This solicitation requests offers for a replace water tower project at the Federal Correctional Institution in Lexington, Kentucky. Offerors must propose design, construction, installation, and testing of a new welded carbon steel water storage tank and foundation to replace the existing tower. The solicitation includes requirements for 500 feet of new 8-inch discharge piping and 100 feet of 8-inch water supply piping to tie into existing lines. Offer submission requirements, such as completion of SF-1442, bid bond, and representations and certifications, are defined. The solicitation also provides instructions for pre-bid meetings, questions, and past performance evaluations. The deadline for offer submission is October 4, 2023. The awarded firm must complete the project within 385 calendar days of notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract FMC Lexington-Signed.pdf | ||
| 1-INSTRUCTIONS TO BIDDERS FMC Lexington.pdf | ||
| 1-INSTRUCTIONS TO BIDDERS FMC Lexington.pdf | ||
| 5-CONSTRUCTION WAGE RATE.pdf | ||
| 2-SOLICITATION 15BFA023B00000039.pdf | ||
| 7-CRIMINAL HISTORY CHECK.pdf | ||
| 6-BID BOND.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15BFA023B00000039/0001 Page 1 of 27
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 27
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
09/26/2023
4. REQUISITION/PURCHASE REQUISITION NUMBER
15B10923PR000214
5. PROJECT NUMBER (If applicable)
BFAOCODE
Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, TX 75051
Kimberly Johnson
(O) 202-598-6059 knjohnson@bop.gov
6. ISSUED BY 15B109CODE
Federal Bureau of Prisons FMC Lexington
3301 LEESTOWN RD
Lexington, KY 40511
7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NUMBER
15BFA023B00000039
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
08/30/2023
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X XThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AMENDMENT 0001 IS AS FOLLOWS:
A. Incorporate Site Visit Meeting Minutes and Sign in Sheet (See attached, 7 pages).
B. Incorporate Questions and Answers (See attached, 2 pages).
C. To incorporate Wage Rate Determination KY20230090 dated 09/08/2023 (See attached, 7 pages).
D. Removed current Instructions to Bidders and added correct one due to a typo made page 4. (08/31/2023 See attached, 10 pages).
E. THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE/TIME TO: 10/11/2023 - 14:00 CT US/Central No other changes at this time.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
15BFA023B00000039
PRE-BID CONFERENCE MEETING MINUTES
15BFA023B00000039 – REPLACE WATER TOWER
FMC LEXINGTON- PROJECT 23Z1AN2
1 | P a g e
DATE: Wednesday, September 20, 2023 Place: LOCATION AT FMC Lexington
Introduction: Joe Hessami CONTRACTING OFFICER (NAME): Kimberly Johnson
I. INTRODUCTIONS:
Round table introduction of all attendee’s.
II. PURPOSE OF MEETING:
Indicate the purpose of this meeting is to familiarize the contractor with the unique circumstances and requirements surrounding a correctional setting. This meeting is also to explain the solicitation, as issued, and not to furnish additional information.
State - nothing said here shall be interpreted as a change to the solicitation without the issuance of a formal amendment through the FAO Contracting Officer, Kimberly Johnson
III. MINUTES:
Advised minutes will be recorded and posted to beta.SAM.gov.
IV. SITE VISIT INFORMATION: Joe Hessami
Walk to selected site for Replace Water Tower immediately following the meeting.
V. FRONT COVER PAGE FORMS AND INSTRUCTIONS:
Note the Instructions to Bidders. Electronic Bids are NOT authorized. All bids shall be addressed to:
FEDERAL BUREAU OF PRISONS
U.S. ARMED FORCES RESERVE COMPLEX
ATTN: CONTRACTING OFFICER AT FAO
346 MARINE FORCES DRIVE
GRAND PRAIRIE, TX 75051
VI. TIME FRAMES AND LOCATION FOR SUBMISSION OF BIDS:
State the deadline for submission of bids for this project is Wednesday October 4, 2023, by 2:00 P.M CST. To the above mentioned address.
FMC LEXINGTON- PROJECT 23Z1AN2
2 | P a g e
VII. GENERAL TOPICS: Dawn Hadden
The following submission/completion items will be addressed:
1. From the solicitation, each bidder SHALL complete and submit the following forms, clauses, and statements with his/her bid. Failure to do so may cause your bid to be considered as non-responsive:
• STANDARD FORM 1442 Pages 1 & 2: Please include DUNS number and Tax ID# and e-mail address where indicated in block 10 and complete blocks 14-20c. If your company has a “doing business as” name reflected in you SAM registration, include this name as well in Block 14.
