140R3021Q0043_RFQ.pdf

PDF 589 KB Posted

Attached to
FENCE INSTALLATION AROUND TWO WATER TANK Federal contract opportunity
Solicitation number
140R3021Q0043
Issued by
Department of the Interior Bureau of Reclamation

View the file

Other files for this federal contract opportunity

Other files attached to FENCE INSTALLATION AROUND TWO WATER TANK, newest first.
File Type Posted
Amendment_0002_0002.pdf PDF
Sol_140R3021Q0043_Amd_0002.pdf PDF
Site_Visit_Sign-In_Sheet_0001.pdf PDF
Sol_140R3021Q0043_Amd_0001.pdf PDF
Attachment_1_-_Revised_SOW_0001.pdf PDF
Amendment_0001_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Sol_140R3021Q0043.pdf PDF
Attachment_1_-_SOW.pdf PDF
Attachment_2_-_Wage_Determination-Clark_County.pdf PDF
ATTACHMENT_3_Site_Visit_Questions_Handout.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quote No. 140R3021Q0043 Purchase Order No. TBD 100% Set-Aside for Small Business

Fence Installation for Tanks at Hoover Dam

U.S. Department of the Interior Bureau of Reclamation Interior Region 8: Lower Colorado Basin 2021

This page intentionally left blank.

Foreword RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover Dam

FOREWORD

The Bureau of Reclamation, Lower Colorado Basin, Lower Colorado Dams Office (LCDO), has a requirement to install a rectangular chain link fence around the Bench tank, a 24-feet wide entry gate, a 12-feet wide exit gate, and a barb wire fence on top of the chain link fence. The overall height of the fence is 8 ft above ground; and install a circular fence around the Warehouse tank, a 24-wide entry gate, and a barb wire fence on top of the chain link fence. The overall height of the fence is 8 ft above ground.

MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction Projects, this construction project is estimated to be between $25,000. and $100,000.

SITE VISIT: A site visit will be held prior to the quote due date which allow quoters to walk the site where the construction will take place. See Section L, FAR 52.236-27 Site Visit (Construction).

The site visit will be held on August 24, 2021 at 1:00 P.M. PT. Each company will ONLY be allowed to have up to two (2) participants attend the site visit.

Please contact Diane Rodriguez at DLRodriguez@usbr.gov by no later than August 23, 2021, if you plan to attend.

COVID 19 Note: Bureau of Reclamation is requiring compliance with CDC guidelines with respect to maintaining physical distance, and other public health measures by on-duty or on-site Federal employees; on-site Federal contractors; and all persons in Federal buildings or on Federal lands. Face masks/coverings are mandatory to participate in the site visit.

The following Personnel Protective Equipment are mandatory:

Safety vest Masks Rocky terrain, so no open toed shoes allowed Hard hats optional

Attendance at the site visit is not mandatory but highly recommended. Vendors are urged and expected to inspect the site where work is to be performed and to satisfy themselves regarding all general and local conditions that may affect the price of the work to be performed, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after award of purchase order.

WRITTEN QUESTIONS: Reclamation will only accept written questions for this RFQ. Please submit all written questions pertaining to this RFQ to Diane Rodriguez, via email, DLRodriguez@usbr.gov, no later than 12:00 p.m., PT, on August 26, 2021. The subject line shall clearly reference the RFQ Number associated with this RFQ. No questions will be entertained after this date.

For date and place of receipt of quotes see Request for Quotations Standard Form 18.

OTHER NOTES TO VENDORS:

For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health Standards" (2009 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause WBR 1452.223-81 Safety and Health.

mailto:DLRodriguez@usbr.gov http://www.usbr.gov/ssle/safety/RSHS/rshs.html

Foreword RFQ No.

Project Title: Fence Installation for Tanks at Hoover Dam

This page left intentionally blank

Table of Contents

RFQ No.

