The file's text, extracted by GovTribe without its formatting.
Instructions
| Text in Red are example values |
| Please ensure you link all cells appropriately |
| Please ensure rounding is IAW RFP instructions, and are consistent with the Model contract values |
| All formulas shall be entered by the Offeror. Formulas entered in Red text are for instructional use only. |
| FAR 52.217-9 Option to Extend Services |
| The Offeror shall calculate the extension of services option by taking the last option’s total cost for CLINs 0501, 502 and 0504, and dividing that cost by two to derive one six-month option amount. The contract type associated with this option is cost-plus-fixed-fee for CLINs 0501 and 0502, and firm-fixed-price for CLIN 0504. For the CPFF efforts, the Offeror shall propose a fixed fee exclusive of Facilities Capital Cost of Money that does not exceed the statutory limitation of 10%. |
Summary by CLIN Series
Table 6.2.3 - Cost Summary by Cost Series
| COST ELEMENT | 0001 | 0101 | 0201 | 0301 | 0401 | 0501 | TOTAL |
| Integration (CPIF) | Prime Hours | | | | | | | |
| Inter-divisional hours | | | | | | | |
| Subcontractor hours | | | | | | | |
| Total Hours | | | | | | | |
| Direct Labor ($) | | | | | | | |
| Overhead ($) | | | | | | | |
| Material ($) | | | | | | | |
| Subcontracts ($) | | | | | | | |
| Interdivisional ($) | | | | | | | |
| Other Direct Costs ($) | | | | | | | |
| Subtotal ($) | | | | | | | |
| Fringe ($) | | | | | | | |
| G&A ($) | | | | | | | |
| Estimated Cost ($) | | | | | | | |
| Facilities Capital Cost of Money ($) | | | | | | | |
| Fee ($) | | | | | | | |
| Total Price ($) | | | | | | | |
| Systems Engineering (CPIF) | COST ELEMENT | 0002 | 0102 | 0202 | 0302 | 0402 | 0502 | TOTAL |
| Prime Hours | | | | | | | |
| Inter-divisional hours | | | | | | | |
| Subcontractor hours | | | | | | | |
| Total Hours | | | | | | | |
| Direct Labor ($) | | | | | | | |
| Overhead ($) | | | | | | | |
| Material ($) | | | | | | | |
| Subcontracts ($) | | | | | | | |
| Interdivisional ($) | | | | | | | |
| Other Direct Costs ($) | | | | | | | |
| Subtotal ($) | | | | | | | |
| Fringe ($) | | | | | | | |
| G&A ($) | | | | | | | |
| Estimated Cost ($) | | | | | | | |
| Facilities Capital Cost of Money ($) | | | | | | | |
| Fee ($) | | | | | | | |
| Total Price ($) | | | | | | | |
| Architecture Support and Information Protection Support (FFP) | COST ELEMENT | 0004 | 0104 | 0204 | 0304 | 0404 | 0504 | TOTAL |
| Prime Hours | | | | | | | |
| Inter-divisional hours | | | | | | | |
| Subcontractor hours | | | | | | | |
| Total Hours | | | | | | | |
| Direct Labor ($) | | | | | | | |
| Overhead ($) | | | | | | | |
| Material ($) | | | | | | | |
| Subcontracts ($) | | | | | | | |
| Interdivisional ($) | | | | | | | |
| Other Direct Costs ($) | | | | | | | |
| Subtotal ($) | | | | | | | |
| Fringe ($) | | | | | | | |
| G&A ($) | | | | | | | |
| Estimated Cost ($) | | | | | | | |
| Facilities Capital Cost of Money ($) | | | | | | | |
| Profit ($) | | | | | | | |
| Total Price ($) | | | | | | | |
| Special Studies (CPFF) | COST ELEMENT | 0005 | 0105 | 0205 | 0305 | 0405 | 0505 | TOTAL |
| Prime Hours | | | | | | | |
| Inter-divisional hours | | | | | | | |
| Subcontractor hours | | | | | | | |
| Total Hours | | | | | | | |
| Direct Labor ($) | | | | | | | |
| Overhead ($) | | | | | | | |
| Material ($) | | | | | | | |
| Subcontracts ($) | | | | | | | |
| Interdivisional ($) | | | | | | | |
| Other Direct Costs ($) | | | | | | | |
| Subtotal ($) | | | | | | | |
| Fringe ($) | | | | | | | |
| G&A ($) | | | | | | | |
| Estimated Cost ($) | | | | | | | |
| Facilities Capital Cost of Money ($) | | | | | | | |
| Fee ($) | | | | | | | |
| Total Price ($) | | | | | | | |
Summary by WBS
Start Date End Date Start Date End Date Start Date End Date Start Date End Date Start Date End Date Start Date End Date FAR 52.217-9