Ensure the address typed in block 14 matches the address in your SAM registration.
• PAST PERFORMANCE SUBMISSION: Please ensure the Instructions to Bidders is reviewed and complied with its entirety. References and banking questionnaire submissions must be submitted in advance of the bid opening directly from the reference to knjohnson@bop.gov via email.
• COMMODITY OR SERVICES SCHEDULE (PAGE 4): Complete the Unit Price (JB = job) and Amount blocks (these amounts will be the same). Note: The amounts listed in this section should be the same as the amount listed in block 17 of the SF-1442.
• BID GUARANTEE: See Page 5 of the solicitation. A bid bond must be submitted in original (ink signatures) with your solicitation. The penal sum of the bond must be at least 20% of the bid price, not to exceed $3 million, whichever is less. A blank bid bond was included in the solicitation. The bid bond must be from a Government approved surety. A list of approved sureties can be located on the Department of Treasury, Bureau of the Fiscal Service website.
• REPRESENTATIONS AND CERTIFICATIONS: All contractors submitting a bid must be registered in beta.SAM.gov. Since this is a small business set-aside, you must meet the small business size standard ($45.0 Mil) which corresponds to the assigned NAICS code 237110.
See provision 52.219-1 in the Representations & Certifications section of your beta.SAM.gov registration.
Various provisions from pages 43-51 of the solicitation require bidders to mark selections within the provisions. Please review the Instructions to Bidders and complete the highlighted areas within the solicitation.
• AMENDMENTS: Amendments (if any) must be acknowledged and submitted with the bid by one of the methods as described in item eleven of the Standard Form 30.
FMC LEXINGTON- PROJECT 23Z1AN2
3 | P a g e
2. Other general items to be addressed: Dawn Hadden
• CONSTRUCTION WAGE RATES: This contract is subject to the Construction Wage Rate Requirements (formerly Davis-Bacon Act). General Decision KY20230090 is applicable for this area and has been included in Section 5 - Attachments. All applicable workers must be paid according to the terms of the wage decision.
• GOALS FOR MINORITY AND FEMALE PARTICIPIATION: Participation goals for this project are 10.8% for minorities and 6.9% for females – A “Good Faith” effort should be put forth by the contractor to achieve these goals (see provision 52.222-23).
• LICENSING AND PERMITS: All required licensing and permits are required to be obtained by the contractor who receives contract award.
• MAGNITUDE: The magnitude of the project is between $5,000,000 and $10,000,000.
• WORK HOURS: Work hours within the secure perimeter shall be between 7:00 am and 3:30 pm Monday through Friday excluding weekends and federal holidays.
• COR: The Contracting Officer’s Representative (COR) is Mr. David Brown, Engineering Technician at FMC Lexington.
• PERIOD OF PERFORMANCE: The completion period is 385 calendar days after issuance of notice to proceed.
• TIME EXTENSIONS: Time extensions for inclement weather will not be granted unless the weather is unusually severe and abnormal in comparison to prior years.
• LIQUIDATED DAMAGES: Liquidated damages for this project are in the amount of $901.10 per calendar day of delay after expiration of the completion period.
• PRE-CONSTRUCTION CONFERENCE: A Pre-Construction conference is required after the contract is awarded and will be scheduled accordingly.
• PROGRESS SCHEDULE: A copy of the progress schedule is to be provided to the Contracting Officer and COR as soon as possible. Each time the progress schedule is updated, it must be provided to both the Contracting Officer and COR. It’s suggested an updated document be provided by the Prime Contractor at the mandatory monthly progress meetings. Changes to the schedule must be approved in advance by the Contracting Officer (thru the COR) and must remain within the contract completion period.
• PROGRESS MEETINGS: Progress meetings are mandatory and will be scheduled monthly.
• PAYMENT REQUESTS: Applications for payment are to be submitted on AIA G702 (with continuation page) or the contractor’s own form as long as the information is similar to the G702
FMC LEXINGTON- PROJECT 23Z1AN2
4 | P a g e
(see FAO-0007 on page 10 of the solicitation). Contactors can get these forms from the following website www.aiabookstore.com
• QUESTIONS: Questions asked at the pre-bid conference/site visit of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation among all bidders. All questions shall be sent in Microsoft Word format to Kimberly Johnson FAO Contracting Officer, via email at knjohnson@bop.gov. In order to provide sufficient response time prior to the bid due date, the Government has established that questions be submitted no later than September 22, 2023, at 12:00 PM CST.
• Joe Hessami: Please submit all of your questions electronically to Mrs. Johnson.
• ACCESS TO SITE/PARKING OF VEHICLES: Parking will be provided for employee vehicles and contractor work vehicles.
• STORAGE OF MATERIALS: Storage of materials will be coordinated with the COR.
• CONTRACTOR TEMPORARY OFFICE: No temporary office space will be provided.
• INSPECTIONS: "Punch List" items generated by inspections will be corrected and discrepancy items re-inspected and approved before contract closure takes place. Should any work be covered without proper notification, the contractor shall uncover that work for inspection at his own expense.
SAFETY MANAGER (Ricky Cline):
3. SAFETY POINTS:
• The contractor is responsible for providing required protective gear to all contractor workers, should it be required. Contractor will ensure that all workers have proper safety gear at all times.
• Contractor is responsible for the prevention of accidents on the project site and has spill kit onsite and containment procedures. OSHA requirements will be adhered to.
• The Contractor will have a Safety Representative on site at all times during the completion of this project.
• Proper storage of any chemicals in lay down yard with SDS present.
• Ensure to follow CFR 1926.
CAPTAIN (Major Roution):
http://www.aiabookstore.com/ mailto:knjohnson@bop.gov
FMC LEXINGTON- PROJECT 23Z1AN2
5 | P a g e
4. SECURITY
• ADVERSE WEATHER: Whenever adverse weather conditions or other institution emergency contingencies are in effect, contract workers will not be permitted passage into the secure institution. Should emergency conditions be implemented while contract workers are inside the secure perimeter, they will be required to secure their tools, remove vehicles and equipment, and leave the institution grounds until the emergency situation has been resolved.
Depending upon the nature of the emergency, this normally will not affect any construction outside of the secure perimeter. Contractor is reminded that fog days will be treated like rain days. The performance period of 385 days will allow adequate time to complete the job, and no consideration will be allowed for normal rain days and normal fog days. The normal rain, snow or fog days will be based on the average over the last ten (10) years for the local community.
• SECURITY CLEARANCES: Contract workers are subject to security investigative procedures.
Please refer to the solicitation for details. Please refer to Page(s) 8 of the solicitation.
• EMPLOYEE IDENTIFICATION: Contractor personnel working on project site must bring valid photo identification to the institution each day. The identification will be surrendered upon entry to, and returned upon exit from institution property.
• TOOL ACCOUNTABILITY: Strict accountability and control of all contractor tools and hazardous materials must be maintained at all times. All contractor tools to be used inside the secure perimeter must be inventoried and accounted for at the conclusion of the work day Contractor tools may not be stored on-site overnight. The contractor should provide for enough time at the conclusion of the work day for the return and accounting of all tools issued during the work day. Lost or missing tools must be reported to the COR the Captain immediately.
• ILLEGAL ITEMS ON FEDERAL PROPERTY: Firearms, ammunition, knives, other weapons, drugs, narcotics, and alcoholic beverages are not permitted inside/outside the secure perimeter or anywhere else on Federal property at any time. This includes the private vehicles of contract workers. Violators will be subject to criminal prosecution. All persons, vehicles, and equipment are subject to search by institution authorities at any time.
• NO CONTACT WITH INMATES: Contract workers are not to have any contact with inmates at any time. No photographs may be taken of inmates.
• CONTRACTOR EMPLOYEE WORK DRESS: Green or khaki‐colored clothing is not allowed, as inmates wear these colors.
• PHOTOGRAPHS: The institution’s Facilities Department maintains a digital camera that will be utilized by FBOP staff to document the project work. The Contractor may request copies of these photos, and may request that photos be taken for specific conditions. Cellular telephones equipped with photographic capabilities are prohibited on the project construction site.
FMC LEXINGTON- PROJECT 23Z1AN2
6 | P a g e
VIII. ADDITIONAL DISCUSSION:
Contractors asked:
Clarification citing that the SOW stated the water tank was to be 500’ from the fence.
Shutting down power for demolition for old water tank.
Electrical source for tank.
Is it more beneficial for the contractor to remove steel from the old tank verses cutting it up into smaller pieces to be placed in an open top for recycling.
Contractors were directed to submit all their questions electronically to Mrs. Johnson and that they would be answered for all to review.
Meeting minutes recorded by:
Hessami, Joe, Facility Manager FMC Lexington
NOTICE:
MEETING MINUTES ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THEY ARE NOT
INTENDED TO CHANGE ANY SPECIFICATIONS, TERMS OR CONDITIONS OF THE
SOLICITATION. ANY AND ALL CHANGES TO THE SOLICITATION SHALL BE ISSUED IN
SUBSEQUENT AMENDMENTS ISSUED BY THE CONTRACTING OFFICER ON A STANDARD
FORM 30 (SF-30).
FMC LEXINGTON – Replace Water Tower PROJECT 23Z1AN2
QUESTIONS & ANSWERS
SOLICITATION 15BFA023B00000039
SUBMITTED BY CALDWELL TANKS, INC.
1. For the Tank Demolition we have the following questions.
CLARIFICATION:
a. What specific requirements will we be required to follow beyond that of OSHA, if the tank coatings contain lead paint? See statement of work, section 13
b. Are you operating under the assumption that the coatings contain lead, or do you know that with certainty? See question above. Section 13 (a)
c. Do we leave the foundation as is, including any of the various smaller foundations? Foundation to stay.
d. Are we responsible for disconnecting the piping? How do you want the piping left after the demolition is complete? Piping would need to be disconnected, so as not to cause deadheading.
e. There is a power line adjacent to the tank. Can that be depowered or relocated during demolition? If not, please provide the voltage and details of this line. No 120/208 V. Highly recommend that contractor verify.
f. Who is responsible for disposing of the material? We are willing to handle this. After review, contractor shall be responsible for disposing of material. FMC Lexington would need only the total weight of the metal.
g. IF FMC is to provide the dumpsters, please provide the dimensions of the dumpsters, the quantity, and the largest size of plate that can be placed into them. Please see above answer.
2. For the New Tank we have the following questions:
CLARIFICATION:
a. NFPA 22 is listed in Statement of Work. Is this tank to be designed and provided per the requirements of
NFPA 22?
i. Please note, at minimum this would require us to provide heaters for the tank and will also likely require us to provide insulation for the tank. 16.1.1 Tanks that are subject to freezing shall be heated. Due to the number of water exchanges, freezing has not been an issue.
ii. NFPA 22 also has requirements for internal nozzles, roof access, and other items, not listed in the Statement of Work. Which are we to follow, if NFPA 22 is to be used. See statement of work,
9) Openings, a) Roof Hatches. The Contractor shall be responsible for all labor, materials, and equipment necessary for the fabrication, construction, installation, painting, disinfection and testing of a welded carbon steel water storage tank built at grade level on a concrete foundation. Must certify/ demonstrate that new water tank meets all institutional water needs along with all ancillary equipment required for a fully functioning water distribution supply system.
b. Is the Cathodic Protection system requested internal or external to the tank? Automatically controlled rectifier systems should be used for cathodic protection of water storage tanks when AC power is available to the tank site. Automatically controlled systems use one or more long-life reference electrodes to monitor the protection levels maintained on the submerged surfaces. The rectifier controller continuously monitors the potential difference between the reference electrode and the tank’s submerged surface, referred to as the tank-to-water potential, which will be free of IR (current × resistance, or voltage) drop error. IR drop must be eliminated or minimized to accurately determine if the voltage difference between the submerged surface of the tank and the reference electrode meets the criteria for cathodic protection. The controller instantaneously interrupts the flow of cathodic protection current, providing an IR drop-free measurement, which closely approximates the polarized potential. The controller compares the measured tank to-water potential to a preset value and automatically adjusts the voltage output of the rectifier, to either increase or decrease current accordingly. Automatic units include a tank-to-water potential monitoring meter, which can be easily checked by the purchaser.
c. Is section 14 of AWWA allowed to be used? Backflow Prevention is installed on the main supply from the city.
3. For the Piping on the exterior of the New Tank we have the following questions.
CLARIFICATION:
b. We are to provide 500’ of new 8” discharge water pipe that ties into the existing discharge line. Where is this tie in point, how are we to get there (if this is not a straight line, where should we run this)? This line is presumably underground – is there any requirements of the depth it is to be buried? You are tying into existing line with minimal bends, the depth would be the same depth of the existing.
c. We have the same questions about the 100’ of new 8” water supply piping. See answer above.
d. How are we to tie into the existing piping? See statement of work, Section C (2). We don’t instruct contractor on what techniques are needed to tie into existing water main.
e. Will valves be required at the tie in location, if so what type? If contractor deems it cost effective.
f. Will manholes be required or shut off vault/sleeve at the tie in location of valves are required, if so what type? See answer above, or Section C (7) underground vault. And (10) Mechanical Piping.
4. What type of fencing is required around our job site?
CLARIFICATION: At a minimum, caution tape
5. Please provide details of the tool tracking program:
CLARIFICATION
a. Will inspections be pre and post workday? No, as long as tools do not go within 50 feet of secure fencing.
b. Can we work an 8-hour day and have our foreman conduct these either before or after the workday? Yes, you can work 8-hour days.
c. Would this apply to fit up gear, including the hundreds of bull pens that will be used to erect the tank? If they are not within 50’ of the secured fencing.
d. Do weld leads have to be disconnected and then reconnected at the end of and start of each workday?
