Statement_of_Work.doc
DOC document 37 KB Posted
- Attached to
- REPLACE 4 INDUSTRIAL DRYERS Federal contract opportunity
- Solicitation number
- 15B61618Q00000184
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional_Provisions.docx | DOCX document | |
| NCIC_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEQ CHAPTER \h \r 1
UNITED STATES DEPARTMENT OF JUSTICE
FEDERAL BUREAU OF PRISONS
FCC VICTORVILLE
13777 Air Expressway
Victorville, California, 92394
SCOPE OF WORK
PART I - GENERAL INFORMATION
A. INTRODUCTION:
This project includes disconnecting and removing four existing dryers and installing four new dryers as specified.
B.
SCOPE:
The overall purpose of this project is to disconnect and remove the existing dryers and install new dryers. The units must be able to be installed with no demolition to walls, doors, or windows.
C. DRYER SPECIFICATIONS:
1. Capacity – 170 lb. (77.11 kg.)
2. 50.76 cu. ft. basket volume.
3. 550,000 btu/hr heat input, 3,700 cfm. airflow.
4. Radial airflow.
5. Steel door with gasketless glass.
6. 18” Diameter vent connection.
7. Front serviceable.
8. Dimensions must not exceed 56” wide x 100” tall x 51” deep.
** NOTE TO SPECIFIER ** Optional Features: Delete options not required.
9. Provide prison package.
10. Natural Gas heated.
11. Four-Point Roller Support System.
12. Stainless steel basket.
13. Reversing Basket.
14. Permanently lubricated motor and drive bearings.
15. Belt Drive
16. Powder coated cabinet.
17. Stainless steel lint screen.
18. 480V 3Ph power supply.
19. Integrated Fire Suppression System.
PART II - WORK REQUIREMENTS
A. Contractor shall disconnect, and remove the existing dryers and place in a location directed by the Facility Manager.
B.
Contractor shall be responsible for bringing new dryers into the facility and placing it in the Institutional Laundry Area.
C.
Contractor shall be responsible for completing electrical, plumbing and ventilation modifications needed for installation of the new dryers.
D.
Contractor shall be responsible for final startup of new dryers.
F. Contractor shall provide Post Certification after factory startup, and before
Final payment is issued.
E. Contractor shall clean all areas of work and return area back to original condition.
PART III- TECHNICAL REQUIREMENTS
A.
Contractor shall provide four new dryers meeting attached specifications and all materials needed to complete project. Equipment must be in current production with replacement parts readily available.
B.
Contractors shall supply tools and equipment needed to remove old dryers and install new dryers.
C.
Contractor shall supply documentation showing a one year warranty on parts and labor.
D.
Contractor’s employees must pass a background investigation and will be responsible for adhering to Bureau of Prison Policies and Procedures while working inside the facility.
E.
Contractor shall be escorted into the facility at 7:30 a.m. and escorted out at 3:00 p.m. Work shall be conducted Monday through Friday.
PART IV- DELIVERABLES
Once the contract is awarded, the contractor shall have 14 days on site to complete all work as specified. Replacement shall be conducted in a manner to allow for simultaneous use of existing laundry equipment to ensure that Laundry Operations can still be conducted.
The contractor shall be paid amount owed for all labor and materials used in the placement and installation of the four new dryers upon inspection of the Facilities Manager or General Foreman. As stated above payment will be made after Post Certification is received.
File details come from the government source that posted it.