| | WBS/CES Description | | Base year (CLIN 00XX) | | Option 1 (CLIN 01XX) | | Option 2 (CLIN 02XX) | | Option 3 (CLIN 03XX) | | Option 4 (CLIN 04XX) | | Option 5 (CLIN 05XX) | | 6 Month Option | |
| CLIN | WBS# | Level 1 | Level 2 | Costs | Hours | Costs | Hours | Costs | Hours | Costs | Hours | Costs | Hours | Costs | Hours | Costs | Hours |
| SMC/RN SE&I Program Direct Labor Cost CPIF CLINs Total | | | | | $ 417,860 | | | | | | | | | | DO NOT ENTER DATA HERE | |
| XX01 | 1.0 | SE&I RN Integration | | | | $ 417,860 | | | | | | | | | | | |
| CPIF | 1.1 | | General Systems Integration | | Example | $ 417,860 | $ 10,000 | | | | | | | | | | |
| 1.2 | | Out Year Plan | | | | | | | | | | | | | | |
| 1.3 | | Spend Plan | | | | | | | | | | | | | | |
| 1.4 | | Support Generation of RFP Documentation for Projects | | | | | | | | | | | | | | |
| 1.5 | | Facilitate RFP Activities | | | | | | | | | | | | | | |
| 1.6 | | Program Integrated Master Schedule | | | | | | | | | | | | | | |
| 1.7 | | Integrate Between RN Projects | | | | | | | | | | | | | | |
| 1.8 | | Support Reviews | | | | | | | | | | | | | | |
| 1.9 | | Evaluate Designs | | | | | | | | | | | | | | |
| 1.10 | | Test Support | | | | | | | | | | | | | | |
| 1.11 | | Anomaly Reporting | | | | | | | | | | | | | | |
| 1.12 | | Independent Verification and Validation (IV&V) | | | | | | | | | | | | | | |
| 1.13 | | Transition Support | | | | | | | | | | | | | | |
| 1.14 | | Turnover Support | | | | | | | | | | | | | | |
| 1.15 | | Program Management of SE&I RN Integration | | | | | | | | | | | | | | |
| CLIN | | | | | | | | | | | | | | | | | |
| XX02 | 2.0 | SE&I RN Systems Engineering Processes | | | | | | | | | | | | | | DO NOT ENTER DATA HERE | |
| CPIF | 2.1 | | Manage SE Processes and Products | | | | | | | | | | | | | | |
| 2.2 | | Configuration Management (CM) | | | | | | | | | | | | | | |
| 2.3 | | Data Management (DM) | | | | | | | | | | | | | | |
| 2.4 | | Requirements Management (RM) | | | | | | | | | | | | | | |
| 2.5 | | Risk and Opportunities Management | | | | | | | | | | | | | | |
| 2.6 | | Test | | | | | | | | | | | | | | |
| 2.7 | | Security | | | | | | | | | | | | | | |
| 2.8 | | Information Assurance/Cybersecurity | | | | | | | | | | | | | | |
| 2.9 | | Safety | | | | | | | | | | | | | | |
| 2.10 | | Reliability, Maintainability, Availability (RMA) | | | | | | | | | | | | | | |
| 2.11 | | Total Life Cycle Analysis | | | | | | | | | | | | | | |
| 2.12 | | Systems Engineering Process Training | | | | | | | | | | | | | | |
| 2.13 | | Program Management of SE&I RN Systems Engineering Processes | | | | | | | | | | | | | | |
| CLIN | | | | | | | | | | | | | | | | | |
| XX04 | 3.0 | SE&I Architecture, LAAFB Security Support, and Certification and Accreditation (C&A) Support | | | | $ 1,253,580 | 30000 | | | | | | | | | DO NOT ENTER DATA HERE | |
| FFP | 3.1 | | FFP- RN Architecture Documents (PWS# 5.2.5.1) | | | $ 417,860 | 10000 | | | | | | | | | | |
| 3.2 | | FFP-Transition/Assessment of existing As-Is Architecture (PWS# 5.2.5.2.1) | | | | | | | | | | | | | | |
| 3.3 | | FFP- Update/Implementation of As-Is Architecture (PWS# 5.2.5.2.2) | | | | | | | | | | | | | | |
| 3.4 | | FFP- To-Be and Future Projects for Architecture Definition Documents (ADDs) (PWS# 5.2.5.2.3.1) | | | | | | | | | | | | | | |
| 3.5 | | FFP- End-to-End Systems Requirements and Verification (PWS# 5.2.5.3.2) | | | | | | | | | | | | | | |
| 3.6 | | FFP- Impacts to Architecture (PWS# 5.2.5.4) | | | | | | | | | | | | | | |
| 3.7 | | FFP- Identify Effective and Efficient Architecture Analysis and Trades (PWS# 5.2.5.5.1) | | | | | | | | | | | | | | |
| 3.8 | | FFP- Assess and Present the As-Is, To-Be, and Future Technical Baselines (PWS# 5.2.5.5.6) | | | | | | | | | | | | | | |
