UNITED STATES DEPARTMENT OF JUSTICE
FEDERAL BUREAU OF PRISONS
FCC VICTORVILLE
13777 AIR EXPRESSWAY BLVD.
VICTORVILLE CALIFORNIA, 92394
STATEMENT OF WORK
PART I - GENERAL INFORMATION
A. INTRODUCTION
| Purchase, Delivery and Install of (2) Ea. Double Rack Gas Ovens for FCI1 Victorville Food Service |
| Kitchen. |
B. SCOPE
Following are specifications for requested equipment
Purchase, Delivery and Installation of (2) Ea. Double Rack Natural Gas Ovens meeting the following specifications:
· Ovens will be in current production with replacement parts readily available, replacement part pricing will be consistent with current market.
· Ovens will be installed side by side, footprint for both ovens combined must be no larger than 179 inches wide x 96 inches deep (to include hood) x 106 inches high.
· Minimum 275 kBTU/hr, Natural Gas Heated
· 208V, 60Hz, 3-Phase 15 amp Blower
· 120V, 60Hz, 1-Phase 15 amp controls
· Rotating, double rack capacity
· Oven may be split into two halves for movement through 36" openings
· 5" thick compartment insulation; rated at 0" combustible wall clearance, sides and back
· Heavy-duty rack lift and rotate with gear driven rotation system
· Standard digital control
· Integrated hood meeting NFPA 96 and Type I & II construction standards
· Heavy-duty stainless steel interior and exterior
· Automatic, heavy-duty lift and gear-driven rotation system, automatically lifts and lowers with door operation, lift capable of lifting 1 double or 2 single racks
· Heavy-duty door with double-pane viewing window
· Interior door safety release mechanism
· Oven accommodates two single or one double rack, will be set up for double racks
· 100-525 deg F temperature range
· Exhaust heat recovery system
· Racks load at floor level (no ramp)
· Fully integrated hood with single point exhaust connection
· Meets the construction requirements of NFPA 96 & UMC for Type I & II Hoods
· Digital Display Control with programmable recipes
· Selectable Automatic Temperature Setback
· Correctional Package Required
· Ovens must be Energy Star Rated
· (4) Ea. Stainless steel Roll-In Oven Racks, Fully Welded, 20 full size sheet pan capacity, double-side load. Oven Racks shall be constructed with minimum 18 gage stainless steel, welded at each slide to the square tubular stainless steel frame and electro-polished to remove weld slag and discoloration. Casters shall be of hi-temperature design, able to withstand up to 600 degrees and shall include a non-metallic, composite wheel. All fasteners shall be stainless steel. Oven racks shall be reinforced at the bottom frame to minimize rack sway when fully loaded.
· One Year Parts and Labor Warranty
· Freight to 13777 Air Expressway Blvd., Victorville Ca. 92394
Installation shall include:
· Removal of existing equipment. Contractor shall disconnect, and remove the existing ovens and place in a location directed by the Facility Manager.
· Contractors shall supply tools and equipment needed to remove old ovens and install new ovens
· Equipment shall be moved into the facility, uncrated, set in place and leveled.
· Final assembly. Final assembly of equipment.
· Final connection. Final utility connections shall be made on all applicable equipment utilizing existing utilities, ductwork and drain plumbing.
· Contractor shall clean all areas of work and return area back to original condition.
· Start up, operation/leak check shall be performed.
· Post Certification to include verification of installation in accordance with manufacturers’ specifications. Post Certification to be submitted to customer within 30 days of completion of installation.
· One Year Parts and Labor Warranty
· Installation will be performed in a manner which will minimize downtime, work will be performed during normal working hours 7:00 am – 3:30 pm, Monday – Friday.
· The installation will be taking place within the secure confines Federal Correctional Institution #1, therefore all contractors will be required to pass background checks per BOP policy.