Nebraska-Kansas Area Office North Driveway Improvement Project
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FedConnect File | — |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140R6018Q0061
Nebraska-Kansas Area Office North Driveway Improvements McCook Office Glen Elder Unit, Solomon, Division Pick-Sloan Missouri River Basin Program Nebraska
U.S. Department of the Interior Bureau of Reclamation June 2018 Great Plains Region
This page intentionally left blank.
Foreward - 1
NEBRASKA-KANSAS AREA OFFICE
NORTH DRIVEWAY IMPROVEMENTS
McCook Office Nebraska
FOREWORD
Work to be performed under this solicitation is to be performed at the Bureau of Reclamation’s Nebraska-Kansas Area Office located at 1706 West 3rd Avenue, McCook, NE 69001. The project is located in Red Willow County and will include construction in the public right-of-way.
Work under these specifications includes:
A. Remove and dispose of existing crushed rock, soil, concrete, asphalt and gravel at the north (rear) driveway entrance including:
1. Existing concrete curb and gutter;
2. Existing sidewalk.
B. Install new concrete driveway including:
1. Concrete curb and gutter;
2. Concrete sidewalk.
C. Repair adjacent landscaping, fencing and other improvements disturbed by construction.
POINT OF CONTACT:
The point of contract is the Contract Officer, Mr. Paris Everson. All questions and correspondence concerning this solicitation will be directed to him via email at peverson@usbr.gov. Phone calls will not be accepted to ensure all communication will be properly documented for record purposes.
METHOD OF SUBMISSION OF QUOTES:
Quotes shall be in 4 hard copies, either sent either by Common Carrier or hand delivered to:
Bureau of Reclamation, Great Plains Region
GP-5000
2021 4th Avenue North Billings, Montana 59101 Attn: Paris Everson
Mark Quote envelope in the bottom left hand corner: “Solicitation No. 140R6018Q0061”. The Government will not accept quotes by telephonic, email, fax or any other method not listed above.
OUOTE CLOSING DATE:
See Section “A”: "SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442” immediately following the “TABLE OF CONTENTS”.
BUSINESS SIZE COMPETITION REQUIREMENTS:
This acquisition is Set Aside to Small Business.
mailto:peverson@usbr.gov
Foreward - 2
TYPE OF CONTRACT:
This requirement is solicited as a “Request For Quote" (RFQ) using the Federal Acquisition Regulation Sub Part 13, Simplified Acquisition Procedures. Results from this solicitation will be an anticipated award of a Firm Fixed Price contract.
MAGNITUDE OF PROJECT:
$25,000 - $150,000.
NORTH AMERICAN INDUSTRIAL CLASSIFICATION SYSTEM:
238990 – Construction of Highways, Roads, Streets & Bridges.
A PRE-QUOTE SITE VISIT: will be held on July 12, 2018, at the Bureau of Reclamation’s Nebraska-Kansas Area Office located at 1706 West 3rd Avenue, McCook, NE 69001, beginning at 1:00 pm CT. Prospective bidders should make arrangements by contacting Carl Koenig at ckoenig@usbr.gov or (308) 345-1023. Attendees are to provide and wear safety boots, hard hats, safety vests.
RECLAMATION SAFETY AND HEALTH STANDARDS (2014 EDITION):
For information regarding Bureau of Reclamation's publication "RECLAMATION SAFETY AND HEALTH STANDARDS" (2014 Edition at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause at "WBR 1452.223-81 SAFETY AND HEALTH."
SYSTEM FOR AWARD MANAGEMENT (SAM):
Effective July 29, 2012 all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database prior to an award or agreement. Note: Registering in “SAM” does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is centralized database for consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Additionally, the contractors “DUNS and BRADSTREET” and banking information are required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220.
INVOICE PROCESSING PLATFORM (IPP):
Payment requests for the anticipated contract or agreement must be submitted electronically through the U.S. Department of Treasury’s “Invoice Processing Platform” (IPP) System via the IPP website at https://www.ipp.gov. Contractors are required to use the IPP website to access and use IPP for submitting request for payment. Registration assistance can be obtained by contacting the “IPP Production Helpdesk” via email ippgroup@bos.fbr.org or phone 1-866-973-3131. If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor can submit a waiver request in writing to the Contractor Officer with its proposal. Note: Waivers will be on a case by case basis and not automatically granted as determined by the Contract Officer.