| 3.9 | | FFP- LAAFB Security Support (PWS# 5.2.7.3) | | | $ 417,860 | 10000 | | | | | | | | | | |
| 3.10 | | FFP- Manage Certification and Accreditation (C&A) Processes (PWS# 5.2.8.12) | | | $ 417,860 | 10000 | | | | | | | | | | |
| 3.11 | | Program Management of SE&I Architecture, LAAFB Security Support, and Certification and Accreditation (C&A) Support | | | | | | | | | | | | | | |
| CLIN | | | | | | | | | | | | | | | | | |
| XX05 | 4.0 | SE&I RN Architecture Improvement Implementation, Future Planning, and Special Studies | | | | $ 1,829,992 | 20000 | | | | | | | | | | |
| CPFF | 4.1 | | CPFF-Implement Architecture Baseline Changes (PWS#5.2.5.2.2.1) | | | | | | | | | | | | | | |
| 4.2 | | CPFF -Implement Improvements to ADDs (PWS# 5.2.5.2.3.2) | | | | | | | | | | | | | | |
| 4.3 | | CPFF- RN Operations and Employment Concepts Production and Management (PWS# 5.2.5.3.1) | | | | | | | | | | | | | | |
| 4.4 | | CPFF- Architectural Analysis and Trades Excursion (PWS # 5.2.5.5.2) | | | | | | | | | | | | | | |
| 4.5 | | CPFF- Architectural Analysis and Modification Assessments (PWS # 5.2.5.5.3) | | | | | | | | | | | | | | |
| 4.6 | | CPFF- Architectural Analysis and Trade Studies (PWS # 5.2.5.5.4) | | | | | | | | | | | | | | |
| 4.7 | | CPFF-Architecture Gap Analysis Report (PWS # 5.2.5.5.5) | | | | | | | | | | | | | | |
| 4.8 | | CPFF-Special Studies (PWS# 5.2.12) | | | | | | | | | | | | | | |
| | Base year (CLIN 00XX) | | Option 1 (CLIN 01XX) | | Option 2 (CLIN 02XX) | | Option 3(CLIN 03XX) | | Option 4 (CLIN 04XX) | | Option 5 (CLIN 05XX) | | FAR 52.217-9 (6 Month Option) | |
| | Cost | Factor/Method | Cost | Factor/Method | Cost | Factor/Method | Cost | Factor/Method | Cost | Factor/Method | Cost | Factor/Method | Cost | Factor/Method |
| Includes CLINS XX01, XX02 | SMC/RN SE&I Program Direct Labor Cost CPIF CLINs Total | | | $ 417,860 | | | | | | | | | | DO NOT ENTER DATA HERE | |
| Overhead | | | $ 208,930 | 50% | | | | | | | | | | |
| Direct Labor + Overhead Subtotal | | | $ 626,790 | | | | | | | | | | | |
| Other Direct Costs (ODC) | | | $ 20,831 | | | | | | | | | | | |
| Travel | | | $ 831 | | | | | | | | | | | |
| Material/Other | | | $ 20,000 | | | | | | | | | | | |
| Subtotal with ODCs | | | $ 668,452 | | | | | | | | | | | |
| Fringe | | | $ 83,572 | 20% | | | | | | | | | | |
| General and Administrative (G&A) | | | $ 20,893 | 5% | | | | | | | | | | |
| Facilities Capital Cost of Money (FCCOM) | | | $ 836 | 0% | | | | | | | | | | |
| Total Costs | | | $ 773,753 | | | | | | | | | | $ - 0 | |
| Fee | Fee | | Fee | Fee | Fee | Fee | Fee |
| Fee Summary | | $ 15,458 | | | | | | |
| Incentive Fee | | $ 15,458 | 2% | | | | | |
| Fixed Fee | | | | | | | | $ - 0 |
| | Price | Price | Price | Price | Price | Price | Price |
| Includes CLIN XX04 | SE&I RN Architecture Support Price | | $ 1,253,580 | | | | | $ - 0 |
| Includes CLIN XX05 | SE&I RN Architecture Improvement Implementation, Future Planning, and Special Studies | | $ 1,949,711 | | | | | |
| | | | | | | | FAR 52.217-9 (6 Month Option) |
| Total Price Per Year | | $ 3,992,502 | | | | | $ - 0 |
Enter "Rights In Data" total costs as detailed in Tables 1 and 2 of Attachment 5 $100,000
GFE-GFI $8,000
Total Price $ 4,100,502
Direct Labor by Year
| | | | Hours per Contract Period | | | | | | | | Rates per Contract Period | | | | | | | Cost per Contract Period | | | | | | |
| WBS Number | WBS/CES Description | | | Base year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 | Totals | Company Name | Base year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 | Company Name | Base year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 | Company Name |
| SMC/RN SE&I Program Total | | | | | 40,000.00 | | | | | | | | | | | | | | | $ 1,671,440.00 | | | | | |