Project Title: Fence Installation for Tanks at Hoover Dam i

TABLE OF CONTENTS

Foreword

Table of Contents i

Section A - Request for Quotations, SF-18 A-1

Section B – Supplies or Services and Prices B-1

Section C – Description and Specifications C-1

Section D – Packaging and Marking – THERE IS NO ADDITIONAL INFORMATION IN THIS SECTION D-1

Section E – Inspection and Acceptance E-1

Section F -- Deliveries or Performance F-1

Section G -- Contract Administration Data G-1

Section H -- Special Contract Requirements – THERE IS NO ADDITIONAL INFORMATION IN THIS

SECTION

H-1

Section I -- Contract Clauses I-1

Section J – List of Documents, Exhibits and Other Attachments

J-1

Section K – Representations, Certifications and Other Statements of Offerors

K-1

Section L – Instructions, Conditions and Notices to Quoters L-1

Section M – Evaluation Factors for Award M-1

Table of Contents

RFQ No.

Project Title: Fence Installation for Tanks at Hoover Dam ii

This page intentionally left blank

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

08/13/2021 0040531194

1 1

Lower Colorado Region Regional Office 500 Fir Street

Bureau of Reclamation

Boulder City NV 89005

60 Days After Notice to Proceed

See Award

99999

702 293-8368Diane Rodriguez

09/09/2021 1400 PD

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

00010 Fence Installation around Two Water Tank

In accordance with attached Scope of Work and Drawings

See Section B for Price Schedule Break Down

Delivery: 60 Days After Notice to Proceed

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

This page intentionally left blank

Section B – Supplies or Services and Prices

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover Dam

B-1

SECTION B – PRICE SCHEDULE

B.1 THE REQUIREMENT

(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.

(b) Vendors are cautioned to carefully review the quote submission requirements contained in Section L.11. Failure to comply with these requirements may result in a quote being determined unacceptable.

(c) Quotes will be considered for award on the schedule in Paragraph B.2, but no quote will be considered for award for only a part of the schedules or a part of any single schedule. Quotes for only a part of the schedules or parts of a single schedule may be determined unacceptable.

(d) Vendors shall complete the schedule(s) in Section B and Request for Quotes, SF-18 form.

(e) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for Mobilization and Preparatory Work Schedule Line Item.”

(f) IMPORTANT NOTE: The requirement for submission of performance and payment bonds is applicable for construction in excess of $150,000.00.

B.2 PRICE SCHEDULE

CLIN

ID CLIN ESTIMATED

QUANTITY UNIT UNIT PRICE TOTAL

1-1 BONDS 1 LS

1-2 MOBILIZATION 1 LS

1-3 RECTANGULAR FENCE ARUND

BENCH TANK 1 LS

1-4 RECTANGULAR FENCE ARUND

WAREHOUSE TANK 1 LS

TOTAL FOR PRICE SCHEDULE: $ __________________________

Section B – Supplies or Services and Prices

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

B-2

This page left intentionally blank.

Section C - Descriptions and Specifications

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

C-1

SECTION C -- DESCRIPTIONS AND SPECIFICATIONS

C.1 STATEMENT OF WORK/SPECIFICATIONS/WORK STATEMENT

The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities (except as otherwise specified) to perform the requirement specified in the Statement of Work and Drawings contained in Attachment No. 1 and No. 2 of this RFQ.

Section C - Descriptions and Specifications

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

C-2

Section D - Packaging and Marking

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

D-1

SECTION D – PACKAGING AND MARKING

(There is no additional information in this section)

Section D - Packaging and Marking

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

D-2

Section E - Inspection and Acceptance

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

E-1

SECTION E – INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:

FAR Clauses - https://www.acquisition.gov/browse/index/far

The following referenced clauses are hereby incorporated into and made a part of this contract.

Clause Title Date 52.246-12 Inspection of Construction August 1996 https://www.acquisition.gov/browse/index/far

Section E - Inspection and Acceptance

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

E-2

Section F - Deliveries or Performance

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

F-1

SECTION F – DELIVERIES OR PERFORMANCE

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following address:

52.242-14 Suspension of Work April 1984

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APRIL 1984

The Contractor shall be required to:

(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) Prosecute the work diligently, and

(c) Complete the entire work ready for use not later than 60 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

Section F - Deliveries or Performance

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

F-2

Section H - Special Contract Requirements

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

H-1

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representatives(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority.