https://www.sam.gov/ https://www.ipp.gov/ mailto:ippgroup@bos.fbr.org
North Driveway Improvements Solicitation No. 140R6018Q0061
Table of Contents
00 01 10 - 1
TABLE OF CONTENTS
PART I
SECTION A SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442
SECTION B PRICE SCHEDULE
SECTION C DESCRIPTION / SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Temporary Safety and Existing Fences 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02
Not Used
DIVISION 03 - CONCRETE
03 30 00 Cast-In-Place Concrete 03 81 10 Concrete Removal
DIVISION 04 – DIVISION 06
Not Used
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 92 00 Joint Sealant
00 01 10 - 2
DIVISION 08 – DIVISION 30
Not Used
DIVISION 31 – EARTHWORK
31 23 11 Earthwork
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 92 20 Turfgrass Sod
DIVISION 33 – DIVISION 50
Not Used
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 09 96 Photographs
DIVISION 52 - DRAWINGS
52 00 00 Drawings
SECTION E -- INSPECTION AND ACCEPTANCE
E.1 52.236-05 Material and Workmanship E.2 52.246-12 Inspection of Construction E.3 52.246-21 Warranty of Construction
SECTION F – DELIVERIES OR PERFORMANCE
F.1 52.211-10 Commencement, Prosecution, and Completion Of Work F.2 52.211-18 Time of Delivery F.3 52.242-14 Suspension of Work
SECTION G -- CONTRACT ADMINISTRATION DATA
G.1 1452.201-70 Authorities and Delegations G.2 DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)
SECTION H -- SPECIAL PURCHASE ORDER REQUIREMENTS
H.1 GP-7 Site Security
PART II
SECTION I – CONTRACT CLAUSES
I.1 52.252-02 Clauses Incorporated by Reference (See Table) I.2 52.203-19 Prohibition Requiring Certain Internal Confidentiality
Agreements or Statements I.3 52.204-18 Commercial and Government Entity Code Maintenance
00 01 10 - 3
I.4 52.222-55 Minimum Wages under Executive Order 13658 I.5 52.225-09 Buy American–Construction Materials I.6 52.228-13 Alternate Payment Protections I.7 52.232-05 Payments under Fixed-Price Construction Contracts I.8 52.232-27 Prompt Payment for Construction Contracts I.9 52.236-02 Differing Site Conditions I.10 52.236-07 Permits and Responsibilities I.11 52.236-12 Clean Up I.12 52.236-13 Accident Prevention I.13 52.236-14 Availability and use of Utility Services I.14 52.236-21 Alt II Specifications and Drawings for Construction I.15 52.236-26 Pre-Construction Conference I.16 52.243-05 Changes and Changed Conditions I.17 52.252-06 Authorized Deviations in Clauses I.18 1452.228-70 Liability Insurance -- Department of the Interior I.19 1452.223-80 Asbestos-Free Warranty I.20 WBR 1452.223-81 Safety and Health -- Bureau of Reclamation I.21 WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to
Tobacco Smoke in the Federal Workplace – Bureau of Reclamation
I.22 WBR 1452.231-81 Equipment Ownership and Operating Expense – Bureau of Reclamation I.23 WBR 1452.232-81 Payment for Mobilization and Preparatory Work I.24 WBR 1452.236-84 Preservation of Cultural Resources - Bureau of Reclamation I.25 WBR 1452.237-80 Security Requirements Bureau of Reclamation Alternate III
ALT III
I.26 WBR 1452.243-80 Modification Proposals - Bureau of Reclamation
ALT III
PART III
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
ATTACHMENT NUMBER 0001 Department of Labor General Decision Number ATTACHMENT NUMBER 0002 Company Experience Reference List
PART IV
SECTION K -- REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
K.1 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements—Representation K.2 52.204-08 Annual Representations and Certifications
SECTION L -- INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
L.1 52.204-07 System for Award Management (SAM) L.2 52.204-16 Commercial and Government Entity Code Reporting
00 01 10 - 4
L.3 52.211-01 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29
L.4 52.211-02 Availability of Specifications, Standards, and Data Item Descriptions List in the Acquisition Streamlining and Standardization Information System (ASSIST)
L.5 52.214-34 Submission of Offers in the English Language L.6 52.214-35 Submission of Offers in U.S. Currency L.7 52.222-05 Construction Wage Rate Requirements –
Secondary Site of the Work L.8 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction L.9 52.225-10 Notice of Buy American Requirement--Construction Materials L.10 52.236-27 ALT I Site Visit (Construction) – Alternate I L.11 52.252-05 Authorized Deviations in Provisions L.12 1452.215-71 Use and Disclosure of Proposal Information – Department of Interior L.13 WBR 1452.211-80 Notice of Intent to Acquire Metric Products and Services –
Bureau of Reclamation L.14 WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule
Line Item
SECTION M -- EVALUATION FACTORS FOR AWARD
M.1 GP-4 Basis For Award M.2 WBR 1452.225-82 Notice of World Trade Organization Government Procurement Agreement Evaluations - Bureau
END OF CONTENTS
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040370244
Bureau of Reclamation
Great Plains Region
Regional Office PO Box 36900
R60
Billings MT 59107
Bureau of Reclamation
Great Plains Region - GP5000 2021 4th Avenue North Billings, Montana 59101
Paris Everson 406-247-7817
106/28/2018
140R6018Q0061
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Nebraska-Kansas Area Office North Driveway Improvement Project
Work to be performed under this solicitation is to be performed at the Bureau of
Reclamation Nebraska-Kansas Area Office located at 1706 West 3rd Avenue, McCook, NE 69001. The project is located in Red Willow County and will include construction in the public right-of-way.