| 1.0 | SE&I RN Integration | | | | 10,000.00 | | | | | | | | | | | | | | | $ 417,860.00 | | | | | |
| 1.1 | | General Systems Integration | | | 10000 | | | | | | | | | | | | | | | $ 417,860.00 | | | | | |
| | | Labor Category (Insert Offeror Specific label) | Example | 6000 | | | | | | KTR A | Example | $ 42.13 | | | | | KTR A | Example | $ 252,780.00 | | | | | KTR A |
| | | Labor Category (Insert Offeror Specific label) | | 4000 | | | | | | KTR B | | $ 41.27 | | | | | KTR B | | $ 165,080.00 | | | | | KTR B |
| | | Additional Space | | | | | | | | | Units in Dollars per hours | | | | | | | Units in Dollars per hours | | | | | | |
| 1.2 | | Out Year Plan | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.3 | | Spend Plan | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.4 | | Support Generation of RFP Documentation for Projects | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.5 | | Facilitate RFP Activities | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.6 | | Program Integrated Master Schedule | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.7 | | Integrate Between RN Projects | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.8 | | Support Reviews | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.9 | | Evaluate Designs | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.10 | | Test Support | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.11 | | Anomaly Reporting | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.12 | | Independent Verification and Validation (IV&V) | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.13 | | Transition Support | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.14 | | Turnover Support | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 1.15 | | Program Management of SE&I RN Integration | | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | | | | | | | | | | | | | | |
| | | Additional Space | | | | | | | | | | | | | | | | | | | | | | |
| 2.0 | SE&I RN Systems Engineering Processes | | |
| 2.1 | | Manage SE Processes and Products | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.2 | | Configuration Management (CM) | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.3 | | Data Management (DM) | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.4 | | Requirements Management (RM) | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.5 | | Risk and Opportunities Management | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.6 | | Test | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.7 | | Security | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.8 | | Information Assurance/Cybersecurity | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.9 | | Safety | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.10 | | Reliability, Maintainability, Availability (RMA) | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.11 | | Total Life Cycle Analysis | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.12 | | Systems Engineering Process Training | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 2.13 | | Program Management of SE&I RN Systems Engineering Processes | |
| | | Labor Category (Insert Offeror Specific label) |
| | | Labor Category (Insert Offeror Specific label) |
| | | Additional Space |
| 3.0 | SE&I Architecture, LAAFB Security Support, and Certification and Accreditation (C&A) Support | | | | 30000 | | | | | | $ 1,253,580.00 | |
| 3.1 | | FFP- RN Architecture Documents (PWS# 5.2.5.1) | | | 10000 | | | | | | $ 417,860.00 | |
| | | Labor Category (Insert Offeror Specific label) | Example | 6000 | KTR A (Prime) | Example | $ 42.13 | KTR A (Prime) | Example | $ 252,780.00 | KTR A (Prime) |
| | | Labor Category (Insert Offeror Specific label) | | 4000 | KTR B (Subcontractor) | | $ 41.27 | KTR B (Subcontractor) | | $ 165,080.00 | KTR B (Subcontractor) |