The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph

(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the risk of the Contractor.

End of Clause

G.2 1452.242-80 POSTAWARD CONFERENCE - BUREAU OF RECLAMATION JULY 1993

(a) Prior to the Contractor starting work, a post award conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project

Requirements

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

H-2

Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.

(b) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the requirement. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.

(c) The Contractor shall include any associated costs for attendance at the conference in its offer.

G.3 GOVERNMENT ADMINISTRATION PERSONNEL

The Contract Specialist responsible for this requirement is:

Diane Rodriguez (LCB-10203), Contract Specialist Bureau of Reclamation Lower Colorado Basin P.O. 61470 Boulder City, NV 89006 Phone No.: 702-293-8368 E-Mail: DLRodriguez@usbr.gov

The Contracting Officer responsible for this requirement is:

Maribel Ruble (LB-10204), Contracting Officer Bureau of Reclamation Lower Colorado Basin 7301 Calle Agua Salada Yuma AZ 85364 Phone No.: 928-343-8217 E-Mail: mruble@usbr.gov mailto:mruble@usbr.gov

Requirements

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

H-3

SECTION H – SPECIAL CONTRACT REQUIREMENTS

(There is no additional information in this section.)

Requirements

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

H-4

Section I - Contract Clauses

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-1

SECTION I – CONTRACT CLAUSES

I.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following address:

52.204-13 System for Award Management Maintenance October 2018 52.204-18 Commercial and Government Entity Code Maintenance August 2020 52.204-19 Incorporation by Reference of Representation and Certifications December 2014 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015 52.215-8 Order of Precedence--Uniform Contract Format October 1997 52.219-6 Notice of Total Small Business Set-Aside November 2020 52.219-28 Post-Award Small Business Program Representation November 2020 52.222-6 Construction Wage Rate Requirements August 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records August 2018 52.222-9 Apprentices and Trainees July 2005 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-22 Previous Contracts and Compliance Reports February 199 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal

Employment for Construction February 1999

52.222-27 Affirmative Action Compliance Requirements for Construction April 2015 52.223-18 Encouraging Contractor Policies to Ban text Messaging While

Driving June 2020

52.228-13 Irrevocable Letter of Credit July 2000 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) February 2021 52.232-5 Payments under Fixed-Price Construction Contracts May 2014 52.232-23 Alternate I

Assignment of Claims – Alternate I May 2014

52.232-27 Prompt Payment for Construction Contracts January 2017 52.236-2 Differing Site Conditions April 1984 52.236-3 Site Investigation and Conditions Affecting the Work April 1984 52.236-5 Material and Workmanship April 1984 52.236-6 Superintendence by the Contractor April 1984 52.236-7 Permits and Responsibilities November 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements April 1984

52.236-12 Cleaning Up April 1984 52.236-13 Accident Prevention November 1991

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-2

52.236-14 Availability and Use of Utility Services April 1984 52.236-15 Schedules for Construction Contracts April 1984 52.236-21 Specifications and Drawings for Construction February 1997 52.242-14 Suspension of Work April 1984 52.243-5 Changes and Changed Conditions April 1984 52.247-21 Contractor Liability for Personal Injury and/or Property Damage April 1984 52.246-21 Warranty of Construction March 1994 52.249-1 Termination for Convenience of the Government (Fixed-Price)

(Short Form April 1984

52.249-10 Default (Fixed-Price Construction) April 1984

I.2 52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS

(OTHER THAN COMMERCIAL ITEMS)

JULY 2021

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L.

115-91).

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(iv) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(vi) 52.222-26, Equal Opportunity (Sept 2016) (E.O.11246).

(vii) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(viii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C.3553).

(ix) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub.L.108-

77, 108-78 (19 U.S.C. 3805 note)).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JAN 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors

(DEC 2013).