They can be left connected if it doesn’t create a safety, or security concern. Leads cannot be left unsecured at the end of the workday.
6. If JLGs are used to weld the tank and expected to be moved often, do we need to barricade off the area below them? Or can we red barricade the general area around the tank?
CLARIFICATION: Please refer to CFR 1926.
7. Is the Pre-Plumb By-Pass Vault listed in section 10 A of the Statement of Work the same as the Underground Vault in Section 7?
CLARIFICATION: YES
8. For electrical we have the following questions:
CLARIFICATION:
a. Where are we performing the directional boring to and from? Rear gate building.
b. We are to install three (3) new 20-amp 120-volt circuits in new vaults that are set by others? What and where are these vaults? -One vault should suffice to include all ancillary equipment required.
c. Who will supply the power to these vaults for the new circuits? See statement of work. Section c (14) Electrical.
d. Is the contractor to provide new panelboards at the vault locations? No
e. What is the wiring conduit requirements for the power from the vaults to the tank location? Wiring in PVC conduit must have at least 18 inches of cover. Backfill surrounding conduit or cables must be smooth granular material without rocks.
SOLICITATION NO.: 15BFA023B00000039
REPLACE WATER TOWER
FMC LEXINGTON
UNITED STATES DEPARTMENT OF JUSTICE
FEDERAL BUREAU OF PRISONS FIELD
ACQUISITION OFFICE
GRAND PRAIRIE, TX 75051
ISSUE DATE:08/30/2023
BID DUE DATE: 10/04/2023 @ 2:00 pm CST
BID SHALL BE ADDRESSED TO:
FEDERAL BUREAU OF PRISONS
FIELD ACQUISITION OFFICE
U.S. ARMED FORCES RESERVE COMPLEX
346 MARINE FORCES DRIVE
GRAND PRAIRIE, TX 75051
ATTN: Kimberly Johnson
BID SUBMISSION PROCEDURES
DEADLINE FOR RECEIPT OF BIDS: 10/04/2023
2:00 P.M. CST
MAIL OFFERS TO:
FEDERAL BUREAU OF PRISONS FIELD ACQUISITION OFFICE
346 MARINE FORCES DRIVE GRAND PRAIRIE, TX 75051
ATTN: Kimberly Johnson, CONTRACTING OFFICER 202-598-6059
NOTE: ANY BIDDERS DESIRING TO BE PRESENT DURING BID OPENING, OCCURING AT THE FBOP FIELD ACQUISITION OFFICE IN GRAND PRAIRIE, TEXAS, MUST SUBMIT THE NAME OF THE PERSON WHO WILL ATTEND NO LESS THAN FIVE (5) DAYS IN ADVANCE OF THE DAY OF THE BID OPENING TO Kimberly Johnson AT knjohnson@bop.gov. VISITORS WILL BE REQUIRED TO PRESENT IDENTIFICATION AT THE SECURITY CHECK
POINT AND TO THE OFFICIAL CONDUCTING THE BID OPENING.
PLEASE BE ADVISED – AN ABSTRACT OF THE BIDS RECEIVED WILL BE POSTED TO THE SAM.GOV WEBSITE IMMEDIATELY AFTER THE BID OPENING. THEREFORE, ATTENDANCE MERELY FOR THIS PURPOSE IS NOT
NECESSARY.
***********************************IMPORTANT*********************************
CONTRACTORS MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) AT WWW.SAM.GOV. YOUR BUSINESS SIZE METRICS INFORMATION IN SAM MUST MEET THE SMALL BUSINESS SIZE STANDARD REQUIREMENT FOR NAICS CODE 237110 (reference FAR provision 52.219-1 in the Representations & Certifications section of your SAM registration).
If you have questions about the System for Award Management (SAM), Government procurements in general, or need assistance in the preparation of your Bid, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org.
Each offeror shall complete and submit the following forms, clauses, and statements (1 original ink signature copy). Failure to furnish all required information or any rejection of or addition to the terms and conditions of the solicitation may cause your offer to be considered as non-responsive and ineligible for award.
A. SECTION 1: SF-1442 – Solicitation, Offer, and Award, pages 1 & 2
Complete blocks 10 and 14 thru 20c (remember to include the signer’s title in block 20a). Ensure the address typed in block 14 matches the address in your
SAM registration.
Blocks 21 thru 31c are to be completed only by the Government!
Include your Unique Entity Identifier, TAX ID#, CAGE# and Email address where indicated in block 10.
B. SECTION 2: Schedule of Supplies/Services, page 4
C. SECTION 5: Attachments page 35
SF-24 BID BOND:
Reference provision 52.228-1 and FAO-0001.
http://www.sam.gov/ http://www.aptac-us.org/
***************************IMPORTANT***************************
The bid bond must be submitted in original (ink signatures) with seals. Penal Sum of the bond must be at least 20% of the bid price.
Ensure that the surety information matches the information for the surety as posted in Treasury Circular 570, at the Department of the Treasury website:
http://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570_a-z.htm
Ensure the liability limit for the surety (located at the bottom of the SF-24) is expressed as a dollar amount (not a percentage). Ensure the liability limit is either equal to the amount reflected for the surety in Treasury Circular 570 or is in an amount at least equal to the penal sum of the bond.
In the bid identification section, ensure the bid date reflects the current date that bids are due per the solicitation (review all amendments, if applicable, to check for any bid due date extensions).
Ensure the information for the principal matches the information as posted in your SAM registration (e.g., company name and address).
D. SECTION 7: Representations and Certifications, pages 41-49
1. FAR provision 52.204-8 (Pages 41-44)
NOTE: Pursuant to section (b)(1) of this provision, provision 52.204-7 is also included in the solicitation. Therefore, offerors should not mark either of the two options under section (b)(2). Leave these options unmarked!
2. FAR provision 52.204-24 (Pages 44-45) Offerors shall complete section 52.204-24(d).
3. FAR provision 52.209-7 (Page 46) Offerors shall complete section (b).
4. FAR provision 52.209-12 (Page 46-47) Offerors shall complete section (b).
3. FAR provision 52.209-13 (Pages 47-48) Offerors should mark as applicable either (b)(1) or (b)(2). If (b)(2) is applicable, please follow additional instructions provided.
4. FAR provision 52.229-11 (Pages 48-49) Offerors shall complete Section (d).
5. Past Performance Past Performance Information should be submitted prior to bid closing.
Submit pages 1, 2, 4 and 41-49 of the solicitation document.
Amendments - if any, may either be submitted in their entirety OR be acknowledged in Block 19 of the SF-1442, Acknowledgement of Amendments (see Block 11 of the SF-30, amendment of solicitation/modification of contract). If an amendment requires the contractor to fill-in information, that amendment must be submitted in its entirety.
PRE-BID CONFERENCE & SITE VISIT:
**********************************IMPORTANT**********************************
A pre-Bid conference and site visit are scheduled for Wednesday, September 20, 2023, at 9:00 A.M. local time, at FMC Lexington, 3301 Leestown Road Lexington, Kentucky 40511.
Attendance is not mandatory (see provision 52.236-27 Alternate-I of the solicitation).
http://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570_a-z.htm http://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570_a-z.htm
Criminal History Check forms checks will be required for all attendees. The authorization for release of information (Form BP-A0660 NCIC Check, attached) shall be completed for each attendee and sent to d1xbrown@bop.gov by 2:00 pm local time on Monday, September 18, 2023. The forms must include a cover letter indicating they are for the Replace Water Tower project:
• Company name and list of individuals from the company who will be attending.
• Phone number/point of contact for the company for notification of any NCICs that are denied.
Please follow up with David Brown(d1xbrown@bop.gov) to ensure receipt of Criminal History Check forms and directions to the institution.
All contractors approved to enter the institution for the pre-bid meeting must bring a photo ID and your license plate number. The following are not allowed: Weapons (including pocket knives), cell phones, blackberries, pagers, radios, cameras, drugs, and alcohol. Please arrive at least 15 minutes early to allow time for security procedures.
NOTE: Due to the COVID-19 pandemic, all visitors will be medically screened prior to allowing entrance to the institution. If a visitor cannot be cleared, the visitor will not be allowed to enter the institution. Additionally, all visitors are required to wear facemasks while on institutional property.
Any questions relating to the solicitation shall be sent to Kimberly Johnson, Contracting Officer, via email at knjohnson@bop.gov no later than Friday, September 22, 2023, at 12:00 p.m. CST. Offerors shall offer in accordance with current solicitation to include all amendments (if any) as issued by the Contracting Officer only.
Past Performance Information Required Refer to Provision FAO-0022, List of References and Banking Information
Attached to this document are two past performance questionnaires, one for your references, and one for your bank.
1. Past Performance Questionnaire: Forward this document to at least 5 companies/Government agencies who you have current work or have completed work within the last 24 months.
The references submitted should be in the same range as your bid price. Please submit reference forms for projects of a similar nature or as similar as possible. If you do not have references similar to what you are bidding for this project, please indicate so by including a separate letter with your bid stating so. Not having references similar will not determine your bid non-responsive.
2. Bank Reference: Forward this document to your bank and inform them in writing they are authorized to respond to this document. Ensure they are aware that only this document will be accepted.
You are responsible to ensure the questionnaires are delivered to your references, and that they respond via forwarding the completed reference to knjohnson@bop.gov. The completed reference documents must come from your reference, and not from an email address in your firm.
mailto:jkercheval@bop.gov mailto:knjohnson@bop.gov bop33096 Highlight Updated due to typo made here.
Each offeror is requested to submit their offer with the following offer label:
This label shall be completed and used on the envelope containing the offer. This envelope shall be placed inside of shipping boxes or envelopes supplied by couriers such as FedEx. Complete the information on the label and cut and paste or transfer it to the LOWER left corner of the envelope containing your offer (not on the courier envelope/packaging). Print or type your name and address in the UPPER left corner of the envelope containing your offer.
Bid
SOLICITATION NO.
15BFA023B00000039
Date For Receipt of Bids/Offers
October 4, 2023
Time for Receipt of Bids/Offers
2:00 p.m.
OFFICE DESIGNATED TO RECEIVE BIDS/OFFERS
Federal Bureau of Prisons Field Acquisition Office 346 Marine Forces Drive Grand Prairie, TX 75051
Contracting Officer
Kimberly Johnson
PAST PERFORMANCE QUESTIONNAIRE
The contractor you are receiving this document from intends to offer a bid to the Federal Bureau of Prisons for an upcoming project. As a potential bidder who may receive the contract, it is required by law that Past Performance be examined. The intention of this request is to ensure contractor responsibility prior to expending your tax payer dollars and awarding a federal contract. It is imperative before we award tax dollars to firms, they are deemed capable and responsible.
A brief one (1) page survey is attached with a second page for comments. Please ensure you provide your professional opinion in the comments section so that I may combine your rating and comments into a fair rating. Please submit responses by 10/04/2023 by 2:00 pm as this is the day of the bid opening. Please scan and email back.
Please provide the name of the company for whom you are providing the reference: ____________________________ Please provide the following information regarding YOUR Company/Government Agency in case I have questions:
a. Name of Company/Government Agency:
b. Telephone Number:
c. Name/Title of Contact Person:
d. Contact Person E-Mail Address:
e. Description of Work Performed:
f. Amount of Contract:
g. Contract Status: Active or Complete ( circle one)
h. List Month/Year of Completion (if applicable): _
If you have any questions please do not hesitate to contact me, knjohnson@bop.gov Contracting Officer, at 202-598- 6059 Your assistance is greatly appreciated!
THIS DOCUMENT MUST BE SENT DIRECTLY TO knjohnson@bop.gov DO NOT EMAIL BACK TO THE REFERENCED
This document, once completed, must be emailed to knjohnson@bop.gov. Do not return this document to the Contractor who forwarded you this document.
mailto:
CONTRACTOR.
RESPONSIBILITY QUESTIONNAIRE
Contractor Name:
RATING
1 5/6 10 Poor Average Best
PERFORMANCE
WORKLOAD
How would you rate their overall performance to date?
How would you rate the contractor’s adherence to contract delivery and/or performance schedule?
How would you rate the contractor’s quality control?
How would you rate the contractor’s efforts in fostering good business relations?
How would you rate the contractor’s meeting all the contract requirements?
Has the contractor required changes to the contract due to contractor problems?
Yes No Comments
BUSINESS
ETHICS
Based on your observations, do you believe the contractor to be ethical in their business relationship with your organization?
Are you aware of any ethics problems being experienced by the contractor?
ORGANIZATION Does the contractor demonstrate good organizational structure?
Do you have recourse within the company if you are not satisfied with the on/off-site supervision? (Please explain under comments)
Are you aware of any organizational deficiencies with the contractor? (If yes, please explain under comments)
RESOURCES Did the contractor demonstrate themselves to have sufficient financial resources?
Did the contractor demonstrate themselves to have sufficient qualified personnel resources?
LEGAL Are you aware of any legal problems being experienced by the contractor?
GENERAL
If the work is complete would you have the contractor come back for another contract if this contract were completed?
Do you have anything else you would like to add? Please attach any notes you may have in reference to this contractor, either positive or negative.