| | | Additional Space | | | | Units in Dollars per hours | | | | | |
| 3.2 | | FFP-Transition/Assessment of existing As-Is Architecture (PWS# 5.2.5.2.1) | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Additional Space | | | | | | | | | |
| 3.3 | | FFP- Update/Implementation of As-Is Architecture (PWS# 5.2.5.2.2) | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Additional Space | | | | | | | | | |
| 3.4 | | FFP- To-Be and Future Projects for Architecture Definition Documents (ADDs) (PWS# 5.2.5.2.3.1) | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Additional Space | | | | | | | | | |
| 3.5 | | FFP- End-to-End Systems Requirements and Verification (PWS# 5.2.5.3.2) | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Additional Space | | | | | | | | | |
| 3.6 | | FFP- Impacts to Architecture (PWS# 5.2.5.4) | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Additional Space | | | | | | | | | |
| 3.7 | | FFP- Identify Effective and Efficient Architecture Analysis and Trades (PWS# 5.2.5.5.1) | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Additional Space | | | | | | | | | |
| 3.8 | | FFP- Assess and Present the As-Is, To-Be, and Future Technical Baselines (PWS# 5.2.5.5.6) | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Additional Space | | | | | | | | | |
| 3.9 | | FFP- LAAFB Security Support (PWS# 5.2.7.3) | | | 10000 | | | | | | $ 417,860.00 | |
| | | Labor Category (Insert Offeror Specific label) | Example | 6000 | KTR A (Prime) | Example | $ 42.13 | KTR A (Prime) | Example | $ 252,780.00 | KTR A (Prime) |
| | | Labor Category (Insert Offeror Specific label) | | 4000 | KTR B (Subcontractor) | | $ 41.27 | KTR B (Subcontractor) | | $ 165,080.00 | KTR B (Subcontractor) |
| | | Additional Space | | | | Units in Dollars per hours | | | | | |
| 3.10 | | FFP- Manage Certification and Accreditation (C&A) Processes (PWS# 5.2.8.12) | | | 10000 | | | | | | $ 417,860.00 | |
| | | Labor Category (Insert Offeror Specific label) | Example | 6000 | KTR A (Prime) | Example | $ 42.13 | KTR A (Prime) | Example | $ 252,780.00 | KTR A (Prime) |
| | | Labor Category (Insert Offeror Specific label) | | 4000 | KTR B (Subcontractor) | | $ 41.27 | KTR B (Subcontractor) | | $ 165,080.00 | KTR B (Subcontractor) |
| | | Additional Space | | | | | | | | | |
| 3.11 | | Program Management of SE&I Architecture, LAAFB Security Support, and Certification and Accreditation (C&A) Support | | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| | | Additional Space | | | | Units in Dollars per hours | | | | | |
Other Direct Costs
| Totals |
| Other Direct Costs (ODC) | $ 20,831.00 |
| Travel | $ 831.00 |
| Material/Other | $ 20,000.00 |
| Travel | Base year | Totals | $ - 0 | | | | | | | | | | |
| From: | To: | # of Trips | # of People | # of Days | Airfare | Lodging | Per diem | Car Rental | Total Airfare | Total Lodging | Total Per diem | Total Car Rental | Total Amount |
Material/Other QTY Unit Price Extended Price Total Amount
| Travel | Option 1 | Totals | $ 20,831.00 | | | | | | | | | | |
| From: | To: | # of Trips | # of People | # of Days | Airfare | Lodging | Per diem | Car Rental | Total Airfare | Total Lodging | Total Per diem | Total Car Rental | Total Amount |
| LA | CO | 1 | 1 | 1 | $ 600 | $ 100 | $ 71 | $ 60 | $ 600 | $ 100 | $ 71 | $ 60 | $ 831 |
| Material/Other | QTY | Unit Price | Extended Price | Total Amount |
| Software License (Yearly Subscription) | 2 | $ 10,000 | $ 20,000 | $ 20,000 |
| Travel | Option 2 | Totals | $ - 0 | | | | | | | | | | |
| From: | To: | # of Trips | # of People | # of Days | Airfare | Lodging | Per diem | Car Rental | Total Airfare | Total Lodging | Total Per diem | Total Car Rental | Total Amount |
Material/Other QTY Unit Price Extended Price Total Amount
| Travel | Option 3 | Totals | $ - 0 | | | | | | | | | | |