(vii) 52.233-1, Disputes (MAY 2014).

(viii) 52.244-6, Subcontracts for Commercial Items (JUL 2021).

(ix) 52.253-1, Computer Generated Forms (JAN 1991).

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-3

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract

Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(ii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2020) (E.O.13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in FAR

2.101 on the date of award of this contract).

(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) (41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(iv) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C.4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(v) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) (29 U.S.C.793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, “United States” includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vi) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C.4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(vii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter

67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(viii) (A) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C.

chapter78 and E.O 13627) (Applies to all solicitations and contracts).

(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).

(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.

13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))

(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-4

(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).

(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP)) will be-

(A) Delivered;

(B) Acquired by the Contractor for use in performing services at a

Federally-controlled facility;

(C) Furnished by the Contractor for use by the Government; or

(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).

(xv) 52.223-20, Aerosols (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent;

or contracts for maintenance or repair of electronic or mechanical devices).

(xvi) 52.223-21, Foams (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.

(xvii) 52.225-1, Buy American-Supplies (JAN 2021) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in FAR 2.101 on the date of award of this contract, and the acquisition-

(A) Is set aside for small business concerns; or

(B) Cannot be set aside for small business concerns (see 19.502-2) and does not exceed $25,000).

(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN

2020) (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).

(xix) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2013)(Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).

(xx) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information).

(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C.55305) (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d)).

(2) Listed below are additional clauses that may apply:

(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems

(JUN 2016) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.

(ii) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020) (Applies to contracts over the threshold specified in FAR 9.405-2(b) on the date of award of this contract).

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-5

(iii) 52.211-17, Delivery of Excess Quantities (Sept 1989) (Applies to fixed-price supplies).

(iv) 52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b.

origin).

(v) 52.247-34, F.o.b. Destination (NOV 1991) (Applies to supplies if delivery is f.o.b. destination).

(c) FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far

(d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its post acceptance rights-

(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(e) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(f) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.

(g) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-6

(h) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

I.3 52.225-9 BUY AMERICAN ACT-CONTRUCTION MATERIALS FEBRUARY 2021

(a) Definitions. As used in this clause- Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued);

or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means-

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.

Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-7

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: _____________________ [Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-8

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) * Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.]

I.4 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS JULY 2000

(a) The Contractor shall submit one of the following payment protections:

A payment bond An irrevocable letter of credit A tripartite escrow agreement

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of receipt of award.

(d) The payment protection shall provide protection for the full contract performance period, plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material who signed the escrow agreement.

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-9

I.7 1452.204-70 RELEASE OF CLAIMS – DEPARTMENT OF THE INTERIOR JULY 1996

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

I.8 1452.228-70 LIABILITY INSURANCE -- DEPARTMENT OF THE INTERIOR JULY 1996

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY

$100,000

GENERAL LIABILITY

$500,000 per occurrence

AUTOMOBILE LIABILITY

$200,000 each person $500,000 each occurrence $ 20,000 property damage

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The Contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

I.9 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES

AND LIMITATIONS--BUREAU OF RECLAMATION

MAY 2018

(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.

RFQ No.

140R3021Q0043

Project Title: Fence Installation for Tanks at Hoover

I-10

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

I.12 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE--BUREAU

OF RECLAMATION

JULY 1998

(a) Definitions. "Acquisition cost," as used in this clause means, the Contractor's original purchase price (including sales tax less salvage value) of an item of equipment including any and all accessories and expendable components required for utilization the item of equipment. For used equipment which is reconditioned and recapitalized, "acquisition cost" shall mean the adjusted amount resulting from the recapitalized value of the equipment as determined from the Contractor's accounting records.

"Equipment," as used in this clause, means equipment in sound workable condition at the construction work site, either owned or controlled by the Contractor or its subcontractors at any tier, or obtained from a commercial rental source, and furnished for use under this contract.

"Ownership cost," as used in this clause, means allowances for construction equipment depreciation and cost of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .