractor of any non-compliance with these requirements and the corrective actions required. This notice, when delivered to the Contractor or the Contractor’s representative on site, shall be deemed sufficient notice of the non-compliance and corrective action required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order suspending all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any suspension of work order issued under this clause.
H.12 SUBCONTRACTORS AND SUPPLIERS
H.12.1 CLAIMS AND ENCUMBRANCES
The Contractor shall satisfy as due all lawful claims of any persons or entities employed by the Contractor, including subcontractors, material men and laborers, for all labor performed and materials furnished under this contract, including the applicable warranty or correction period, unless the Government shall be directly liable by contract. The Contractor shall not at any time permit any lien, attachment, or other encumbrance to be entered against or to remain on the building(s), or the premises, whether public or private, or any portion thereof, as a result of nonperformance of any part of this contract.
H.12.2 APPROVAL OF SUBCONTRACTORS
(a) REVIEW AND APPROVAL. The Government reserves the right to review proposed subcontractors for a period of five (5) days before providing notice of approval or rejection of any or all subcontractors.
(b) REJECTION OF SUBCONTRACTORS. The Government reserves the right to reject any or all subcontractors proposed if their participation in the project, as determined by the Contracting Officer, may cause damage to the national security interests of the United States.
The Contractor agrees to promptly replace any subcontractor rejected by the Government under this clause.
H.13 CONSTRUCTION PERSONNEL
H.13.1 REMOVAL OF PERSONNEL
The Contractor shall maintain discipline at the site and at all times take all reasonable precautions to prevent any unlawful, riotous, or disorderly conduct by or among those at the site.
The Contractor shall ensure the preservation of peace and protection of persons and property in the neighborhood of the project. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee that the Contracting Officer deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the project is deemed by the Contracting Officer to be contrary to the Government's interests.
H.13.2 CONSTRUCTION PERSONNEL SECURITY
After award of the contract, the Contractor shall have ten days to submit to the
Contracting Officer a list of workers and supervisors assigned to this project. This information shall be completed under the Canada Authority for Release of Information of each personnel using the form DS-7673 for the Government to conduct all necessary security checks. Refer to Attachment 5. It is anticipated that security checks will take 2 weeks to perform. For each individual the list shall include:
Full Name Place and Date of Birth Identification Number
Failure to provide any of the above information may be considered grounds for rejection and/or re-submittal of the application. Once the Government has completed the security screening and approved the applicants, the Government will provide a badge to the individual for access to the site.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.