| From: | To: | # of Trips | # of People | # of Days | Airfare | Lodging | Per diem | Car Rental | Total Airfare | Total Lodging | Total Per diem | Total Car Rental | Total Amount |
Material/Other QTY Unit Price Extended Price Total Amount
| Travel | Option 4 | Totals | $ - 0 | | | | | | | | | | |
| From: | To: | # of Trips | # of People | # of Days | Airfare | Lodging | Per diem | Car Rental | Total Airfare | Total Lodging | Total Per diem | Total Car Rental | Total Amount |
Material/Other QTY Unit Price Extended Price Total Amount
| Travel | Option 5 | Totals | $ - 0 | | | | | | | | | | |
| From: | To: | # of Trips | # of People | # of Days | Airfare | Lodging | Per diem | Car Rental | Total Airfare | Total Lodging | Total Per diem | Total Car Rental | Total Amount |
Material/Other QTY Unit Price Extended Price Total Amount
CLIN XX05
Special Studies
| Inflation used | | 2.5% | 2.5% | 2.5% | 2.5% | 2.5% |
| Contract Period | Base Year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 |
| Fully Burdened Composite Labor Rate | $ 89.27 | $ 91.50 | $ 93.79 | $ 96.13 | $ 98.54 | $ 101.00 |
| Hours per year | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 |
| Yearly Total | $ 1,785,358 | $ 1,829,992 | $ 1,875,742 | $ 1,922,635 | $ 1,970,701 | $ 2,019,969 |
| Fixed Fee Proposed (%) | 7% | | | | | |
| Fixed Fee Proposed ($) | $116,799 | $119,719 | $122,712 | $125,780 | $128,924 | $132,147 |
| Basis of Estimate for Base year rate | | | | | | | | | |
| Labor Categories | Hours | Direct Rate | Total Direct Labor | Overhead/Fringe/G&A | ODCs\Travel | FCCOM | Fixed Fee | Extended Rate | Extended Price |
| Labor Category (Insert Offeror Specific label) | 25 | $ 35.22 | $ 880.50 | $ 660 | $ 500 | $ 2 | $ 143 | $ 87 | $ 2,185 |
| Labor Category (Insert Offeror Specific label) | 15 | $ 30.20 | $ 453.00 | $ 340 | $ 501 | $ 1 | $ 91 | $ 92 | $ 1,385 |
| Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| Labor Category (Insert Offeror Specific label) | | | | | | | | | |
| Additional Space if Necessary | | | | | | | | | |
| 40 | | | | | | | $ 89.27 | $ 3,571 |
Efficiency Matrix
Table 9 Sample Efficiency Matrix
| Volume II Technical | | | | Volume III Cost/Price | | | Page Ref. | Likelihood |
| Factor | Subfactor | Proposal Requirement | Efficiency Implementation | WBS and CLIN Number | Cost, Hours, and Benefits | Schedule Benefits | | 0% or 100% |
| T2 | 3-Program Management | Transition Plan | As stated in the technical volume page 13 paragraph 5 the team will use a cross organizational approach as we transfer information from knowledge managers and process owners. We will set up a KM system that will provide access to past work in a living document format, which will allow for uninterrupted service and little to no oversight by the Government. See Proposal Volume II, Attachment T4, paragraphs 1.5-1.9 for additional justification. | 1.15 - CLIN 1501 | $200,000, 1960 hours, Reduction of 4 Engineers (490 hours per person). | Potential Schedule savings of 4 weeks to allotted 6 month transition. | | For Government Use |
GFE-GFI
| Table 1: Government Furnished Equipment/Information | | | | | | | | |
| Item No. | ITEM DESCRIPTION | QTY | UNIT PRICE | TOTAL PRICE | LOCATION | DATE FURNISHED TO CONTRACTOR | PERIOD AVAILABLE | ISSUED BY |
| 1 | Example: Computer workstation and accessories | 2 | $ 4,000 | $ 8,000 | El Segundo, CA | TBD | TBD (if all options exercised) | SMC/RN |
Total Price $ 8,000
Rate Table
| Base year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 |
| Direct labor | | | | | | |
| Labor Category (Insert Offeror Specific label) | | | | | | |
| Indirect Rates | |
| Overhead | 50.00% |
| Fringe | 20.00% |
| G&A | 5.00% |
| Facilities Capital Cost of Money | 0.20% |
| Target Fee | 2.00% |
| Fixed Fee | 7.00% |
| 6 Month Option |
| 52.217-9 Option to extend services (Fixed Fee) | 8% |