Estimated Price Range is $25,000 to $150,000
North American Classification Code is 238990
This is a Total Small Business Set-Aside and the small Business size is $15M Tax
Payer Identification:_____________________
Data Universal Numbering System: ____________________
Commercial and Government Entity Code: ___________________
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 179 calendar days and complete it within ________________ ________________ calendar days after receiving
See Section F.1
07/31/2018
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Paris Everson
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R6018Q0061
00010
Continuation of Section B - Supplies or
Services - Price or Cost.
Nebraska-Kansas Area Office Driveway
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
Document No.
140R6018Q0061
Document Title
Nebraska- Kansas Area Office North Driveway Improvements
This page intentionally left blank
North Driveway Improvements Specifications No. 60-C0671
Price Schedule
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
NEBRASKA-KANSAS AREA OFFICE
NORTH DRIVEWAY IMPROVEMENTS
McCook, Nebraska
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Schedule, but no offer will be considered for award on only a part of the Schedule.
(b) All offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Schedule are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum of $
2 03 30 00 Cast-In-Place Concrete 170 yd3 $ $
3 03 81 10 Saw-Cutting Existing Concrete
224 lin ft $ $
4 03 81 10 Concrete Removal 19 yd3 $ $
5 01 56 20 Temporary Safety Fencing
For the lump sum of $
Price Schedule
B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
6 01 56 20 Temporary Removal and Re-Installation of Existing Gate and Wire Fencing
For the lump sum of $
7 31 23 11 Excavation for Driveway Slab
258 yd3 $ $
8 31 23 11 Compacting Sub-Grade Beneath the Driveway Slab and Adjacent Grades
774 yd2 $ $
9 31 23 11 Installation of Base Course Beneath the Driveway Slab
86 yd3 $ $
10 32 92 20 Turfgrass Sod Installation
200 ft2 $ $
TOTAL FOR PRICE SCHEDULE $_________________
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work to be performed under this solicitation is to be performed at the Bureau of Reclamation’s Nebraska-Kansas Area Office located at 1706 West 3rd Avenue, McCook, NE 69001. The project is located in Red Willow County and will include construction in the public right-of-way.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Remove and dispose of existing crushed rock, soil, concrete, asphalt and gravel at the north (rear) driveway entrance including:
1. Existing concrete curb and gutter;
2. Existing sidewalk.
B. Install new concrete driveway including:
1. Concrete curb and gutter;
2. Concrete sidewalk.
C. Repair adjacent landscaping, fencing and other improvements disturbed by construction
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.
1.04 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 52:
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
Summary of Work
01 11 00 - 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
END OF SECTION
Use of Site 01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. Cleaning Manual-2012 Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2012 Edition Available online at: http://www.usbr.gov/mussels/prevention
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:
1. For each Contractor use site on Government land:
a. Show use location and extent of impact. Uses include but are not limited to the following:
1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.
2) Parking areas, temporary roads, and haul routes.
3) Utilities including air, power, and water lines; fire hydrants; and compressor station.
4) Areas for processing, storing, and disposing of waste materials from construction operations.
5) Temporary fences.
b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.
http://www.usbr.gov/mussels/prevention
01 14 10 - 2
c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.
d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.
2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.
1.04 PROJECT CONDITIONS
A. Government land (as shown in Section 52 00 00 – Drawings) may be used for required construction facilities.
B. Portions of construction will be located in the public right-of-way. The Government shall secure construction permits through the City of McCook Public Works Department for driveway and sidewalk improvements.
C. Work is located within a restricted, Government access area. Temporary removal of a portion of the perimeter security fencing will be necessary to complete the work.
Temporary orange fencing will be installed by the Contractor as shown on the drawings in Section 52 00 00 – Drawings. The Contractor will not perform work beyond the orange fencing, within the perimeter security fencing area of site, without a Government representative present. Refer to Section 01 56 20 – Temporary Safety and Existing Fences.
D. Buried electric, water and sanitary sewer lines are located beneath the project area. Care should be taken to protect these lines from damage. Refer to Section 01 56 15 – Protection of Existing Utilities.
E. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of COR.
F. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.
G. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by COR.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 CLEANING
A. Construction equipment:
01 14 10 - 3
1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.
2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in Cleaning Manual.
3. COR will inspect construction equipment following procedures described in Cleaning Manual before allowing equipment onsite.
3.02 RESTORATION
A. After completion of work, regrade and scarify Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate revegetation, provide proper drainage, and prevent erosion.
B. Landscaped disturbed areas of Government land used for construction purposes and not required for completed installation in accordance with Section 32 92 20 – Turfgrass Sod.
01 14 10 - 4
Submittals
01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME)
1. ASME Y14.1-2005(2010) Decimal Inch Drawing Sheet Size and Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-2011 United States National CAD Standards, Version 5
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236- 21, Specifications and Drawings for Construction.
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number and title, and RSN.
3. Measurement units: US Customary Units.
C. Drawings:
1. Minimum identification in title block:
a. Contract number and title.
b. Contractor’s or supplier’s title and drawing number.
01 33 00 - 2
c. Date.
2. Provide space next to title block for review stamps.
3. Print Size: D size (22 inches by 34 inches).
4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.
a. Lettering shall be neat when drawing preparation with drafting equipment is allowed.
5. Government Format drawings:
a. Prepare drawings designated as “Government Format” in the specifications as follows:
1) Title block and sheet format:
a) Government will provide specific title block information to be used.
2) Drawing format:
a) AUTOCAD, Version 2007 or later.
b) In accordance with NIBS NCS.
3) Size: D size (22-inch by 34-inch) as defined by ASME Y14.1.
4) Government will provide an electronic AutoCAD template.
6. Final drawings:
a. Drawing format: AUTOCAD, Version 2007 or later.
b. Show as-built changes, including revision dates, made during installation.
Indicate changes by clouding.
c. Electronic files: On CD or DVD discs.
d. Original plots: D size (22 inches by 34 inches).
e. Government will provide an electronic AutoCAD template.
D. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
E. Certifications:
01 33 00 - 3
1. Certifications by a registered professional: Signed and sealed by registered professional.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of Submittals.
1. Electronic submittals:
a. In Portable Document Format (PDF).
b. Include RSN transmittal letter.
c. Do not include Personally Identifiable Information (PII) in electronic submittals.
2. Submit electronic submittals via email or CD/DVD based on size:
a. The Government can receive e-mails up to 25 MB. However, e-mails over 10 MB should be considered extra large. E-mailing of electronic submittals exceeding 10 MB should only occur after transmittal of larger size e-mail has been verified.
b. Address e-mail of electronic submittals less than extra large size to:
1) sha-GPR-CONSTSVCS@usbr.gov
c. Include electronic submittals that are too large to e-mail with paper copy of submittal. These electronic submittals shall be on CD or DVD.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
mailto:sha-GPR-CONSTSVCS@usbr.gov
01 33 00 - 4
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 28 days after receiving the comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
F. Each submittal shall be submitted under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned to the Contractor for resubmittal.
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 21 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.
B. Time in Excess of Specified:
1. The CO may extend the contract completion date to allow additional time for completing work affected by excess review time.
a. The time extension will be to the extent that excess review time caused delay to the contract completion date.
b. The time extension will not exceed the time used in excess of the specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending the contract completion date.
2. No time extension will be allowed if the Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to the extent that:
a. Approval was required under the contract, and
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work, however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Submittal Response:
1. A response letter from the COR for each submittal will be sent to the Contractor indicating if the submittal is either approved, approved subject to identified changes, or not approved.
01 33 00 - 5
a. Revise and resubmit submittals not approved.
b. Do not change designs without approval of the COR after drawings, documentation, and technical data have been approved.
1.07 TRANSMITTAL
A. Addresses for codes listed in Table 01 33 00A - List of Submittals:
1. Where the recipient is the Contracting Officer, address the transmittal letter to Bureau of Reclamation, Attention: GP-5000, P.O. Box 36900, Billings, MT 59107-6900. Physical address is 2021 4th Avenue North, Billings, MT 59101.
2. Where the recipient is the Contracting Officer’s Representative, address the transmittal letter to Bureau of Reclamation, Attention: GP-2600, P.O. Box 36900, Billings, MT 59107-6900. Physical address is 2021 4th Avenue North, Billings, MT 59101.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Submittals 01 33 00 - 6
Table 01 33 00A. – List of Submittals **CO indicates Contracting Officer and COR indicates Contracting Officer’s Representative
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
1 Bonds 52.228-15
Performance and Payment Bonds
Within 10 calendar days after award
CO 1 paper 0
2 Insurance-work on a Government Installation 1452.228-70
1) Written certification that the required insurance has been obtained
2) Current certification of insurance for each subcontractor
Before commencing onsite work
CO 1 paper
1 paper
3 Liability Insurance 1452.228-70
Acceptable Certificate of Liability Insurance
Prior to commencement of work under the contract
CO 1 paper 0
4 Equal Opportunity 52.222-26
Information required by Executive Order 112246
(SF-100)
Within 30 days following award
CO 1 paper 0
5 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10
Certification that executive compensation and subcontract awards were reported
Within 10 days of each report being submitted
CO 1 paper 0
6 Release of Claims 1452.204-70
Release of Claims (DI-
137) against the Government
After completion of the work and prior to final payment
CO 1 paper 0
7 Site Security
GP-7
List of all contractor and subcontractor employees
At least 10 days prior to arriving at worksite
COR 0 2 paper
8 Site Security
GP-7
List of all vehicles and equipment to be brought onsite
At least 10 days prior to arriving at worksite
COR 0 1 paper + 1 electronic
9 Labor Standards Data 52.222-11
1) List of subcontractors
2) Statement and acknowledgement Form (SF-1413) for each subcontract
Within 14 days after award of contract
COR 1 paper
1 paper
1 paper + 1 electronic
1 paper + 1 electronic
10 Payrolls 52.222-08
Copies of all payrolls Weekly for each week of contract performance
COR 1 paper 2 paper
11 Schedules for Construction Contracts 52.236-15
Practicable schedule Within 5 days after work commences on the contract or another period of time as determined by Contracting Officer
COR 1 paper 1 paper + 1 electronic
01 33 00 - 7
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
12 Schedules for Construction Contracts 52.236-15
Updated Schedule showing actual progress
Monthly or as directed by the Contracting Officer
COR 1 paper 1 paper + 1 electronic
01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan
At least 28 days before use of Government land
COR 0 1 paper + 1 electronic
01 35 10-1 Safety Data Sheets
Complete LHM and
MSDS
At least 21 days before jobsite delivery of hazardous material
COR 0 1 paper + 1 electronic
01 35 10-2 Safety Data Sheets
Updated LHM and MSDS At least 21 days before jobsite delivery of hazardous material not previously listed
COR 0 1 paper + 1 electronic
01 35 20-1 Safety and Health
Safety Program Submitted and accepted before commencing onsite work. See section 3 of RSHS
COR 0 1 paper + 1 electronic
01 35 20-2 Safety and Health
Monthly Accident Summary Report
First day of each month.
See paragraph 3.8 of
RSHS
COR 0 1 paper + 1 electronic
01 35 20-3 Safety and Health
Respirator User Documentation
At least 21 days before arriving at worksite
COR 0 2 paper
01 35 20-4 Safety and Health
Other Training Certificates
At least 21 days before arriving at worksite
COR 0 2 paper
01 35 30-1 Contractor’s Onsite Safety Personnel
Qualifications At least 21 days before beginning onsite work
COR 0 2 paper
01 46 00-1 Quality Procedures
Contractor Quality Control Program
At the time of the pre-construction meeting
COR 0 1 paper + 1 electronic
01 46 00-2 Quality Procedures
Contractor Daily Reports Weekly COR 0 1 paper + 1 electronic
01 46 00-3 Quality Procedures
Quality Control Supervisor
At least 21 days before beginning onsite work
COR 0 2 paper
01 46 00-4 Quality Procedures
Contractor Quality Testing Plan
At least 21 days before beginning onsite work
COR 0 1 paper + 1 electronic
01 46 20-1 Testing Agency Services
Testing Agency Services Plan
At least 21 days before beginning onsite work
COR 0 1 paper + 1 electronic
01 55 20-1 Traffic Control Traffic Control Plan At least 21 days before affecting public traffic
COR 0 1 paper + 1 electronic
01 56 10-1 Protection of Existing Installations
Plan for Protecting Existing Installations
At least 21 days before commencing onsite construction work
COR 0 1 paper + 1 electronic
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit
At least 21 days before commencing onsite construction work
COR 0 1 paper + 1 electronic
01 57 30-1 Water Pollution Control
Water Management Plan At least 21 days before commencing onsite construction work
COR 0 1 paper +
01 33 00 - 8
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
01 57 30-2 Water Pollution Control
Pollution Prevention Plan At least 21 days before commencing onsite construction work
COR 0 1 paper + 1 electronic
01 57 30-3 Water Pollution Control
Spill Prevention Control and Countermeasure Plan
(SPCC)
At least 21 days before delivery or storage of oil.
COR 0 1 paper + 1 electronic
01 71 20-1 Surveying Surveying Plan At least 21 days before beginning of survey work
COR 0 1 paper + 1 electronic
01 71 20-2 Surveying Resumes At least 21 days before beginning of survey work
COR 0 1 paper + 1 electronic
01 71 20-3 Surveying Accuracy Check Results At least 21 days before beginning of survey work
COR 0 1 paper + 1 electronic
01 71 20-4 Surveying Completed and Reduced Survey Notes
Within 2 days of completing and reducing notes
COR 0 1 paper + 1 electronic
01 71 20-5 Surveying Quantity Survey Notes and Computations
Accompanying progress payment requests
COR 0 1 paper + 1 electronic
01 71 20-6 Surveying Workday’s Survey Notes At conclusion of workday if requested by Government
COR 0 1 paper + 1 electronic
01 74 00-1 Cleaning and Waste Management
Waste Production and Disposal Plan
At least 21 days before beginning onsite work
COR 0 1 paper + 1 electronic
01 74 00-2 Cleaning and Waste Management
Waste Production and Disposal Records
Within 7 days of waste disposal
COR 0 1 paper + 1 electronic
01 74 00-3 Cleaning and Waste Management
Environmental Consultant Resume (if required)
At least 21 days before beginning environmental assessment
COR 0 2 paper
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment (if required)
Within 14 days of completion of work
COR 0 1 paper + 1 electronic
01 78 30-1 Project Record Documents
Final As-Built Drawings Within 14 days of completion of work
COR 0 1 paper + 1 electronic
03 30 00-1 Cast-In-Place Concrete
Approval Data At least 21 days before beginning of concrete work
COR 0 1 paper + 1 electronic
03 30 00-2 Cast-In-Place Concrete
Concrete Placement Drawings
At least 21 days before beginning of concrete work
COR 0 1 paper + 1 electronic
03 30 00-3 Cast-In-Place Concrete
Concrete Placement Schedule
At least 21 days before beginning of concrete work
01 33 00 - 9
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
03 30 00-4 Cast-In-Place Concrete
Certifications At least 21 days before beginning of concrete work
COR 0 1 paper + 1 electronic
03 30 00-5 Cast-In-Place Concrete
Cementitious Materials Certifications and Test Reports
At least 21 days before beginning of concrete work
COR 0 1 paper + 1 electronic
03 81 10-1 Concrete Removal
Concrete Removal Plan At least 21 days before beginning of concrete removal
COR 0 1 paper + 1 electronic
07 92 00-1 Joint Sealant Certification At least 21 days before beginning of concrete removal
COR 0 1 paper + 1 electronic
07 92 00-2 Joint Sealant Instructions At least 21 days before beginning of concrete removal
COR 0 1 paper + 1 electronic
31 23 11-1 Earthwork Test Results At least 21 days before beginning of earthwork
COR 0 1 paper + 1 electronic
31 23 11-2 Earthwork Sub-Grade and Aggregate Base Course Design Report
At least 21 days before beginning of earthwork
COR 0 1 paper + 1 electronic
32 92 20-1 Turfgrass Sod Certifications At least 21 days before beginning of landscaping
01 33 00 - 10
Safety Data Sheets
01 35 10 - 1
SECTION 01 35 10
SAFETY DATA SHEETS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 DEFINITIONS
A. LHM: List of Hazardous Materials.
B. SDS: Safety Data Sheet.
1. Referred to as Material Safety Data Sheets in the clause at 52.223-3, Hazardous Material Identifications and Material Safety Data - Alternate 1.