Signed: Date:
Company Name:
THIS DOCUMENT MUST BE SENT DIRECTLY TO knjohnson@bop.gov. DO NOT EMAIL BACK TO THE REFERENCED
PLEASE PROVIDE ANY COMMENTS EITHER POSITIVE OR NEGATIVE THAT YOU BELIEVE
COULD IMPACT THE GOVERNMENTS ABILITY TO DO BUSINESS WITH THIS
FIRM:
THIS DOCUMENT MUST BE SENT DIRECTLY TO knjohnson@bop.gov. DO NOT EMAIL BACK TO THE REFERENCED
BANKING QUESTIONNAIRE
The contractor you are receiving this document from intends to offer a bid to the Federal Bureau of Prisons for an upcoming project. As a potential bidder who may receive the contract, it is required by law that Past Performance be examined. The intention of this request is to ensure contractor responsibility prior to expending your tax payer dollars and awarding a federal contract. It is imperative before we award tax dollars to firms, they are deemed capable and responsible.
A brief one (1) page survey is attached. Please ensure you provide the date the contractor’s bank account was opened, and respond to each of the three questions posed. The document does not require any detailed bank account information.
Please submit responses by October 4, 2023 @ 2:00 pm, as this is the day of the bid opening. Please scan and email back.
This document once completed must be emailed to knjohnson@bop.gov. Do not return this document to the Contractor who forwarded you this document.
If you have any questions, please do not hesitate to contact me, Kimberly Johnson Contracting Officer, at 202-598- 6059. Your assistance is greatly appreciated!
mailto:knjohnson@bop.gov
CONTRACTOR FINANCIAL INQUIRY:
THE INTENTION OF THIS REQUIREMENT IS TO ENSURE CONTRACTOR FINANCIAL
RESPONSIBILITY PRIOR TO AWARDING A FEDERAL CONTRACT. THE COMPANY
LISTED BELOW HAS GIVEN YOUR NAME AND INFORMATION SO THAT WE MAY
CONTACT YOU TO INQUIRE REGARDING THEIR STANDING WITH YOUR BANK. IF
YOU HAVE ANY QUESTIONS PLEASE DO NOT HESITATE TO CONTACT ME AT
202-598-6059.
Contractor:
Contractor Name:
Contractor Point of Contact:
Contractor Address:
Name and Address of Financial Institution:
Name of Bank:
Bank Point of Contact:
Bank Address:
PLEASE ANSWER THE FOLLOWING:
1. Does the contractor maintain satisfactory account status (making timely debt payments, maintains positive cash flow and overdraft protection, etc.)?
[ ] always [ ] often [ ] not often
2. What credit standing does the contractor currently have?
[ ] excellent [ ] fair [ ] poor
3. Generally, their average monthly balance in the last six months is:
[ ] less than $10,000 [ ] $10,000 - $100,000 [ ] greater than $100,000
Signature and Title of Bank Representative Date
THIS DOCUMENT MUST BE SENT DIRECTLY TO KNJOHNSON@BOP.GOV. DO NOT EMAIL
BACK TO THE REFERENCED CONTRACTOR.
DATE ACCOUNT OPENED:
| SOLICITATION NO.: 15BFA023B00000039 |
| REPLACE WATER TOWER |
| FMC LEXINGTON |
| BID SUBMISSION PROCEDURES |
| ***********************************IMPORTANT********************************* |
| CONTRACTORS MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) AT WWW.SAM.GOV. YOUR BUSINESS SIZE METRICS INFORMATION IN SAM MUST MEET THE SMALL BUSINESS SIZE STANDARD REQUIREMENT FOR NAICS CODE 237110 (reference FAR provision 52.219-1 in the... |
| A. SECTION 1: SF-1442 – Solicitation, Offer, and Award, pages 1 & 2 |
| C. SECTION 5: Attachments page 37 |
| D. SECTION 7: Representations and Certifications, pages 43-51 |
| 2. FAR provision 52.204-24 (Pages 46-47) |
| Offerors shall complete section 52.204-24(d). |
| 3. FAR provision 52.209-7 (Page 48) |
| Offerors shall complete section (b). |
| 4. FAR provision 52.209-12 (Page 49) |
| Offerors shall complete section (b). |
| 3. FAR provision 52.209-13 (Pages 49-50) |
| Offerors should mark as applicable either (b)(1) or (b)(2). If (b)(2) is applicable, |
| please follow additional instructions provided. |
| 4. FAR provision 52.229-11 (Pages 50-51) |
| Offerors shall complete Section (d). |
| *************************************************************************** |
| RESPONSIBILITY QUESTIONNAIRE |