This document contains performance standards for a federal contract supporting actuarial technology services. The Pension Benefit Guaranty Corporation seeks to issue an indefinite delivery indefinite quantity contract for Actuarial Technology Support Services to support its Office of Information Technology. The base period of performance is one year with nine one-year option periods. Key performance standards include maintaining adequate staffing levels and skillsets to perform required activities, tracking and reporting on all performance standards monthly, and improving system performance and reducing costs annually. Deliverables must be thorough, accurate, and on schedule, and change requests will follow a four-step review process. Response time for urgent service desk tickets must be within one business hour for 95% of tickets.

Attachment C.6 Performance Standards

View the file

Other files for this federal contract opportunity

Other files attached to Actuarial Techology Support Services (ATSS), newest first.
File Type Posted
Attachment_B.5_ATSS_TO_1_Price_Schedule_-_Amend_1.xlsx XLSX spreadsheet
Attachment_C.6_Performance_Standards_-_Amend_1.xlsx XLSX spreadsheet
Attachment_L.2.1_ATSS_Task_Order_1_-_Amend_1.docx DOCX document
Consolidated_Questions_for_Amendment_01_Posting.xlsx XLSX spreadsheet
Attachment_L.3.a_ATSS_Labor_Category_Crosswalk_-_Amend_1.xlsx XLSX spreadsheet
Amend_01_16PBGC19R0007.pdf PDF
Attachment_B.5_ATSS_IDIQ_Price_Schedule_-_Amend_1.xlsx XLSX spreadsheet
Attachment_C_Acronym_List.pdf PDF
Attachment_C.1_OIT_Organizational_Chart.pdf PDF
Attachment_B.5_ATSS_TO_1_Price_Schedule.xlsx XLSX spreadsheet
Attachment_C.2.a_TRM_AD_Tools.xlsx XLSX spreadsheet
Attachment_L.3.a_ATSS_Labor_Category_Crosswalk.xlsx XLSX spreadsheet
Attachment_C.4.2.b_ITSLCM_Handbook_v3.0.pdf PDF
Attachment_L.2.1.2_Proposed_Staffing_by_Labor_Category_.xlsx XLSX spreadsheet
Attachment_L.2.1_ATSS_Task_Order_1.pdf PDF
Attachment_C.4.2.a_ITSLCM_Framework_v3.0.pdf PDF
Solicitation_19R0007_rev_9122018.pdf PDF
Attachment_L.3.b_ATSS_Proposed_Labor_Build_Up.xlsx XLSX spreadsheet
Attachment_C.2_ATSS_Environment_and_Requirements.pdf PDF
Attachment_B.5_ATSS_IDIQ_Price_Schedule.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TierPWS SectionCategoryPerformance RequirementPerformance RequirementPerformance Standard = Exceptional AQL = Acceptable/Yes No = UnacceptableMonitoring MethodFrequency
ProgramProgram ManagementManagementStaffingStaffing resources are deployed (and redeployed as necessary) to ensure adequate personnel and skill levels are available to perform all required activities.

All personnel have requisite skillsets and qualifications.

All personnel meet established clearance requirements.Yes/NoCOR review and customer feedbackPeriodic
ProgramProgram ManagementManagementService Level MonitoringAll performance standards included in the PWS are tracked and performance levels are reported to the COR and in the PMR on a monthly basis.Yes/No100% COR review/inspectionMonthly
ProgramProgram ManagementManagementProgram Effectiveness and EfficiencyOverall performance of systems improves each year and costs decrease

Note: COR and Contractor will agree on requirements that are to be kept out of this performance standard calculation due to government decisions so these do not affect contractor’s performance.

Yes/NoCOR inspection of performance standards reportsAnnually
ProgramProgram ManagementManagementSmooth TransitionThe service provider shall be 75% staffed no later than 30 days after the kickoff meeting and 100% staffed by 60 days .

Key Personnel shall be 100% staffed at transition start.