1.03 APPLICATION
A. For the purposes of this contract, “delivered under this contract” in paragraph (b) of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1, includes:
1. Materials delivered to Government.
2. Materials incorporated into work.
3. Materials used by the Contractor during contract performance at the jobsite.
1.04 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 35 10-1, Complete LHM and SDS.
C. RSN 01 35 10-2, Updated LHM and SDS:
1. Comply with paragraph (e) of clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1.
1.05 DELIVERY
A. Do not deliver hazardous materials to jobsite which are not included on original or previously updated LHM and SDS before receipt of updated LHM and SDS by the Contracting Officer’s Representative.
Safety Data Sheets
01 35 10 - 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Safety and Health
01 35 20 - 1
SECTION 01 35 20
SAFETY AND HEALTH
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include the cost of complying with this section in the prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. RSHS Reclamation Safety and Health Standards, including revisions posted at:
http://www.usbr.gov/ssle/safety/RSHS/rshs.html.
2. FIST 1-1 (2012) Hazardous Energy Control Program
a. Available on the Internet at:
www.usbr.gov/power/data/fist_pub.html
B. Occupational Safety and Health Administration (OSHA)
1. 29 CFR Part 1910 Occupational Safety and Health Standards
2. 29 CFR Part 1926 Safety and Health Regulations for Construction
3. Available on the Internet at www.osha.gov.
C. American Conference of Governmental Industrial Hygienists (ACGIH), Threshold Limit Values (TLVs)
1. Available at www.acgih.org
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 35 20-1, Safety Program:
1. Submit a comprehensive, job-specific safety and health program in accordance with Section 01 33 00 – Submittals and in accordance with the requirements of Section 3.3 of the Reclamation Safety and Health Standards (RSHS) and these specifications.
2. The Safety Program will not be accepted for review by the COR unless it addresses, in order, lettered and numbered per Appendix B of the RSHS, a http://www.osha.gov/ http://www.acgih.org/
01 35 20 - 2 comprehensive narrative for each applicable item in the outline and program elements contained in these specifications.
3. Generic company safety programs are not acceptable. The Safety Program must be site specific for this contract.
4. The Contractor’s Safety Program must be submitted and accepted by Reclamation prior to commencing onsite work, including mobilization.
5. The Safety Program Statement of Responsibility must state that “the contractor is responsible for ensuring that all work will be in compliance with Reclamation Safety and Health Standards and these specifications.”
6. The Safety and Health Program shall include but not be limited to the following program elements:
a. Emergency Action Plan:
1) Detail coordination plan for outside emergency services including response time and a site visit where a rescue requires special capabilities or equipment.
2) This plan shall address detailed emergency contacts and procedures to be used during an onsite emergency.
b. Electrical Safety:
1) Include safe work procedures at the site, electrically qualified persons, grounding techniques, use of mobile generators, construction lighting, power tool safety, and use of personal protective equipment.
c. Job Hazard Analysis:
1) Provide a list of proposed JHA’s in the Safety Program for each anticipated work task.
2) A detailed JHA shall be completed onsite prior to starting each work task. Work will not begin on the phase of the work until a JHA is acceptable to the Onsite Government Representative.
3) Activities involving hazardous materials shall have the appropriate Material Safety Data Sheet(s) attached to the JHA.
d. Respiratory Protection:
1) Identify respirator users, tasks and operations with recognized respiratory hazards.
2) The plan shall address exposure to respirable silica associated with concrete work as follows.
a) Use of tight fitting half face air purifying respirators with P100 cartridges in the absence of an on-site exposure assessment.
01 35 20 - 3
b) The level of respiratory protection may only be diminished on the basis of an exposure assessment conducted by a certified industrial hygienist (CIH) specific to each dust-generating operation that is acceptable to Reclamation.
e. Hearing Conservation:
1) Include a task- and site-specific hearing conservation plan.
2) Identify the type of hearing protection and verify that workers are in a Hearing Conservation Program.
f. Personal Protective Equipment (PPE):
1) Include a detailed plan for each task that specifies which personal protective equipment shall be used for all construction activities.
2) The employer must ensure that the PPE is verified by the manufacturer for the intended use and protection.
3) Provide appropriate PPE at no cost to the employees.
4) Standard designs are used.
7. The Contractor shall be responsible for insuring that Subcontractors comply with the requirements set forth in these specifications, the regulatory standards and the industry standards incorporated by reference in the RSHS and OSHA standards.
C. RSN 01 35 20-2, Monthly Accident Summary Report:
1. Form 7-2218 or other acceptable form in accordance with paragraph 3.8 of RSHS.
2. Submit on the first day of every month.
D. RSN 01 35 20-3 Respirator User Documentation:
1. Submit documentation of medical qualifications less than 12 months old for all respirator users at the site.
2. Submit results of fit tests less than 12 months old for all users of tight fitting negative pressure respirators at the site.
E. RSN 01 35 20-4, Other Training Certificates:
1. First Aid/CPR certifications for onsite foremen and/or safety personnel.
1.04 SAFETY AND HEALTH
A. Comply with RSHS, local safety programs, and any other referenced safety and health standards. Perform work in accordance with the specific safety program elements and referenced standards.
B. Provide and maintain a work environment and procedures that will:
01 35 20 - 4
1. Safeguard the public, Government personnel, and Contractor employees from Contractor operations and activities that are unsanitary, hazardous, or dangerous to health and safety.
2. Avoid interruptions of site operations and delays in project completion dates.
3. Control costs in contract performance.
C. For each operation requiring the use of heavy equipment, in addition to the use of backup alarms and high visibility vests, include in the JHA specific steps to ensure the protection of onsite personnel (internal traffic control) from the hazards of being struck by or caught between moving equipment while working around such equipment. Possible methods of controlling said hazards may include radio communications, backup cameras and/or proximity devices, designated observers, etc. Provide all appropriate safety barricades, signs, and warnings. Erect or label all limited approach and arc flash hazard boundaries for exposed energized equipment. Coordinate these activities with Reclamation electricians.
D. Comply specifically with all requirements contained in RSHS Section 3 - Contractor Requirements.
E. Investigate and report all accidents, incidents and near misses in accordance with RSHS Section 3.7.
F. When the Contractor fails or refuses to promptly correct a compliance directive, the Contracting Officer may issue an order to stop all or any part of the work:
1. When satisfactory corrective action is taken, an order to resume work will be issued.
2. The Contractor shall not be entitled to extension of time or to claim for damage or to additional compensation by reason of ether the directive or the stop order.
3. Failure of the Contracting Officer to order discontinuance of any or all of the Contractor’s operations shall not relieve the Contractor of the responsibility for the safety of personnel and property.
G. Disputes regarding safety and health issues will be settled in accordance with RSHS Section 3.
H. The Contractor shall be responsible for providing medical and emergency assistance in a timely manner that is consistent with recognized emergency protocols.
1. In instances where local emergency responders are not readily available, the responsibility to provide emergency services shall default back to the Contractor.
I. The Contractor shall be responsible for insuring that Subcontractors comply with the requirements set forth in this specification, written programs, the regulatory standards and the industry standards incorporated by reference in the RSHS and OSHA standards.
01 35 20 - 5
J. Where there is conflict between the standards, the more stringent or restrictive shall be utilized.
K. The Contractor shall fully participate in the Contractor Safety Program Review meeting, according to RSHS Section 3.4.1. The Contractor Safety Program Review meeting will take place before the start of construction:
1. Include subcontractor management representatives.
2. The Safety Personnel shall be present, in order to discuss in detail the Safety Program and Plans.
3. The COR, the Contractor's principal onsite representative, and designated members of respective staffs must participate in the scheduled monthly safety meeting (JPSM) according to RSHS Section 3.4.2.
L. The minimum work crew at any time on the construction site shall consist of no less than two (2) people.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
01 35 20 - 6
Contractor’s Onsite Safety Personnel 01 35 30 - 1
SECTION 01 35 30
CONTRACTOR’S ONSITE SAFETY PERSONNEL
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in the prices offered in the Price Schedule for other items of work.
1.02 REFERENCES
A. Bureau of Reclamation (USBR)
1. RSHS Reclamation Safety and Health Standards, including revisions posted at:
http://www.usbr.gov/ssle/safety/RSHS/rshs.html.
1.03 SUBMITTALS
A. Submit the following in accordance with Section…