Yes/No unless prior COR approvalCOR inInspectionAt 30 days and at 60 days
ProgramProgram ManagementManagementDeliverablesAll documents and deliverables are thorough, complete, comprehensive, free from error, and comply with all templates and other guidance.No deviation without prior COR approval.COR InspectionPeriodic
ProgramProgram ManagementManagementDeliverablesAll SOPs and artifacts are reviewed and revised every 4 months or more frequently as needed.No deviation without prior COR approval.COR InspectionPeriodic
ProgramProgram ManagementManagementDeliverablesReported data is presented in a manner that facilitates rapid and clear understanding.No deviation.COR InspectionPeriodic
ProgramProgram ManagementManagementDeliverablesAll deliverables are verifiable by examining underlying data.No deviation.COR InspectionPeriodic
ProgramProgram ManagementScheduleDeliverablesAll deliverables meet the schedule or are delivered sooner.No more than 2 are late per release. No more than 2 are late per month for other deliverables.COR InspectionEvery release or quaterly.
SystemOperations - Tier 3ScheduleTicket agingActively managing backlog of open tickets pending resolution. Must report to business stakeholders (IPT) for status.Exceptional: Weekly review and report

Acceptable: Monthly review and report Unacceptable: Less often than monthly (quarterly)

HP Qc/service now (System Health Dashboard)Monthly
SystemPM -ManagementChange RequestFour step high-level process: 1. Intake/record CR, 2. Analysis of LOE of CR, 3. Triage of CRs, 4. Handoff to Fed PM for inclusion in CCB meetings.Y/NHP QC/Service Now/SBMMonthly
SystemExecution - Req AnalScheduleResponse time to Service Desk (SD) ticketsResponse within 1 hour (from when assigned to the team) for urgent tickets.Exceptional: ≥ 95% of tickets are responded to in 1 business hours

Acceptable: >= 85% and <95%of tickets are responded to in 1 business hours

Unacceptable: < 85% of tickets are responded to in 1 business hours for urgent ticketsHP QC/Service Now (system Health Dashboard)Bi-Weekly
SystemOperations - Tier 3ScheduleResponse time to SD ticketsResponse within 3 hours (from when assigned to the team) for non-urgent ticketsExceptional: ≥ 95% of tickets are responded to in 3 business hours

Acceptable: >= 85% and <95%of tickets are responded to in 3 business hours

Unacceptable: < 85% of tickets are responded to in 3 business hours for urgent ticketsHP QC/Service Now (system Health Dashboard)Bi-Weekly
SystemOperations - COOPManagementCOOP supportProvide sufficient on-call and/or on-site support (as requested) for annual COOP testing events. (If COOP is applicable to the application)Yes/NoYearly COOPYearly
SystemPM - DocumentationManagementDocumentation (timely)Required documents, in accordance with ITSLCM (e.g., meeting agendas/materials/minutes, PMR, project and system documentation)Yes/NoDetermined by document typeMonthly (also Determined by document type)
SystemOperations - Tier 3ScheduleResolve the ticketAverage urgent ticket resolution time is less than or equal to 1 business days. Resolution means the issue has been fixed or provided a workaround, or the issue has been created as a CR and will be trackedExceptional: Average ticket resolution time is less than or equal to 1 business day

Acceptable: Average ticket resolution time is greater than 1 and less than or equal to 2 business days

Unacceptable: Average resolution time is greater than 2 business days.HP Qc/service now (System Health Dashboard)Bi-Weekly
SystemOperations - Tier 3ScheduleResolve the ticketAverage non-urgent ticket resolution time is less than or equal to 2 business days. Resolution means the issue has been fixed or provided a workaround, or the issue has been created as a CR and will be trackedExceptional: Average ticket resolution time is less than or equal 2 business day

Acceptable: Average ticket resolution time greater than 2 and less than or equal to 4 business days.

Unacceptable: Average resolution time is greater than 4 business days.HP Qc/service now (System Health Dashboard)Bi-Weekly
SystemExecution - Release Mgt CsatCustomer SatisfactionInternal SurveysSurvey after every release or quaterly: 1) Usability of the system (eg. Ease of navigation, availability of on-line help, clear and appropriate error messages; did these things improve or degrade?)

2) How well business needs were met by the release

3) Quality of training provided for the release]

4) System performance (eg. is it the same or better than before the release?) Exceptional: Average score at or above 3.6 Acceptable: Average score between 2.6 and 3.5 Unacceptable: Average score below 2.6

Review surveysEvery release or quaterly.
SystemExecution -Customer SatisfactionUser friendlyIs the system user friendly, adequate hints built in the application, Proper error message displayed.
Exceptional: Average score at or above 3.6

(out of 4) Acceptable: Average score between 2.6 and 3.6 (out of 4)

Unacceptable: Average score below 2.6 (out of 4)SurveysEvery release or quaterly.
SystemExecution - TestingRegulatory ComplianceInfrastructure (EOSL sustainability)Include Infrastructure Roadmap Efforts into our testing and remediation plans for our specific application.Yes/NoITIOD road mapSemi-Annual
SystemExecution - Release MgtRegulatory ComplianceSustainability RoadmapSustainability roadmaps are integrated into release planning.Sustainability roadmap is included in CIO/CXO BriefingMonthly BriefingMonthly
SystemExecution - TestingRegulatory ComplianceSustainability RoadmapEstablish Sustainability Roadmap for all of the technical stack and tools that the system is sitting on.Sustainability roadmap is included in CIO/CXO BriefingMonthly BriefingMonthly
SystemPM - Compliance
Regulatory ComplianceITSCLM complianceAll IT

programs will comply with PBGC’s ITSLCM, including control gates, IT standards, and artifacts.

Yes/NoPM ReviewOn-Going
Project (AGILE)Execution -QualityAcceptance variance points (AVP)Calculated as accepted points/completed pointsExceptional: >= 0.98

Acceptable: = 0.90 - 0.97

Not Acceptable: <= 0.89Iteration closeout report presented to PBGC upon iteration completionUpon iteration completion
ProjectExecutionQualityPost Production High Defect CountMeasure the quality of code deployed to production based on high severity defects (with no workarounds) logged after a release.Acceptable: 0 high defects

Unacceptable: 1 or more high defects

Track the number of high severity production issues recorded in HP QC that are related to the implemented requirements deployed into the production environment in the latest application releaseMonthly
ProjectPM - DocumentationQualityDocumented requirements metReleased product meets documented requirementsYes/NoClosure of all scoped release items (i.e. no defered items, no items with defects deferred)Monthly
ProjectExecution - DeploymentQualitySuccessful deployment of defect free codeSuccessful code deployment with no urgent fix releases required to address issues introduced with the release.Acceptable: No urgent fix releases within 45 calendar days of deployment to production
Unacceptable: One or more urgent fix releases within 45 calendar days of deployment to productionNumber of urgent release RFCs requested within 45 calendar days of deployment to productionMonthly
ProjectExecution - TestingQualityPerformance testingTest plan for each release identifies release items that require performance testing and provides high level description of performance test required.Acceptable: Appropriate performance testing is planned and executed as part of release.
Unacceptable: Performance testing not addressed in test plan.Review of documented test plan and test results.Per Release
ProjectExecution - TestingQualityRegression testingTest plan for each release will address regression testing and provide a high level description or list of the components to be regression tested.Acceptable: Appropriate regression testing is planned and executed as part of release.
Unacceptable: Regression testing not addressed in test plan.Review of documented test plan and test results.Per Release
ProjectPM - Waterfall projectsScheduleSchedule Performance Index (SPI)Projects measured within an acceptable rangeExceptional: Between .96 and 1.04

Acceptable: Between .90 and .96 OR between 1.04 and 1.10

Unacceptable: Less than or equal to .90 or greater than or equal to 1.10Periodic review of EVM reports (P3M)Monthly
ProjectExecuction - TrainingScheduleTimely trainingTraining provided when release includes changes or enhancements that directly impact internal user experience.Acceptable: Training provided within 20 business days prior to production deployment or further in advance with approval from business owner.
Unacceptable: Training not provided prior to production deploymentTraining sign-in or registration report.Per Release
ProjectExecution - Release MgtScheduleBaseline/RebaselineRelease are delivered on time and within cost per the original baseline.Exceptional: No rebaseline required

Acceptable: 1 rebaseline required

Unacceptable: more than 1 rebaseline requiredReview of baseline history in P3M.At end of release
ProjectPM -ScheduleProject MilestonesMeaningful Milestones are met 100% of the time (ie. Baselined cost loaded schedule, Approved Requirements doc, Approved Design doc, Approved test results, Training coducted, Deploy to Prod, Lessons Learned completeExceptional: 100% of milestones are met on time

Acceptable: 95-99% of milestones are met on time

Unacceptable: <95% of milestones are met on timeCOR Review of P3M scheduleevaluate progress toward completion monthly (waterfall), At end of each sprint (Agile) Final reporting end of release
ProjectPM - Cost - Waterfall projects
CostCost Performance Index (CPI)Projects are measured within an acceptable range within costExceptional: Between .96 and 1.04

Acceptable: Between .90 and .96 OR between 1.04 and 1.10

Unacceptable: Less than or equal to .90 or greater than or equal to 1.10Periodic review of EVM reports (P3M)Monthly
ProjectPM - CostCostWithin costProject is delivered at or below costYes/NoCOR ReviewMonthly
ProjectPM - DocumentationManagementDocumentation (timely)Required documents, in accordance with ITSLCM (e.g., meeting agendas/materials/minutes, PMR, project and system documentation)Timely: Yes,
not timely: NoPM ReviewPeriodic
ProjectPM -ManagementProgram and project management plans (issue, escalation, communications plans)All program and project management plans are adheared to.
All project plans include a communications planAcceptable: Project has/adheres to Pgm/PM plans Unacceptable: Project does not have/adhere to plansCOR reviewPeriodic
ProgramPM - ComplianceRegulatory ComplianceAdhering to the OIT risk management process (see PPL)The project adheres to the OIT Risk Management processYes/NoPM reviewPeriodic
ProgramPM - ComplianceManagementContract administrationAdherence to terms and conditions of contract, including key personnel changes, corrective action plans, timeliness of submitting invoices to PBGCYes/NoCOR Surveillancemonthly (invoices), quarterly for other administration
ProjectExecution - TrainingCustomer SatisfactionQuality of trainingCustomer Satisfaction with Training.Survey results.

4/4 Exceptional, 3/4 Acceptable,

2/4 (and below) unacceptablePM Review/post-training survey resultsPost training
Project/SystemOperations - Tier 3Customer SatisfactionComplaints/spike in tickets/callsLimit Spike in calls/ tickets (complaints) based on normal threshold of calls/tickets/complaintsExceptional = No spike;

Acceptable = %5 above average,

Unacceptable = 10% above average,Review of tickets
Call log reportsMonthly
ProjectPM - ComplianceRegulatory ComplianceITSCLM complianceEvery project shall comply with ITSLCMYes/NoPM reviewPeriodic
ProjectExecution - TestingQualityUAT Defect Escape RateMeasure percentage of defects discovered in UAT as a percentage of all UAT and SIT defects found in the release.Exceptional: <= 15%

Acceptable: >15% and <= 35%

Unacceptable: >35%Review of defects captured in defect repository.Monthly
ProjectOperations - TicketsQualityUAT High Defect CountMeasure the quality of code deployed to UAT environment based on the percentage of high severity defects found in UAT in relation to the number of test scripts executed in UATExceptional: <= 10%

Acceptable: >10% <= 20%

Unacceptable: >20%Review of defects captured in defect repository.Monthly
SystemOperations - TicketsQualityProduction Ticket Root Cause Analysis rateMeasure the percentage of production tickets with associated root cause analysis findings logged as PTR/SCRs so that effective prioritization of corrective action can be made based on the highest impact. Metric formula: Total # production tickets with associated PTR/SCR/Total qualifying production tickets.Exceptional: >= 75%

Acceptable: <75% >= 25%

Unacceptable: <25%Review of production tickets.Quarterly.
SystemOperations - Tier 3QualitySystem Performance: Unplanned Application Outage or Degradation in Application Performance or Fault preventing Application Use (per occurrence)Resolve issue or provide workaround within 1 business day (12 business hours)Exceptional: Outage resolution time is less than 4 business hours

Acceptable: Outage resolution time is within 1 business day.

Unacceptable: Outage resolution time is greater than 1 business day.Review of production ticketsMonthly
ProjectPM - DocumentationScheduleTimeliness of deliverablesProject artifacts and management deliverables meet delivery timelines as agreed to with the COR.Exceptional: 100% of deliverables meet delivery timeline

Acceptable: less than 100% and greater than or equal to 90% of deliverables meet delivery timeline

Not Acceptable: Less than 90% of deliverables meet delivery timelineReview of deliverable received against milestone delivery date in project schedule.Monthly
ProjectPM - DocumentationQualityMaintenance of system documentationSystem documents reflect release in production.Exceptional: 100% compliance

Acceptable: 95-99% compliance

Unacceptable: Less than 95% complianceReview of project artifacts as linked on the P3M Document DashboardPer Release
ProjectPM -QualityCapture of Lessons LearnedLessons learned are discovered and captured throughout the project lifecycle.Exceptional: 2 or more lessons documented

Acceptable: 1 improvement documented

Unacceptable: 0 improvements documentedReview of P3M lessons learned capturedMonthly
Project (AGILE)Execution -QualityAcceptance Variance Story Count (AVS)Calculated as Accepted Count /Completed Story CountExceptional: >= 0.98

Acceptable: = 0.90 - 0.97

Not Acceptable: <= 0.89Iteration Closeout Report presented to PBGC upon iteration completionUpon iteration completion
Project (AGILE)Execution -QualityDefect Density (DD)Calculated as Total number of defects captured in each sprintExceptional: >= 0.98

Acceptable: = 0.90 - 0.97

Not Acceptable: <= 0.89Iteration Closeout Report presented to PBGC upon iteration completionUpon iteration completion
Project (AGILE)Execution -QualityQuality – InterimDeliver quality software meeting the business need.94% of Sprint Backlog items, on average, are accepted at the end of the Sprint.Sprint Demo / Sprint Summary ReportUpon iteration completion
Project (AGILE)Execution -QualityConduct testing of the developed softwareTest cases for the developed requirements along with an updated Requirements Traceability Matrix are built in Quality Center by iteration. Quality center shows a completed testing at the end of each iteration with all defects addressed. The Deployment guide is built by the end of each sprint for deployment into ITC if requiredAcceptable: 100% compliance on the building of test cases in Quality Center and the updated RTM document. No Show stopper, High or Medium defects for the software developed at the end of the iterationQuality Center Reports. Updated RTM and Deployment Guide documents on SharePointPer Release
Project (AGILE)Execution -ScheduleEffectiveness – ScopeComplete Agile development activities according to the Release Plan that includes prioritized release backlog, number of Sprints with durations, ITC & UAT testing activities and release activitiesAcceptable: Complete the identified number of Sprints in the allocated schedule.Inspection of PBGC's Project Management application system of recordUpon iteration completion
Project (AGILE)Execution -ManagementAnalyze and document the detailed requirements from the Options Analysis output (functional and non-functional) for the software developed at the end of each iterationA complete requirements backlog is created at the end of iteration Zero for the phase. At the end of each iteration, the detailed requirements document is updated to reflect the components built during the iteration and approved by the Product OwnerAcceptable: 100% complianceRequirements document with the detailed requirements of the sprint fully documented and approved by the Federal PM and PBGC department product owner at the end of each iterationUpon iteration completion
Project (AGILE)Execution -Customer SatisfactionEffectivenessRelease meets desired business value.Acceptable: 94% of the initial release backlog is delivered in releaseInspection of Release Plan and iteration Demo / iteration Summary ReportsPer Release
Project (AGILE)Execution -Regulatory ComplianceDevelop / Configure SolutionThe software is developed, configured and deployed in the CDE-T and CDE-I environments in accordance with the ITSLCM System Development standard, Data standard, IT Software Services Standard, Information System Connection standard, System Protection Standard, and Access Control Standard.Acceptable: 100% compliance. Any issues identified are corrected in the following development iterationWorking software as required by the product owner and Federal PM and determined in the Sprint backlog is deployed and available in the CDE-T and CDE-I environmentsPer Release